19AQMM20R0065 QA.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
Antidrug School Construction, Muzu, Bogota, Colombia
Solicitation number
19AQMM20R0065
Issued by

About this file

This document contains questions and answers related to a solicitation for the construction of an Antidrug School in Muzu, Colombia. The solicitation seeks proposals for the supply, refurbishing, and installation of 40-foot and 20-foot high cube containers to create a two-story container facility. The period of performance is 180 calendar days with an estimated value between $500,000 and $1,000,000. Key dates include the pre-proposal conference on January 27, 2020, site visit on January 29, 2020, and proposal due date of March 13, 2020. The place of performance is the Colombian National Police Aviation School in Mariquita, Tolima, Colombia. The solicitation is being conducted by the Department of State Office of Acquisition Management.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

19AQMM20R0065

#QuestionsAnswers
#1In the attachments no. 1 and no. 2, the specificactions and the drawings, we look at a very complete design, with, in general terms, three different kinds of spaces. Those spaces which are under a ceiling, hard uncovered areas, and soft areas. The scope of the proposal should encompass every element designed and/or specified, such as, for e.g., A/A system or the automatic sprinkler system? Are the hard uncovered areas, such as the soccer field, shoud be within the scope?In drawings A-01; A-02 and A-03 is clearly identified wich areas and buildings shall be done at the first phase and which ones on the second. The actual solicitation process designs and attachments refer only to first phase of the project, so contractors shall only consider the scope of the first phase of the construction.
#2Did the Embassy had a budget contracted parallel to the execution of the architectural design plans and engineering calculations? We are concerned not only about the budget range described in different documents ($250.000 and $500.000-$1.000.000) but also with the maximum amount destined to the whole project execution, as designed. Is this maximum negotiable?Contractor shall submit the Price Proposal considering the conditions described only for the first phase of the project as mentioned in Q#001. The range given in the solicitation documents is only a refernce.
#3Is the project exempt of IVA?Contractor shall refer to Paragraph B.1.3. of the solicitation documents for VAT information on the contract.
#4Is the time for execution negotiable? It is a bit scarceThe POP (Period of Performance) for the project execution has been estimated based on a very accurate design process. This POP shall be consider as stated in the solictation documents.
#5Is the contract supposed to be financed by stages and execution cuts? How many?Contractor shall refer to solicitation Paragraph G.4. and G.7. for Payments applications.
#6Does the Embassy does as Controller directly?Contractor shall refer to solicitation Paragraph E.5. for QA/QC on the contract.
#7The design does not show the main electrical and hidraulic utilities, please clarify.Refer to drawings C-04 and E-18 where main electric, water supply and sewage existing networks are shown. Also, during the site visit during the solicitation process the existing main utilities and connection points were shown and inspected.
#8We understand the contractor receives the site with some of the work done, flattened and leveled, ready for the digging for the foundations. Please clarify.This is not accurate, contractor shall perform all earthwork and leveling activities as described in the contract technical documents.
#9How would be the payment schedule suggested for the project?Refer to answer to Q#005.
#10Please specify where the downspouts located are.Contractor shall refer to drawings HS-31 to HS-37
#11In the plan A-31 please specify where is going to be located the tempered glass, and what are the dimensions.Contractor shall refer to drawings A-96 to A-101 where window and door schedules are indicated.
#12What is the difference between – Metallic sheet corrugated (Plan A-31) and– the folded sheet 2.5mm. It is possible to use the folded sheet instead of the metallic sheet corrugated?The contractor shall refer to final version of the drawings in the amendment where these notes has been clarified.
#13Please provide the structural plan for the metallic deck.Contractor shall refer to drawings S-37 to S-38.
#14Please specify the foundation plan.Contractor shall refer to drawings S-01 to S-04 of the final version of the drawings included in the amendment, where foundation plans and details are complete.
#15During the site visit it was stated that the CNP will remove the paintball obstacles before completion, please confirm if that is correctThis is not accurate, contractor shall include this activity as part of the scope of the project. The material to be removed by the contractor shall be delivered to the CNP at a location not larger than 100 m from the project site.
#16During the site visit the CNP commander said that there are no restriction to work hours for the base and that the site was accessible 24/7.It is viable for Contractor to coordinate with CNP authorities in order to extend working hours for the project.
#17During the preproposal conference and site visit it was stressed that previous performance for work on containers was essential for this project. Please confirm that this is important and will be evaluated as a primary factor for performing the work. Section M Factor 1confirm. Since this works require a major modification of each container, each offeror's previous relevant expereince will be evaluated under Factor 1, while their technical approach will also be evaluated under factor 3.
#18Is it necessary for the containers to be nationalized in Colombia?Yes, containers shall be nationalized in Colombia.
#19Does Division 13 Metal Building System specification apply to this project?Yes. This section describes the containers construction system requried for the project.
#20Please provide the specifications for the containers?See Division 13 Metal Building Systems at Specs Intact published and drawings G-02 and C-12 to C-14.
#21The designer Arkplus for this project is competing in for build construction projects in other locations - isn’t this a conflict of interest?No, the Government does not see any potential conflict of interest because: 1) The company (Arkplus) has their rights to submit their bids for other requirements since they did not being involved with any of those other requriements, 2) The company representative showed up during this solicitation's site visit to only provide technical support and confirm announced that they will not submit their bid for this requirement.
#22Will the US Embassy help with importation of containers?No. Contractor shall include all costs related to its logistical process in his price proposal.
#23Please confirm that furnishings are not required in this scope of work.Furnishing to be incluided in this solicitation are only those what was designed in detail and detailed drawings are published in the complete package.
#24Can there be consideration for bid due date extension?Contractor shall monitor the Beta Sam Web Page for changes in the proposal due date.
#25The POP of 180 days is unrealistic for magnitude and complexity of this project please consider POP 365 days, alternatively LD’s will have to be factored into the proposal.Refer to answer to Q#004.
#26•Could we please get a second round of questions? Due to the considerable amount of drawings and due to special systems required for this project (CCTV, Fire detection, Elevator, etc) we kindly request more time for more questionsNo.
#27•Could we please get more time to deliver the final proposal? Due to the considerable amount of drawings we kindly request more time to deliver the proposalRefer to answer to Q#024.
#28•Can the execution time for this project be extended? Due to the considerable amount of activities to perform in this project, and our previous experience with containers works, we consider that 180 calendar days is not enough time to finish this project. We proposed 90 extra days for a total of 270 daysRefer to answer to Q#024.
#29•Is the construction of the sports field included in the scope of the project?This is not part within the scope of this first Phase.
#30•During the site visit we noticed that the existing pole for the electrical connection is at its full capacity to install new ducts. Do we still consider the route and procedure marked in the drawings for the electrical connection? Even if the pole does not have any more capacity?Contractor shall follow the design of the electrical utility as shown in the electrical drawings of the project.
#31•Please confirm if we shall consider a hot maneuver for the electrical connection. The drawings do not specify it but during the site visit and because of past experience we consider this shall be a required activityContractor shall consider a hot maneuver for the electrical connecftion for the project.
#32•Please clarify the requirement as far as the specification of the containers. It must be high cube and from a recent model? This information is not clear and not found in the specifications of drawings for this project. If the required containers are high cube, taking into account investigations with the container companies, high cube 20ft containers are not easy to find and if they are found they are not available for selling for other purposes than sea transportation.See Division 13 Metal Building Systems at Specs Intact published and drawings G-02 and C-12 to C-14.
#33•Taking into account the picture of the initial state of the containers, and taking into account that these type of containers are the ones available for selling for refurbishing purposes (models 2006-2007). Can a container in this condition be acceptable by the COR in the container yard (because in the site visit it was mention that the COR would go to the container yard to approved the containers before taking them to the project site) including all the costs of refurbishing, testings and activities that assure the final delivery of a container like the picture of the "after" attached?According to the solicitation paragrapg H.35, "Standard of quality - All materials and equipment incorporated into the work shall be new and for the purpose intended, unless otherwise specified, and all workmanship shall be of good quality and performed in a skillful manner as determined by the Contracting Officer".
#34•During the site visit it was said that the electrical connection network was going to change not to go through the parking lot and instead it would go for a sidewalk causing less impact to the existing conditions. Please confirm if this requirement is going to change and if so, please send the updated drawing with the new proposed locationThe location of the electrical substation is not going to change.
#35•Drawing E19. The drawing does not show if we shall supply a power plant and the capacity of if. Please clarify this requirementThe power Generator is not part of the scope of this contract.
#36•Drawing E19. The single line diagram of drawing E-19 does not show if the transformer is pad mounted or not. Please clarify this requirementYes, the transformer is Pad Mounted. See drawing E-19.
#37•Drawing T06. Drawing T06 talks about a rack No.2. however, there is not a detail of this rack, please provide the detail of rack No. 2 or provide clarification to this activityThere are three racks. See drawing T-09 for details of telecommunication racks.
#38•Drawing E-15. Drawing E-15 shows the detail of the connection of the principal pumps to an electrical breaker. However, due to investigation with suppliers, this principal pumps shall not be connected to any electrical breaker cause if the system fails so it does the pumps. please clarify if the connection of these pumps shall be done as the drawings shows and in case of any modification please submit the updated version of the drawingProtection shall be installed on all electrical power supplies. To feed the pumps, Contractor shall supply a thermo-magnetic automatic switch to protect the electrical wiring. For the fire pump contractors shall supply a circuit breaker, but only with a magnetic trip to allow the fire pump to always work, even when there is an overload.
#39•Electrical Drawings. Please provide information on the route and length for the optical fiber. The drawings do not show information about this taskSee Drawing T-08
#40•Site Visit. Shall we take into account the dismount of the existing substation?There is NO dismounting of existing substation required for the project.
#41•Site visit. Shall we consider the removal of any existing elements of the project site? If so please specify which elements and where shall they be deliver.Refer to answer to Q#015.
#42•Architectural drawings. According to the attached picture, it can be seen that portion of a container is offside with respect to the one in the first floor. Shall we include any columns to support the container? The drawings do not show the structural detail of support to these points. please clarifySee structural drawings. There were no additional supports to the designed containers cantilever.
#43•Architectural drawings. According to the attached picture, it can be seen that portion of a container is offside with respect to the one in the first floor (red square). Shall we include any columns to support the container? The drawings do not show the structural detail of support to these points. please clarify because the offset portion of the container in the second floor is considerableRefer to answer Q#042.
#44•Architectural drawings. Does the scope of the project includes any furniture for the project?Refer to answer Q#023
#45•Electrical drawings. The starting point of connection of the optical fiber shall be from an existing rack (according to the site visit). However, the drawings do not specify what equipment shall be installed in this existing rack. Please send us a detail of the rack along with the specification of any new equipment we must take into account for this activityInternal Technical personnel of the DINAE School explained that it is not required installing a new equipment into the existing communications rack. During the site visit it was shown how would the connection be handled to the existing rack for contractor to consider it for bidding.
# 46apparently the entire structural plans/sections is missing! – there is only one page for structural details and they aren’t even complete – many details lacking.Refer to amendment to contract for complete structural drawings.
# 47There aren’t any details for metal roof structure, there aren’t details for the stairs / details for the elevator etc – it’s like this whole structural discipline wasn’t done yet!!Refer to amendment to contract for complete structural drawings.

19AQMM19R0146

Questions and Answers

19AQMM19R0146

Questions and Answers

19AQMM19R0146

Questions and Answers

19AQMM19R0146

Questions and Answers

19AQMM19R0146

Questions and Answers

19AQMM19R0146

Questions and Answers

File details come from the government source that posted it. Updated .