Attachment 3 19AQMM20R0065 Bidding Chart 0002.xls
XLS spreadsheet 98 KB Posted
- Solicitation number
- 19AQMM20R0065
About this file
This document contains a bidding chart and solicitation notice for a federal contract opportunity. The bidding chart provides cost estimates for the construction of an Antidrug School at Muzu, Bogota, Colombia, totaling over $2 billion. The project involves general construction requirements, concrete work, metals, openings, finishes and more. The solicitation notice seeks the supply, refurbishing and installation of shipping containers for use in the two-story school. The estimated value is between $500,000 and $1,000,000, with a 180-day period of performance. Key dates include registration for a pre-proposal conference by January 23rd, the conference on January 27th, a site visit on January 29th, questions due by February 14th and proposals due by March 13th. The contracting agency is the Department of State Office of Acquisition Management.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Antidrug School
| OFFICIAL BIDDING CHART | ||||||||||||
| PROJECT: | Antidrug School- MUZU | |||||||||||
| Place: | CNP Facilities at Muzu, Bogota, Colombia | |||||||||||
| Solicitation: | 19AQMM20R0065 | 3400 | ||||||||||
| ANTIDRUG SCHOOL - BASE BID | ||||||||||||
| DIVISION | DESCRIPTION | U.M. | QUANTITY | U.M. | QUANTITY | UNIT PRICE | UNIT PRICE | TOTAL COST | TOTAL COST BY CHAPTER | |||
| A. GENERAL REQUIREMENTS | $ - 0 | |||||||||||
| 1 | GENERAL REQUIREMENTS | $ - | ||||||||||
| 01 32 16.00 20 | Construction progress Schedules and documentation | LS | 1 | LS | 1 | $ 7,200,000 | ||||||
| 01 33 00 | Submittal procedures | LS | 1 | LS | 1 | $ 4,500,000 | ||||||
| 01 50 00 | Temporary construction facilities and controls | LS | 1 | LS | 1 | $ 15,900,000 | ||||||
| 01 50 00 | Removal and disposition of existing temporary facilities | LS | 1 | LS | 1 | $ 15,900,000 | ||||||
| 01 78 00 | Closeout submittals | LS | 1 | LS | 1 | $ 4,350,000 | ||||||
| 01 78 23 | Operation and maintenance data | LS | 1 | LS | 1 | $ 2,100,000 | ||||||
| B. ANTIDRUG SCHOOL AREA | $ - 0 | |||||||||||
| 3 | CONCRETE | $ - | ||||||||||
| 03 20 00.00 10 | Concrete reinforcing (Steel bars and mesh) | Kg | 24,200 | LS | 1 | $ 3,300 | $ 79,860,000 | |||||
| 03 30 00 | Cast in place structural concrete under containers | M3 | 203 | LS | 1 | $ 475,000 | $ 96,334,750 | |||||
| Concrete Slab subfloor e=,12 | M2 | 378 | LS | 1 | $ 92,000 | $ 34,800,840 | ||||||
| Concrete sidewalks e=,08 | M2 | 135 | LS | 1 | $ 54,000 | $ 7,266,240 | ||||||
| Concrete tanks for water storage | M3 | 30.26 | LS | 1 | $ 715,000 | $ 21,635,900 | ||||||
| 03 55 16 | Gypsum concrete floor planks | M2 | 804 | LS | 1 | $ 54,700 | $ 43,990,834 | |||||
| 5 | METALS | $ - | ||||||||||
| 05 05 23.13 10 | Ultrasonic inspection of weldments | Un | 100 | LS | 1 | $ 71,000 | $ 7,100,000 | |||||
| 05 12 00 | Structural Steel | |||||||||||
| Metallic roofing trusses | Kg | 7,355 | LS | 1 | $ 9,100 | $ 66,930,500 | ||||||
| Structural seismic reinforcement | Kg | 38,308 | LS | 1 | $ 9,100 | $ 348,602,800 | ||||||
| Structural cabins for stairs and elevator | Kg | 3,431 | LS | 1 | $ 9,100 | $ 31,220,280 | ||||||
| Structural structure for metallic brigde | Kg | 13,921 | LS | 1 | $ 9,100 | $ 126,681,100 | ||||||
| 05 50 13 | Miscellaneus metal fabrications | |||||||||||
| Shipping containers 40' High Cube type adequacy | Un | 33 | LS | 1 | $ 14,900,000 | $ 491,700,000 | ||||||
| 05 52 00 | Metal railings | M | 71.28 | LS | 1 | $ 180,000 | $ 12,830,400 | |||||
| Metallic gutters | M | 88.64 | LS | 1 | $ 29,400 | $ 2,606,045 | ||||||
| Metallic downspouts | M | 60.5 | LS | 1 | $ 22,100 | $ 1,337,050 | ||||||
| 05 51 00 | Metal stairs (solo los escalones en lámina Alfajor) | Un | 3 | LS | 1 | $ 1,320,000 | $ 3,960,000 | |||||
| 6 | WOOD, PLASTIC AND COMPOSITES | $ - | ||||||||||
| 06 20 00 | Finish carpentry | Ls | 1 | LS | 1 | $ 12,000,000 | $ 12,000,000 | |||||
| 7 | THERMAL AND MOISTURE PROTECTION | $ - | ||||||||||
| 07 21 16 | Mineral Fiber blanket insulation | M2 | 884.64 | LS | 1 | $ 11,300 | $ 9,996,455 | |||||
| 07 22 00 | Roof and deck insulation (Sandwich deck) | M2 | 745.00 | LS | 1 | $ 139,100 | $ 103,629,500 | |||||
| 07 60 00 | Flashing and sheet metal | LS | 88.64 | LS | 1 | $ 29,600 | $ 2,623,774 | |||||
| 07 92 00 | Joint sealants for cover sheets | LS | 88.64 | LS | 1 | $ 10,800 | $ 957,323 | |||||
| 8 | OPENINGS | $ - | ||||||||||
| 08 11 13 | Steel doors and frames (1 sheet, ,84 x 2,04 + montante) panel type | Un | 45 | LS | 1 | $ 550,000 | $ 24,750,000 | |||||
| Curtain glass door with aluminum frame(tempered glass) | M2 | 33.57 | LS | 1 | $ 427,400 | $ 14,347,818 | ||||||
| Curtain glass door with stainless steel accesories(tempered glass) | M2 | 5.74 | LS | 1 | $ 427,400 | $ 2,453,276 | ||||||
| 08 44 00 | Curtain wall and glazed assemblies (tempered glass) | M2 | 114.29 | LS | 1 | $ 427,400 | $ 48,847,546 | |||||
| 08 51 13 | Aluminum windows (Type proyectante) | M2 | 252.48 | LS | 1 | $ 215,000 | $ 54,283,200 | |||||
| 08 60 45 | Skylights and translucent panels | M2 | 24.82 | LS | 1 | $ 445,700 | $ 11,062,274 | |||||
| 08 71 00 | Door hardware | Set | 45 | LS | 1 | $ 260,000 | $ 11,700,000 | |||||
| 08 81 00 | Glazing (laminated 3+3 for windows) | M2 | 252.48 | LS | 1 | $ 102,000 | $ 25,752,960 | |||||
| 08 87 23.13 | Safety films | M2 | 44.00 | LS | 1 | $ 65,000 | $ 2,859,675 | |||||
| 9 | FINISHES | $ - | ||||||||||
| 09 23 00 | Gypsum plastering | LS | 1515.657 | LS | 1 | $ 7,500 | $ 11,367,428 | |||||
| 09 29 00 | Cementitious board ceilings 6 mm thickness | M2 | 915.00 | LS | 1 | $ 85,000 | $ 77,775,000 | |||||
| Fiber cement acoustical walls (Panel e=10 mm). Base 9. double face. | M2 | 399.79 | LS | 1 | $ 112,000 | $ 44,776,480 | ||||||
| Fiber cement acoustical walls (Panel e=10 mm). Base 9. single face. | M2 | 978.08 | LS | 1 | $ 89,000 | $ 87,049,120 | ||||||
| Wood fiber decks (Peatonal bridge) | LS | 163.00 | LS | 1 | $ 195,000 | $ 31,785,000 | ||||||
| 09 30 10 | Ceramic, quarry and glass tiling | M2 | 173.00 | LS | 1 | $ 87,500 | $ 15,137,500 | |||||
| 09 51 00 | Acoustical ceilings (Micro-perforated panels) | M2 | 49.5 | LS | 1 | $ 125,000 | $ 6,187,500 | |||||
| 09 62 38 | Static control flooring (Vinyl type on roll) | M2 | 742.00 | LS | 1 | $ 129,900 | $ 96,385,800 | |||||
| 09 84 20 | Acoustical wall folding panels (Multipurpose room) | M2 | 30.4 | LS | 1 | $ 517,000 | $ 15,716,800 | |||||
| 09 90 00 | Paints and coatings (Internal walls and divisions) | M2 | 2430.66 | LS | 1 | $ 7,300 | $ 17,743,796 | |||||
| 09 97 13.00 40 | Steel coatings (Exterior shipping containers) | M2 | 978.08 | LS | 1 | $ 25,900 | $ 25,332,272 | |||||
| 09 97 13.27 | Exterior coating of steel structures | M | 1242 | LS | 1 | $ 7,200 | $ 8,942,400 | |||||
| Apparatusses | Ls | 1 | LS | 1 | $ 12,150,000 | $ 12,150,000 | ||||||
| 10 | SPECIALTIES | $ - | ||||||||||
| 10 14 00.20 | Interior signage | LS | 1 | LS | 1 | $ 2,300,000 | $ 2,300,000 | |||||
| 10 21 13 | Toilet compartments (Stainless steel) | M2 | 58.04 | LS | 1 | $ 340,000 | $ 19,732,512 | |||||
| 10 28 13 | Toilet accesories (Stainless steel) | Set | 9 | LS | 1 | $ 400,000 | $ 3,600,000 | |||||
| 10 44 16 | Fire cabinet Type II | Un | 5 | LS | 1 | $ 895,000 | $ 4,475,000 | |||||
| 12 | FURNISHINGS | $ - | ||||||||||
| 12 21 00 | Window blinds Ref: Celoscreen paso 150 or similar. | M2 | 72.41 | LS | 1 | $ 215,000 | $ 15,568,150 | |||||
| 12 36 00 | Countertops | M | 26.54 | LS | 1 | $ 139,000 | $ 3,689,060 | |||||
| 14 | CONVEYING EQUIPMENT | $ - | ||||||||||
| 14 24 23 | Hydraulic passenger elevators | Un | 1 | LS | 1 | $ 36,888,000 | $ 36,888,000 | |||||
| 21 | FIRE SUPRESSION | $ - | ||||||||||
| 21 12 00 | Standpipe system line | LS | 1 | LS | 1 | $ 19,320,000 | $ 19,320,000 | |||||
| 21 13 00.00 40 | Fire supression Siamesa connection | LS | 1 | LS | 1 | $ 2,650,000 | $ 2,650,000 | |||||
| Fire supression Cabinet type II | Un | 5 | LS | 1 | $ 920,000 | $ 4,600,000 | ||||||
| 22 | PLUMBING | $ - | ||||||||||
| 22 00 00 | Plumbing general purpose | LS | 1 | LS | 1 | $ 162,500,000 | $ 162,500,000 | |||||
| 22 13 29 | Hydraulic pumps and equipments | LS | 1 | LS | 1 | $ 19,540,000 | $ 19,540,000 | |||||
| 23 | HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $ - | ||||||||||
| 23 00 00 | Air supply, distribution, ventilation and exhaust systems | LS | 1 | LS | 1 | $ 7,990,000 | $ 7,990,000 | |||||
| 23 03 00.00 20 | Basic mechanical materials and methods | LS | 1 | LS | 1 | $ 4,280,000 | $ 4,280,000 | |||||
| 23 81 00.00 20 | Unitary air conditioning equipment | Un | 8 | LS | 1 | $ 10,475,000 | $ 83,800,000 | |||||
| 26 | ELECTRICAL | $ - | ||||||||||
| 26 00 00.00 20 | Basic electrical materials and methods | LS | 1 | LS | 1 | $ 14,200,000 | $ 14,200,000 | |||||
| 26 05 00.00 40 | Common work results for electrical | LS | 1 | LS | 1 | $ 8,750,000 | $ 8,750,000 | |||||
| 26 05 13.00 40 | Medium voltage cables | LS | 1 | LS | 1 | $ 22,350,000 | $ 22,350,000 | |||||
| 26 05 19.10 10 | Insulated wire and cable | LS | 1 | LS | 1 | $ 18,370,000 | $ 18,370,000 | |||||
| 26 12 19.10 | Three-phase, liquid-filled, medium voltage transformer | Un | 1 | LS | 1 | $ 18,440,000 | $ 18,440,000 | |||||
| 26 20 00 | Interior distribution system | Un | 322 | LS | 1 | $ 52,500 | $ 16,905,000 | |||||
| 26 24 16.00 40 | Panelboards | Un | 11 | LS | 1 | $ 795,000 | $ 8,745,000 | |||||
| 26 36 00.00 10 | Automatic transfer switch and by-pass/isolation switch | LS | 1 | LS | 1 | $ 26,400,000 | $ 26,400,000 | |||||
| 26 41 00 | Lightning protection system | LS | 1 | LS | 1 | $ 14,450,000 | $ 14,450,000 | |||||
| 26 51 00 | Interior Lighting | Un | 241 | LS | 1 | $ 57,900 | $ 13,953,900 | |||||
| 26 52 00.00 40 | Emergency lighting | Un | 33 | LS | 1 | $ 143,000 | $ 4,719,000 | |||||
| 26 53 00.00 40 | Exit signs | Un | 24 | LS | 1 | $ 93,600 | $ 2,246,400 | |||||
| 26 56 00 | Exterior lighting | LS | 1 | LS | 1 | $ 14,150,000 | $ 14,150,000 | |||||
| 26 56 13.00 40 | Lighting poles and standards | LS | 1 | LS | 1 | $ 7,480,000 | $ 7,480,000 | |||||
| 27 | COMMUNICATIONS | $ - | ||||||||||
| 27 05 28.36 40 | Cable trays for communications systems | LS | 1 | LS | 1 | $ 6,162,500 | $ 6,162,500 | |||||
| 27 10 00 | Building telecommunications cabling system | LS | 1 | LS | 1 | $ 29,784,200 | $ 29,784,200 | |||||
| 28 | ELECTRONIC SAFETY AND SECURITY | $ - | ||||||||||
| 28 31 64.00 10 | Fire detection and alarm system addresable, CCTV Network, Access control | LS | 1 | LS | 1 | $ 74,700,000 | $ 74,700,000 | |||||
| C. EXTERIOR WORKS | $ - 0 | |||||||||||
| 31 | EARTHWORK | $ - | ||||||||||
| 31 00 00 | Earthwork (Filling) | M3 | 630.31 | LS | 1 | $ 94,500 | $ 59,564,295 | |||||
| 31 11 00 | Clearing and grubbing | M2 | 1700 | LS | 1 | $ 9,900 | $ 16,830,000 | |||||
| 31 23 00.00 20 | Excavation | M3 | 278.96 | LS | 1 | $ 18,500 | $ 5,160,760 | |||||
| 31 60 00 | Foundation preparation | M2 | 1634 | LS | 1 | $ 4,300 | $ 7,026,200 | |||||
| 32 | EXTERIOR IMPROVEMENTS | $ - | ||||||||||
| 32 01 19 | Sealing joints in rigid pavements | M | 155 | LS | 1 | $ 12,900 | $ 1,999,500 | |||||
| 32 13 13.06 | Concrete paver (Joints on concrete slab subfloor) | M | 235 | LS | 1 | $ 12,557 | $ 2,950,895 | |||||
| 32 92 23 | Sodding | M2 | 280 | LS | 1 | $ 9,700 | $ 2,716,000 | |||||
| 32 93 00 | Exterior plants | Gb | 1 | LS | 1 | $ 2,900,000 | $ 2,900,000 | |||||
| Concrete prefabricated banks | Un | 14 | LS | 1 | $ 285,000 | $ 3,990,000 | ||||||
| 33 | UTILITIES | $ - | ||||||||||
| 33 11 00 | Water utility distribution piping | Ls | 1 | LS | 1 | $ 5,922,000 | $ 5,922,000 | |||||
| 33 30 00 | Sanitary sewerage | Ls | 1 | LS | 1 | $ 8,137,500 | $ 8,137,500 | |||||
| 33 40 00 | Storm drainage utilities | Ls | 1 | LS | 1 | $ 5,670,000 | $ 5,670,000 | |||||
| 33 71 02 | Underground electrical distribution | Ls | 1 | LS | 1 | $ 37,850,000 | $ 37,850,000 | |||||
| D. MARKUPS | $ - 0 | |||||||||||
| TOTAL DIRECT COSTS PHYSICAL ADECUATION WORKS (A+B+C) | $ - 0 | |||||||||||
| Administration | 5% | $ - 0 | ||||||||||
| Unforenseens | 3% | $ - 0 | ||||||||||
| Profit | 4% | $ - 0 | ||||||||||
| DBA | ||||||||||||