Rural Station Calamar Warehouses

19AQMM19R0133 Supplemental Questions & Answers

# Questions Answers

#1 Regarding your answer No. 6 we have the following requests:

Altough its mentioned that boundary área is defined, there is no indication of the type of finish surface for those more than 5K m2 in area K- Please provide technical specifications for that surface finish

The designated K area refers to supplementary areas which are existing areas not intervened in the project such as green areas.

Therefore, these areas do not require a technical specification.

#2 Regarding your answer No. 6 we have the following

On same dwg ( área K) its shown what appears to be sidewalks with a total área of 1300 m2- Please indicate if these have to be built and provide technical specs for them

For the technical specifications for the sidewalk, refer to Attachment

#2 – Drawings, drawing U-03 in the section detail (SD-1, SD-2 &

SD-3).

See the Description for further details.

#3 Regarding your answer No. 6 we have the following

Please provide tech specs for the vehicular way and parking lots of área K

For the technical specifications for the vehicular way and parking lots, refer to Attachment #2 – Drawings, Drawing U-03 in the section detail SD-3.

See the Description for further details.