Attachment__5_-_Insurance.pdf
PDF 198 KB Posted
- Attached to
- CNP Rural Station Base Building Construction Federal contract opportunity
- Solicitation number
- 19AQMM19R0133
About this file
Attachment #5 - Insurance
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM19R0133_0003_-_Questions_and_Answers__2.pdf | ||
| Sections_B-M_19AQMM19R0133_0002_(without_track_changes).pdf | ||
| 19AQMM19R0133_0002_-_Questions_and_Answers.pdf | ||
| Attachment__2.1_-_New_or_Revised_Drawings_(folder).zip | ZIP file | |
| Attachment__9_-_Soil_Study_ES_Informe_Calamar.pdf | ||
| Sections_B-M_19AQMM19R0133_0002_(with_track_changes).pdf | ||
| SF30_19AQMM19R0133_0002.pdf | ||
| 19AQMM19R0133_0001.pdf | ||
| Attachment__7_-_Offeror_Experience.docx | DOCX document | |
| 19AQMM19R0133_B-M.pdf | ||
| Attachment__2_-_Drawings.zip | ZIP file | |
| Attachment__3_-_Bid_Chart.xlsx | XLSX spreadsheet | |
| Attachment__4_-_Submittal_Register.pdf | ||
| Attachment__6_-_Firm_and_Project_Information.pdf | ||
| 19AQMM19R0133.pdf | ||
| Attachment__8_-_Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| Attachment__1_-_19AQMM19R0133_Specifications.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 4 ‐ INSURANCE FOR CONSTRUCTION CONTRACTS
Performance Policy (Póliza de Cumplimiento): Submitted after the contractor is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract and valid for the duration of the contract and a further two months, Payment Policy (Póliza de Pago de Salarios y Prestaciones Sociales): Submitted after the contract is signed and prior to the notice to proceed in a sum equal to 20% of the value of the contract, and valid for the duration of the contract and a further three years for the salaries and social benefits of the workers.
Liability Policy ( Póliza de Responsabilidad Civil Contractual): submitted after the contract is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract, and valid for the duration of the contract and a further two months covering contractual and Third Party Civil Liability, Stability Policy (Póliza de Estabilidad): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for three years from the date of the handover of the work/ substantial completion.
Elements Quality Policy ( Póliza de Calidad de Elementos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion.
Correct Equipment Functioning Policy (Póliza de correcto funcionamiento de los equipos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion