CNP Rural Station Base Building Construction

Awarded Award Notice Posted

Solicitation number
19AQMM19R0133
Agency
Office of Acquisition Management Department of State
Awarded
to Estudios Edificaciones E Interventorias En Ingenieria Eeii S A S
Set-aside
No set-aside

Opportunity facts

Contract number
19AQMM19C0093 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Colombian National Police Dicar Cnp Facilities located in the city of Calamar Guaviare, Colombia. This location can be accessed through commercial flights and by road. Colombia

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

This requirement is to awarded to ESTUDIOS EDIFICACIONES E INTERVENTORIAS EN INGENIERIA EEII S A S on July 03, 2019.. Awarded Vendors: ESTUDIOS EDIFICACIONES E INTERVENTORIAS EN INGENIERIA EEII S A S. Contract Award Dollar Amount: 939,036.87. Contract Award Date: 2019-07-03.

Update #5 ·

This is a Solicitation Notice of the U.S. Government's intent to issue a solicitation for the Construction of three (3) buildings for the Colombian National Police (CNP) in Calamar (Guaviare) Colombia.

The order of magnitude of this requirement is between $500,000 and $1,000,000.


The estimated period of performance is: 180 calendar days


This acquisition will be issued under full and open procedures.


The project entails the construction of one Rural Station Base in Calamar (Guaviare) Colombia, which consists of three (3) buildings for the Colombian National Police (CNP) Facilities to support the INL REDS program. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.


Two of the buildings shall have a length of 18.70m, a width of 13.90m, and total height of 4.00m above finish floor, and a third building shall have a length of 25.05m, a width of 10.53m, and total height of 4.80m above finish floor. The structural system chosen for this building corresponds to reinforced masonry wall. The lightweight roof system will be supported by purlins, which are supported over concrete beam, supported over reinforced masonry wall. The foundation of the building consists in concrete cyclopean and footings. This facility shall have electrical, hydraulic and sewage utilities and internal installations, doors, door hardware, air conditioning, sanitary fittings, and finishes as indicated in the attached drawings. The building shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10).


NOTE: The contractor shall be responsible for transportation, meals and lodging of the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.



PLACE OF PERFORMANCE:
Colombian National Police (CNP) DICAR CNP facilities located in the city of Calamar Guaviare, Colombia. It is located at the central part of the country in the Guaviare Department. It is located 483 Km from Bogota, capital city of Colombia, and can be accessed through charters flights and by road. The elevation 228 m. (748 ft.) above sea level and the weather is tropical.


See attached solicitation and its attachments for details.


**IMPORTANT SCHEDULES**
1. Site Visit Request is due April 03, 2019 at 12:00 PM Eastern
2. Site Visit will be held on April 11, 2019 at 10:00 AM Local Time
3. Questions are due April 24, 2019 at 12:00 PM Eastern
4. Proposals are due May 24, 2019 at 12:00 AM/PM Eastern




**Amendment #1 (19AQMM19R0133 0001) is hereby posted as of April 2, 2019. See attached Amendment for details.


**Amendment #2 (19AQMM19R0133 0002) is hereby posted as of May 15, 2019. See attached Amendment for details.


**Amendment #3 (19AQMM19R0133 0003) is hereby posted as of May 20, 2019. See attached Amendment for details.




.

Update #4 ·

This is a Solicitation Notice of the U.S. Government's intent to issue a solicitation for the Construction of three (3) buildings for the Colombian National Police (CNP) in Calamar (Guaviare) Colombia.

The order of magnitude of this requirement is between $500,000 and $1,000,000.


The estimated period of performance is: 180 calendar days


This acquisition will be issued under full and open procedures.


The project entails the construction of one Rural Station Base in Calamar (Guaviare) Colombia, which consists of three (3) buildings for the Colombian National Police (CNP) Facilities to support the INL REDS program. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.


Two of the buildings shall have a length of 18.70m, a width of 13.90m, and total height of 4.00m above finish floor, and a third building shall have a length of 25.05m, a width of 10.53m, and total height of 4.80m above finish floor. The structural system chosen for this building corresponds to reinforced masonry wall. The lightweight roof system will be supported by purlins, which are supported over concrete beam, supported over reinforced masonry wall. The foundation of the building consists in concrete cyclopean and footings. This facility shall have electrical, hydraulic and sewage utilities and internal installations, doors, door hardware, air conditioning, sanitary fittings, and finishes as indicated in the attached drawings. The building shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10).


NOTE: The contractor shall be responsible for transportation, meals and lodging of the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.



PLACE OF PERFORMANCE:
Colombian National Police (CNP) DICAR CNP facilities located in the city of Calamar Guaviare, Colombia. It is located at the central part of the country in the Guaviare Department. It is located 483 Km from Bogota, capital city of Colombia, and can be accessed through charters flights and by road. The elevation 228 m. (748 ft.) above sea level and the weather is tropical.


See attached solicitation and its attachments for details.


**IMPORTANT SCHEDULES**
1. Site Visit Request is due April 03, 2019 at 12:00 PM Eastern
2. Site Visit will be held on April 11, 2019 at 10:00 AM Local Time
3. Questions are due April 24, 2019 at 12:00 PM Eastern
4. Proposals are due May 24, 2019 at 12:00 AM/PM Eastern




**Amendment #1 (19AQMM19R0133 0001) is hereby posted as of April 2, 2019. See attached Amendment for details.


**Amendment #2 (19AQMM19R0133 0002) is hereby posted as of May 15, 2019. See attached Amendment for details.


.

Update #3 ·

This is a Solicitation Notice of the U.S. Government's intent to issue a solicitation for the Construction of three (3) buildings for the Colombian National Police (CNP) in Calamar (Guaviare) Colombia.

The order of magnitude of this requirement is between $500,000 and $1,000,000.


The estimated period of performance is: 180 calendar days


This acquisition will be issued under full and open procedures.


The project entails the construction of one Rural Station Base in Calamar (Guaviare) Colombia, which consists of three (3) buildings for the Colombian National Police (CNP) Facilities to support the INL REDS program. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.


Two of the buildings shall have a length of 18.70m, a width of 13.90m, and total height of 4.00m above finish floor, and a third building shall have a length of 25.05m, a width of 10.53m, and total height of 4.80m above finish floor. The structural system chosen for this building corresponds to reinforced masonry wall. The lightweight roof system will be supported by purlins, which are supported over concrete beam, supported over reinforced masonry wall. The foundation of the building consists in concrete cyclopean and footings. This facility shall have electrical, hydraulic and sewage utilities and internal installations, doors, door hardware, air conditioning, sanitary fittings, and finishes as indicated in the attached drawings. The building shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10).


NOTE: The contractor shall be responsible for transportation, meals and lodging of the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.



PLACE OF PERFORMANCE:
Colombian National Police (CNP) DICAR CNP facilities located in the city of Calamar Guaviare, Colombia. It is located at the central part of the country in the Guaviare Department. It is located 483 Km from Bogota, capital city of Colombia, and can be accessed through charters flights and by road. The elevation 228 m. (748 ft.) above sea level and the weather is tropical.


See attached solicitation and its attachments for details.


**IMPORTANT SCHEDULES**
1. Site Visit Request is due April 03, 2019 at 12:00 PM Eastern
2. Site Visit will be held on April 11, 2019 at 10:00 AM Local Time
3. Questions are due April 24, 2019 at 12:00 PM Eastern
4. Proposals are due May 24, 2019 at 12:00 AM/PM Eastern




**Amendment #1 (19AQMM19R0133 0001) is hereby posted as of April 2, 2019. See attached Amendment for details.




.

Update #2 ·

This is a Solicitation Notice of the U.S. Government's intent to issue a solicitation for the Construction of three (3) buildings for the Colombian National Police (CNP) in Calamar (Guaviare) Colombia.

The order of magnitude of this requirement is between $500,000 and $1,000,000.


The estimated period of performance is: 180 calendar days


This acquisition will be issued under full and open procedures.


The project entails the construction of one Rural Station Base in Calamar (Guaviare) Colombia, which consists of three (3) buildings for the Colombian National Police (CNP) Facilities to support the INL REDS program. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.


Two of the buildings shall have a length of 18.70m, a width of 13.90m, and total height of 4.00m above finish floor, and a third building shall have a length of 25.05m, a width of 10.53m, and total height of 4.80m above finish floor. The structural system chosen for this building corresponds to reinforced masonry wall. The lightweight roof system will be supported by purlins, which are supported over concrete beam, supported over reinforced masonry wall. The foundation of the building consists in concrete cyclopean and footings. This facility shall have electrical, hydraulic and sewage utilities and internal installations, doors, door hardware, air conditioning, sanitary fittings, and finishes as indicated in the attached drawings. The building shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10).


NOTE: The contractor shall be responsible for transportation, meals and lodging of the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.



PLACE OF PERFORMANCE:
Colombian National Police (CNP) DICAR CNP facilities located in the city of Calamar Guaviare, Colombia. It is located at the central part of the country in the Guaviare Department. It is located 483 Km from Bogota, capital city of Colombia, and can be accessed through charters flights and by road. The elevation 228 m. (748 ft.) above sea level and the weather is tropical.


See attached solicitation and its attachments for details.


**IMPORTANT SCHEDULES**
1. Site Visit Request is due April 03, 2019 at 12:00 PM Eastern
2. Site Visit will be held on April 09, 2019 at 10:00 AM Local Time
3. Questions are due April 24, 2019 at 12:00 PM Eastern
4. Proposals are due May 24, 2019 at 12:00 AM/PM Eastern




.

Update #1 ·

This is a Pre-solicitation Notice of the U.S. Government's intent to issue a solicitation for the construction of three (3) buildings for the Colombian National Police (CNP) in Calamar (Guaviare) Colombia.
The order of magnitude for this requirement is between $500,000 and $1,000,000.
The estimated period of performance is 180 calendar days.
This acquisition will be issued under Full and Open procedures.
The project entails the construction of one Rural Station Base in Calamar (Guaviare) Colombia, which consists of three (3) buildings for the Colombian National Police (CNP) Facilities to support the INL REDS program. The construction shall include the use of quality materials that are capable of withstanding tropical rainy climate.
Two of the buildings shall have a length of 18.70m, a width of 13.90m, and total height of 4.00m above finish floor, and a third building shall have a length of 25.05 m, a width of 10.53m, and total height of 4.80m above finish floor. The structural system chosen for this building corresponds to reinforced masonry wall. The lightweight roof system will be supported by purlins, which are supported over concrete beam, supported over reinforced masonry wall. The foundation of the building consists in concrete cyclopean and footings. This facility shall have electrical, hydraulic and sewage utilities and internal installations, doors, door hardware, air conditioning, sanitary fittings, and finishes as indicated in the attached drawings. The building shall comply with the current standards of the Colombian Seismic Resistance Code (NSR Standard, 10).

NOTE: The contractor shall be responsible for transportation, meals and lodging of the construction team on the work site (away from the project site), or as arranged with the CNP personnel. The contractor shall have a representative at the work site to receive materials, which shall be responsible for unloading materials and transporting it to the actual work site.The solicitation is expected to be posted on or around March 29, 2019, and it will be available for 30 days - reference 19AQMM19R0133. Award of a Hybrid (Firm-Fixed Price and Cost Reimbursable) contract is within 120 calendar days from the solicitation response date. A pre-proposal conference and/or site visit(s) will be scheduled and included in the solicitation.


Contracts shall express their interest in this solicitation by written correspondence to the attention of Annie Harlow. All correspondence shall be submitted via email to: harlowal@state.gov and hwangj2@state.gov must include the pre-solicitation number 19AQMM19R0133 in the subject line. DO NOT TELEPHONE.


Firms shall be knowledgeable in written and spoken English and possess all appropriate permits and licenses to perform such work in Colombia. Solicitation and award will be subject to the laws and regulations of the United States of America and is being competed utilizing full and open competition procedures.


.

Attachments