Attachment__4_-_Submittal_Register.pdf
PDF 251 KB Posted
- Attached to
- CNP Rural Station Base Building Construction Federal contract opportunity
- Solicitation number
- 19AQMM19R0133
About this file
Attachment #4 - Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM19R0133_0003_-_Questions_and_Answers__2.pdf | ||
| Attachment__2.1_-_New_or_Revised_Drawings_(folder).zip | ZIP file | |
| Attachment__9_-_Soil_Study_ES_Informe_Calamar.pdf | ||
| Sections_B-M_19AQMM19R0133_0002_(with_track_changes).pdf | ||
| SF30_19AQMM19R0133_0002.pdf | ||
| Sections_B-M_19AQMM19R0133_0002_(without_track_changes).pdf | ||
| 19AQMM19R0133_0002_-_Questions_and_Answers.pdf | ||
| 19AQMM19R0133_0001.pdf | ||
| Attachment__7_-_Offeror_Experience.docx | DOCX document | |
| 19AQMM19R0133_B-M.pdf | ||
| Attachment__2_-_Drawings.zip | ZIP file | |
| Attachment__3_-_Bid_Chart.xlsx | XLSX spreadsheet | |
| Attachment__8_-_Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| Attachment__1_-_19AQMM19R0133_Specifications.pdf | ||
| Attachment__6_-_Firm_and_Project_Information.pdf | ||
| Attachment__5_-_Insurance.pdf | ||
| 19AQMM19R0133.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 24 PAGES
RURAL STATION CONSTRUCTION AT CALAMAR, GUAVIARE, FOR THE CNP
01 33 00 SD-01 Preconstruction Submittals
1.6Submittal Register
01 50 00 SD-01 Preconstruction Submittals
1.2Construction Site Plan
01 78 00 SD-03 Product Data
1.4.1Warranty Management Plan
1.4.4Warranty Tags
SD-08 Manufacturer’s Instructions
1.3Preventative Maintenance
1.3Condition Monitoring (Predictive
Testing)
1.3Inspection
1.4.1Posted Instructions
SD-10 Operation and Maintenance
Data
1.5Operation and Maintenance
Manuals
SD-11 Closeout Submittals
1.2.1Record Drawings
03 31 01.00 10 SD-03 Product Data
3.1.3 GConstruction Joint Treatment
SD-06 Test Reports
3.3Tests and Inspections
3.3.2.2 GQuality of Aggregates
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 24 PAGES
03 31 01.00 10 1.3Concrete Field Testing
Technicians
1.3.2Cementitious Materials
2.1.1Cementitious Materials
1.3.2Admixtures
04 20 00 SD-02 Shop Drawings
1.4.4Detail Drawings
SD-03 Product Data
2.4.2Cement
SD-04 Samples
2.2Concrete Masonry Units (CMU)
2.6Anchors, Ties, and Bar
Positioners
2.10Expansion-Joint Materials
1.5.2Joint Reinforcement
1.4.3Portable Panel
SD-06 Test Reports
3.21.1Field Testing of Mortar
3.21.2Field Testing of Grout
3.21.3Prism Tests
2.4Masonry Cement
SD-07 Certificates
1.5.1Concrete Masonry Units
3.2.7.1Concrete Masonry Units
2.6Anchors, Ties, and Bar
Positioners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 24 PAGES
04 20 00 1.5.2Joint Reinforcement
2.4Masonry Cement
2.4.1Admixtures for Masonry Mortar
1.4.2Contamination
SD-08 Manufacturer’s Instructions
2.4Masonry Cement
05 12 00 SD-02 Shop Drawings
1.3.1 GFabrication Drawings
SD-03 Product Data
2.4Shop Primer
2.3.1Welding Electrodes and Rods
SD-07 Certificates
2.1Steel
2.2Bolts, Nuts, and Washers
1.3.2.1Welding Procedures and
Qualifications
07 32 13 SD-02 Shop Drawings
1.7.1Tile Roofing System
SD-03 Product Data
2.1.1Insulated roof system
3.3.1Fastening system
SD-04 Samples
2.1.1Roof tile
SD-08 Manufacturer’s Instructions
3.3Installation
08 11 16 SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 24 PAGES
08 11 16 1.5.1.1Finish Samples
SD-08 Manufacturer’s Instructions
2.1Doors and Frames
08 51 13 SD-03 Product Data
2.1Windows
2.2.7.1Hardware
2.2.2Fasteners
1.8Window Performance
2.2.9Screens
2.4Weatherstripping
2.2.7Accessories
2.2.3Adhesives
SD-04 Samples
1.3.1.1Finish Sample
1.3.1.2Window Sample
SD-10 Operation and Maintenance
Data
2.1Windows
08 71 00 SD-03 Product Data
2.1Hardware Items
08 91 00 SD-04 Samples
1.4Wall louvers
2.2Wall louvers
1.4Door louvers
2.3Door louvers
09 24 23 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 24 PAGES
09 24 23 3.4Proportions and Mixing
SD-04 Samples
2.2Colored Stucco Finish Coat
1.3Sample Panel
09 30 10 SD-03 Product Data
2.1CERAMIC TILE
2.2Setting-Bed
2.4Mortar, Grout, and Adhesive
SD-04 Samples
2.1CERAMIC TILE
2.4Grout
SD-07 Certificates
2.1Tile
2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions
3.5Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2Installation
09 90 00 SD-02 Shop Drawings
3.11Piping Identification
SD-03 Product Data
2.1Coating
3.3.5Sealant
Manufacturer's Technical Data
Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 24 PAGES
09 90 00 SD-04 Samples
1.3.2Textured Wall Coating System
SD-08 Manufacturer’s Instructions
3.7.2Mixing
1.6.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1Coatings
09 96 00 SD-01 Preconstruction Submittals
1.3Material, Equipment and Fixture
List
SD-03 Product Data
2.1Heat-Resistant Coatings
2.2Epoxy Coatings
2.3Polyurethane Coatings
2.4Chlorinated-Rubber Coatings
SD-04 Samples
1.3Color Chips
SD-07 Certificates
2.1Heat-Resistant Coatings
2.2Epoxy Coatings
2.3Polyurethane Coatings
2.4Chlorinated-Rubber Coatings
10 21 13 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 24 PAGES
10 21 13 1.2Cleaning and Maintenance
Instructions
2.6Colors And Finishes
2.1.1Galvanized Steel Sheet
2.1.2Anchoring Devices and Fasteners
2.1.4Hardware and Fittings
2.1.3Brackets
2.1.5Door Hardware
2.4Pilaster Shoes
SD-04 Samples
2.6Colors and Finishes
2.1.4Hardware and Fittings
2.1.2Anchoring Devices and Fasteners
SD-07 Certificates
1.5Warranty
22 00 00 SD-02 Shop Drawings
3.7.1Plumbing System
SD-03 Product Data
2.4Fixtures
3.7.1Plumbing System
SD-06 Test Reports
3.7Tests, Flushing and Disinfection
SD-07 Certificates
1.3Materials and Equipment
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 24 PAGES
22 00 00 3.7.1Plumbing System
23 00 00 SD-02 Shop Drawings
1.4.5Detail Drawings
SD-03 Product Data
3.2.2Air Handling Units
2.10.1Room Fan-Coil Units
2.10.1Test Procedures
1.2.1.2Diagrams
SD-06 Test Reports
3.8Performance Tests
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.9.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.9.1Operation and Maintenance
Manuals
23 23 00 SD-02 Shop Drawings
2.3Refrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.3.1Qualifications
3.5Refrigerant Piping Tests
3.4Demonstrations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 24 PAGES
23 23 00 3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-10 Operation and Maintenance
Data
1.5Maintenance
3.4Operation and Maintenance
Manuals
23 81 00.00 20 SD-02 Shop Drawings
2.5.2Field-Assembled Refrigerant
Piping
1.4.2Control System Wiring Diagrams
SD-03 Product Data
2.1Room Air Conditioners
2.2Air Conditioners
2.2.10Thermostats
2.5Refrigerant Piping and
Accessories
2.3Coatings for Finned Tube Coils
SD-06 Test Reports
3.8.3Start-Up and Initial Operational
Tests
SD-08 Manufacturer’s Instructions
2.2Air Conditioners
2.5Refrigerant Piping and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 24 PAGES
23 81 00.00 20 SD-10 Operation and Maintenance
Data
2.2Air Conditioners
SD-11 Closeout Submittals
1.4.4Posted Operating Instructions
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1Material, Equipment, and Fixture
Lists
SD-03 Product Data
2.1.1Conduits and Raceways
2.1.3Wire and Cable
3.2.1.9Splices and Connectors
2.1.4Switches
2.1.5Receptacles
2.1.6Outlet Boxes, Pull Boxes and
Junction Boxes
2.1.8Circuit Breakers
2.1.7Panelboards
2.1.9Lamps and Lighting Fixtures
2.1.12Dry-Type Distribution
Transformers
SD-06 Test Reports
3.3Continuity Test
3.3Phase-Rotation Tests
3.3Insulation Resistance Test
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 24 PAGES
26 05 00.00 40 1.4Certification
SD-08 Manufacturer’s Instructions
Part 2Manufacturer's Instructions
3.1Manufacturer's Instructions
26 05 19.10 10 SD-03 Product Data
2.1.1Wire and Cable
2.1.3.1Conductors
3.1Cable Manufacturing Data
3.1Installation instructions
SD-06 Test Reports
3.2Test Report(s), Inspection
Report(s), and Verification
Report(s)
26 05 71.00 40 SD-02 Shop Drawings
3.1Protective Devices
SD-03 Product Data
2.4Fuses
2.1Instrument Transformers
2.2Enclosures
2.3Circuit Breakers
3.1Control Devices
2.7Indicating Instruments
2.9Indicating Lights
SD-06 Test Reports
3.2.1Dielectric Tests
3.2.1Final Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 24 PAGES
26 05 71.00 40 SD-08 Manufacturer’s Instructions
3.1Protective Devices
SD-10 Operation and Maintenance
Data
2.3Circuit Breakers
26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections
SD-07 Certificates
1.4.1Qualifications
26 09 23.00 40 SD-03 Product Data
2.1.1Photoconductive Control Devices
3.1Installation Drawings
2.1.1Light-Sensitive Control Devices
2.2.2Photocell Switch
2.2.3Occupancy Sensors
1.3Motion Sensors
SD-06 Test Reports
3.2System Operation Tests
SD-10 Operation and Maintenance
Data
1.3Lighting Control System
26 20 00 SD-02 Shop Drawings
2.14Panelboards
2.17Transformers
2.4Busway
2.5Cable trays
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 24 PAGES
26 20 00 2.24Wireways
3.1.10.1Marking strips
SD-03 Product Data
2.13Receptacles
2.14.3Circuit breakers
2.11Switches
2.17Transformers
2.15Enclosed circuit breakers
2.20.3Grounding Busbar
2.25Surge protective devices
SD-06 Test Reports
3.5.2600-volt wiring test
3.5.5Grounding system test
3.5.3Transformer tests
3.5.4Ground-fault receptacle test
SD-07 Certificates
2.12Fuses
SD-09 Manufacturer’s Field
Reports
2.27.1Transformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1Electrical Systems
26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings
2.1.1Outline Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 24 PAGES
26 24 16.00 40 SD-03 Product Data
1.3Panelboards
2.1.1Panelboards
SD-06 Test Reports
3.2Continuity Tests
3.2Insulation Tests
SD-07 Certificates
1.4.1Certifications
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
26 28 01.00 10 SD-03 Product Data
2.10Fault Current Analysis
2.10Protective Device Coordination
Study
2.1Equipment
1.4.1System Coordinator
3.3.5Protective Relays
3.2Installation
SD-06 Test Reports
3.3Field Testing
SD-07 Certificates
1.6Devices and Equipment
26 28 21.00 40 SD-02 Shop Drawings
2.1Connection Diagrams
2.1Fabrication Drawings
2.1Installation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 24 PAGES
26 28 21.00 40 SD-03 Product Data
2.1Equipment and Performance
Data
2.3.1Contacts
2.3.2Indicating Lights
2.3.3Terminal Board
2.2.2Enclosures
2.5Accessories
SD-06 Test Reports
1.3Qualification Testing
1.3Operation Tests
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
26 32 14.00 10 SD-02 Shop Drawings
1.4.3Detailed Drawings
3.10Acceptance
SD-03 Product Data
2.4Manufacturer's Catalog
3.9Instructions
1.4.2Experience
3.2General Installation
3.1Site Visit
SD-05 Design Data
2.8Sound Limitations
2.14Generator
2.5.4Integral Main Fuel Storage Tank
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 24 PAGES
26 32 14.00 10 2.14.2Power Factor
2.7.2Heat Exchanger
2.18.5Time-Delay on Alarms
2.7Cooling System
1.2.5Vibration Isolation
SD-06 Test Reports
3.5.6Performance Tests
3.5Onsite Inspection and Tests
SD-07 Certificates
1.2.5Vibration Isolation
3.4Prototype Tests
1.2.6Reliability and Durability
2.11Emissions
2.8Sound limitations
2.14.1Current Balance
2.3Materials and Equipment
2.27Factory Inspection and Tests
3.5.4Inspections
2.7Cooling System
SD-10 Operation and Maintenance
Data
1.6.1Operation Manual
1.6.2Maintenance Manual
1.6.3Extra Materials
26 33 53.00 20 SD-02 Shop Drawings
1.6.1UPS Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 24 PAGES
26 33 53.00 20 1.6.2UPS Installation
SD-03 Product Data
2.3UPS Module
2.9Factory Testing
2.2UPS System
1.10.2Spare Parts
SD-06 Test Reports
1.6.4Factory Test Plan
1.6.5Performance Test Plan
2.9Factory Tests
1.6.7Performance Tests Report
1.6.6Factory Tests Report
SD-09 Manufacturer’s Field
Reports
3.2.2Initial Inspection and Tests
3.2.3Performance Tests
SD-10 Operation and Maintenance
Data
1.10.1UPS Operation and Maintenance
SD-11 Closeout Submittals
3.1Installation
26 41 00 SD-02 Shop Drawings
1.4.1.1Overall lightning protection system
1.4.1.2Each major component
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 24 PAGES
26 41 00 2.2.1Air Terminals
2.3Main and Secondary Conductors
Ground Rods
Clamp-Type Connectors
2.2.6Lightning Protection Components
2.5Lightning Protection Components
Hardware
Accessories
SD-06 Test Reports
3.6.1Grounding System Test
1.4.4Lightning Protection System
Inspection
SD-07 Certificates
Lightning Protection System
Installers Documentation
1.4.2UL Listed or Label or equivalent
26 51 00 SD-03 Product Data
1.6.1LED lighting fixtures
2.7Lighting Contactor
2.8Photocell switch
2.10LED Exit Signs
2.11LED Emergency Lighting
Equipment
2.12Occupancy Sensors
SD-06 Test Reports
3.2Operating Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 24 PAGES
27 10 00 SD-02 Shop Drawings
1.6.1.1Telecommunications drawings
1.6.1.2Telecommunications Space
Drawings
SD-03 Product Data
2.4Telecommunications cabling
2.5.6Patch panels
2.6Telecommunications outlet/connector assemblies
2.5.3Equipment support frame
SD-06 Test Reports
3.5.1Telecommunications cabling testing
SD-07 Certificates
1.6.2.1Telecommunications Contractor
1.6.2.3Manufacturer Qualifications
1.6.3Test plan
SD-10 Operation and Maintenance
Data
1.10.1Telecommunications cabling and pathway system
SD-11 Closeout Submittals
1.10.2Record Documentation
28 10 05 SD-02 Shop Drawings
1.3.3.1ESS Components
1.3.3.2Overall System Schematic
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 24 PAGES
28 10 05 SD-03 Product Data
2.3.6Premise Control Unit
2.3.7Detection Sensors
2.4.4Access Control Unit
2.4.5Access Control Devices
2.5.1Cameras
2.5.2Thermal Imaging System
2.5.5.3Video Recording
2.6.4Printers
2.7Communications Interface
Devices
2.7.3Radio Frequency Link
2.7.5Network Switch
2.7.6Video and ESS Transmission
2.9.1Uninterruptible Power Supply
(UPS)
2.9.2Batteries
2.10Component Enclosure
2.11Equipment Rack
SD-07 Certificates
1.3.4.1Contractor Qualifications
2.7.4Data Encryption
SD-10 Operation and Maintenance
Data
1.3.3.1ESS Components
1.3.3.1ESS Software
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 24 PAGES
28 10 05 SD-11 Closeout Submittals
1.7As-Built Drawings
28 31 00.00 10 SD-02 Shop Drawings
1.5.5Detail Drawings
SD-03 Product Data
2.5Storage Batteries
2.1.2Low Battery Voltage
1.4Spare Parts
1.6 GTechnical Data and Computer
Software
3.6Training
3.7Testing
SD-06 Test Reports
3.7Testing
SD-07 Certificates
2.1Equipment
1.5.1Qualifications
SD-10 Operation and Maintenance
Data
1.3 GOperating and Maintenance
Instructions
1.6 GTechnical Data and Computer
Software
28 31 64.00 10 SD-02 Shop Drawings
1.3.2Detail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 24 PAGES
28 31 64.00 10 2.5Storage Batteries
2.1.2Low Battery Voltage
1.6Special Tools and Spare Parts
1.4 GTechnical Data and Computer
Software
3.6Training
3.7Testing
SD-06 Test Reports
3.7Testing
SD-07 Certificates
2.1.6Equipment
1.3.1Qualifications
SD-10 Operation and Maintenance
Data
3.6 GOperating and Maintenance
Instructions
31 00 00 SD-01 Preconstruction Submittals
3.5Shoring
1.6.2Dewatering Work Plan
SD-03 Product Data
3.9Utilization of Excavated Materials
1.6.1.2Rock Excavation
3.4Opening of any Excavation or
Borrow Pit
3.15Shoulder Construction
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 24 PAGES
31 00 00 3.18Testing
SD-07 Certificates
3.18Testing
31 23 00.00 20 SD-01 Preconstruction Submittals
1.5.1Shoring and Sheeting Plan
1.5.2Dewatering work plan
SD-06 Test Reports
3.12.2.1Fill and backfill
3.12.2.2Select material
3.12.2.3Density tests
32 16 19 SD-03 Product Data
2.1Concrete
SD-06 Test Reports
3.8Field Quality Control
33 11 00 SD-03 Product Data
2.1.1Piping Materials
2.1Water distribution main
2.2Water Service Line
2.1.2.2Valve Boxes
2.2.2.2Valve Boxes
3.1.4.1Corporation Stops
SD-06 Test Reports
2.2.2.4Bacteriological Disinfection
SD-07 Certificates
2.1Water distribution main
2.2Water service line
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 24 PAGES
33 30 00 SD-02 Shop Drawings
1.4.1Drawings
2.3.1Precast concrete manhole
2.3.3.1Frames, covers, and gratings
SD-03 Product Data
2.1Pipeline materials
SD-06 Test Reports
2.4Reports
SD-07 Certificates
2.1.1.2Gaskets
33 71 02 SD-03 Product Data
3.13.1.1Low voltage cable
2.11.2Manhole frames and covers
2.11.3Handhole frames and covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it.