19AQMM18R0250 Questions and Answers
| Section / Attachment Number |
| Page Number and Paragraph |
| Solicitation Requirement |
| Question |
Answers
| 1. |
| Solicitation L-8 |
| Page 77. Part A: Factor One Corporate Experience by PSC Group. |
| A maximum of seven (7) projects can be submitted. Offerors shall submit projects for at least 4 out of the following PSCs D302, D305, D308, R410 and D309. The additional 3 projects may correspond with any of the PSCs listed below. To be considered no project may be used more than once and no individual project value shall be less than $5 Million. |
| Please confirm that the offeror must submit projects with 4 out of the following PSCs: D302, D305, D308, R410 and D309. Our understanding is that a combination using less than 4 of the D302, D305, D308, R410 and D309 PSC group would be noncompliant. |
Yes, submitting less than 4 corporate experience submissions would make an offeror non-compliant
| 2. |
| Solicitation L-8 |
| Page 77. Part A: Factor One Corporate Experience by PSC Group. |
| A maximum of seven (7) projects can be submitted. Offerors shall submit projects for at least 4 out of the following PSCs D302, D305, D308, R410 and D309. The additional 3 projects may correspond with any of the PSCs listed below. To be considered no project may be used more than once and no individual project value shall be less than $5 Million. |
| Can the offeror combine 2 projects that carried over or continued under separate contract numbers as an individual project when both contracts taken together exceed the $5M value? |
For example: An initial programming project that continued into a sustainment and maintenance phase under a follow-on contract with the same customer and supporting the same software No, however, the threshold has been reduced to 2 million.
| 3. |
| Solicitation L-8 |
| Page 77. Part A: Factor One Corporate Experience by PSC Group. |
| The additional 3 projects may correspond with any of the PSCs listed below. |
| Would INL clarify if the remaining 3 projects can be in any of the PSC codes to include D302, D305, D308, R410 and D309 in addition to the PSC codes listed below? |
| The additional three projects must be from any of the PSCs listed in “Relevant PSC Codes:” |
| 4. |
| Attachment 1 |
| Part I: Project Identification. |
| One of the Mandatory PSCs? (Per L-9, 4 of the 7 Corporate Experience Projects must be one of these PSC categories) |
| It appears that PSC D309 is not included in the drop-box list and per section L-8 Page 75 is listed as one of the Mandatory PSC codes. Can INL add D309 to the drop-box list? |
| D309 has been added to the drop down menu |
| 5. |
| L-8 PROPOSAL PREPARATION INSTRUCTIONS |
| Page 81. Part B: Factor Two, Corporate Experience Biometrics and Cloud Computing |
| All project work must have been performed as the Prime Contractor. A Subcontract under a U.S. Federal or State Government Prime Contract for the purposes of this evaluation will not be considered a Non-Government project and will be rejected as a material nonconformity if submitted as a project. |
| Would the government clarify that past performance / projects must come from the Prime (Offeror) only? Not from subcontractors. |
| Past Performance must have been performed as a Prime Contractor (aka the Offeror) |
| 6. |
| L-8 PROPOSAL PREPARATION INSTRUCTIONS |
| Page 77. Part A: Factor One Corporate Experience by PSC Group |
| A maximum of seven (7) projects can be submitted. Offerors shall submit projects for at least 4 out of the following PSCs |
D302, D305, D308, R410 and D309. The additional 3 projects may correspond with any of the PSCs listed below.
| Would the government clarify that past performance / project must come from the Prime Offeror only? Not from subcontractors. |
| Past Performance must have been performed as a Prime Contractor (aka the Offeror) |
| 7. |
| Section L-8 Volume II Cost/Price (b) (8) |
| Page 86 |
| In Pricing tables 1 and 2, the proposed indirect cost rates shall reflect the impact of this potential contract. Therefore, such rates shall reflect the dollar amount the offeror anticipates to receive through the duration of this potential contract (cumulative of all task orders). |
| Pricing Tables 1 and 2 do not have a column for dollar amount of indirect costs. Please clarify where the offeror is to include the dollar value for the proposed indirect cost rates. |
| No. Offerors shall not include dollars amounts in Pricing Tables 1 and 2. Offerors shall include only provisional indirect cost rates in Pricing Table 1 and ceiling indirect cost rates in Pricing Table 2. See RFP Section L-8, Volume II Cost/Price (b) (5) through (12).. |
When developing the indirect cost rates proposed in Pricing Tables 1 and 2, offerors should refer to FAR 31.203(c), which reads in part, “The contractor shall accumulate indirect costs by logical cost groupings with due consideration of the reasons for incurring such costs. The contractor shall determine each grouping so as to permit use of an allocation base that is common to all cost objectives to which the grouping is to be allocated. The base selected shall allocate the grouping on the basis of the benefits accruing to intermediate and final cost objectives.” (bolding added for emphasis)
Offerors are further advised to refer to FAR 42.704(b), which reads in part, “In establishing billing rates, the contracting officer (or cognizant Federal agency official) or auditor should ensure that the billing rates are as close as possible to the final indirect cost rates anticipated for the contractor’s fiscal period, as adjusted for any unallowable costs.” (bolding added for emphasis)
Therefore, offerors shall rely on their own business forecast to derive the dollar amount that they anticipate to receive through the duration of this potential contract (and other potential contracts and existing contracts), and subsequently, their indirect cost rates proposed in Pricing Tables 1 and 2. See also Section L-8, Volume II Cost/Price (b)(29).
| 8. |
| M-8 TECHNICAL EVALUATION FACTOR 1: Corporate Experience PSC Groups |
| Page 95 |
| The government will evaluate the degree to which the corporate experience aligns with PSC Codes the offerors site for each submitted corporate experience. |
| Would the government clarify that corporate experience refers to contracts performed by the Prime Offeror only? Not subcontractor past performance. |
| Projects submitted by PSC must have been performed as a Prime Contractor (aka the Offeror) |
| 9. |
| M-9 TECHNICAL EVALUATION FACTOR 2: Corporate Experience Biometric and Cloud Projects |
| Page 96 |
| The government will judge how well the projects align with the Cloud and Biometrics definitions detailed provided in Section L. |
| Would the government clarify that projects must be performed by the Prime Offeror and no subcontractor projects that are submitted will be evaluated. |
| Biometric and Cloud projects must have been performed as a Prime Contractor (aka the Offeror) |
| 10. |
| M-12 TECHNICAL EVALUATION FACTOR 5: PAST PERFORMANCE |
| Page 96 |
| Past performance will be evaluated as a measure of the Government’s confidence in the offeror’s ability to successfully perform solicitation requirements based on previous and current contract efforts. |
| Would the government clarify that Past Performance must be performed as the Prime Offeror No subcontractor past performance will be evaluated as part of the offer. |
| Past Performance must have been performed as a Prime Contractor (aka the Offeror) |
| 11. L |
| L-8 PROPOSAL PREPARATION INSTRUCTIONS Volume III Business |
| Pages 90 & 91 of 98 |
| Business volume requirement listing goes from Item # 6 Contractor Teaming Arrangement to Item # 8 Claiming Relevant Experience….Partnership. Item # 7 is missing. |
| Please confirm that Item # 8 should be Item # 7 |
| This has been corrected on page 91. |
| 12. |
| L-8 Volume-1 Part B Factor 2 / Solicitation Document |
| Page 79, 1st paragraph |
| All project work must have been performed as the Prime Contractor. A Subcontract under a U.S. Federal or State Government Prime Contract for the purposes of this evaluation will not be considered a Non-Government project and will be rejected as a material nonconformity if submitted as a project. |
| We bring very strong experience and expertise for the requested requirement; and have Past Performance (PP) working for INL, as a subcontractor for the requirement. This clause does not allow to participate to respond to this solicitation. Could Government please remove/release this clause and allow subcontractor work performed for Government Agency (Federal, State, Local) AND/OR prime/subcontractor work performed for commercial customer to be an acceptable PP? |
| Past Performance must have been performed as a Prime Contractor (aka the Offeror). |
| 13. |
| L-8 Volume-1 Part A Factor 1 / Solicitation Document |
| Page 75, 1st paragraph of the section |
| Offeror shall submit projects for at least 4 out of the following PSCs D302, D305, D308, R410 and D309. |
| It is difficult to map PSC code as most of the government agency uses NAICS code. Could Government please provide mapping NAICS code to the PSC codes provided? |
| Please read the submission instructions carefully because it includes what to do when you have a missing, inaccurate or incomplete FPDS report. |
| 14. |
| L-8 Volume-1 Part A Factor 1 / Solicitation Document |
| Page 75, 1st paragraph of the section |
| A maximum of seven (7) projects can be submitted. Offeror shall submit projects for at least 4 out of the following PSCs D302, D305, D308, R410 and D309. |
| We have relevant experience at other agencies required for this solicitation but the contract is not issued using PSC code. Could Government accept PP from other agency and relax the restriction for accepting PP based on PSC code only? |
| Please follow PSC experience the submission guidelines. “Verification of PSC Group Relevant Experience” |
| 15. |
| B.1 Type of Contact |
| Page 2 and B.1(a) |
| (a) This is a multiple-award indefinite-delivery, indefinite-quantity (IDIQ) contract, as defined in Federal Acquisition Regulation |
(FAR) 16.504 (Indefinite-Quantity Contracts), awarded on an unrestricted basis.
| Could the Government please confirm the exact number of awards anticipated? |
| The government currently intends to make 3 awards; however, it reserves the right to award a different number. |
| 16. |
| F-3 Place of Performance |
| Page 38 and first paragraph |
| There are no geographic limitations for task orders to be awarded under this contract. The Government expects the majority of task orders |
awarded under this contract to be performed outside the United States, mainly in Western Hemisphere countries.
Services specified in a task order may be performed at the contractor’s facilities, at host country government facilities, and/or USG facilities
| Could the Government please provide a sample task order to allow offerors a better understanding of the potential places of performance? |
| We cannot at this time. |
| 17. |
| F-3 Place of Performance |
| Page 38 and first paragraph |
| There are no geographic limitations for task orders to be awarded under this contract. The Government expects the majority of task orders |
awarded under this contract to be performed outside the United States, mainly in Western Hemisphere countries.
Services specified in a task order may be performed at the contractor’s facilities, at host country government facilities, and/or USG facilities
| Could the Government please provide any indication for the immediate need and or place of performance for task orders within the first six (6) months? |
| We cannot at this time. |
| 18. |
| L-8 PROPOSAL PREPARATION INSTRUCTIONS |
| Page 77 and Volume I Technical Quote |
| Part A: Factor One Corporate Experience by PSC Group |
A maximum of seven (7) projects can be submitted. Offerors shall submit projects for at least 4 out of the following PSCs D302, D305, D308, R410 and D309. The additional 3 projects may correspond with any of the PSCs listed below. To be considered no project may be used more than once and no individual project value shall be less than $5 Million.
| Could the Government please clarify if this means $5M total for the project? |
| 5 million is the total project value, however, we have reduced the amount to 2 million. |
| 19. |
| L-8 PROPOSAL PREPARATION INSTRUCTIONS |
| Page 78 4th paragraph and Volume I Technical Quote |
| Offeror are advised to use reasonable discretion in reviewing their potential PSC Projects before determining if a specific PSC citation |
among those listed in the PSC Groups is appropriate. For example, if a PSC is cited as D399 in Federal Procurement Data System
- Next Generation (FPDS-NG) Report, the Offeror is not limited to citing their PSC Project to that PSC coded as D399 under the condition it meets another PSC definition. If the scope of work and deliverables of the proposed PSC relevant experience Project meets a differently coded defined PSC, follow the submission requirements of this solicitation to support any subjective determination
| Could the Government please clarify if this PSC Group Project’s relevancy match any task areas defined in the solicitation and not necessary have to be Cloud Computing and Biometric experience only? |
| The PSC factor and, the Cloud and Biometrics factor are separate evaluation factors. Please follow the instructions for Factor 2. |
| 20. |
| L-8 PROPOSAL PREPARATION INSTRUCTIONS |
| Page 79, PART B and Volume I Technical Quote |
| Part B: Factor Two, Corporate Experience Biometrics and Cloud Computing |
A maximum of seven projects can be submitted. Projects used to satisfy experience in Biometrics and Cloud Computing must have a value of at least $5 Million inclusive of Options. It is permissible to use the same projects sited in Part A. Projects shall be aligned with the following definitions of Biometrics and Cloud Computing:
| Could the Government please clarify if the experience could be from 2 different projects 1st one being for Cloud Computing and 2nd one for Biometric experience? |
| You can submit as many as 7 projects to demonstrate experience in both areas in line with the cloud and biometric definitions provided in the solicitation. |
| 21. |
| L-8 PROPOSAL PREPARATION INSTRUCTIONS |
| Page 79, PART B and Volume I Technical Quote |
| Part B: Factor Two, Corporate Experience Biometrics and Cloud Computing |
A maximum of seven projects can be submitted. Projects used to satisfy experience in Biometrics and Cloud Computing must have a value of at least $5 Million inclusive of Options. It is permissible to use the same projects sited in Part A.
| Could the Government please clarify if all the projects being submitted for PART B be different from the projects used in PART A? |
| As stated in the RFQ it is permissible to use the same projects for Part B that were used in Part A. |
| 22. |
| Section C |
| Page 18-26 |
| Minimum Education Requirements |
| With the primary exceptions being the Cloud Architect and Biometrics Expert, will INL define the minimum Education/Experience/Training for the other categories? |
| INL will not be defining a minimum experience level for the other categories. |
| 23. |
| Section C |
| Page 18-26 |
| Minimum Education Requirements |
| With the primary exceptions being the Cloud Architect and Biometrics Expert, will INL define the minimum Education/Experience/Training for the other categories? |
| See the answer for question 22. |
| 24. |
| Section L |
| Page 88-89, Part 6 |
| An Offeror must have proven experience and performance as an existing Contractor Teaming Arrangement (ATA) in the form of a Partnership or Joint Venture in accordance with the proposal submission requirements. An Offeror may submit a proposal… |
| Can the Government please confirm the Offeror is not limited to Contractor Teaming Arrangements (CTA) as a means to subcontract and that Offeror’s may subcontract in accordance with FAR 52.244-2 and may create teaming arrangements in accordance with FAR 9.6.? |
| The Offeror is not limited to a CTA as a subcontracting arrangement but subcontractors Past Performance and Corporate Experience cannot be used in the proposal. |
| 25. |
| Section L |
| Page 80 |
| Sample Task |
| Since Microsoft has/will discontinue their support for Smartphones, does DOS still want to consider Windows 10 OS (perhaps for a tablet vs. a smartphone)? Is DOS willing to consider developing for iOS (Apple OS)? |
| The requirement should be changed to the Android platform and IOS. Since we wrote this, we have changed directions based on the availability of the Android platform in Mexico. We have developed an Android based capture client since the majority of the phones and tablets sold down south use that technological platform. I would remove Windows 10 as a requirement. |
| 26. |
| Section L |
| Page 80 |
| Sample Task – Requirement #5. maintaining proper data transmission security requirements; |
| Does DOS intend to transfer all information via cellular or Wi-Fi connections? Or is there a preference/desire to include USB or other mechanisms? |
| Cell phone and WiFi are the basic requirements and are sufficient to meet the need of the stakeholder. |
| 27. |
| Section L |
| Page 80 |
| Sample Task – Requirement #6 connect to one or more centralized repositories to perform biometric searches |
| Does DOS intend to provide RSA Tokens or other means to connect to OpenNet or other secure networks? |
| Transfer of information to a central repository will be done through VPN authorized by the Host government into their central system. Tokens and/or access to OpenNet are not relevant to the network infrastructure. |
| 28. |
| Section L |
| Page 81 |
| Sample Task – Address #2 Installing on specified devices for use by one or more agencies |
| Are these agencies all owned/maned, and operated by USG and USG personnel? Or do we need to consider export regulations for these deployments? |
How does DOS propose the contactor provide products services that may be protected/covered by Import/Export regulations?
Any deployment that is requested will be for use by Host government with authorization by the Host government. The deployment of the software solution does not maintain import/export requirements as it relates to the statement in the solicitation. Import and export requirements for any orders of hardware will be subject to the regulations of the applicable country. It will be the responsibility of the contractor to work with DOS and the Host partner to ensure compliance to all requirements, laws and regulations.
| 29. |
| Section E |
| 81 |
| Past Performances |
What qualifies as a viable past performance (PP)?
| Do Subcontractor Past Performances qualify for evaluation purposes? Can we Past Performances for customers in other countries? |
| No Subcontractors past performance cannot be used for evaluation purposes. The Second question is unclear. |
| 30. |
| Section H, Part 10 |
| 48, paragraph 1 |
| All personnel will be required to have a Moderate Public Trust (MRPT) certification |
| Is there anticipation that work under this IDIQ will require a higher level of clearance in the future? |
| No. |
| 31. |
| Section H, Part 28 |
| 57, paragraph 1 |
| Required language requirements are identified in the positions description of the applicable labor category. |
| None of the labor category’s list language requirements in section C-2. How should that be interpreted? |
If there is a specific language requirement that will be addressed at the Task Order level.
| 32. |
| Section L-8 |
| Page 85. B.13 |
| In Pricing Table 3, offerors shall review all of the content, which is presented for illustration purposes as guidance, and replace the content in the table (rows 4 through 10) with the offeror’s fiscal year period and the ceiling indirect cost rates (proposed in Pricing Table 2) that contain software licenses in the allocation base. Offerors may add rows, if necessary. See Instruction No. 22 below. |
| In Attachment 7, Table 3 is password protected and offeror is unable to enter/replace the data as required. Can an updated unprotected file be provided? |
| Yes. Pricing Table 3 is now not password-protected in the amended RFP. Also, RFP Section L-8, Volume II Cost/Price (b)(13) now reads, “…software licenses and hardware…” in the amended RFP. |
| 33. |
| Section L-8 |
| Page 86. B.23 |
| In Pricing Table 4, the Government provided formulas to calculate automatically each proposed Subtotal, Total, and Overall Proposed Price. Offerors shall verify all formulas and otherwise the arithmetic accuracy of all proposed information. |
| In Attachment 7, Table 4 requires pricing in three different currencies as well as one subtotal for all total prices (line 284). Since offerors will be providing pricing in various currencies, the Subtotal will be totaling three different currencies. Is that the government’s intention, or should there be a separate Subtotal column for each currency type? |
| Yes, that is the Government’s intention. Please see RFP Section L-8, Volume II Cost/Price (b)(16) and the paragraph preceding Note 1 in RFP Section M.15. The Government will take the rates proposed in Colombian and Mexican currency in Pricing Table 4 and convert them to U.S. dollars for evaluation purposes only. |
| 34. |
| Section F-3 / Amendment_One_19AQMM18R0250 |
| Page 33, Paragraph 3 |
| Services specified in a task order may be performed at the contractor’s facilities, at host country government facilities, and/or USG facilities. |
| Could the Government please clarify whether the contractor would be required to have a contractor facility located in Mexico and/or Colombia? |
| This will be determined at the task order level. |
| 35. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 78, Paragraph 1 |
| To be considered no project may be used more than once and no individual project value shall be less than $5 Million. |
| Could the Government please clarify whether a single project may be used to satisfy more than one PSC code for Part A: Factor One Corporate Experience by PSC Group? |
| No project can be used more than once for Part A. |
| 36. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 82, Paragraph 8 |
| The contractor will design a mobile smartphone application compatible with the Android 6.0 Marshmallow operating system for the |
procurement of biographic and biometric information using the newly designed cradle technology.
When the Government refers to “the newly designed cradle technology” on Page 80 of the RFP, does the Government refer to a specific vendor proprietary technology?
This response is dependent on the proposal. If the contractor sees fit, the government is willing to review and work with the contractor on a new solution for cradle technologies. A design that meets the specifications of the government that can be owned by the government would be seen as advantageous in the long term. If the contractor determines to propose an existing solution for cradle technology, close attention should be paid to the overall design, usability, licensing, maintenance fees, and sustainability of the proposed solution.
| 37. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 81, Paragraph 2 |
| All project work must have been performed as the Prime Contractor. |
| Could the Government please clarify whether it is acceptable to use project work for Corporate Experience Biometric and Cloud Computing from a company that will be designated as a subcontractor on this bid, given that the company performed as the prime for that project work? |
No subcontractor experience or past performance can be used.
| 38. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 90, Paragraph 7 |
| An Offeror must have proven experience and performance as an existing Contractor Teaming Arrangement (CTA) in the form of a Partnership or Joint Venture in accordance with the proposal submission requirements. An Offeror may submit a |
proposal under an existing CTA in the form of a Partnership or Joint Venture only if the existing Partnership or Joint Venture has a corresponding DUNS Number in https://www.sam.gov and all the proposal submission documents are in the name of the existing Partnership or Joint Venture, not the individual members of the Partnership or Joint Venture.
Could the Government please clarify whether a CTA is required for a partnership or joint venture or is a standard prime and subcontractor agreement acceptable?
A CTA is not required contractors can use other subcontractor agreements however subcontractor experience or past performance cannot be submitted.
| 39. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 90, Paragraph 7 |
| An Offeror must have proven experience and performance as an existing Contractor Teaming Arrangement (CTA) in the form of a Partnership or Joint Venture in accordance with the proposal submission requirements. An Offeror may submit a |
proposal under an existing CTA in the form of a Partnership or Joint Venture only if the existing Partnership or Joint Venture has a corresponding DUNS Number in https://www.sam.gov and all the proposal submission documents are in the name of the existing Partnership or Joint Venture, not the individual members of the Partnership or Joint Venture.
Could the Government please confirm that the government is not limiting competition to only Partnerships or Joint Ventures as defined by FAR 9.601(1)? Does the Government require all bidders to have a CTA in order to qualify for this opportunity?
The government does not require all bidders to have a CTA.
| 40. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 90, Paragraph 7 |
| An Offeror must have proven experience and performance as an existing Contractor Teaming Arrangement (CTA) in the form of a Partnership or Joint Venture in accordance with the proposal submission requirements. An Offeror may submit a |
proposal under an existing CTA in the form of a Partnership or Joint Venture only if the existing Partnership or Joint Venture has a corresponding DUNS Number in https://www.sam.gov and all the proposal submission documents are in the name of the existing Partnership or Joint Venture, not the individual members of the Partnership or Joint Venture.
Could the Government please confirm section “6. Contractor Teaming Arrangements” on page 88 of Solicitation No. 19AQMM18R0250 applies only to Partnerships or JV’s as defined in FAR 9.601(1)?
This is the only type of CTA that will allowed for the submissions of past performance and corporate experience and the only type of CTA that will be considered are those defined in FAR 9.601(1).
| 41. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 90, Paragraph 7 |
| An Offeror must have proven experience and performance as an existing Contractor Teaming Arrangement (CTA) in the form of a Partnership or Joint Venture in accordance with the proposal submission requirements. An Offeror may submit a |
proposal under an existing CTA in the form of a Partnership or Joint Venture only if the existing Partnership or Joint Venture has a corresponding DUNS Number in https://www.sam.gov and all the proposal submission documents are in the name of the existing Partnership or Joint Venture, not the individual members of the Partnership or Joint Venture.
: Could the Government please confirm that a large for-profit business bidding as prime, which is not a Partnership or Joint Venture, will be able to utilize subcontractors, under this Solicitation No. 19AQMM18R0250?
Yes. Large Businesses/other than small businesses will be able to use subcontractors but they cannot site their past performance or experience in their proposal.
| 42. |
| Section G-6/ Amendment_One_19AQMM18R0250 |
| Page 38, Paragraph 12 |
| All invoices under the contract shall be stated in U.S. dollars, and all payments will be made in U.S. dollars. |
| If all invoices under this contract are in U.S. dollars and all payments in U.S. dollars, could the Government please clarify why Pricing (RFQ page 87 and Table 4) is required in U.S. dollars, Columbian pesos, and Mexican pesos? Could the Government please explain the purpose and intent of pricing in three currencies? |
The principal purposes are to: 1) minimize the financial risk of each party regarding potential significant fluctuations in exchange rates during contract performance; 2) facilitate contractor’s agreements with and payments to local nationals because such agreements and payments likely will be in local currency; and 3) minimize the number of currency conversions, modifications, and problems during contract administration, which results in less time, cost, and dispute for all parties.
| 43. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 87, Paragraph 7 |
| In Pricing Table 4, each proposed NTE fully-loaded hourly labor rate shall be in United States dollars, Colombian pesos, or Mexican pesos. |
If pricing in Mexican pesos and Columbian pesos remains a requirement, could the Government please clarify how are these hourly rates to be determined? Are they a currency conversion? Should they be based on host country market rates and geographical salaries?
Offerors may derive their proposed NTE fully-loaded hourly labor rates, regardless of currency, in a manner of their choosing, as long as offerors comply with RFP Section L-8, Volume II Cost/Price (b)(14) through (21).
| 44. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 84, Paragraph 3 |
| The Offeror shall provide percentages for all SB, SDB, WOSB, HUBZone, VOSB, SDVOSB and be expressed as a percentage of the total subcontracting dollars to all concerns (both other-than-small and small business). |
| Could the Government please clarify if there are specific small business targets required for the Subcontracting Plan and if so, what are they? |
| The Department of State’s mandatory socio-economic goals are a 38% involvement of small businesses in subcontracts and a portion of those small businesses with the following categories and percentages: |
5% SDB
5% WOSB
3% SDVOSB
3% HUBZone
| 45. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 82, Paragraph 9 |
| The contractor shall generate an innovative biometric mobile device single application… |
| Could the Government please clarify whether they intend for the contractor to develop a single application that can run on both Android and Windows 10 Mobile, or is it acceptable to develop two separate applications? |
| Any application that is created should be built separately on the respective platform required. IOS and Android applications, though similar in form and function, will be two separate applications. |
| 46. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 82, Paragraph 9 |
| Capable of performing biometric capture compatible with the Android 6.0 Marshmallow and Microsoft Windows 10 Mobile operating systems. |
Could the Government please clarify if the Government has identified potential candidates for biometric scanners or peripherals that are compatible with Windows 10 Mobile to be integrated with the biometric capture software to be developed?
The government cannot provide any preference to specified hardware or a manufacturing company. The current design of the working piloted mobile device requires an Integrated Biometrics Five-O four-finger platen conduit scanner. The camera can be the camera from the tablet or cellular phone. Given the variance in iris collection technologies, the government maintains no preference in iris capture. The government prefers not to require the subject to contact the device with any part of their face to attain the proper iris capture.
| 47. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 82, Paragraph 9 |
| Capable of performing biometric capture compatible with the Android 6.0 Marshmallow and Microsoft Windows 10 Mobile operating systems. |
Could the Government please clarify if the Government has identified potential candidates for biometric scanners or peripherals that are compatible with both Windows 10 Mobile and Android to be integrated with the biometric capture software to be developed?
See answer for question #46
| 48. |
| Section L-8/ Amendment_One_19AQMM18R0250 |
| Page 82, Paragraph 9 |
| Capable of performing biometric capture compatible with the Android 6.0 Marshmallow and Microsoft Windows 10 Mobile operating systems. |
Could the Government please clarify if in the absence of any acceptable biometric capture devices that are compatible with Windows 10 Mobile, would facial image capture using the Windows 10 Mobile device native camera sufficiently fulfill the requirement that the software “enables quick biometric procurement”?
The vendor can recommend any devices necessary to meet the requirements of biometric capture, including the integration of the application with any functions of the tablet or mobile phone.
| 49. |
| Section C-1, Statement of Work |
| Page 13, Section C-1(4) |
| The last sentence of Section C-1(4) states, “For more detailed on information about the particular”. |
| This last sentence of Section C-1(4) is incomplete and could be important for Contractors. Please complete the sentence. |
| This has been corrected. |
| 50. |
| Section C-1, Statement of Work |
| Pages 13 and 14, Sections 4 & 6 |
| 4. Components of an IT Solution |
6. Infrastructure components of an integrated IT solution can be categorized as follows:
| The government requests that open source solutions shall be promoted, but also states that COTS components be promoted to the maximum extent possible. Often times, open source licenses preclude commercial uses and licenses. Can the government state which option is preferred, open source or commercial licenses, or if the government prefers commercial open source. |
| Open Source is generally preferred, however, if there are no open source products that meet or exceed the requirements of the government COTS can be used. This will of course be determined at the task order level. |
| 51. |
| Section C-1, Statement of Work |
| Page 15, Section 6 |
| 6. Infrastructure components of an integrated IT solution can be categorized as follows: |
Back Office Services
| For Back Office Services, is the government’s intention that the contractor support back office services and tools, but not directly undertake tasks such as the management of government personnel. |
| Correct. The contract strictly prohibits management of government personnel. This reference has been removed. |
| 52. |
| Section H-10 |
| Page 49 |
| The Contractor shall obtain for the Department an Organizational Conflict of Interest Disclosure Statement or Representation from each intended Subcontractor or consultant. The Contractor shall not enter into any subcontract nor engage any consultant unless the CO shall have first notified the Contractor that there is little or no likelihood that an organizational conflict of interest exists or that despite the existence of a conflict of interest the ward is in the best interest of the Government |
| Can the government specify the conflict of interest language that the contractor and subcontractors must represent? Is it the subcontractor COI Certification in addition to the 52.244-2 requirements? Can the government please clarify that “engage any subcontractor or consultant” is for post award and during the Task Order process and not applicable during the teaming phase of the IDIQ? |
| This is a post award requirement that is standard in almost all Department of State contracts. |
| 53. |
| Section H-1 |
| Page 44 |
| Failure of the Contractor to fulfill any such commitment shall render the Contractor liable for liquidated or other damages due to the Government under the terms of this contract. |
| Can the government please confirm that liquidated damages will be identified at the Task Order level and not at the IDIQ Level? |
| Yes, any liquidated damages, including the completion and application of FAR 52.211-11, will be identified and assessed at the task order level. |
| 54. |
| Section H |
| Page 51, Section H-12 Facilities |
| The Contractor shall arrange for renting/leasing and equipping facilities for all staff in support of operations. This shall include, but not limited to furnishing office space, telephone/fax, and copying services and other appropriate workspaces. |
| Please verify that these costs are allowable and allocable to the program at the prime contractor Task Order level as appropriate. |
| Yes. Please see RFP Section B.10(i). |
| 55. |
| Section H-36 |
| Page 59 |
| Incorporation of additional terms and conditions at the Task Order Level |
| Can we assume the labor rate build up for each country would exclude VAT since its applicability will be identified at a Task Order level? |
| Yes. |
| 56. |
| Section L-8 |
| Pages 77 – 83, Section L-8, Parts A, B and E, regarding Corporate Experience and Past Performance |
| Section L-8, Part A, Corporate Experience by PSC Group, Section L-8, Part B, Corporate Experience Biometrics and Cloud Computing, and Section L-8, Part E, Past Performance. |
| If a prime offeror’s corporate affiliate (i.e. a parent, subsidiary or sister company) will meaningfully contribute to performance of the awarded contract, may contracts performed by such corporate affiliate be cited for the prime’s past performance required by the RFP? |
| Yes. As long as the offeror can demonstrate that the resources of the affiliate company will affect the performance of the offeror and that they will meaningfully contribute to any task order awarded under the IDIQ. |
| 57. |
| Section L-8, General Content Requirements |
| Page 92, General Content Requirements, Volume I – Technical Proposal, |
Attachment 9-Key Personnel Resume Format, & Page 84, Part F: IDIQ Level Key Personnel
| The General Content Requirements places a three (3) page single-sided limit on Volume I, Part F: IDIQ Level - Key Personnel. |
| Under Part F on page 84, it states that “The offeror shall submit resume profiles for all contractor-designated key personnel to include, as a minimum, the IDIQ Program Manager and Contract Administrator.” This seems to imply that the Offeror can propose additional key personnel. If that is true, then please consider placing a page limit on a per resume basis, e.g., a page limit of 4 pages per key person resume. This would allow a more complete description of each person’s relevant experience and quality of performance asked for in Attachment 9 as well as not constrain the number of key personnel proposed. |
| The solicitation has been updated to allow a total of 8 pages to be submitted for key personnel but there are only two required positions. |
| 58. |
| FAR Clause 52.222-46 |
| Page 82, Part C & Page 75, FAR Clause 52.222-46 |
| As a part of their proposals, offerors will submit a total compensation plan setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract. |
| Pay scales/grades and candidate availability differ significantly within the various, states, municipalities and regions in each country. Are we to assume that the operations will function in the capitals of Mexico City and Bogota? Using other areas of Colombia and Mexico may significantly change the salary and wage structure of the program. |
| Offerors shall assume that performance in Colombia and Mexico may occur anywhere in these respective countries. Thus, offerors shall submit a total compensation plan that relies on this assumption. |
| 59. |
| Attachment 1 |
| Part I: Project Identification, Table Cell entitled “One of the Mandatory PSCs?” |
| Per L-9, 4 of the 7 Corporate Experience Projects must be one of these PSC categories |
| Please clarify that the reference to L-9 should be L-8. |
| This has been changed to L-8. |
| 60. |
| Section L-8 & Attachment 1 |
| Page 77; L-8 Volume I – Technical Quote, Part A |
| The instruction states: “Offerors shall submit projects for at least 4 out of the following PSCs: D302, D305, D308, R410 and D309.” However, Attachment 1, Relevant Experience (PSC Group) Project Template, does not list D309 in the drop down menu. |
| Attachment 1, Relevant Experience (PSC Group) Project Template, does not list D309 in the drop down menu. Please adjust this attachment or clarify. |
| D309 has been added to Attachment 1. |
| 61. |
| Section L-8, General Content Requirements |
| Page 92; Paragraph 3.1.3, Exclusions from the Page Limitations |
| Paragraph 3.1.3 lists material excluded from Volume I – Technical Proposal to include Copies of Statement of Work, and Technical and Price Proposals submitted as part of Relevant Experience. |
| Please confirm that the excluded material cited here also includes all requested copies of contract award documentation, i.e., Contract Award Document, SF 1449, SF26, SF33, and Award Forms as requested in Parts A and B of Volume I. |
| Yes all requested copies of contract award documentation are excluded from the page count. |
| 62. |
| Section L-8, General Content Requirements |
| Page 92, Volume I-Technical Proposal |
| There is a three (3) page single sided limit imposed on Volume I, Part F: IDIQ Level - Key Personnel. |
| Please clarify that this is the page count per resume. Considering the amount of requested information, in particular the extensive Chronological Work History, the offeror requests a total of 3 pages per Key Personnel resume. |
| This has been changed to 8 pages. |
| 63. |
| Section L-8 |
| Page 78-79, Verification of PSC Group Relevant Experience, Item 2 |
and Page 81, Verification of Relevant Experience – Biometrics and Cloud Computing, Item 2
| 2. FPDS-NG UNAVAILABLE, INCOMPLETE OR INACCURATE If the FPDS-NG Report is unavailable, incomplete, or inaccurate, offerors are required to submit significantly more verification documentation. The sentence begins if….”the FPDS-NG Report does not substantiate all information on the Relevant Experience (PSC Group) Project Template...” Please clarify the term “all.” |
| Please confirm that the government will accept a FPDS-NG Report that is available, complete and accurate for each Experience Submission provided the report shows verification of the contract, the PSC Code, and supporting information fields as depicted in Attachment 3, FPDS Sample and Crosswalk. |
| Confirmed. |
| 64. |
| L-8, General Content Requirements |
| Pages 93, 3.1.4 General Format |
| Please verify that is it acceptable to submit Volumes I (Technical), III (Business), and IV (Contract) in PDF format? |
| It is acceptable to submit proposal Volumes III and IV in PDF format. |
| 65. |
| Section B-3 and Section J’s Attachment_7 |
| Page 3, B.3 f) and Tab 4. IDIQ Prices |
| The negotiated NTE fully-loaded hourly labor rates are in United States dollars, Colombian pesos, or Mexican pesos. |
| The Subtotal columns in Tab 4. IDIQ Prices have a mix of currencies summarized into the Subtotal. Should the Government revise the Pricing Template to covert COP & MXN into USD before summation? |
| No. Please see the Government’s answer to Question #33. |
Attachment 1, & Attachment 2 Page 79, Part A, Paragraph 2.b. FPDS-NG Unavailable, Incomplete, Or Inaccurate and Last Page of Attachment 1, and Last Page of Attachment 2 Paragraph 2.b. The completed Attachment, Relevant Experience (PSC Group) Project Template must be signed by a Contracting Officer (CO) with cognizance over the submitted project.
Last Page of Attachment 1: Signature below by a Contracting Officer, Contracting Officer’s Representative, or Corporate Official for the ordering activity constitutes acceptance of the above project information to be accurate as ordered and received by the listed entity.
Last Page of Attachment 2: Signature below by a Contracting Officer, Contracting Officer’s Representative (COR), or Corporate Official for the ordering activity constitutes acceptance of the above project information to be accurate as ordered and received by the listed entity. Signature by COR must include copy of email notification to the cognizant Contracting Officer.
| The RFP requires the Government Contracting Officer to sign Attachments 1 and 2 when these are completed in lieu of a complete FDPS-NG Report. This imposes an onerous requirement on each bidder, especially if the proposal schedule is limited to no more than 30 days and due to possibly limited availability of Government personnel during the holiday season. Please consider eliminating the need to have the Government CO sign the completed Attachments 1 and 2. The Government will receive either CPARS on each project or a completed and signed Past Performance Rating Form by the Government CO, which should verify the information required. |
| The government will not be changing this requirement at this time. |
| 67. |
| Section L-8 |
| Page 83, 8th Paragraph |
| Part E:Past Performance |
The Offeror shall instruct each rater to send a completed form directly back to the Offeror. The Offeror must follow up with each rater to ensure the Past Performance Rating Forms were received and completed prior to the proposal closing date. The Offeror must submit all Past Performance Rating Forms, as applicable, with their proposal submission.
| Please confirm that it is the Government’s intent that the bidder include in its proposal the completed and signed Past Performance Rating Forms for those projects that do not have PPIRS information. Typically, RFPs require that the Government CO or COTR, completing and signing the Past Performance Rating Forms, send those directly to the Government. The bidder never sees the completed and signed Rating form. Please consider having the completed/signed forms sent directly to the Government as this requirement to include the completed/signed forms in the proposal poses places onerous constraints on the bidder. |
| The government is requiring the offeror to compile and submit all past performance questionnaires with their proposal. |
| 68. |
| Section H-4 |
| Page 45, H-4, d) |
| Aircraft Public and Passenger Liability – When aircraft are used in connection with performing the contract, the Contractor shall provide aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per occurrence for property damage. |
Coverage of passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
| As the contract is expected to be an IT services contract, would INL consider removing this requirement? |
| No. Aircraft/Air travel is expected to be used in connection with performing the contract. |
| 69. |
| Section H-4 |
| Page 45, H-4, e) |
| Vessel Liability – When contract performance involves use of vessels, the Contractor shall provide vessel collision liability and protection and indemnity liability insurance. |
| As the contract is expected to be an IT services contract, would INL consider removing this requirement? |
| This will only apply if a task order requires the use of a vessel. |
| 70. |
| Section H-4 |
| Page 45, H-4, a) |
| Workers' Compensation and Employer's Liability – The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $5,000,000 is required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private earners. |
| Would INL consider reducing the Workers’ Compensation requirement from $5M to $2M? |
| We will not be changing the amount at this time. |
| 71. |
| Section L.8, Part C: Factor 3.e) |
| Page 82 |
| Offerors should describe how the proposed total compensation plan shows consistency between proposed professional compensation and a total plan for compensation. |
| Please clarify/define what is meant by “proposed professional compensation.” |
| “Proposed professional compensation,” in this context, means “the salaries and fringe benefits proposed for the professional employees who are proposed to work under the contract.” “Professional employees” are defined in 29 CFR 541. |
| 72. |
| Section L.8, Volume I, Part A, “Verification of PSC Group Relevant Experience” & Attachment 3 |
| Page 78, Item 1. & Attachment 3 |
| 1. FPDS-NG AVAILABLE, COMPLETE AND ACCURATE. If the FPDS-NG Report provides verification of all information included on the Attachment 3, Relevant Experience (PSC Group) Project Template Attachment 1. |
| Please clarify that Attachment 3 is a tool for the offeror to use to ensure the information on the FPDS-NG Report is complete and accurate, and it is not the Government’s intention that Attachment 3 be included in our proposal. |
| Correct. |
| 73. |
| Section L.8, Volume I, Part D, Factor 4, Sample Task Order |
| Page 82 |
| The offeror shall also submit how their team worked on this solution including pictures. |
| Please clarify what is meant by “how their team worked on this solution” and what is meant by “pictures to be included”? |
| The photo requirement refers to basic screenshots of the client that was created. If the screens are proprietary, then disregard the requirement for visuals. The “how” refers to a brief narrative of the creation of the client in which the offeror explains the methodology that was used to develop the client (waterfall, agile...) design challenges, methodologies for enabling improvements, and testing methods. |
| 74. |
| 3.1.4 General Format |
| Page 93 |
| All proposals shall be submitted electronically via email to weakley-lugokf@state.gov . |
| Several documents required for submission will be sizable due to the Corporate Experience information to verify incomplete FPDS-NG Reports. Please state the maximum file size for delivery. Will zipped files be allowed? |
| Files must be clearly labeled and indexed. Emails greater than 5MB in total size may be problematic. If submitting multiple emails, offerors must identify the total number of emails in the email subject line. To ensure proper receipt Offerors must utilize the following subject line: |
“19AQMM18R0250 – Offer – Company Name – Email 1 of X”
| 75. |
| Section L.8, Volume I |
Part A, “Verification of PSC Group Relevant Experience” & Attachment 1 and Part B, “Verification of PSC Group Relevant Experience” & Attachment 2 Page 79, item 2.b
Page 81, item 2.b.
& Attachment 2 Part A, Item 2. FPDS-NG UNAVAILABLE, INCOMPLETE OR INACCURATE:
b. The completed Attachment, Relevant Experience (PSC Group) Project Template must be signed by a Contracting Officer (CO) with cognizance over the submitted project. The citation must include the CO’s point-of-contact information (POC) that includes direct telephone number and direct email address.
and Part B, Item 2. FPDS-NG UNAVAILABLE, INCOMPLETE OR INACCURATE:
b. The completed Attachment, Relevant Experience ((Biometrics and Cloud Projects)) Project Template must be signed by a Contracting Officer (CO) with cognizance over the submitted project. The citation must include the CO’s point-of-contact information (POC) that includes direct telephone number and direct email address.
| If an offeror is unable to locate the CO or COR for cited projects (e.g. retirement, reassignment), will the government accept verification of the information on Attachment 1 or 2 through other means such as the formal backup documentation, i.e., the contract award forms and SOW? |
| The government has updated the language for clarity. Attachments one and two are only necessary if there is not a complete and accurate FPDS report. |
| 76. |
| Section L.8, Volume I |
Part A, “Verification of PSC Group Relevant Experience” & Attachment 1
Part B, “Verification of PSC…