SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 32 PAGES

TITLE AND LOCATION

NEW LODGING BUILDING - MARIQUITA

01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance insurance (Poliza de Cumplimiento):

Payment insurance (Poliza de Pagos de Salarios y Prestaciones Sociales:

Liability insurance (Poliza de Responsabilidad Civil Extracontractual):

Stability insurance (Poliza de Estabilidad):

Elements Quality insurance (Poliza de Calidad de Elementos):

Correct Equipment Functioning insurance (Poliza de Correcto funcionamiento de los Equipos):

Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors List of Proposed Products

01 32 16.00 20 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 32 PAGES

NEW LODGING BUILDING

01 32 16.00 20 1.3Construction schedule Submittal Register

01 33 00 SD-01 Preconstruction Submittals 1.7Submittal Register

01 50 00 SD-01 Preconstruction Submittals 1.3Construction site plan

01 74 19 SD-01 Preconstruction Submittals 1.6Waste Management Plan

SD-11 Closeout Submittals 1.7Records

01 78 00 SD-03 Product Data As-Built Record of Equipment and Materials

1.4.1Warranty Management Plan 1.4.4Warranty Tags

Spare Parts Data SD-08 Manufacturer’s Instructions

1.3Preventative Maintenance 1.3Condition Monitoring (Predictive

Testing) 1.3Inspection 1.4.1Instructions

SD-10 Operation and Maintenance Data

1.5Operation and Maintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 32 PAGES

01 78 00 SD-11 Closeout Submittals Record Drawings Final report

02 41 00 SD-01 Preconstruction Submittals 1.2.1Demolition Plan 1.2.1Deconstruction Plan 1.9Existing Conditions

03 11 13.00 10 SD-03 Product Data 1.2Design 2.1Form Materials 2.1.5Form Releasing Agents

SD-04 Samples Sample Panels

SD-06 Test Reports 3.5Inspection

SD-07 Certificates Fiber Voids

03 15 00.00 10 SD-03 Product Data 2.1Preformed Expansion Joint Filler 2.2Sealant 2.3Waterstops

SD-07 Certificates 2.1Preformed Expansion Joint Filler 2.2Sealant 2.3Waterstops

03 20 00.00 10 SD-03 Product Data Welding

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 32 PAGES

03 20 00.00 10 3.1.4.1Butt-Splices Material

SD-06 Test Reports Material Tests, Inspections, and Verifications

SD-07 Certificates 2.3Reinforcing Steel

Qualification of Steel Bar Butt-Splicers

03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Special Construction 1.6.2.3Reinforcing steel

SD-03 Product Data 2.4.7Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.4.1Cement 2.4.1.1Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor barrier 2.6Bonding Materials 2.3.3Concrete Curing Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 32 PAGES

03 30 00 2.5Reinforcement 1.6.2.1Reinforcement Materials 2.4.10Epoxy bonding compound 2.4.9.3Waterstops 3.13.2Waterstops 2.1.1Wood Forms 2.4.11Biodegradable Form Release

Agent SD-04 Samples

1.6.5.1Slab finish sample 2.4.9.3Dumbbell Type 2.4.9.3Rubber 2.4.9.3Polyvinylchloride (PVC)

SD-05 Design Data 2.3.1mix design 1.6.1.1Calculations

SD-06 Test Reports 1.6.4.1Concrete mix design 1.6.4.2Aggregates

Tolerance report 3.11.2.3Compressive strength tests 2.7.4Slump 2.7.1Air Entrainment

SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.3Finishing plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 32 PAGES

03 30 00 1.6.3.6Material Safety Data Sheets 2.5.5Steel Bar

04 20 00 SD-02 Shop Drawings 1.4.4Detail Drawings

SD-03 Product Data Local/Regional Materials Environmental Data

2.4.2Cement SD-04 Samples

2.2Concrete Masonry Units (CMU) 2.6Anchors, Ties, and Bar

Positioners 2.10Expansion-Joint Materials 2.7Joint Reinforcement 1.4.3Portable Panel

SD-06 Test Reports 3.21.1Field Testing of Mortar 3.21.2Field Testing of Grout 3.21.3Prism tests 2.4.2Masonry Cement

SD-07 Certificates 2.2Concrete Masonry Units (CMU) 2.6Anchors, Ties, and Bar

Positioners 2.10Expansion-Joint Materials 2.7Joint Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 32 PAGES

04 20 00 2.4.2Masonry Cement 2.4.1Admixtures for Masonry Mortar

Admixtures for Grout 1.4.2Contamination

SD-08 Manufacturer’s Instructions 2.4.2Masonry Cement

SD-10 Operation and Maintenance Data Plastic Identification Take-Back Program

05 05 23 SD-03 Product Data 1.5Welding Procedure Qualifications 1.5.5Welder, Welding Operator, and

Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination 1.5.1Certified Welding Procedure

Specifications (WPS) 1.5.1Certified Procedure Qualification

Records (PQR) 1.5.1Certified Welder Performance

Qualifications (WPQ)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 32 PAGES

05 12 00 SD-02 Shop Drawings 1.3.1Fabrication drawings

SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers

Welding procedures and qualifications

05 50 13 SD-02 Shop Drawings 2.7structural steel door frames 2.3Access doors and panels 2.4Cover plates and frames

SD-03 Product Data 2.3Access doors and panels 2.4Cover plates and frames

Control-joint covers 2.7Structural steel door frames

06 20 00 SD-02 Shop Drawings 1.3Detail Drawings

SD-03 Product Data 2.1.13Siding 2.1.13.9Epoxy-Aggregate Panels 2.1.13.7Wood

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 32 PAGES

06 20 00 Wood for walls; Wood for decks;

Siding

Wood Shingles 2.1.13.9Moldings 2.3Fascias and Trim

SD-07 Certificates 1.4Certificates of grade

Certificates of compliance Treatements fo fungus, insects and fire. The contractor shall certified that the wood complies with Enviromental management plan.

07 41 63 SD-01 Preconstruction Submittals 1.5.1Qualification of Manufacturer 1.5.3Qualification of Manufacturer 1.5.1Qualification of Installer

SD-02 Shop Drawings 1.5.1Roofing Panels 1.5.1Flashing and Accessories 1.5.1Gutter/Downspout Assembly

SD-03 Product Data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 32 PAGES

07 41 63 1.5.1Pressure Sensitive Tape 1.5.1Sealants and Caulking 1.5.1Galvanizing Repair Paint 1.5.1Aluminized Steel Repair Paint 1.5.1Accessories

SD-04 Samples 1.5.1Roofing Panels 2.2.2Fasteners 2.4.1Metal Closure Strips 1.5.1Insulation 1.5.1Manufacturer s color charts and chips SD-05 Design Data

1.5.1Wind design analysis SD-07 Certificates

2.2.2Fasteners 1.5.1Enamel Repair Paint

SD-08 Manufacturer’s Instructions 1.5.1Installation of Roof panel assemblies SD-11 Closeout Submittals

1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets

07 44 56 SD-03 Product Data Cementitious Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 32 PAGES

07 44 56 Accessories SD-08 Manufacturer’s Instructions Manufacturers Instructions

SD-10 Operation and Maintenance Data Manufacturer maintenance instructions

07 60 00 SD-02 Shop Drawings 3.1.7Gutters 3.1.8Downspouts 3.1.11Flashing at roof penetrations 3.1.9Eave flashing

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 16 SD-04 Samples 1.5.1.1Finish sample

SD-08 Manufacturer’s Instructions 2.1Doors and frames

08 51 13 SD-03 Product Data 2.2Windows 2.3.8.1Hardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 32 PAGES

08 51 13 2.3.3Fasteners 1.9Window Performance 2.5Mullions 2.3.10Screens 2.3.2Weatherstripping 2.3.8Accessories 2.3.4Adhesives

SD-04 Samples 1.3.1.1Finish Sample 1.3.1.2Window Sample

SD-10 Operation and Maintenance Data

2.2Windows 08 71 00 SD-03 Product Data

2.1Hardware Items SD-08 Manufacturer’s Instructions

3.1Installation SD-11 Closeout Submittals

1.3.1Key Bitting 08 81 00 SD-01 Preconstruction Submittals

Installation SD-02 Shop Drawings Glass

1.3Glazing Accessories SD-03 Product Data

2.3.2Glazing Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 32 PAGES

08 81 00 2.3.4Tape 2.3.3.1Sealant

SD-05 Design Data 2.3Setting and Sealing Materials 3.2Glass Setting

09 06 90 SD-04 Samples 2.2Color Schedule

09 24 23 SD-02 Shop Drawings 3.2Lath

SD-03 Product Data 3.4Proportions and Mixing

SD-04 Samples 2.2Colored Stucco Finish Coat 1.3Sample Panel

09 26 00 SD-03 Product Data 2.1.4Gypsum base 2.1.5Gypsum veneer plaster

09 30 00 SD-02 Shop Drawings 1.4Detail Drawings

SD-03 Product Data 2.1Tile 2.2Setting-Bed 2.4Mortar, Grout, and Adhesive

Certification SD-04 Samples

2.1Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 32 PAGES

09 30 00 Accessories Marble Thresholds

2.4Grout SD-07 Certificates

2.1Tile 2.4Mortar, Grout, and Adhesive

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-03 Product Data Ceiling Systems Certification

SD-04 Samples Ceiling Tiles

09 90 00 SD-02 Shop Drawings 3.11Piping identification 3.11stencil

SD-03 Product Data Certification

2.1Coating 2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9Color 1.4.2Textured Wall Coating System 1.4.3Sample Textured Wall Coating

System Mock-Up

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 32 PAGES

09 90 00 SD-07 Certificates Applicator's qualifications Qualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.7.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1Coatings:

09 96 00 SD-01 Preconstruction Submittals

1.3Material, Equipment and Fixture List

SD-03 Product Data Heat-Resistant Coatings

2.1Epoxy Coatings 2.2Polyurethane Coatings

Chlorinated-Rubber Coatings SD-04 Samples

1.3Color Chips SD-07 Certificates

2.1Epoxy Coatings 2.2Polyurethane Coatings

10 14 00.20 SD-02 Shop Drawings Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 32 PAGES

10 14 00.20 SD-03 Product Data 3.1Installation

SD-04 Samples Interior Signage

SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 28 13 SD-03 Product Data

2.1.2Finishes 2.2Accessory Items

SD-04 Samples 2.1.2Finishes 2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

10 44 16 SD-02 Shop Drawings 2.1Fire Extinguishers

Accessories 2.4Cabinets 2.5Wall Brackets

SD-03 Product Data 2.1Fire Extinguishers

Accessories 2.5Wall Brackets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 32 PAGES

10 44 16 SD-04 Samples 2.1Fire Extinguisher 2.5Wall Brackets

Accessories SD-07 Certificates

2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 12 36 00 SD-02 Shop Drawings

2.3Fabrication 3.1Installation Drawings

SD-03 Product Data In situ polishedGranite material components

Tile SD-04 Samples

2.3Countertop 2.3Backsplash, Bronce Counter top joints Manufacturer's Standard Color Charts

2.2Filler Material SD-08 Manufacturer’s Instructions Manufacturer's Instructions

13 48 00 SD-03 Product Data 3.1Bracing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 32 PAGES

13 48 00 1.3Equipment Requirements 22 00 00 SD-02 Shop Drawings

3.6.1Plumbing System SD-03 Product Data

2.4Fixtures 2.4.2Flush valve urinals 2.4.3Flush tank water closets

Wall hung lavatories 2.4.4Countertop lavatories

Kitchen sinks Service sinks Water heaters Shower Faucets

3.6.1Plumbing System SD-06 Test Reports

3.6Tests, Flushing and Disinfection SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.6.1Plumbing System 23 00 00 SD-02 Shop Drawings

1.4.5Detail Drawings SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 32 PAGES

23 00 00 Air Vents, Penthouses, and Goosenecks

Ceiling Exhaust Fans Air Handling Units

2.10.1Room Fan-Coil Units Test Procedures Diagrams

SD-06 Test Reports 3.8Performance Tests

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.9.2Operation and Maintenance

Training SD-10 Operation and Maintenance Data

3.9.1Operation and Maintenance Manuals

23 05 48.00 40 SD-02 Shop Drawings 1.2Installation Drawings 1.2Outline Drawings

SD-03 Product Data 1.2Equipment and Performance

Data 2.3Isolators

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 32 PAGES

23 05 48.00 40 Type of Isolator Type of Base Allowable Deflection Measured Deflection

23 07 00 SD-03 Product Data Pipe Insulation Systems

SD-08 Manufacturer’s Instructions Pipe Insulation Systems

23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System

SD-03 Product Data 2.3Refrigerant Piping System 3.5Refrigerant Piping Tests 3.4Demonstrations 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-10 Operation and Maintenance Data

1.5Maintenance 3.4Operation and Maintenance

Manuals 23 81 00.00 20 SD-02 Shop Drawings

2.5.2Field-assembled refrigerant piping

1.4.2Control system wiring diagrams

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 32 PAGES

23 81 00.00 20 SD-03 Product Data 2.2Air conditioners 2.5Refrigerant piping and accessories 2.3Coatings for finned tube coils

SD-06 Test Reports 3.8.3Start-up and initial operational tests SD-08 Manufacturer’s Instructions

2.1Room air conditioners 2.2Air conditioners 2.5Refrigerant piping and accessories SD-10 Operation and Maintenance Data

2.1Room air conditioners 2.2Air conditioners

SD-11 Closeout Submittals 1.4.4Posted operating instructions

26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture

Lists SD-03 Product Data

2.1.1Conduits and Raceways 2.1.3Wire and Cable 3.2.1.9Splices and Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 32 PAGES

26 05 00.00 40 2.1.4Switches 2.1.5Receptacles 2.1.6Outlets, Outlet Boxes, and Pull

Boxes 2.1.8Circuit Breakers 2.1.7Panelboards 2.1.9Lamps and Lighting Fixtures 2.1.12Dry-Type Distribution

Transformers SD-06 Test Reports

3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test

SD-07 Certificates 1.4Certification

SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions

26 05 19.00 10 SD-03 Product Data 3.1Installation Instructions

SD-06 Test Reports 3.2Tests, Inspections, and

Verifications 26 05 71.00 40 SD-02 Shop Drawings

3.1Protective Devices SD-03 Product Data

2.2Enclosures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 32 PAGES

26 05 71.00 40 2.3Circuit Breakers 3.1Control Devices 2.7Indicating Instruments

SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports

SD-08 Manufacturer’s Instructions 3.1Protective Devices

SD-10 Operation and Maintenance Data

2.3Circuit Breakers 26 08 00 SD-06 Test Reports

3.1Acceptance tests and inspections 1.4.3Acceptance test and inspections procedure 26 09 23.00 40 SD-03 Product Data

2.1.1Photoconductive Control Devices 3.1Installation Drawings 2.1.1Light-Sensitive Control Devices

Lighting Contactor 2.2.2Photocell Switch 2.2.3Occupancy Sensors 1.3Motion Sensors

SD-06 Test Reports 3.2System Operation Tests

26 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 32 PAGES

26 20 00 2.14Panelboards 2.17Transformers 2.4Busway 2.5Cable trays 2.24Wireways 3.1.10.1Marking strips

SD-03 Product Data 2.13Receptacles 2.14.3Circuit breakers 2.11Switches 2.17Transformers 2.15Enclosed circuit breakers

CATV outlets 2.20.3Grounding Busbar 2.25Surge protective devices

SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test

SD-09 Manufacturer’s Field Reports

2.27.1Transformer factory tests 26 24 16.00 40 SD-02 Shop Drawings

2.1.1Detail Drawings 2.1.1Outline Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 32 PAGES

26 24 16.00 40 SD-03 Product Data 1.3Panelboards 2.1.1Panelboards

SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests

SD-07 Certificates 1.4Statements

SD-08 Manufacturer’s Instructions 1.3Panelboards 2.1.1Panelboards

26 28 01.00 10 SD-03 Product Data 2.10Fault Current Analysis 2.10Protective Device Coordination

Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation

SD-06 Test Reports 3.3Field Testing

SD-07 Certificates 1.6Devices and Equipment

26 33 53.00 20 SD-02 Shop Drawings 1.6.1UPS Drawings 1.6.2UPS Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 32 PAGES

26 33 53.00 20 SD-03 Product Data 2.3UPS Module 2.9Factory Testing 2.2UPS System

Spare Parts SD-06 Test Reports

1.6.4Factory Test Plan 1.6.5Performance Test Plan 2.9Factory Tests 1.6.7Performance Tests Report 1.6.6Factory Tests Report

SD-09 Manufacturer’s Field Reports

3.2.2Initial Inspection and Tests 3.2.3Performance Tests

SD-10 Operation and Maintenance Data

1.10.1UPS Operation and Maintenance SD-11 Closeout Submittals

3.1Installation 26 41 00.00 40 SD-02 Shop Drawings

1.4.1Overall lightning protection system

1.4.1Each major component SD-03 Product Data

2.2.1Air Terminals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 32 PAGES

26 41 00.00 40 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors 2.5Lightning Protection Components 2.1Hardware 2.1Accessories

SD-06 Test Reports 3.6.1Grounding system test 3.6.2Lightning protection system inspection SD-07 Certificates UL listing or label or Equivalent

3.6.3Certificates 26 51 00 SD-03 Product Data

LED lighting fixtures LED lamps

2.7Lighting contactor 2.8Photocell switch 2.10LED Exit signs

LED Emergency lighting equipment

2.12Occupancy sensors SD-06 Test Reports

3.2Operating test 27 10 00 SD-02 Shop Drawings

1.6.1.1Telecommunications drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 32 PAGES

27 10 00 1.6.1.2Telecommunications Space Drawings

SD-03 Product Data 2.4Telecommunications cabling 2.5.6Patch panels 2.6Telecommunications outlet/connector assemblies 2.5.3Equipment support frame

SD-06 Test Reports 3.5.1Telecommunications cabling testing SD-07 Certificates

1.6.2.1Telecommunications Contractor 1.6.2.3Manufacturer Qualifications 1.6.3Test plan

SD-10 Operation and Maintenance Data

1.10.1Telecommunications cabling and pathway system

SD-11 Closeout Submittals 1.10.2Record Documentation

28 31 74.00 20 SD-03 Product Data Fire Smoke Detectors

SD-08 Manufacturer’s Instructions Smoke detector

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 32 PAGES

28 31 74.00 20 1.6.2.1System as-built drawings 31 00 00 SD-01 Preconstruction Submittals

3.5 GShoring

SD-03 Product Data

3.9Utilization of Excavated Materials SD-06 Test Reports

3.17Testing 2.1Borrow Site Testing

SD-07 Certificates 3.17Testing

31 11 00 SD-03 Product Data 3.6.1Nonsaleable Materials

31 23 00.00 20 SD-06 Test Reports 1.6Borrow Site Testing 3.11.2.1Fill and backfill 3.11.2.2Select material 3.11.2.3Porous fill 3.11.2.4Density tests 3.11.2.5Moisture Content Tests

31 60 00 SD-03 Product Data 3.2.1.1Tools

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports 3.8Field Quality Control

32 92 23 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 32 PAGES

32 92 23 2.3Fertilizer SD-06 Test Reports Topsoil composition tests

SD-07 Certificates 2.1sods

33 11 00 SD-03 Product Data 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line

Corporation stops 2.1.2.2Valve boxes 2.2.2.2Valve boxes

SD-06 Test Reports 2.2.2.4Disinfection

SD-07 Certificates 2.1Water distribution main 2.2Water service line

Displacement Type Meters Compound Type Meters

SD-08 Manufacturer’s Instructions 1.3Delivery, storage, and handling

Installation 33 30 00 SD-01 Preconstruction Submittals

Existing Conditions SD-02 Shop Drawings

1.4.1Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 32 PAGES

33 30 00 2.3.1Precast concrete manhole 2.3.3.1Frames, covers, and gratings

SD-03 Product Data 2.1Pipeline materials

SD-06 Test Reports 2.4Reports

SD-07 Certificates Gaskets

33 40 00 SD-03 Product Data 3.3Placing Pipe

SD-04 Samples 2.1Pipe for Culverts and Storm

Drains SD-07 Certificates

2.1.1Resin Certification 3.7Pipeline Testing 3.6.5Determination of Density 2.3.5Frame and Cover for Gratings

33 70 02.00 10 SD-02 Shop Drawings

1.4.1 GDetail Drawings

1.4.2 GAs-Built Drawings

SD-03 Product Data

2.2 GNameplates

2.1 GMaterial and Equipment

3.2 GInstallation Requirements

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 32 PAGES

33 70 02.00 10 Factory Tests 3.9Field Testing 3.9.8Operating Tests 3.3.1.4Cable Installation

SD-07 Certificates 2.1Material and Equipment 3.10.2Installation Engineer

SD-10 Operation and Maintenance Data

3.10.1Operation and Maintenance Manuals

33 71 02 SD-03 Product Data Low voltage cable Low voltage cable terminations Sealing Material

2.11.2Manhole frames and covers 2.11.3Handhole frames and covers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it.