PROJECT: New Lodging Building
Place: CNP Aviation School, Mariquita, Colombia Solicitation: 19SAQMMA19R0244
BASE BID
ITEM DESCRIPTION
MATERIAL
UNIT
MATERIAL
QUANTITY
MATERIAL
UNIT COST
LABOR UNIT
LABOR
QUANTITY
LABOR UNIT
COST
EQUIPMENT
UNIT
EQUIPMENT
QUANTITY
EQUIPMENT
UNIT COST
TOTAL COST TOTAL COST BY CHAPTER
A. GENERAL REQUIREMENTS $ 0.00
1 GENERAL REQUIREMENTS $ 0.00
01 32 16 00 20 Construction Progress Documentation $ 0.00
$ 0.00
01 33 00 Submittal Procedures $ 0.00
$ 0.00
01 50 00 Temporary Construction Facilities and Controls $ 0.00
$ 0.00
01 78 00 Execution and Closeout Submittals $ 0.00
$ 0.00
B. NEW LODGING BUILDING
2 EXISTING CONDITIONS $ 0.00
02 41 00 Demolition and Deconstruction $ 0.00
$ 0.00
3 CONCRETE $ 0.00
03 11 13.00 10 Structural cast-in-place concrete forming $ 0.00
$ 0.00
03 15 00.00 10 Concrete accesssories $ 0.00
$ 0.00
03 20 00.00 10 Concrete Reinforcing $ 0.00
$ 0.00
03 31 01.00 10 Cast-in-Place Structural Concrete for Civil Works $ 0.00
$ 0.00
4 MASONRY $ 0.00
04 20 00 Masonry $ 0.00
$ 0.00
5 METALS $ 0.00
05 05 23 Welding, Structural $ 0.00
$ 0.00
05 12 00 Structural Steel $ 0.00
$ 0.00
05 50 13 Miscelaneous metal fabrications $ 0.00
$ 0.00
6 WOOD, PLASTICS, AND COMPOSITES $ 0.00
06 10 00 Rough carpentry $ 0.00
$ 0.00
06 20 00 Finish carpentry $ 0.00
$ 0.00
7 THERMAL AND MOISTURE PROTECTION $ 0.00
07 41 63 Fabricated roof panels assemblies $ 0.00
$ 0.00
07 44 56 Fiber reinforced cementitiuos panels $ 0.00
$ 0.00
07 60 00 Flashing and Sheet Metal $ 0.00
$ 0.00
07 92 00 Joint Sealants $ 0.00
$ 0.00
OFFICIAL BIDDING CHART
NEW LODGING BUILDING Page 1 of 4 MARIQUITA, COLOMBIA
Colombia Solicitation: 19SAQMMA19R0244
BASE BID
ITEM DESCRIPTION
MATERIAL
UNIT
MATERIAL
QUANTITY
MATERIAL
UNIT COST
LABOR UNIT
LABOR
QUANTITY
LABOR UNIT
COST
EQUIPMENT
UNIT
EQUIPMENT
QUANTITY
EQUIPMENT
UNIT COST
TOTAL COST TOTAL COST BY CHAPTER
OFFICIAL BIDDING CHART
8 OPENINGS $ 0.00
08 11 16 Aluminium Doors and Frames $ 0.00
$ 0.00
08 51 13 Aluminum Windows $ 0.00
$ 0.00
08 71 00 Door Hardware $ 0.00
$ 0.00
08 81 00 Glazing $ 0.00
$ 0.00
9 FINISHES $ 0.00
09 06 90 Color Schedule $ 0.00
$ 0.00
09 06 90 Stucco $ 0.00
$ 0.00
09 06 90 Veneer plaster $ 0.00
$ 0.00
09 30 00 Ceramic tile, quarry tile, and paver tile $ 0.00
$ 0.00
09 51 00 Acoustical Ceilings $ 0.00
$ 0.00
09 90 00 Paints and Coatings $ 0.00
$ 0.00
09 96 00 High-Performance Coatings $ 0.00
$ 0.00
10 SPECIALTIES $ 0.00
10 14 00.20 Interior Signage $ 0.00
$ 0.00
10 28 13 Toilet Accessories $ 0.00
$ 0.00
10 44 16 Fire Extinguishers $ 0.00
$ 0.00
12 FURNISHINGS $ 0.00
12 36 00 Countertops $ 0.00
$ 0.00
13 SPECIAL CONSTRUCTION $ 0.00
12 36 00 Seismic protection for miscellaneous equipment $ 0.00
$ 0.00
22 PLUMBING $ 0.00
22 00 00 Plumbing, General Purpose $ 0.00
$ 0.00
23 HEATING, VENTILATING, AND AIR CONDITIONING $ 0.00
23 00 00 Air Supply, Distribution, Ventilation and Exhaust Systems $ 0.00
$ 0.00
23 03 00.00 20 Basic Mechanical Materials and Methods $ 0.00
$ 0.00
23 05 48.00 40 Vibration and seismic controls for HVAC piping and equipment $ 0.00
$ 0.00
NEW LODGING BUILDING Page 2 of 4 MARIQUITA, COLOMBIA
Colombia Solicitation: 19SAQMMA19R0244
BASE BID
ITEM DESCRIPTION
MATERIAL
UNIT
MATERIAL
QUANTITY
MATERIAL
UNIT COST
LABOR UNIT
LABOR
QUANTITY
LABOR UNIT
COST
EQUIPMENT
UNIT
EQUIPMENT
QUANTITY
EQUIPMENT
UNIT COST
TOTAL COST TOTAL COST BY CHAPTER
OFFICIAL BIDDING CHART
23 07 00 Thermal insulation for mechanical systems $ 0.00
$ 0.00
23 23 00 Refrigerant Piping $ 0.00
$ 0.00
23 81 00.00 20 Unitary Air Conditioning Equipment $ 0.00
$ 0.00
26 ELECTRICAL $ 0.00
26 00 00.00 20 Basic Electrical Materials and Methods $ 0.00
$ 0.00
26 05 00.00 40 Common Work Results for Electrical $ 0.00
$ 0.00
26 05 19.00 10 Insulated Wire and Cable $ 0.00
$ 0.00
26 05 71.00 40 Low Voltage Overcurrent Protective Devices $ 0.00
$ 0.00
26 08 00 Apparatus Inspection and Testing $ 0.00
$ 0.00
26 09 23.00 40 Lighting Control Devices $ 0.00
$ 0.00
26 20 00 Interior Distribution System $ 0.00
$ 0.00
26 24 16.00 40 Pannelboards $ 0.00
$ 0.00
26 28 01.00 10 Coordinated Power System Protection $ 0.00
$ 0.00
26 41 01.00 40 Lightning Protection System $ 0.00
$ 0.00
26 51 00 Lighting $ 0.00
$ 0.00
27 COMMUNICATIONS
27 10 00 Building Telecommunications Cabling System $ 0.00
$ 0.00
28 ELECTRONIC SAFETY AND SECURITY $ 0.00
28 31 74.00 20 Interior fire detection and alarm system $ 0.00
$ 0.00
E. EXTERIOR WORKS $ 0.00
31 EARTHWORK $ 0.00
31 00 00 Earthwork $ 0.00
$ 0.00
31 11 00 Clearing and Grubbing $ 0.00
$ 0.00
31 23 00.00 20 Excavation and Fill $ 0.00
$ 0.00
NEW LODGING BUILDING Page 3 of 4 MARIQUITA, COLOMBIA
Colombia Solicitation: 19SAQMMA19R0244
BASE BID
ITEM DESCRIPTION
MATERIAL
UNIT
MATERIAL
QUANTITY
MATERIAL
UNIT COST
LABOR UNIT
LABOR
QUANTITY
LABOR UNIT
COST
EQUIPMENT
UNIT
EQUIPMENT
QUANTITY
EQUIPMENT
UNIT COST
TOTAL COST TOTAL COST BY CHAPTER
OFFICIAL BIDDING CHART
31 60 00 Foundation Preparation $ 0.00
$ 0.00
32 EXTERIOR IMPROVEMENTS $ 0.00
32 16 13 Concrete Sidewalks and Curbs and Gutters $ 0.00
$ 0.00
32 92 23 Sodding $ 0.00
$ 0.00
33 UTILITIES $ 0.00
33 11 00 Water Distribution $ 0.00
$ 0.00
33 30 00 Sanitary Sewer $ 0.00
$ 0.00
33 40 00 Storm drainage utilities $ 0.00
$ 0.00
33 70 02.00 10 Electrical distribution system, underground $ 0.00
$ 0.00
33 71 02 Underground Electrical and Telecomunications Distribution $ 0.00
$ 0.00
F. MARKUPS
D TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID)
D Administration % D Unforenseens % D Profit % D TAX(Over the profit value) % D DBA Insurance Unit
T TOTAL COSTS (BASE BID) $
NEW LODGING BUILDING Page 4 of 4 MARIQUITA, COLOMBIA
$20,000.00