2.1.1 Annexure – 1 to SOW-Cleaning Area Breakdown.pdf
PDF 1 MB Posted
- Solicitation number
- 191Z2525R0002
- Issued by
-
Department of State
About this file
The document is an annexure detailing a comprehensive cleaning area breakdown for the Consulate General of the United States in Erbil, Iraq. The breakdown provides an extensive matrix of cleaning requirements across multiple facility areas, including the Consulate Office Building, TDY Building, Pool, Residences/Apartments, Utilities, Warehouse, Support Annex, Entrances, Service Entrance, Break Room, Smoking Areas, Dormitory, HATS units, Booths, and Exterior spaces.
The cleaning schedule categorizes spaces by standard and deep cleaning frequencies, specifying cleaning times per day, work week (Sunday-Thursday), weekend (Friday-Saturday), and annual deep cleaning requirements. Each area is meticulously mapped with specific square meter measurements, cleaning frequencies, and special considerations. The breakdown includes routine tasks like standard daily cleaning, restroom sanitization, weekly and bi-weekly cleaning, annual deep cleaning, and specific maintenance for areas like mechanical rooms, corridors, offices, exterior spaces, parking areas, and specialized zones like the pool and gymnasium. The document serves as a detailed implementation guide for custodial services, ensuring comprehensive coverage of all facility spaces with precise cleaning specifications.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description of The Rquirement (Occurrence) Unit of Measure Total Quantity
Standard Routine Cleaning for Interior Areas COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Total Quantity Per
Occurrence A 1 Areas requiring cleaning one time per day from Sunday to Thursday m2 5187 1434 1097 12 1937 32 84 46 50 1690 80 11649 A 2 Areas requiring cleaning two times per day from Sunday to Thursday m2 35 94 168 297 A 3 Areas requiring cleaning one time per day from Friday to Saturday m2 136 553 42 1690 2421 A 4 Areas requiring cleaning one time per week to be done between Sunday and Thursday m2 2581 180 82 4104 606 993 38 140 220 110 9054 A 5 Areas requiring cleaning two times per week to be done between Sunday and Thursday m2 37 136 733 54 1200 35 2195 A 6 Restroom requiring cleaning three times per day from Sunday to Thursday Fixture 38 23 12 3 1 2 45 3 2 1 8 2 140 A 7 Restroom requiring cleaning three times per day from Friday to Saturday Fixture 22 12 3 1 45 3 2 1 8 97
Deep Cleaning for Interior Areas COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Total Quantity Per
Occurrence B 1 Areas requiring deep cleaning one time per year to be done between Sunday and Thursday m2 256 360 709 1907 130 65 300 155 224 50 434 110 4700 B 2 Areas requiring deep cleaning one time per year to be done between Friday and Saturday m2 442 442 B 3 Areas requiring deep cleaning two times per year to be done between Sunday and Thursday m2 4617 2686 5976 635 41 3909 98 378 48 75 2148 82 20693
B 4 Areas requiring deep cleaning two times per year to be done between Friday and Saturday m2 5797 215 341 250 6603
B 5 Areas requiring deep cleaning four times per year to be done between Sunday and Thursday m2 15 114 105 10 5 249 B 6 Restrooms requiring deep cleaning two times per year to be done between Sunday and Thursday Fixture 23 23 12 3 1 2 45 2 2 1 8 2 124 B 7 Restrooms requiring deep cleaning two times per year to be done between Friday and Saturday Fixture 15 1 16
TDY Lodging Rooms COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Total Rooms Per
Year C 1 Cleaning of TDY Lodging Rooms according to Paragraph 13.2 (and following sub-par) of the SOW Room 1300 1300
Make Ready Cleaning of Residences COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Total Square Meters
Per Year D 1 Cleaning Residential Units according to Paragraph 8.20. (and following sub-par) of the SOW m2 14,703 224 434 15361
Compound and Outdoor Areas (Exterior Cleaning) according to Paragraph 9.0. (And following sub-par except sub-par 9.11.1.) of the SOW. COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Total Quantity Per
Occurrence E 1 Areas requiring cleaning one time per day from Sunday to Thursday m2 236 9500 9736 E 2 Areas requiring cleaning one time per week to be done between Sunday and Thursday m2 1750 1750 E 3 Areas requiring cleaning two times per week to be done between Sunday and Saturday m2 15360 15360 E 4 Areas requiring deep cleaning one time per year to be done between Sunday and Saturday m2 12000 12000 E 5 Areas requiring deep cleaning two times per year to be done between Sunday and Saturday m2 1126 26910 28036 E 6 Areas requiring deep cleaning four times per year to be done between Sunday and Saturday m2 236 54000 54236
Swimming Pool as per Sub-Paragraph 9.11.1 of the SOW COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Total Square Meters
Per Occurrence
F 1 Standard Cleaning and Maintenance for areas requiring cleaning one time per day from Sunday to Thursday m2 764 764 F 2 Standard Cleaning and Maintenance for areas requiring cleaning one time per day from Friday to Saturday m2 764 764 F 3 Areas requiring deep cleaning four times per year to be done between Sunday and Thursday m2 803 803
Integrated Pest Management as per Paragraph 11. of the SOW COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Total Quantities Per Occurrence
G 1 Control of mammals, rodents, and reptiles Month 12 12 G 2 Application of pesticides four times per year m2 150000 150000
Waste Management as per Paragraph 10. of the SOW COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Total Quantities Per Year
H 1 Combined Trash and Recyclables, compacted in truck, per m3 m3 96 96 48 120 24 60 48 12 12 12 24 48 48 48 12 24 732 H 2 Cardboard, Paper, and Cellulose materials, per m3 m3 72 48 120 12 12 264 H 3 Compostable food waste and landscaping waste, per m3 m3 48 48 48 72 216 H 4 Oil / fuel / lead Acid Batteries, per m3 m3 200 1000 800 2000
H 5 Other Waste including but not limited to: Tires, batteries (assorted), oil / fuel filters, paint, chemicals, wood, construction materials, electronic waste, furniture, appliances, scrap materials, Etc., per m3 m3
200 1000 400 1600 Temporary Additional Services (per square meter) COB TDY POOL SDA UTL WHE SPX CACs SCAC LGBR CES DSAs DORM WA HATS GBs Exterior Suare Meters
I 1 Interior, standard service, non-scheduled, business hours, including restrooms, per m2, 100 to 10,000 m2 per year m2 1 I 2 Interior, standard service, non-scheduled, non-business hours, including restrooms, per m2, 100 to 10,000 m2 per year m2 1 I 3 Exterior, standard service, non-scheduled, business hours, per m2, 100 to 20,000 m2 per year m2 1 I 4 Exterior, standard service, non-scheduled, non-business hours, per m2, 100 to 20,000 m2 per year m2 1 I 5 Cleaning Additional TDY Lodging Rooms to those under SUBCLIN C-1 (not to exceed 600 additional rooms per year) Room 1 I 6 Cleaning Additional Residential Units to those under SUBCLIN D-1 (not to exceed 3000 m2 per year) m2 1 I 7 Additional Combined Trash and Recyclables, per compacted in truck, per "FIVE" m3 truck, up to 30 trucks per year Truck 1 I 8 Additional Cardboard, Paper, and Cellulose materials, per "FIVE" m3 truck, up to 30 trucks per year Truck 1 I 9 Additional Compostable food waste and landscaping waste, per "FIVE" m3 truck, up to 20 trucks per year Truck 1 I 10 Additional Oil / fuel / lead Acid Batteries, per m3, up to 50 m3 per year m3 1
I 11 Additional Other Waste including but not limited to: Tires, batteries (assorted), oil / fuel filters, paint, chemicals, wood, construction materials, electronic waste, furniture, appliances, scrap materials, Etc., per "FIVE" m3 truck, up to 20 trucks per year Truck 1
SUBCLIN D
SUBCLIN E
Quantities will be determined on as needed and when needed basis, Contractor is required to provide the price per one (1) Unit of Measure only.
SUBCLIN I
SUBCLIN F
SUBCLIN G
SUBCLIN H
SUBCLIN # Breakdown of Quantity for each SUBCLIN in each Building or Location
SUBCLIN A
SUBCLIN B
SUBCLIN C
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
Solicitation No. 191Z2525R0002
SUBCLIN # SUBCLIN
A1
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6
SUBCLIN
A7
SUBCLIN
B1
SUBCLIN
B2
SUBCLIN
B3
SUBCLIN
B4
SUBCLIN
B5
SUBCLIN
B6
SUBCLIN
B7
Total Sq. Meters 5187 35 2581 38 256 442 4617 5797 15 23 15
RM #
Area Identification Times Per Day
Times Per Work Week
(S-Th)
Times Per Weekend (Fri-Sat)
Times Per Year
Conducted Work Week
(S-Th)
Conducted Weekend (Fri-Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-
Thu
2x per Week Sun-
Thu
Restroom Sun - Thur
Restroom Fri- Sat
Deep 1x per Year Sun-
Thu
Deep 1x per Year Fri-
Sat
Deep 2x per Year Sun-
Thu
Deep 2x per Year Fri-
Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-
Thu
Restroom Deep 2x per
Year Fri- Sat
1 Gallery / Atrium <3m 366 1 5 2 1 366 366 2 Waiting Area 161 1 5 2 1 161 161 3 Wait Restrooms 2 3 5 2 1 2 2 2 4 Offices 230 1 5 2 1 230 230 5 Kitchenette 25 1 5 2 1 25 25 6 Storage 31 1 1 31 7 Mechanical 28 1 1 28 8 Storage 41 1 1 41 9 Waiting Area 75 1 5 2 1 75 75
10 Wait Restrooms 1 3 5 2 1 1 1 1 11 Office 551 1 1 2 1 551 551 12 Mechanical 103 2 1 103 13 Training 42 1 5 2 1 42 42 14 Storage 17 2 1 17 15 Mechanical 179 2 1 179 16 Mechanical 72 2 1 72 17 Storage 65 2 1 65 18 Telecom 68 2 1 68 19 Telecom 36 2 1 36 20 Mechanical 26 2 1 26 21 Mail Room 90 1 5 2 1 90 90 22 Storage 83 2 1 83 23 Mechanical 17 2 1 17 24 Main Entrance 35 2 5 2 1 35 35 25 Booth 15 1 5 2 1 15 15 26 Booth 14 1 5 2 1 14 14 27 Mechanical 196 2 1 196 28 Electrical 157 2 1 157 29 Main Lobby <3m 202 1 5 2 1 202 202 30 Offices 82 1 5 2 1 82 82 31 Meeting 127 1 5 2 1 127 127 32 vestibule 15 1 5 2 1 15 15 33 Mechanical 72 2 1 72 34 Offices 498 1 1 2 1 498 498 35 Restroom 2 3 5 2 1 2 2 2 36 Mechanical 20 2 1 20 37 Mechanical 68 2 1 68 38 office 81 2 1 81 39 office 74 2 1 74 40 Offices 665 1 1 2 1 665 665 41 Balcony 31 1 5 2 1 31 31 42 Corridor 282 1 5 2 1 282 282 43 Offices 175 1 5 2 1 175 175 44 Restroom 4 3 5 2 1 4 4 4 45 Offices 791 1 5 2 1 791 791 46 Mechanical 99 2 1 99 47 Health Unit Waiting 27 1 5 2 1 27 27 48 Health Unit Office 37 1 5 2 1 37 37 49 Health Unit Exam Room 17 1 5 2 1 17 17 50 Health Unit Observation 35 1 5 2 1 35 35 51 Health Unit Restroom 2 3 5 2 1 2 2 2 52 Health Unit Lab 20 1 5 2 1 20 20 53 Health Unit corridor 60 1 5 2 1 60 60 54 Storage 14 1 5 2 1 14 14 55 Booth 55 1 5 2 1 55 55 56 Offices and Cubicles 567 1 1 2 1 567 567 57 Office 140 1 5 1 1 140 140 58 Restroom 2 3 5 2 1 2 2 2 59 Kitchenette 25 1 5 2 1 25 25 60 Conference Rooms 43 1 5 2 1 43 43 61 Restroom 2 3 5 2 1 2 2 2 62 Kitchenette 15 1 5 4 1 15 15 63 Corridor 71 1 5 2 1 71 71 64 Mechanical 67 1 1 67 65 Mechanical 89 1 1 89 66 Collaboration 88 1 5 2 1 88 88 67 Hallways / Corridors 259 1 5 2 1 259 259 68 Conference Rooms 31 1 5 2 1 31 31 69 Storage 16 2 1 16 70 Offices 1171 1 5 2 1 1171 1171 71 Mechanical 93 2 1 93 72 Atrium glass wall 120 1 1 120 73 Corridor 302 1 5 1 1 302 302 74 Mechanical 518 2 1 518 75 Mechanical 14 2 1 14 76 Mechanical 38 2 1 38 77 Mechanical 62 2 1 62 78 Mechanical 1159 2 1 1159 79 Corridor 51 1 5 2 1 51 51 80 Restroom 2 3 5 2 1 2 2 2 81 Stairwell 45 1 1 45 82 Stairwell 45 1 1 45 83 Stairwell 45 1 1 45 84 Stairwell 45 1 1 45 85 Elevator 3 1 5 3 86 Restroom 1 3 5 2 1 1 1 1 87 Restroom 4 3 5 2 1 4 4 4 88 Restroom 4 3 5 2 1 4 4 4 89 Restroom 3 3 5 2 1 3 3 3 90 Restroom 3 3 5 2 1 3 3 3 91 Restroom 3 3 5 2 1 3 3 3 92 Restroom 3 3 5 2 1 3 3 3
Consulate Office Building (COB) Standard Cleaning Schedule
Area or Number of
Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6
SUBCLIN
A7
SUBCLIN
B1
SUBCLIN
B2 SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Meters 1434 136 180 37 23 22 2686 215 114 23
RM # Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-
Thu
2x per Week Sun-
Thu
Restroom Sun - Thur
Restroom Fri-Sat
Deep 1x per Year Sun-
Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-
Thu
Restroom Deep 2x per Year Fri-
Sat 1 Reception 15 1 5 2 1 15 15 2 Working area 18 1 5 2 1 18 18 3 Storage 28 2 1 28 4 Office 11 1 5 2 1 11 11 5 Lobby Waiting 38 1 5 2 1 38 38 6 office 15 1 5 2 1 15 15 7 Vending 9 1 5 2 1 9 9
8 EMR 7 2 1 7
9 storage 12 2 1 12 10 Break Room 16 1 5 2 1 16 16 11 Restroom 1 3 5 2 1 1 1 1 12 Laundry 11 1 5 2 1 11 11 13 Housekeeping 38 1 5 2 1 38 38 14 J.C. 6 4 1 6 15 Mechanical 108 4 1 108 16 Electrical 17 2 1 17
17 TSS 9 2 1 9
18 Telecom 8 2 1 8 19 Trash 9 1 5 2 1 9 9 20 Library 36 1 5 2 1 36 36 21 Sales 17 1 5 2 1 17 17 22 Business Center 13 1 5 2 1 13 13 23 Project Room 17 1 5 2 1 17 17 24 Game Room 34 1 5 2 1 34 34 25 TV Room 17 1 5 2 1 17 17 26 Restroom 6 3 5 2 2 1 6 6 6 6 27 Stock Room 123 28 Commissary 154 29 Vestibule 19 1 5 2 1 19 19 30 Vestibule 18 1 5 2 1 18 18 31 Business Center 16 1 5 2 1 16 16 32 Activity Room 104 1 5 2 1 104 104 33 Storage 6 1 5 2 1 6 6 34 Storage 12 1 5 2 1 12 12 35 J.C. 2 2 1 2 36 Gym 114 1 5 2 2 1 114 114 114 37 Locker Room 8 3 5 2 2 1 8 8 8 8 38 Atrium <3m 120 1 5 2 1 120 120 39 Corridor 300 1 5 2 1 300 300 40 Guest Room 42 2 1 42 41 Guest Room 39 2 1 39 42 Guest Room 39 2 1 39 43 Guest Room 39 2 1 39 44 Guest Room 39 2 1 39 45 Guest Room 39 2 1 39 46 Guest Room 39 2 1 39 47 Guest Room 39 2 1 39 48 Guest Room 39 2 1 39 49 Guest Room 39 2 1 39 50 Guest Room 39 2 1 39 51 Guest Room 39 2 1 39 52 Guest Room 39 2 1 39 53 Residential Corridor 138 1 5 2 1 138 138 54 Elec, TSS, Tele 15 2 1 15 55 Trash 11 1 2 2 1 11 11 56 Restroom 8 3 5 2 2 1 8 8 8 8 57 Corridor 120 1 5 2 1 120 120 58 Guest Room 42 2 1 42 59 Guest Room 39 2 1 39 60 Guest Room 39 2 1 39 61 Guest Room 39 2 1 39 62 Guest Room 39 2 1 39 63 Guest Room 39 2 1 39 64 Guest Room 39 2 1 39 65 Guest Room 39 2 1 39 66 Guest Room 39 2 1 39 67 Guest Room 39 2 1 39 68 Guest Room 39 2 1 39 69 Guest Room 39 2 1 39 70 Residential Corridor 114 1 5 2 1 114 114 71 Laundry / Vending 22 1 5 2 2 1 22 22 22 72 Housekeeping 15 1 5 2 1 15 15 73 Trash 26 1 2 2 1 26 26 74 Mechanical 330 2 1 330 75 GWA Stairwell 60 1 1 60 76 GWA Stairwell 60 1 1 60 77 GWA Stairwell 60 1 1 60 78 Elevator 2 1 5 2
TDY Building Standard Cleaning Schedule Deep Clean Schedule m2 or Number of Fixtures
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
E1
SUBCLIN
G1
SUBCLIN
G2
SUBCLIN
A4
SUBCLIN
A6
SUBCLIN
A7
SUBCLIN
E5
SUBCLIN
G3
SUBCLIN
B6
SUBCLIN
E6
Total Sq. Meters 236 764 764 82 12 12 1126 803 12 236
RM
# Area Identification Times Per
Day
Times Per Work Week (S-
Th)
Times Per Weekend (Fri-
Sat)
Times Per Year
Conducted Work Week (S-
Th)
Conducted Weekend (Fri-
Sat)
1x per Day Sun-Thu
1x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-
Thu
Restroom Sun - Thu
Restroom Fri - Sat
Deep 2x per Year Sun-
Thu
Deep 4x per Year Sun-
Thu
Restroom Deep 2x per Year Sun-
Thu
Deep 4x per Year Sun-
Thu
1 Locker Room 6 3 5 2 4 1 6 6 6 2 Locker Room 6 3 5 2 4 1 6 6 6 3 Rec Storage 23 1 1 2 1 23 23 4 Pool Pump / Equipment 59 1 1 4 1 59 59 5 Mechanical 23 2 1 23 6 Pool 249 1 5 2 4 1 249 249 249 7 Pool Deck 495 1 5 2 4 1 495 495 495 8 Cabana Deck and Bar 236 1 5 4 1 236 236 9 Stairs 20 1 5 2 2 1 20 20 20
10 Roof Cabana 60 2 1 60 11 Façade 1000 2 1 1000
Standard Cleaning Schedule Pool
Area or Number of
Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN # SUBCLIN A1 SUBCLIN A2 SUBCLIN A3 SUBCLIN A4 SUBCLIN A5 SUBCLIN A6 SUBCLIN A7 SUBCLIN B1 SUBCLIN B2 SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN D1
Total Sq.
Meters 1097 553 4104 136 3 3 360 5976 3 14703
RM #
Area Identification Times Per
Day
Times Per Work Week (S-
Th)
Times Per Weekend (Fri-
Sat)
Times Per Year
Conducted Work Week (S-
Th)
Conducted Weekend (Fri-
Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri- Sat
1x per Week Sun-Thu
2x per Week Sun-Thu
Restroom Sun
- Thur
Restroom Fri- Sat
Deep 1x per Year Sun-Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-Thu
Make Ready 1X/yr Sun-
Thu
1 Corridor 268 1 5 2 1 268 268
2 Apartment Type 8A 35 1 1 35
3 Apartment 7 (A and B) 65 1 1 65
4 Apartment Type 8B 35 1 1 35
5 ApartmentType 7 (A and B) 65 1 1 65
6 Apartment Type 7 (A and B) 65 1 1 65
7 Apartment Type 7 (A and B) 65 1 1 65
8 Apartment Type 7 (A and B) 65 1 1 65
9 Apartment Type 7 (A and B) 65 1 1 65
10 Apartment Type 7 (A and B) 65 1 1 65
11 Apartment Type 7 (A and B) 65 1 1 65
12 Storage 38 2 1 38
13 Office 69 1 5 2 1 69 69
14 Lounge 108 1 5 2 2 1 108 108 108
15 Utilities laundry 44 1 5 2 1 44 44
16 Mechanical 83 2 1 83
17 Mechanical 33 2 1 33
18 Trash 43 1 5 2 1 43 43
19 Mechanical 47 2 1 47
20 Storage 30 2 1 30
21 Mechanical 22 2 1 22
22 Lobby 283 1 5 2 2 1 283 283 283
23 Lounge 162 1 5 2 2 1 162 162 162
24 Mechanical 24 2 1 24
25 Mechanical 18 2 1 18
26 Storage 223 2 1 223
27 Mechanical 176 2 1 176
28 Trash 56 1 5 2 1 56 56
29 Mechanical 22 2 1 22
30 Corridor 476 1 1 2 1 476 476
31 Corridor 249 1 1 2 1 249 249
32 Corridor 249 1 1 2 1 249 249
33 Corridor 246 1 1 2 1 246 246
34 Corridor 246 1 1 2 1 246 246
35 Corridor 197 1 1 2 1 197 197
36 Corridor 236 1 1 2 1 236 236
37 Corridor 236 1 1 2 1 236 236
38 Corridor 236 1 1 2 1 236 236
39 Corridor 214 1 1 2 1 214 214
40 Corridor 214 1 1 2 1 214 214
41 Mechanical 468 1 1 2 1 468 468
42 Mechanical 477 1 1 2 1 477 477
43 Stairwell 90 1 1 1 1 90 90
44 Stairwell 90 1 1 1 1 90 90
45 Stairwell 90 1 1 1 1 90 90
46 Stairwell 90 1 1 1 1 90 90
47 Elevator 1 1 5 2 1 1 1
48 Elevator 1 1 5 2 1 1 1
49 Elevator 1 1 5 2 1 1 1
50 Elevator 1 1 5 2 1 1 1
51 Trash 6 1 5 2 1 6 6
52 Trash 6 1 5 2 1 6 6
53 Trash 6 1 5 2 1 6 6
54 Trash 6 1 5 2 1 6 6
55 Trash 6 1 5 2 1 6 6
56 Trash 6 1 5 2 1 6 6
57 Trash 6 1 5 2 1 6 6
58 Trash 6 1 5 2 1 6 6
59 Trash 6 1 5 2 1 6 6
60 Trash 6 1 5 2 1 6 6
61 Mechanical 28 2 1 28
62 Mechanical 28 2 1 28
63 Mechanical 28 2 1 28
64 Mechanical 28 2 1 28
65 Mechanical 28 2 1 28
66 Mechanical 28 2 1 28
67 Mechanical 28 2 1 28
68 Mechanical 28 2 1 28
69 Mechanical 28 2 1 28
70 Mechanical 28 2 1 28
71 Terrace 68 1 2 2 1 68 68
72 Terrace 68 1 2 2 1 68 68
73 Apartment Type 1 114 1 1 114
74 Apartment Type 1 114 1 1 114
75 Apartment Type 1 114 1 1 114
76 Apartment Type 1 114 1 1 114
77 Apartment Type 1 114 1 1 114
78 Apartment Type 1 114 1 1 114
79 Apartment Type 1 114 1 1 114
80 Apartment Type 3 114 1 1 114
81 Apartment Type 2A 114 1 1 114
82 Apartment Type 1 114 1 1 114
83 Apartment Type 1 114 1 1 114
84 Apartment Type 1 114 1 1 114
85 Apartment Type 1 114 1 1 114
86 Apartment Type 1 114 1 1 114
87 Apartment Type 1 114 1 1 114
88 Apartment Type 1 114 1 1 114
89 Apartment Type 3 114 1 1 114
90 Apartment Type 2A 114 1 1 114
91 Apartment Type 4 133 1 1 133
92 Apartment Type 1 114 1 1 114
93 Apartment Type 4 133 1 1 133
94 Apartment Type 1 114 1 1 114
95 Apartment Type 4 133 1 1 133
96 Apartment Type 1 114 1 1 114
97 Apartment Type 2A 114 1 1 114
98 Apartment Type 3 114 1 1 114
99 Apartment Type 4 133 1 1 133
100 Apartment Type 1 114 1 1 114
101 Apartment Type 1 114 1 1 114
102 Apartment Type 1 114 1 1 114
103 Apartment Type 1 114 1 1 114
104 Apartment Type 1 114 1 1 114
105 Apartment Type 1 114 1 1 114
106 Apartment Type 3 114 1 1 114
107 Apartment Type 4 133 1 1 133
108 Apartment Type 1 114 1 1 114
109 Apartment Type 1 114 1 1 114
110 Apartment Type 1 114 1 1 114
111 Apartment Type 1 114 1 1 114
112 Apartment Type 1 114 1 1 114
113 Apartment Type 1 114 1 1 114
114 Apartment Type 4 133 1 1 133
115 Apartment Type 1 114 1 1 114
116 Apartment Type 1 114 1 1 114
117 Apartment Type 1 114 1 1 114
118 Apartment Type 6 200 1 1 200
119 Apartment Type 1 114 1 1 114
120 Apartment Type 5 133 1 1 133
121 Apartment Type 4 133 1 1 133
122 Apartment Type 1 114 1 1 114
123 Apartment Type 1 114 1 1 114
124 Apartment Type 1 114 1 1 114
125 Apartment Type 6 200 1 1 200
126 Apartment Type 1 114 1 1 114
127 Apartment Type 5 133 1 1 133
128 Apartment Type 4 133 1 1 133
129 Apartment Type 1 114 1 1 114
130 Apartment Type 1 114 1 1 114
131 Apartment Type 1 114 1 1 114
132 Apartment Type 6 200 1 1 200
133 Apartment Type 1 114 1 1 114
134 Apartment Type 5 133 1 1 133
135 Apartment Type 4 133 1 1 133
136 Apartment Type 1 114 1 1 114
137 Apartment Type 1 114 1 1 114
138 Apartment Type 1 114 1 1 114
139 Apartment Type 6A 200 1 1 200
140 Apartment Type 1 114 1 1 114
141 Apartment Type 4A 133 1 1 133
142 Apartment Type 1 114 1 1 114
143 Apartment Type 1 114 1 1 114
144 Apartment Type 1 114 1 1 114
145 Apartment Type 6 200 1 1 200
146 Apartment Type 1 114 1 1 114
147 Restroom 1 3 5 2 2 1 1 1 1 1
148 Restroom 1 3 5 2 2 1 1 1 1 1
149 Restroom 1 3 5 2 2 1 1 1 1 1
150 Townhouse 250 1 1 250
151 Townhouse 250 1 1 250
152 Townhouse 250 1 1 250
153 Townhouse 250 1 1 250
154 Townhouse 250 1 1 250
155 Townhouse 250 1 1 250
156 Townhouse 250 1 1 250
157 Townhouse 250 1 1 250
158 Townhouse 250 1 1 250
159 Townhouse 250 1 1 250
160 Townhouse 250 1 1 250
161 Townhouse 250 1 1 250
162 Townhouse 250 1 1 250
163 Townhouse 250 1 1 250
164 Townhouse 250 1 1 250
165 Townhouse 250 1 1 250
166 Townhouse 250 1 1 250
167 Townhouse 250 1 1 250
168 Townhouse 250 1 1 250
169 Townhouse 250 1 1 250
Standard Cleaning Schedule
Residences/Appartments
(SDA)
Area or Number of
Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6
SUBCLIN
A7
SUBCLIN
B1
SUBCLIN
B2
SUBCLIN
B3
SUBCLIN
B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Met 606 733 1 1 709 635 105 1
RM
# Area Identification Times
Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-
Thu
2x per Week Sun-
Thu
Restroom Sun - Thur
Restroom Fri-Sat
Deep 1x per Year Sun-
Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-
Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year
Sun-Thu
Restroom Deep 2x per Year Fri-Sat
1 Corridor 64 1 1 1 1 64 64 2 Mechanical 105 1 1 4 1 105 105 3 Generator 85 1 1 1 1 85 85 4 Switchgear 138 1 1 1 1 138 138 5 Switchgear 138 1 1 1 1 138 138 6 Control Room 28 1 1 1 1 28 28 7 Control Room 27 1 1 27 8 Control Room 13 1 1 1 1 13 13 9 Workroom 11 1 1 1 1 11 11
10 Equipment 2 1 1 2 11 J.C. 4 1 1 4 12 Vest 3 1 1 1 1 3 3 13 Restroom 1 3 5 2 2 1 1 1 1 1 14 Electrical 25 1 1 25 15 Corridor 21 1 1 1 1 21 21 16 Telecom 7 1 1 7
17 TSS 5 1 1 5
18 Mechanical 317 1 2 2 1 317 317 19 mechanical 317 1 2 2 1 317 317 20 Stairwell 39 1 1 39 21 Mechanical 99 1 2 1 1 99 99
Standard Cleaning Schedule Utilities (UTL) m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6
SUBCLIN
A7
SUBCLIN
B1
SUBCLIN
B2
SUBCLIN
B3
SUBCLIN
B4
SUBCLIN
B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Meter 12 993 54 2 1907 41 2
RM # Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-
Thu
2x per Week Sun-
Thu
Restroom Sun - Thur
Restroom Fri-Sat
Deep 1x per Year Sun-
Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-
Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-
Thu
Restroom Deep 2x per Year
Sun-Thu
Restroom Deep 2x per Year Fri-Sat
1 Loading Dock <3m 211 1 1 1 1 211 211 2 Receiving Area <3m 133 1 1 1 1 133 133 3 High Bay Storage <3m 642 1 1 1 1 642 642 4 Work Room 32 1 2 2 1 32 32 5 Vestibule 7 1 2 2 1 7 7 6 Restroom 1 3 5 2 1 1 1 1 7 Storage 4 1 2 1 1 4 4 8 Corridor 102 1 1 102 9 Restroom 1 3 5 2 1 1 1 1
10 Storage 13 1 1 13 11 Storage 13 1 1 13 12 Storage 13 1 1 13 13 Storage 13 1 1 13 14 Storage 13 1 1 13 15 Storage 73 1 1 73 16 Supplies 79 1 1 79 17 Archives 35 1 1 35 18 Welcome Kits 51 1 1 51 19 Corridor 12 1 5 1 1 12 12 20 Storage 15 1 1 15 21 Storage 15 1 1 15 22 Storage 15 1 1 15 23 Storage 14 1 1 14 24 J.C. 7 1 1 1 1 7 7 25 Laundry 11 1 2 1 1 11 11
26 TSS 3 1 1 3
27 Mechanical 4 1 1 4 28 Mechanical 4 1 1 4 29 Mechanical 6 1 1 6 30 Mechanical 195 1 1 195 31 Mechanical 143 1 1 143 32 Storage 38 1 1 38 33 Stairwell 30 1 1 30
Standard Cleaning Schedule Warehouse (WHE) m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN # SUBCLIN A1 SUBCLIN A2 SUBCLIN A3 SUBCLIN A4 SUBCLIN A5 SUBCLIN A6 SUBCLIN A7 SUBCLIN B1 SUBCLIN B2 SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Mete 1937 94 38 1200 45 45 130 3909 45
RM # Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-
Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri- Sat
1x per Week Sun-Thu
2x per Week Sun-Thu
Restroom Sun
- Thur
Restroom Fri- Sat
Deep 1x per Year Sun-Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per
Year Sun-Thu
Restroom Deep 2x per Year Fri-Sat
1 Lobby 51 1 5 2 1 51 51 2 Corridor 117 1 5 2 1 117 117 3 Office 33 1 5 2 1 33 33 4 Office 40 1 5 2 1 40 40 5 Vest 10 1 5 2 1 10 10 6 Storage 69 1 2 1 1 69 69 7 Storage 49 1 2 1 1 49 49 8 Mechanical 13 2 1 13 9 Mechanical 10 2 1 10
10 Mechanical 74 2 1 74 11 Vehicle maintenance 207 2 2 2 1 207 12 Mechanical 9 2 1 9 13 Janitor Closet 26 1 2 2 1 26 26 14 Office 718 1 5 2 1 718 718 15 Office 13 1 5 2 1 13 13 16 Office 63 1 5 2 1 63 63 17 Office 55 1 5 2 1 55 55 18 Office 11 1 5 2 1 11 11 19 Conference Room 26 1 5 2 1 26 26 20 Restroom 2 3 5 2 2 1 2 2 2 2 21 Restroom 2 3 5 2 2 1 2 2 2 2 22 Corridor 62 1 5 2 1 62 62 23 Storage 8 1 2 1 1 8 8 24 Breakroom 42 1 5 2 1 42 42 25 Vest 5 1 5 2 1 5 5 26 Prayer 2 1 5 2 1 2 2 27 Vest 5 1 5 2 1 5 5 28 Prayer 2 1 5 2 1 2 2 29 Storage 38 1 1 2 1 38 38 30 Mechanical 70 2 1 70 31 Mechanical 7 2 1 7 32 Mechanical 13 2 1 13 33 Mechanical 18 2 1 18 34 Janitor Closet 4 1 2 1 1 4 4 35 Vest 3 1 5 2 1 3 3 36 Locker Room 2 3 5 2 2 1 2 2 2 2 37 Vest 3 1 5 2 1 3 3 38 Locker Room 5 3 5 2 2 1 5 5 5 5 39 Vehicle maintenance 425 1 2 2 1 425 425 40 Restroom 1 3 5 2 2 1 1 1 1 1 41 Bulk Storage 26 1 2 2 1 26 26 42 Shop 33 1 2 2 1 33 33 43 Storage 30 1 2 2 1 30 30 44 Shop 34 1 2 2 1 34 34 45 Storage 100 1 2 2 1 100 100 46 Shop 100 1 2 2 1 100 100 47 Shop 100 1 2 2 1 100 100 48 Shop 100 1 2 2 1 100 100 49 Shop 20 1 2 2 1 20 20 50 Shop 40 1 2 2 1 40 40 51 Corridor 155 1 5 2 1 155 155 52 Change Room 4 3 5 2 2 1 4 4 4 4 53 Change Room 8 3 5 2 2 1 8 8 8 8 54 Change Room 2 3 5 2 2 1 2 2 2 2 55 Change Room 2 3 5 2 2 1 2 2 2 2 56 Change Room 5 3 5 2 2 1 5 5 5 5 57 mechanical 5 2 1 5 58 mechanical 9 2 1 9 59 Break Room 60 2 5 2 1 60 60 60 Storage 21 1 2 2 1 21 21 61 Break Room 121 1 5 2 1 121 121 62 Break Room 28 1 5 2 1 28 28 63 Prayer 22 2 5 2 1 22 22 64 Prayer 12 2 5 2 1 12 12 65 Vest 14 1 5 2 1 14 14 66 Training Room 43 1 5 2 1 43 43 67 Lounge 73 1 5 2 1 73 73 68 Storage 5 1 2 2 1 5 5 69 Janitor Closet 3 1 2 2 1 3 3 70 Mechanical 256 2 1 256 71 Mechanical 6 2 1 6 72 Mechanical 7 2 1 7 73 Mechanical 21 2 1 21 74 Bunk Room 39 1 5 2 1 39 39 75 Vest 7 1 2 2 1 7 7 76 Bunk Room 68 1 5 2 1 68 68 77 Showers 4 3 5 2 2 1 4 4 4 4 78 Showers 8 3 5 2 2 1 8 8 8 8 79 Stairwell 45 1 5 2 1 45 45 80 Stairwell 45 1 5 2 1 45 45 81 Stairwell 45 1 5 2 1 45 45
Standard Cleaning Schedule
SUPPORT ANNEX
(SPX)
m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6
SUBCLIN
A7
SUBCLIN
B1
SUBCLIN
B2
SUBCLIN
B3
SUBCLIN
B4
SUBCLIN
B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Met 32 168 140 3 3 98 341 2 1
RM
# Area Identification Times Per
Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-
Thu
2x per Week Sun-
Thu
Restroom Sun - Thur
Restroom Fri-Sat
Deep 1x per Year Sun-
Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-
Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-
Thu
Restroom Deep 2x per Year
Sun-Thu
Restroom Deep 2x per Year Fri-Sat
1 Entry 58 2 5 2 1 58 58 2 Booth 12 1 5 2 1 12 12 3 Vehicle Area <3m 67 1 1 2 1 67 67 4 Restroom 1 3 5 2 2 1 1 1 1 1 5 Storage 4 2 1 4 6 Mechanical 10 2 1 10 7 Mechanical 7 2 1 7 8 Mechanical 8 2 1 8 9 Mechanical 6 2 1 6
10 Mechanical 4 2 1 4 1 Entry 57 2 5 2 1 57 57 2 Booth 10 1 5 2 1 10 10 3 Restroom 1 3 5 2 2 1 1 1 1 1 4 Booth 9 1 1 2 1 9 9 5 Mechanical 5 2 1 5 6 Mechanical 6 2 1 6 7 Mechanical 5 2 1 5 8 Mechanical 5 2 1 5 1 Entry 53 2 5 2 1 53 53 2 Booth 10 1 5 2 1 10 10 3 Vehicle Area <3m 64 1 1 2 1 64 64 4 Restroom 1 3 5 2 2 1 1 1 1 1 5 Storage 3 2 1 3 6 Mechanical 12 2 1 12 7 Mechanical 6 2 1 6 8 Mechanical 5 2 1 5 9 Mechanical 5 2 1 5
10 Mechanical 5 2 1 5
Standard Cleaning Schedule Entrances (CACs) m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6
SUBCLIN
A7 SUBCLIN B1 SUBCLIN B2 SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Met 84 220 2 2 378 250 10 2
RM # Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-
Thu
2x per Week Sun-
Thu
Restroom Sun - Thur
Restroom Fri-Sat
Deep 1x per Year Sun-Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per
Year Sun-Thu
Restroom Deep 2x per Year Fri-Sat
1 Entry 84 1 5 2 1 84 84 2 Booth 11 1 1 2 1 11 11 3 Vehicles Area <3m 155 1 1 2 1 155 155 4 Mechanical 15 2 1 15 5 Storage 6 2 1 6 6 Restroom 1 3 5 2 2 1 1 1 1 1 7 Janitor Closet 4 2 1 4 8 Mechanical 13 2 1 13 9 Mechanical 15 2 1 15
10 Restroom 1 3 5 2 2 1 1 1 1 1 11 Mechanical 6 2 1 6 12 Mechanical 5 2 1 5 13 Mechanical 6 2 1 6 14 Office 47 2 1 47 15 Trash Transfer 54 1 1 2 1 54 54 16 Receiving 55 2 1 55 17 Store 5 2 1 5 18 Mechanical 8 2 1 8 19 Mechanical 7 2 1 7 20 Mechanical 55 2 1 55 21 Mechanical 8 2 1 8 22 Mechanical 32 2 1 32 23 Mechanical 35 2 1 35 24 Façade 10 4 1 10
Standard Cleaning Schedule
Service Entrance (SCAC) m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN # SUBCLIN A1 SUBCLIN A2 SUBCLIN A3 SUBCLIN A4 SUBCLIN A5 SUBCLIN A6 SUBCLIN A7 SUBCLIN B1 SUBCLIN B2 SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Meters 46 42 1 1 65 48 1
RM # Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-
Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun- Thu
2x per Day Sun- Thu
1x per Day Fri- Sat
1x per Week Sun-Thu
2x per Week Sun-Thu
Restroom Sun - Thur
Restroom Fri- Sat
Deep 1x per Year Sun-Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-
Thu
Restroom Deep 2x per Year Fri-
Sat
1 Break Room 42 1 5 2 2 1 42 42 42 2 Mechanical 4 1 1 4 3 Storage 6 1 1 6 4 Restroom 1 3 5 2 2 1 1 1 1 1 5 Janitor Closet 1 2 1 1 6 Trash 4 1 5 2 1 4 4 7 Mechanical 5 1 1 5 8 Office 40 1 1 40 9 Mechanical 6 1 1 6
10 Mechanical 4 1 1 4
Standard Cleaning Schedule Break Room (LGBR) m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN # SUBCLIN A1 SUBCLIN A2 SUBCLIN A3 SUBCLIN A4 SUBCLIN A5 SUBCLIN A6 SUBCLIN A7 SUBCLIN B1 SUBCLIN B2 SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Met 300 75
RM # Area Identification Times Per Day Times Per Work
Week (Sun- Thu)
Times Per Weekend (Fri-
Sat) Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun- Thu
2x per Day Sun- Thu 1x per Day Fri-Sat 1x per Week Sun-
Thu 2x per Week Sun-
Thu Restroom Sun -
Thur Restroom Fri-Sat Deep 1x per Year Sun-Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-Thu
Restroom Deep 2x per Year Fri-Sat
1 Office 22 2 1 22 2 Façade 100 1 1 100 3 Office 31 2 1 31 4 Façade 100 1 1 100 5 Office 22 2 1 22 6 Façade 100 1 1 100
Standard Cleaning Schedule Office (CES) m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6
SUBCLIN
A7
SUBCLIN
B1
SUBCLIN
B2
SUBCLIN
B3
SUBCLIN
B4
SUBCLIN
B5
SUBCLIN
B6 SUBCLIN B7
Total Sq. Met 35 155 5
RM # Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-Thu
2x per Week Sun-Thu
Restroom Sun - Thur
Restroom Fri-Sat
Deep 1x per Year Sun-
Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-
Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-
Thu
Restroom Deep 2x per Year Sun-
Thu
Restroom Deep 2x per Year Fri-Sat
101 Smoking Area One, floor 6 1 2 1 1 6 6 Walls and Glass 25 2 1 1 25 Ash Receptacles 1 1 2 4 1 1 1
102 Smoking Area Two, floor 6 1 2 1 1 6 6 Walls and Glass 25 2 1 1 25 Ash Receptacles 1 1 2 4 1 1 1
103 Smoking Area Three, floor 6 1 2 1 1 6 6 Walls and Glass 25 2 1 1 25 Ash Receptacles 1 1 2 4 1 1 1
104 Smoking Area Four, floor 6 1 2 1 1 6 6 Walls and Glass 25 2 1 1 25 Ash Receptacles 1 1 2 4 1 1 1
105 Smoking Area Five, floor 6 1 2 1 1 6 6 Walls and Glass 25 2 1 1 25 Ash Receptacles 1 1 2 4 1 1 1
Standard Cleaning Schedule Smoking Area (DSA) m2 or Number of
Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6
SUBCLIN
A7
SUBCLIN
B1
SUBCLIN
B2
SUBCLIN
B3
SUBCLIN
B4
SUBCLIN
B5
SUBCLIN B6 SUBCLIN B7
Total Sq. Met 50 224
RM
# Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-
Sat) Times Per Year
Conducted Work Week (Sun-
Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-Thu
2x per Week Sun-Thu
Restroom Sun - Thur
Restroom Fri-Sat
Deep 1x per Year Sun-
Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-
Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-
Thu
Restroom Deep 2x per
Year Sun-Thu
Restroom Deep 2x per Year Fri-Sat interior - Hallway only 50 1 5 50 Room 100 14 1 1 14 Room 101 14 1 1 14 Room 102 14 1 1 14 Room 103 14 1 1 14 Room 104 14 1 1 14 Room 105 14 1 1 14 Room 106 14 1 1 14 Room 107 14 1 1 14 Room 108 14 1 1 14 Room 109 14 1 1 14 Room 110 14 1 1 14 Room 111 14 1 1 14 Room 112 14 1 1 14 Room 113 14 1 1 14 Mechanical 28 1 1 28
Standard Cleaning Schedule Dormatory (DORM) m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN # SUBCLIN A1 SUBCLIN A2 SUBCLIN A3 SUBCLIN A4 SUBCLIN A5 SUBCLIN A6 SUBCLIN A7 SUBCLIN B1 SUBCLIN B2 SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Met 1690 1690 8 8 50 2148 8
RM # Area Identification Times Per Day Times Per
Work Week (Sun-Thu)
Times Per Weekend (Fri-
Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun- Thu
2x per Day Sun- Thu
1x per Day Fri- Sat
1x per Week Sun-Thu
2x per Week Sun-Thu
Restroom Sun - Thur
Restroom Fri- Sat
Deep 1x per Year Sun-Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-
Thu
Restroom Deep 2x per Year Fri-
Sat gym interior 915 1 5 2 2 1 915 915 915 gym exterior 700 1 5 2 2 1 700 700 700 Restrooms 1,2,3,4 8 3 5 2 2 1 8 8 8 8 Kitchennette 50 1 5 2 1 1 50 50 50 Laundry 25 1 5 2 2 1 25 25 25 Vendor Rooms 500 2 1 500
Standard Cleaning Schedule Wellness Annex (WA) m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN
A2
SUBCLIN
A3
SUBCLIN
A4
SUBCLIN
A5
SUBCLIN
A6 CLIN D1
SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Met 80 2 434 82 2
RM # Area Identification Times Per Day Times Per
Work Week (Sun-Thu)
Times Per Weekend (Fri-
Sat) Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun-Thu
2x per Day Sun-Thu
1x per Day Fri-Sat
1x per Week Sun-
Thu
2x per Week Sun-
Thu
Restroom Sun - Thur
Make Ready 1/Year
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-
Thu
Restroom Deep 2x per Year Fri-
Sat
Kitchen 20 1 5 2 1 20 20 Laundry 20 1 5 2 1 20 20 Restroom 2 3 5 2 1 2 2 2 Living Room 40 1 5 2 1 40 40 HATS Unit #100 14 1 1 14 HATS Unit #101 14 1 1 14 HATS Unit #102 14 1 1 14 HATS Unit #103 14 1 1 14 HATS Unit #104 14 1 1 14 HATS Unit #105 14 1 1 14 HATS Unit #106 14 1 1 14 HATS Unit #107 14 1 1 14 HATS Unit #108 14 1 1 14 HATS Unit #109 14 1 1 14 HATS Unit #110 14 1 1 14 HATS Unit #111 14 1 1 14 HATS Unit #112 14 1 1 14 HATS Unit #113 14 1 1 14 HATS Unit #114 14 1 1 14 HATS Unit #115 14 1 1 14 HATS Unit #116 14 1 1 14 HATS Unit #117 14 1 1 14 HATS Unit #118 14 1 1 14 HATS Unit #119 14 1 1 14 HATS Unit #120 14 1 1 14 HATS Unit #121 14 1 1 14 HATS Unit #122 14 1 1 14 HATS Unit #123 14 1 1 14 HATS Unit #124 14 1 1 14 HATS Unit #125 14 1 1 14 HATS Unit #126 14 1 1 14 HATS Unit #127 14 1 1 14 HATS Unit #128 14 1 1 14 HATS Unit #129 14 1 1 14 HATS Unit #130 14 1 1 14
Standard Cleaning Schedule
HATS
m2 or Number of Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN # SUBCLIN A1 SUBCLIN A2 SUBCLIN A3 SUBCLIN A4 SUBCLIN A5 SUBCLIN A6 SUBCLIN A7 SUBCLIN B1 SUBCLIN B2 SUBCLIN B3 SUBCLIN B4 SUBCLIN B5 SUBCLIN B6 SUBCLIN B7
Total Sq. Mete 110 110
RM
# Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-
Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun- Thu
2x per Day Sun- Thu
1x per Day Fri- Sat
1x per Week Sun-Thu
2x per Week Sun-Thu
Restroom Sun - Thur
Restroom Fri- Sat
Deep 1x per Year Sun-Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-
Thu
Restroom Deep 2x per Year Fri-
Sat
1 Booth 5 1 1 1 1 5 5 2 Booth 5 1 1 1 1 5 5 3 Booth 5 1 1 1 1 5 5 4 Booth 5 1 1 1 1 5 5 5 Booth 5 1 1 1 1 5 5 6 Booth 5 1 1 1 1 5 5 7 Booth 5 1 1 1 1 5 5 8 Booth 5 1 1 1 1 5 5 9 Booth 5 1 1 1 1 5 5
10 Booth 5 1 1 1 1 5 5 11 Booth 5 1 1 1 1 5 5 12 Booth 5 1 1 1 1 5 5
100 Booth 10 1 1 1 1 10 10 101 Booth 10 1 1 1 1 10 10 102 Booth 10 1 1 1 1 10 10 103 Booth 10 1 1 1 1 10 10 104 Booth 10 1 1 1 1 10 10
Standard Cleaning Schedule Booths (GBs) m2 or Number of
Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
SUBCLIN # SUBCLIN E1 SUBCLIN E2 SUBCLIN E3 SUBCLIN E4 SUBCLIN E5 SUBCLIN E6
Total Sq. Met 9500 1750 15360 12000 26910 54000
RM
# Area Identification Times Per Day
Times Per Work Week (Sun-Thu)
Times Per Weekend (Fri-
Sat)
Times Per Year
Conducted Work Week (Sun-Thu)
Conducted Weekend (Fri-
Sat)
1x per Day Sun- Thu
2x per Day Sun- Thu
1x per Day Fri- Sat
1x per Week Sun-Thu
2x per Week Sun-Thu
Restroom Sun - Thur
Restroom Fri- Sat
Deep 1x per Year Sun-Thu
Deep 1x per Year Fri-Sat
Deep 2x per Year Sun-Thu
Deep 2x per Year Fri-Sat
Deep 4x per Year Sun-Thu
Restroom Deep 2x per Year Sun-
Thu
Restroom Deep 2x per Year Fri-
Sat
Roads A, B, C, D, E 12500 1 2 2 1 12500 12500 Walkways 8000 1 5 2 1 8000 8000 Road East Access 2500 1 2 2 1 2500 2500 COB Main Entrance Courtyard 1000 1 5 2 1 1000 1000 COB Atrium Courtyard 500 1 5 2 1 500 500 Tennis Court 450 1 1 2 1 450 450 Volleyball Court 300 1 1 2 1 300 300 Bar-B-Que's 60 1 2 2 1 60 60 Outdoor Eating Areas 300 1 2 2 1 300 300 Outdoor Eating Areas roof 300 2 1 300 Ponds and water features 5000 4 1 5000 Parking, Covered FAV 2100 1 4 1 2100 Parking, Employee 5000 1 4 1 5000 Parking, HATS area 900 1 4 1 900 Parking, Covered Utility Bldg. 500 1 4 1 500 Parking, Main Entry 500 1 4 1 500 Car Wash HATS 500 1 1 2 1 500 500 Car Wash Utility Bldg. 500 1 1 2 1 500 500 Perimeter wall both sides, m2 12000 1 1 12000 Area outside perimeter wall Est. m2 40000 4 1 40000
Standard Cleaning Schedule Exterior m2 or Number of
Fixtures
Deep Clean Schedule
Consulate General of the United States of America Erbil, IKR Annexure – 1 Cleaning Area Breakdown
| Building Totals |
| COB |
| TDY |
| POOL |
| SDA |
| UTL |
| WHE |
| SPX |
| CACs |
| SCAC |
| LGBR |
| CES |
| DSAs |
| DORM |
| WA |
| HATS |
| GBs |
| Exterior |
File details come from the government source that posted it. Updated .