This is Annexure XI – Structural Guidance, a technical appendix providing detailed construction standards for ADA toilet construction, lintel construction, and masonry connections.
The document specifies comprehensive requirements for ADA-compliant toilet construction, requiring vendors to conduct pre-construction site inspections, verify existing structural systems, and prepare layouts meeting Americans with Disabilities Act guidelines including minimum 5-foot clear turning radius and 32-inch minimum door openings. All structural design and civil work must comply with IS:456 (latest version), with vendors required to produce basis of design and CADD calculations for OBO representative review and approval. Civil and structural works include site marking, SBC testing, PCC bed and RCC footing construction (independent structure with 20–50 mm gap filled with flexible material to prevent stress transfer), floor and roof slab design, masonry walls, and plastering. Plumbing works encompass water supply line extensions, ADA-compliant WC installation at 17–19 inches height, wash basin installation, health faucet/bidet spray, floor trap connections to existing sewer lines with proper drainage slope, and stainless steel ADA-compliant grab bar installation. Electrical works include light points, exhaust fan, and switches at maximum 48 inches height. Finishing works require anti-skid floor tiles, wall tiles to lintel level, outward-opening doors, painting, and waterproofing. Critical ADA accessibility features include horizontal and vertical grab bars at 33–36 inches height, mirrors with bottom at maximum 40 inches, lever-type faucets, adequate maneuvering clearance, and threshold-free entry. Waterproofing must include membrane application on floors and walls to minimum 300 mm height with 24–48 hour ponding test and pipe penetration sealing. For lintel construction where new door openings occur in 230 mm thick masonry walls (maximum 1 meter opening), the process includes marking, temporary support provision, wall cutting to lintel level, shuttering, reinforcement fixing, minimum M20 concrete pouring, 7–10 day curing, gradual support removal, and minimum 150 mm bearing on each side. Old and new masonry joinery requires cutting existing walls in staggered (toothed) pattern with new bricks interlocked using strong cement mortar mix (1:4 or less) and avoiding butt joints. Deliverables include architectural drawings, structural drawings with connection details, plumbing and electrical layouts, and testing reports.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annexure XI – Structural Guidance
1. ADA Toilet Construction.
2. Lintel Construction.
3. New and Old Masonry connection.
Note:
1. Entire structural design and civil work shall be done as per IS:456 (latest version).
2. Vendor shall produce basis of design and share CADD calculations along with submittals for OBO representative review and approval.
1. ADA Toilet Construction:
Pre-Construction Activities
1. Site inspection and measurement of available vacant space.
2. Verification of existing structural system (RCC frame / load-bearing walls)
3. Preparation of layout as per ADA (Americans with Disabilities Act) guidelines:
a. Minimum clear space (minimum 5 ft clear turning radius)
b. Door width ≥ 32 inches clear opening
4. Approval of drawings (architectural + plumbing + electrical)
Option I:
Civil & Structural Works
• Marking and layout on site
• Excavation for the new foundation as designed and certified by a registered structural engineer and approved by COR.
• Designing of the columns and beams along with design basis and CADD calculations.
• Vendor shall test the SBC and also extent of existing foundations for the house, around to ensure that the design happens according to the ground realities.
• Construction of PCC (Plain Cement Concrete) bed followed by RCC footing
(independent structure).
• Floor slab design and calculations.
• Masonry walls (brick/block work)
• Roof slab design and calculations.
• Plastering (internal & external)
Method:
• Provide independent foundation and columns
• Maintain a small gap (20–50 mm) between new and old structure
• Fill gap with flexible material (foam / sealant)
Points to be noted:
• No stress transfers to existing structure.
• Prevents cracks due to differential settlement
C. Plumbing Works
• Extension of water supply lines from existing system
• Installation of:
o WC (Western, ADA height ~17–19 inches. Please refer guidance provided in SOW and Annexures) o Wash basin (ADA compliant. please refer guidance on installation of washbasin in SOW) o Health faucet / bidet spray
• Floor trap and drainage connection to existing sewer line (please refer attached plumbing drawing showing the main sanitary line passing close to this location for new connections.
• Proper slope for drainage
• Installation of grab bars (SS, ADA compliant)
D. Electrical Works
• Light points and exhaust fan
• Switches at accessible height (max. 48 inches above finished floor surface)
E. Finishing Works
• Anti-skid floor tiles
• Wall tiles up to lintel level
• Door installation (outward opening)
• Painting and waterproofing
F. Fixtures & Accessibility Features
• Grab bars (horizontal & vertical)
• Mirror at accessible height (bottom of mirror max. 40 inches above finished floor surface)
• Lever-type faucets
• Adequate maneuvering clearance
• Threshold-free entry
G. Waterproofing (Critical for Toilets)
• Apply waterproofing membrane on floor and walls (min 300 mm height) preferably full height)
• Conduct ponding test for 24–48 hours
• Use sealing around pipe penetrations
H. Key ADA Design Requirements
• Clear turning radius: 5 feet / 1524 mm
• Door: outward opening or sliding
• WC centerline: 16–18 inches from wall
• Grab bar height: 33–36 inches
• Sink clearance below for wheelchair
I. Important Precautions
• Do NOT cut existing beams/columns without structural approval
• Ensure proper slope for drainage (1:40 approx.)
• Maintain ventilation (window/exhaust)
• Avoid rigid connection if soil settlement risk exists
J. Deliverables
• Architectural drawings
• Structural drawings with connection details
• Plumbing & electrical layouts
• Testing reports
1. Lintel Construction (where new door openings are coming):
Note: No opening in masonry wall shall be more than 1m.
All walls are 230mm thick.
Make sure no slab or beam are directly resting on lintel.
a. Mark Opening.
b. Provide temporary support.
c. Cut wall up to the lintel level.
d. Place shuttering.
e. Fix reinforcement.
f. Pour concrete (minimum M20)
g. Cure for 7-10 days.
h. Remove support gradually.
i. Minimum bearing on each side – 150mm.
2. Old and New Masonry Joinery
a. Existing wall is cut in a staggered (toothed) pattern.
b. New bricks are interlocked in to these gaps.
c. Use strong mix of cement mortar (1:4 or less).
d. No butt joints.