This document is a Statement of Work (SOW) and Bill of Quantities (BOQ) for a federal contract opportunity to install UPVC windows and perform related renovation work at the Consulate General of the United States of America in Chennai, India.

The SOW outlines the required services, which include demolition of existing windows, civil works to prepare the window openings, installation of UPVC window frames and double-glazed toughened glass, carpentry work, painting, and disposal of materials. The BOQ provides detailed specifications and estimated quantities for the work, including dimensions and quantities of windows to be installed on the first and third floors. The contract also requires installation of scaffolding, gypsum and grid false ceilings, and Mylar film on the windows. The estimated total cost for the project is approximately 27,500 USD, inclusive of labor, materials, overhead, contingencies, and applicable taxes. The contract completion timeline is not specified. Vendors must provide all materials and be responsible for site work and cleanup in accordance with local regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW

CONSULATE GENERAL OF THE

UNITED STATES OF AMERICA

220 Anna Salai, Gemini Circle Chennai 600 006

PROJECT: Installation of UPVC windows for Consulate office building in Third Floor and First Floor

BOQ Date: Nov 03, 2023
***Please submit your quote ONLY as per this format. Quotes submitted in any other format shall not be considered.
SL #Description of WorkUnitQTYMaterialLaborRemarks, if any
RateAmountRateAmount
1Consulate General of The United States of America, Chennai has a requirement of hiring services of a civil / fabrication / interior contractor to carry out renovation and modifications in consulate office building. Work involved is replacement of old windows with UPVC frame, double glazed toughened glass windows in LAA space and first floors of Consulate office building. Work includes civil, fabrication, welding, windows installation, painting, and finishing works etc.

Contractor is responsible to provide and install all the materials on site for this work. Contractor shall be responsible for disposal of the dismantled / demolished material as per host Government rules and regulations.

Dismantling of existing windows.

Civil demolition works.

Disposal of materials as per regulations Civil works to get the window openings ready for installation.

UPVC Window frame installation works – GFCI (Govt. Furnished and Contractor Installed) Installation of glasses onto the window frames - GFCI Necessary carpentry works inclusive of ply barricading to be done.

(Total qty 22 no's of 176 Sqm approximately)

First Floor West side 5.11w x 1.605ht W51 to 58, 87&88Nos10.000.000.00
4.400w x 0.900ht W1Nos1.000.000.00
4.900 x 0.900ht W1Nos1.000.000.00
Third floor LAA area 5.195w x 1.650ht W61 to 67Nos7.000.000.00
2.420w x 2.55ht W26Nos1.000.000.00
5.130w x 2.55htNos1.000.000.00
2.410w x 2.555htNos1.000.000.00
2

Supply and installation of Gypsum and grid false ceiling work as necessary.

Painting and finishing.

(Total qty 22 no's of 176 Sqm approximately)Nos22.000.000.00
3Installation of Mylar film fixing to the glass inb windows to be done – GFCI (Total qty 22 nos of 176 Sqm approximately)Nos22.000.000.00
4Installation of Ms / Aluminum scaffolding in east side of office building with necessary working platforms to facilitate the installation of windows in 3rd floor. The scaffolding installed to be movable type so to demobilize away from windows during non working hours (Tentative Qty 10 no's)Nos10.000.000.00
Subtotal-A0.000.00
GST 18%-B0.000.00
A+B0.000.00
Duration for Project Completion (Mention No. of working days required)

Note: Qty Mentioned above are indicative

IMPORTANT POINTS:
1Please include any other additional requirement in the above table, as deemed necessary.
2If you notice any deviations between the SOW shared and BOQ, please raise during site inspection or submit questions in writing.
3Please include all applicable charges & provide clear price break-up in the quote.
4Please include brand/ make of product quoted, as applicable.
5Please include necessary remarks in the quote for the purpose of clarity.
6Necessary MS-Scaffoldings/ Suitable ladders to be provided for height above 1.5 meters
7Vendors need to take measurements at the time of site inspection
8The vendor should take extra care on the existing service and utility lines any damages caused during work progress to be rectified and handed over in its original state
9Contractor shall follow OBO code and IBC 2015 and applicable Indian local codes for any reference during work.

&P of &N &F|&A

IGCE

PROJECT NO: PROJECT NAME: SUPPLY AND INSTALLATION OF UPVC WINDOWS FOR CONSULATE OFFICE BUILDING THIRD FLOOR CONSULATE GENERAL OF THE

UNITED STATES OF AMERICA

ORIGIN OF CHANGE:DATE: NOVEMBER-03-2023
CONTRACT NO:
PROPERTY ID: 33064LOCATION: CONSULATE OFFICE BUILDING220 ANNA SALAI GEMINI CIRCLE
CHENNAI 600 006DRAWING NO:ESTIMATE NO:52
DOLLAR RATE: 1$ = ₹ 83SHEET NO:1
ITEM NODESCRIPTION OFWORKADDITIONSDEDUCTIONS
LABOURMATERIALSLABOURMATERIALS
QTYUNITCOST IN INRTOTAL IN DOLLARSQTYUNITCOST IN INRTOTAL IN DOLLARSQTYUNITCOST IN INRTOTAL IN DOLLARSQTYUNITCOST IN INRTOTAL IN DOLLARS

1 Consulate General of The United States of America, Chennai has a requirement of hiring services of a civil / fabrication / interior contractor to carry out renovation and modifications in consulate office building. Work involved is replacement of old windows with UPVC frame, double glazed toughened glass windows in LAA space and first floors of Consulate office building. Work includes civil, fabrication, welding, windows installation, painting, and finishing works etc.

Contractor is responsible to provide and install all the materials on site for this work. Contractor shall be responsible for disposal of the dismantled / demolished material as per host Government rules and regulations.

Dismantling of existing windows.

Civil demolition works.

Disposal of materials as per regulations Civil works to get the window openings ready for installation.

UPVC Window frame installation works – GFCI (Govt. Furnished and Contractor Installed) Installation of glasses onto the window frames - GFCI Necessary carpentry works inclusive of ply barricading to be done.

(Total qty 22 nos of 176 Sqm approximately)1LS440000.005301.201LS102300012325.30
SUBTOTAL5301.2012325.300.000.00
OVER HEAD CHARGES 15%795.18

tc={5C2801F1-6CE6-440A-88B5-E1C033076973}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

OHC for american escort not added because its done by Consulate directly1848.800.00.0
SUBTOTAL6096.3914174.100.00.0
CONTIGENCIES 10%609.641417.410.00.0
SUBTOTAL6706.0215591.510.00.0
GST 18%1207.082806.470.00.0
TOTAL7913.1118397.980.00.0
GRAND TOTAL IN NUMBERS26311.09
GRAND TOTAL IN WORDSRounded off Twenty seven thousand Five hundred only

&G

&1#&"Times New Roman,Regular"&10&K000000 &F|&A

Measurements

CONSULATE GENERAL OF THE

UNITED STATES OF AMERICA

220 Anna Salai, Gemini Circle Chennai 600 006

PROJECT: Installation of UPVC windows for Consulate office building in Third Floor and First Floor

BOQ Date: Nov 03, 2023
***Please submit your quote ONLY as per this format. Quotes submitted in any other format shall not be considered.
Sl noDescription of WorkUnitUnitNosLengthWidthHeightQty
1Consulate General of The United States of America, Chennai has a requirement of hiring services of a civil / fabrication / interior contractor to carry out renovation and modifications in consulate office building. Work involved is replacement of old windows with UPVC frame, double glazed toughened glass windows in LAA space and first floors of Consulate office building. Work includes civil, fabrication, welding, windows installation, painting, and finishing works etc.

Contractor is responsible to provide and install all the materials on site for this work. Contractor shall be responsible for disposal of the dismantled / demolished material as per host Government rules and regulations.

22.00
2Dismantling of existing windows.

Civil demolition works.

Disposal of materials as per regulations Civil works to get the window openings ready for installation.

UPVC Window frame installation works – GFCI (Govt. Furnished and Contractor Installed) Installation of glasses onto the window frames - GFCI Necessary carpentry works inclusive of ply barricading to be done.

(Total qty 22 nos of 176 Sqm approximately)

First Floor West side 5.11w x 1.605ht W51 to 58, 87&88Nos1.0010.001.001.001.0010.00
4.400w x 0.900ht W1Nos1.001.001.001.001.001.00
4.900 x 0.900ht W1Nos1.001.001.001.001.001.00
Third floor LAA area 5.195w x 1.650ht W61 to 67Nos1.007.001.001.001.007.00
2.420w x 2.55ht W26Nos1.001.001.001.001.001.00
5.130w x 2.55ht W27Nos1.001.001.001.001.001.00
2.410w x 2.555htNos1.001.001.001.001.001.00
22.00
3

Supply and installation of Gypsum and grid false ceiling work as necessary.

Painting and finishing.

(Total qty 22 nos of 176 Sqm approximately)

First Floor West side 5.11w x 1.605ht W51 to 58, 87&88Nos1.0010.001.001.001.0010.00
4.400w x 0.900ht W1Nos1.001.001.001.001.001.00
4.900 x 0.900ht W1Nos1.001.001.001.001.001.00
Third floor LAA area 5.195w x 1.650ht W61 to 67Nos1.007.001.001.001.007.00
2.420w x 2.55ht W26Nos1.001.001.001.001.001.00
5.130w x 2.55ht W27Nos1.001.001.001.001.001.00
2.410w x 2.555htNos1.001.001.001.001.001.00
22.00
4Installation of Mylar film fixing to the glass inb windows to be done – GFCI (Total qty 22 nos of 176 Sqm approximately)
First Floor West side 5.11w x 1.605ht W51 to 58, 87&88Nos1.0010.001.001.001.0010.00
4.400w x 0.900ht W1Nos1.001.001.001.001.001.00
4.900 x 0.900ht W1Nos1.001.001.001.001.001.00
Third floor LAA area 5.195w x 1.650ht W61 to 67Nos1.007.001.001.001.007.00
2.420w x 2.55ht W26Nos1.001.001.001.001.001.00
5.130w x 2.55ht W27Nos1.001.001.001.001.001.00
2.410w x 2.555htNos1.001.001.001.001.001.00
22.00
5Installation of Ms / Aluminum scaffolding in east side of office building with necessary working platforms to facilitate the installation of windows in 3rd floor. The scaffolding installed to be movable type so to demobilize away from windows during non working hours (Tentaive Qty 10 nos)
Nos11011110