J.25 11x17 Final Drawings USIBWC Sediment Basins 20180807.pdf

PDF 13 MB Posted

Attached to
Thurman Arroyos I and II Federal contract opportunity
Solicitation number
191BWC18B0004
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

J.25

View the file

Other files for this federal contract opportunity

Other files attached to Thurman Arroyos I and II, newest first.
File Type Posted
J.28_11x17_Final_Drawings_USIBWC_Sediment_Basins_20180808.zip ZIP file
J.30_Thurman_Amendment__Revised_Drawings_20180808.zip ZIP file
191BWC18B0004_0005.pdf PDF
J.29 22x34 Final Drawings USIBWC Sediment Basins 20180808.pdf PDF
J.29_22x34_Final_Drawings_USIBWC_Sediment_Basins_20180808.zip ZIP file
J.28 11x17 Final Drawings USIBWC Sediment Basins 20180808.pdf PDF
J.26_22x34_Final_Drawings_USIBWC_Sediment_Basins_20180807.zip ZIP file
191BWC18B0004_0004.pdf PDF
J.25_11x17_Final_Drawings_USIBWC_Sediment_Basins_20180807.zip ZIP file
J.27 Thurman Amendment Revised Drawings 20180807.pdf PDF
J.26 22x34 Final Drawings USIBWC Sediment Basins 20180807.pdf PDF
191BWC18B0004_0003.pdf PDF
J.21 22x34 Final Drawings USIBWC Sediment Basins 2018-06-14(d).pdf PDF
J.21_22x34_Final_Drawings_USIBWC_Sediment_Basins_2018-06-14(d).zip ZIP file
J.22 191BWC18B0004 Thurman Specs 20180731.pdf PDF
J.23 Thurman Add to Specs Mitigation Figures.pdf PDF
J.24 Thurman Amendment for changes to specifications and drawings 20180731.pdf PDF
J.22_191BWC18B0004_Thurman_Specs_20180731.zip ZIP file
J.20_11x17_Final_Drawings_USIBWC_Sediment_Basins_2018-06-14(d).pdf PDF
191BWC18B0004_0002.pdf PDF
J.23_Thurman_Add_to_Specs_Mitigation_Figures.zip ZIP file
191BWC18B0004_0001.pdf PDF
191BWC18B0004.pdf PDF
J.06_2015_10_20_Channel_Maint_Alternatives.pdf PDF
J.19_NM180014_01052018_NM14.pdf PDF
J.05_2011_10_BA_for_RGCP.pdf PDF
J.03_191BWC18B0004_Drawings_20180626_22x34.pdf PDF
J.12_Geotech_Hatch_Final_VI_S&B_8-4-2008.pdf PDF
J.10_2018_05_02_Mitigation_Plan_Thurman_I_and_II.pdf PDF
J.09_2017_12_06_EA_Thurman_I_and_II.pdf PDF
J.08_2017_08_16_BO_for_RGCP.pdf PDF
J.02_191BWC18B0004_Drawings_20180626_11x17.pdf PDF
J.04_2009_06_04_ROD_for_RGCP.pdf PDF
J.14_IBWC_Form_110.pdf PDF
J.17_IBWC_Form_245_Minimum_Quals_for_Award.pdf PDF
J.16_IBWC_Form_117.pdf PDF
J.07_2017_03_01_NWP_NMED_cert.pdf PDF
J.13_Geotech_Hatch_Final_VII_S&B_8-4-2008.pdf PDF
J.15_IBWC_Form_116.pdf PDF
J.11_2018_06_14_Thurman_Arroyos_Design_Report.pdf PDF
J.18_IBWC_Form_245B_Backup_Information.pdf PDF
J.01_Thurman_Specs_20180705.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

O

R

R

A

L

T

R

A

I

L

H

E

R

R

E

R

A

A

D

R

I

V

E

A

D

P

N

M

E

R

I

C

H

W

Y

BB ROMIG

RED HILLS RD

CANAL RD

C A

S T

A N

E D

A

R

D

A R

C H

S

T

C E

D E

R

G

R O

V

R

O

D

Y

L

T

E

R

A

L

H A

T C

H C

A N

A L

HATCH CANAL

C

A

N

Y

NEW MEXICO

DOÑA ANA

COUNTY

H

E

R

R

E

A

D

N

N

R

I

L

R

G

A

N

D

E

R

A

N

D

E

R

I

V

A

D

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

LOC

L

O

C

L

O

C

L O

C

L

O

C

L O

C

LOC

L

O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

LOC

LOC

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L O

C

L

O

C

L

O

C

L

O

C

Thurman I Arroyo

Thurman II Arroyo

USIBWC R-O-W NORTH SIDE

& LIMITS OF CONSTRUCTION

HATCH

USIBWC R-O-W SOUTH SIDE

LIMITS OF CONSTRUCTION

SOUTH SIDE OF RIVER

LEVEE ROAD

SAN JUAN

RIO

ARRIBA

TAOS

COLFAX

MCKINLEY

CIBOLA

SANDOVAL

SANTA

FE

UNION

SAN MIGUEL

MORA

HARDING

ROOSEVELT

CATRON

GRANT

SOCORRO

LINCOLN

VALENCIA

TORRANCE

SIERRA

HIDALGO

LUNA

DOÑA

ANA

OTERO

QUAY

BERNALILLO

GUADALUPE

CURRY

DE BACA

CHAVES

LEA

EDDY

MEXICO

OKLAHOMA

TEXAS

UTAH

COLORADO

ARIZONA

NEW MEXICO

UNITED STATES INTERNATIONAL

BOUNDARY AND WATER COMMISSION

Construction of Channel Maintenance Alternatives within the Rio Grande Canalization Project at

Thurman I Arroyo and Thurman II Arroyo

Doña Ana County, New Mexico

FINAL SUBMITTAL

9400 AMBERGLEN BLVD

AUSTIN, TEXAS 78729

(512) 454-4797

U.S. INTERNATIONAL BOUNDARY AND

WATER COMMISSION

4171 NORTH MESA, SUITE C-100

EL PASO, TEXAS 79902

PROJECT VICINITY MAP PROJECT LOCATION MAP

CONTRACT NO: IBM15D0003

TASK ORDER NO: IBM16T0018

SURVEY CONTROL

Horizontal coordinates are referenced to New Mexico State

Plane, Central Zone, North American Datum of 1983 (NAD 83).

Vertical coordinates are referenced to North American Vertical

Datum of 1988 (NAVD 88).

NOT TO SCALE

PROJECT LOCATION

0 1,000 2,000500

SCALE IN FEET

L A

G E

P r o j e c t s I N

F R i b w c I B n g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M T

C h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

C o v e r

S h e e t d w g

P l o t t e d

T u e s d a y

J u l y

P

M

1 2 3 4 5

D

C

A

B

DRAWING NO.:

SOLICITATION NO: 191BWC18B0004 CONTRACT NO: S

O

LI

C

IT

A

TI

O

N N

O : 1

B

W C

B

N

TR

A C

T N r a b y

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

I n d e x d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n c e t e r n a t i v e s w i t h i n t h e

R i o a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m a r r o d h u r m

A r r o y o

D o ñ u n t y

N x i c o

U R

S

G r o u p

I n c m b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

D R

A W

I N

G

I N

D E

X

A

N D

S U

M M

A R

Y

O

F

Q

U A

N T

I T

I E

S

DRAWING INDEX

Sheet

Number

Sheet Title

1 COVER SHEET

2 DRAWING INDEX AND SUMMARY OF QUANTITIES

3 LEGEND AND ABBREVIATIONS

4 GENERAL NOTES

5 EXISTING BORING PLAN

6 EXISTING BORING LOGS

7 OVERALL SITE PLAN SHEET 1 OF 2

8 OVERALL SITE PLAN SHEET 2 OF 2

9 THURMAN I ARROYO EXISTING SITE PLAN

10 THURMAN I ARROYO PLAN AND PROFILE

11 THURMAN I ARROYO SEDIMENT BASIN CROSS-SECTIONS

12 THURMAN II ARROYO EXISTING SITE PLAN

13 THURMAN II ARROYO PLAN AND PROFILE

14 THURMAN II ARROYO SEDIMENT BASIN CROSS-SECTIONS

15 TYPICAL SECTIONS

16 THURMAN I AND II ARROYO ACCESS ROAD PLANS

17 THURMAN I ARROYO END WALL PLAN AND PROFILE

18 THURMAN II ARROYO END WALL PLAN AND PROFILE

19 THURMAN I ARROYO INLET FLUME PLAN AND PROFILE

20 THURMAN I ARROYO INLET FLUME CROSS-SECTIONS

21 THURMAN II ARROYO INLET FLUME PLAN AND PROFILE

22 THURMAN II ARROYO INLET FLUME CROSS-SECTIONS

23 INLET FLUME DETAILS

24 STRUCTURAL GENERAL NOTES

25 END WALL FOUNDATION DETAILS

26 END WALL SECTIONS AND DETAILS SHEET 1 OF 2

27 END WALL SECTIONS AND DETAILS SHEET 2 OF 2

28 SEDIMENT REMOVAL PLAN & PROFILE STA 4555+00 TO STA 4546+00

29 SEDIMENT REMOVAL PLAN & PROFILE STA 4546+00 TO STA 4537+00

30 SEDIMENT REMOVAL PLAN & PROFILE STA 4537+00 TO STA 4528+00

31 SEDIMENT REMOVAL PLAN & PROFILE STA 4528+00 TO STA 4519+00

32 SEDIMENT REMOVAL PLAN & PROFILE STA 4519+00 TO STA 4510+00

33 SEDIMENT REMOVAL PLAN & PROFILE STA 4510+00 TO STA 4501+00

34 SEDIMENT REMOVAL PLAN & PROFILE STA 4501+00 TO STA 4492+00

35 SEDIMENT REMOVAL PLAN & PROFILE STA 4492+00 TO STA 4483+00

36 SEDIMENT REMOVAL PLAN & PROFILE STA 4483+00 TO STA 4474+00

37 SEDIMENT REMOVAL PLAN & PROFILE STA 4474+00 TO STA 4465+00

38 SEDIMENT REMOVAL PLAN & PROFILE STA 4465+00 TO STA 4456+00

39 SEDIMENT REMOVAL CROSS-SECTIONS STA 4554+50 TO STA 4548+00

40 SEDIMENT REMOVAL CROSS-SECTIONS STA 4547+00 TO STA 4540+00

41 SEDIMENT REMOVAL CROSS-SECTIONS STA 4539+00 TO STA 4532+00

42 SEDIMENT REMOVAL CROSS-SECTIONS STA 4531+00 TO STA 4524+00

43 SEDIMENT REMOVAL CROSS-SECTIONS STA 4523+00 TO STA 4516+00

44 SEDIMENT REMOVAL CROSS-SECTIONS STA 4515+00 TO STA 4508+00

45 SEDIMENT REMOVAL CROSS-SECTIONS STA 4507+00 TO STA 4500+00

46 SEDIMENT REMOVAL CROSS-SECTIONS STA 4499+00 TO STA 4492+00

47 SEDIMENT REMOVAL CROSS-SECTIONS STA 4491+00 TO STA 4484+00

48 SEDIMENT REMOVAL CROSS-SECTIONS STA 4483+00 TO STA 4476+00

49 SEDIMENT REMOVAL CROSS-SECTIONS STA 4475+00 TO STA 4468+00

50 SEDIMENT REMOVAL CROSS-SECTIONS STA 4467+00 TO STA 4460+00

51 SEDIMENT REMOVAL CROSS-SECTIONS STA 4459+00

1B

W C

B

JU

LY

1, STATE PLANE COORDINATES

INDICATES SECTION OR DETAIL

TAKEN FROM AND SHOWN ON

THE SAME SHEET, LETTER

INDICATES SECTION & NUMBER

INDICATES DETAIL

A

ABBREVIATIONS LEGEND

EXCAVATION

DEMOLITION

CHIMNEY BLANKET

CONCRETE

RIPRAP

N 614102.28

E 1354228.13

M

TYPE III BARRICADE

SIGN

MESSAGE BOARD

USIBWC EASEMENT

XX

SECTION "LETTER" OR DETAIL "#"

SHEET NUMBER

ALIGNMENT

DITCH

AC ACRES

ACP ASPHALTIC CONCRETE PAVING

AGGR AGGREGATE

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

APPROX APPROXIMATE

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AZ AZIMUTH

B/B BACK TO BACK

BC BACK OF CURB

BL BASE LINE

BM BENCHMARK

BMPS

BEST MANAGEMENT PRACTICES SYSTEM

BOT F BOTTOM FACE

C&G CURB AND GUTTER

CB CATCH BASIN

CFS CUBIC FEET PER SECOND

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONSTRUCTION JOINT

CL CENTER LINE

CMP CORRUGATED METAL PIPE

CONC CONCRETE

CONST CONSTRUCTION

COR

CONTRACTING OFFICER REPRESENTATIVE

CP CONTROL POINT

CPT CONE PENETRATION TEST

CU FT CUBIC FEET

CU YD CUBIC YARD

DEPTH

DA

DRAINAGE AREA

DEG DEGREE

DEMO DEMOLITION

DIA DIAMETER

DIST DISTANCE

DMS DEGREES, MINUTES, SECONDS

EASTING

EA EACH

EC EDGE OF CURB

EL ELEVATION

ELEC ELECTRIC

ENV ENVIRONMENTAL

ESMT EASEMENT

EW EACH WAY

EX EXTERNAL LENGTH

EXIST EXISTING

EXIST GR EXISTING GRADE

FH FIRE HYDRANT

FHWA FEDERAL HIGHWAY ADMINISTRATION

FIN FINISH

FIN GR FINISH GRADE

FLL FLOW LINE

FOC FACE OF CURB

FOW

FACE OF WALL

FT FOOT

FW FLOODWALL

NATURAL GAS

G LN GAS LINE

GALV GALVANIZED

GCA

GRADED CRUSHED AGGREGATE

GR GROUND

GR LN GRADE LINE

HORIZONTAL

HDWL HEADWALL

HGL

HYDRAULIC GRADE LINE

HNDRL HANDRAIL

HR HOUR

HS HIGH STRENGTH

HV HIGH VOLTAGE

HWY HIGHWAY

ID

INSIDE DIAMETER

IN INCHES

K-VALUE

kVA KILOVOLT AMPERE

LENGTH

LAT LATERAL

LBS POUNDS

LF LINEAR FEET (FOOT)

LR LEVEE RAISE

LS LUMP SUM

MAX MAXIMUM

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MSE MECHANICAL STABILIZED EARTH

MTZ METZGER

NORTHING

NAD83 NORTH AMERICAN DATUM (1983)

NAVD88 NORTH AMERICAN VERTICAL DATUM (1988)

No NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC

ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

PC POINT OF CURVE

PGL PROFILE GRADE

PI POINT OF INTERSECTION

PL

PROPERTY LINE

PP POWER POLE

PROP PROPOSED

PT POINT OF TANGENCY

PVMT PAVEMENT

PSI POUNDS PER SQUARE INCH

PVC POLY VINYL CHLORIDE

DISCHARGE

RADIUS

RCP REINFORCED CONCRETE PIPE

RD ROAD

REL RELOCATE

REM REMOVE

ROW RIGHT OF WAY

RR RAILROAD

SOUTH

SD STORM DRAIN

SEC SECOND

SF SQUARE FEET

SHLDR SHOULDER

SQ YD SQUARE YARD

SS SANITARY SEWER

ST STREET

STA STATION

SW SIDEWALK

SWPPP STORM WATER POLLUTION PREVENTION PLAN

TAN TANGENT

TCP TRAFFIC CONTROL PLAN

TE TOP ELEVATION

TEMP TEMPORARY

TOC TOP OF CURB

TOC FTG TOP OF CONCRETE FOOTING

TOC WALL TOP OF CONCRETE WALL

TOLE TOP OF LEVEE ELEVATION

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UNPV RD UNPAVED ROAD

USACE UNITED STATES ARMY CORPS OF ENGINEERS

USIBWC

U.S. INTERNATIONAL BOUNDARY & WATER COMMISSION

VERTICAL

VC

VEL VELOCITY

VFZ VEGETATION FREE ZONE

VPC VERTICAL POINT OF CURVATURE

VPI

VERTICAL POINT OF INTERSECTION

VPT VERTICAL POINT OF TANGENCY

WEST

W/ WITH

W/O WITHOUT

WPNT WATER PAINT MARK ON GROUND

EMBANKMENT FILL

LRGV LOWER RIO GRANDE VALLEY

TRAFFIC FLOW ARROW

N

NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

Q

R

S

V

W

K

L

H

G

E

D

VERTICAL CONTROL POINT

HORIZONTAL CONTROL POINT

HORIZONTAL VERTICAL CONTROL POINT

CULV CULVERT

RCB REINFORCED CONCRETE BOX

UNION PACIFIC RAILROADUPRR

CR COUNTY ROAD

FM FARM TO MARKET

FND FOUND

PCC POINT OF COMPOUND CURVE

SCP SECONDARY CONTROL POINT

CONSTRUCTION ZONE

FLOW

EPCWID1 EL PASO COUNTY WATER IMPROVEMENT DISTRICT #1

FLEX BASE

TOPSOIL

AREA TO BE SEEDED

WSE

WSE WATER SURFACE ELEVATION

X SECT CROSS SECTION

LOC

LIMITS OF CONSTRUCTION

LT LEFT

RT RIGHT

SHPO STATE HISTORIC PRESERVATION OFFICER

PRC POINT OF REVERSE CURVE

EMD ENVIRONMENTAL MANAGEMENT DIVISION

RGRP RIO GRANDE RECTIFICATION PROJECT

LEGEND

N.T.S.

R.O.W.

SQ.FT.

O.P.R.

D.P.R.

OVERHEAD ELECTRIC LINE

UTILITY POLE

FOUND 1" IRON PIPE

RECORD INFORMATION

NOT TO SCALE

OFFICIAL PUBLIC RECORD OF REAL PROPERTY OF

BEXAR COUNTY, TEXAS

DEED AND PLAT RECORDS OF BEXAR COUNTY, TEXAS

SQUARE FEET

RIGHT-OF-WAY

FIRE HYDRANT

LIGHT STANDARD

STORM WATER MANHOLE

WASTEWATER MANHOLE

WATER VALVE

SIGN/BILLBOARD (AS NOTED)

ELECTRIC TRANSFORMER

FOUND 1/2" IRON ROD

TELEPHONE PEDESTAL

FIR

FIP

GAS VALVE

GATE POST

CONCRETE

RCP REINFORCED CONCRETE PIPE

N.C.B.

NEW COUNTY BLOCK

FOUND NMDOT CONCRETE MONUMENT

UNLESS OTHERWISE NOTED

UNLESS OTHERWISE NOTED

UNLESS OTHERWISE NOTED

SOIL BORE

ROW

OHE

LOD LOD

LIMITS OF DISTURBANCE

CONCRETE WALL FOOTING

A

XX

SLURRY WALL

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

L e g e n d d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

L E

G E

B B

R E

V I A

T I O

N S

VERTICAL CURVE

TOB TOP OF BANK

WL WATER LINE / WALL BASELINE

OS OFFSET

1B

W C

B

JU

LY

1, a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

G e n e r a l

N o t e s d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

General Notes:

1.0 Coordinate work activities, including access, with the USIBWC

Contracting Officer's Representative (COR).

1.1 Contractor shall refer to technical Specifications Division 01-General

Requirements, 01.57.00 "Temporary Controls for Work Areas", and

01.57.13 "Temporary Environmental Controls".

1.2 The contractor will not contact the New Mexico Historical Preservation

Department (NPD), New Mexico Environmental Department (NMED), U.S. Fish and wildlife Service (USFWS), NEW MEXICO Parks and

Wildlife Department (NMPWD or the Environmental Protection Agency

(EPA) unless USIBWC environmental staff are present or have authorized the contractor to contact those entities.

1.3 All equipment that is used on government property must be fully operational and free of any oil or fluid leaks. Any leaks noted on equipment onsite shall be repaired immediately by the contractor, failure to do so will be cause for the government to reject the deficient equipments use onsite.

1.4 Contractor is responsible for condition of all completed contractual work until final acceptance of project is completed and contractor warranty is implemented by USIBWC.

1.5 Contractor is aware that other federal agencies / property owners / local agencies, may operate within project right of way. Contractor is responsible for securing any open excavations and other safety hazards at end of work shift every day.

1.6 The contractor is not allowed to use vegetative buffer as part of their

SWPPP Controls.

1.7 The contractor shall maintain all erosion control as required per the applicable specification 01.57.13 Temporary Environmental Controls throughout construction and shall inspect erosion controls on a minimum weekly basis.

1.8 All work shall be done by a contractor having a valid, appropriate contractor's license issued by the State of New Mexico Regulation and

Licensing Department.

1.9 All bid items are complete in place, including furnishing all materials, equipment, tools, supplies, incidentals, transportation and experienced personnel and superintendence required.

1.10 The contractor shall protect all adjacent property and existing and new improvements, and shall provide positive control of earth spillage, construction water and runoff water from the site.

1.11 The contractor shall limit all construction activities to within the USIBWC

Right-of -Way and easements as noted on the contract drawings.

1.12 All fees and permits required for the work shall be obtained and paid by the contractor. No project extension will be allotted due to time required to obtain permits.

1.13 The contractor shall comply with all local, state, and federal regulations related to the safety of personnel and the public on the job site, including

Applicable Occupational Safety and Health Administration Regulations, as well as USACE EM 385-1-1.

1.14 The contractor shall be responsible for site security at the staging and storage area during construction. Temporary fencing noted in the contractor's site security plan shall be installed and maintained by the contractor during the entire construction of the project.

1.15 During the course of all work on the project, the contractor shall assume sole and complete responsibility for all job site conditions including safety of all persons and security of all property. The contractor shall supervise and direct the work using the skills and attention utilized within the industry. The contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the work under this contract. This requirement shall apply continuously and not be limited to normal working hours. The contractor shall defend, indemnify and hold the USIBWC and the engineer harmless from any and all liability, real or alleged, in connection with the performance of the work on this project, excepting liability arising from the sole negligence of the USIBWC or engineer.

Survey Notes:

2.0 Existing topographic data shown on these plans was produced from a LiDAR survey performed in 2011.

2.1 This survey does not identify or delineate any surface or subsurface mineral rights, nor does it identify any rights to the surface resulting from said mineral rights.

2.2 Coordinates are based on North American Datum of 1983 (NAD83), New

Mexico State Plane Coordinate System, Central Zone (FIPS 3002), Grid

Coordinates.

2.3 Elevations shown herein are based on North American Vertical Datum of

1988 (NAVD 88) per the LiDAR data.

2.4 Utilities shown herein are based on field observations only.

Utility Coordination Notes:

3.0 A New Mexico 811 utility locate (Ticket #16OC310653) was requested for the subject property during design. At the time, the project area was found to be free of utilities. However, it will be the responsibility of the contractor to confirm that no utilities exist at the two sites.

3.1 Contractor shall contact New Mexico (811) 48 hours prior to beginning work at any location to ensure that the area is free of utilities within the work zone.

Contact information:

www.NM811.Org.

Phone: (505) 260-1165

Traffic Control Notes:

4.0 The contractor shall maintain traffic control for the project site in accordance with Specification Section 01.55.00 Vehicular Access and Parking.

Stormwater Pollution Prevention Plan (SWPPP) Notes:

5.0 The contractor shall perform SWPPP work in accordance with Specification

Section 01.57.13 Temporary Environmental Controls.

General Notes (cont):

1.16 If unanticipated conditions are encountered during the course of construction, the contractor shall immediately bring the condition to the attention of the USIBWC (COR).

1.17 A copy of these contract drawings shall be kept in an easily accessible location on the project site at all times during construction.

1.20 The contractor shall perform excavation in a safe condition. The contractor is solely responsible for shoring, sheeting, or other protective measures to prevent damage to adjacent properties, structures or utility facilities.

1.19 The USIBWC (COR) shall determine acceptability of the materials of construction as indicated in the applicable sections of the specifications. The contractor shall bear all costs of providing the burden of proof that non-conforming work is reasonable and adequately addresses the design purpose. The contractor shall bear all risk for continuing with non-conforming work in question until a determination regarding its acceptability is made by USIBWC (COR). The USIBWC (COR) may impose conditions for acceptance of non-conforming work. The contractor shall bear all costs for the fulfillment of the conditions imposed. All decisions regarding whether the work satisfies the design purpose, whether non-conforming work is reasonably acceptable, and the conditions for acceptance shall be at the sole discretion of the USIBWC (COR).

1.20 All trash, rubble, and debris encountered within the project limits shall be removed and disposed of offsite by the contractor at an approved location. The contractor shall pay all associated dumping fees.

1.21 Equipment and material not in use shall be located outside of the limits of the arroyo.

The floodplain shall remain clear of any obstruction when the contractor isn't actively working in the area.

1.22 These contract drawings have been prepared based on a LIDAR Survey. The existing underground utilities shown are based on as-built information provided by the

USIBWC. The best effort has been made to depict these utilities, but these locations shall be considered approximate. There may be additional underground utilities not shown on the contract drawings. It shall be the responsibility of the contractor to verify existence and location of all utilities including use of private utility locating service and potholing as necessary to confirm all utilities prior to construction per the applicable specification requirements.

1.23 Quantities shown on various “Quantity Summary Tables” herein shall be considered as informational only and shall not serve as the basis of the contractors bid. It is expressly understood and agreed that the quantities noted in these tables are not by virtue of submitting a bid, a part of the contract, and represent only an opinion by the engineer as to the quantities specific to that table. The quantity tables are included in the plans only for the convenience of bidders and their use is subject to all the conditions and limitations set forth in the contract documents relating to the examination of the contract documents and the submission of a bid. Specifically, submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality, and scope of work to be performed, the quantities of materials to be furnished, and the requirements of the contract documents. The bidder is cautioned that it is his/her sole responsibility to make such independent investigation and examination as the bidder deems necessary in order to satisfy his/herself as to the conditions to be encountered in the performance of work and the quantities required to complete the work in accordance with the contract documents. The bidder shall take no advantage of any apparent error or omission in the plans, bid schedule items, estimated quantities noted in the schedule, specifications or other contract documents. In the event the bidder discovers an apparent error or omission or be in doubt as to their meaning, the bidder shall immediately notify the USIBWC, in writing, requesting a clarification or interpretation.

Any clarification and or interpretation deemed appropriate by the USIBWC shall be issued to all prospective bidders in the form of an addendum. Any addendum so issued shall form a part of the contract documents.

1.24 Neither the USIBWC nor the engineer warrants or guarantees the results of any geotechnical or subsurface investigations as being representative of the site, beyond the actual location of the test specimen(s) and assumes no responsibility for the manner in which this information may be used or the conclusions reached in utilizing the information as provided in the contract documents. Further, the USIBWC and the engineer neither warrants or guarantees the conclusions reached, recommendations made or test results presented as part of the geotechnical or subsurface investigation as being representative of the entire site. It shall be the contractors sole responsibility to supplement any information provided with additional subsurface investigations and testing, at their sole expense in order to assure the information provided in the contract documents is representative of the conditions to be encountered within the limits of the project at the time of construction.

G E

N E

R A

L

N

O T

E S

1B

W C

B

JU

LY

1, © 2017 DigitalGlobe ©CNES (2017) Distribution Airbus DS © 2017 Microsoft Corporation

HT-72

HT-73

HT-74

HT-75

HT-77

HT-162

HT-163

HT-164

HT-165

HT-166

R

A

N

D

E

R

A N

D

E

THURMAN I ARROYO

THURMAN II ARROYO

U

S

I

B

O

W

U

S

I

B

O

W

U

S

I B

O

W

U

S

I B

O

W

U

S

I

B

O

W

U

S

I

B

O

W

HT-161

HT-76

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

B o r i n g

P l a n d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

0 200' 400'

SCALE: 1" = 200'

100'

N

E X

I S

T I N

G

B

O R

I N

G

P

L A

N

NOTES:

1. Boring locations are from the Final Technical Memorandum, Geotechnical Explorations of Levee System within the Rio Grande

Canalization Project, Hatch-Tonuco Levee Segment prepared by

S&B Infrastructure, Ltd. in association with Raba-Kistner Consultants, Inc. dated August 4, 2008.

2. See Sheet No. 6 for boring logs.

HT-74

EXISTING SOIL BORING

LEGEND:

1B

W C

B

JU

LY

1, NOTES:

1. No site or project specific geotechnical field investigation or sampling was performed for this design.

2. Boring logs shown hereon are from the Final Technical Memorandum, Geotechnical Explorations of Levee System within the Rio Grande

Canalization Project, Hatch-Tonuco Levee Segment prepared by

S&B Infrastructure, Ltd. in association with Raba-Kistner Consultants, Inc. dated August 4, 2008.

3. The existing geotechnical borings available for review as shown on this drawing only extend slightly below the bottom elevation of the proposed basin end walls. Consequently, unknown subsurface conditions exist below the proposed end walls.

4. Due to the lack of site-specific information, URS has made conservative assumptions of subsurface conditions to develop preliminary recommendations for drilled pier foundations. URS has conservatively assumed the subsurface conditions below the proposed basin end walls consist of loose, saturated sand with a unit weight of 100 pcf and effective friction angle of 28 degrees.

5. Although not a requirement of the contract, URS recommends these assumptions stated in Note 4 be validated prior to construction with additional deep geotechnical borings at each basin end wall location to:

1) ascertain if soil strengths are equal to or greater than those assumed for design; and 2) identify any challenging construction conditions that could result in unforeseen complications during construction. Such complications could include underground obstructions

(boulders/cobbles), conditions leading to borehole instability such as excessive drilling fluid loss in permeable sands/gravels or dense layers that preclude temporary casing advancement, and presence of soils requiring different drilling methods (e.g., very soft versus very hard material).

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

B o r i n g

P l a n d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

E X

I S

T I N

G

B

O R

I N

G

L

O G

S

1B

W C

B

JU

LY

1, C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L O

C

L O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L O

C

LOC LOC

LOC LOC

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L O

C

LOC

L O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

LOC

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

N

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

O v e r a l l

S i t e

P l a n d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

O V

E R

A L

L

S

I T

E

P

L A

N

S H

E E

F

0 200' 400'100'

SCALE IN FEET

SHEET 28

S

H

E

S

H

E

S

H

E

S

H

E

PROPOSED THURMAN II ACCESS

ROAD. SEE SHEET NO. 16.

PROPOSED THURMAN II ARROYO

SEDIMENT BASIN. SEE SHEET NO. 13

FOR PLAN AND PROFILE.

PROPOSED THURMAN I ARROYO

SEDIMENT BASIN. SEE SHEET NO. 10

FOR PLAN AND PROFILE.

PROPOSED THURMAN I ACCESS

ROAD. SEE SHEET NO. 16.

PROPOSED SEDIMENT REMOVAL.

SEE SHEETS 28 THRU 51.

R a n d e

R a n d e

C a n y

C a n y

BB Romig

H a t a i n

P e r i c y

L e v

L e v

U

S

I B

O

W

U

S

I B

O

W

U

S

I

B

O

W

Hatch Drain

SEE NOTE 1

SEE NOTE 3

SEE NOTE 3

U

S

I

B

O

W

T H

U R

M A

N

I I

A

R R

O Y

O

T

H

U

R

M

R

O

Y

O

D r a i n

M

A

T

E

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

SEE NOTE 2

LOC

LOC

Legend:

Limits of Construction

NOTES:

1. Limits of Construction on the north side of the project shall correspond to the the USIBWC Right-of-Way. The Contractor shall not encroach onto the private property north of the USIBWC Right-of-Way.

2. Limits of Construction on the south side of the project shall correspond to the the USIBWC Right-of-Way. The Contractor shall not encroach onto the private property south of the USIBWC Right-of-Way.

3. The Limits of Construction shall extend along the existing access road out to

Highway 26 to the east, and to Highway 187 to the west to allow for Contractor access.

4. The Contractor shall use a limited number of access points to the river within the Limits of Construction as shown for the sediment removal work. The COR shall approve all access points.

SEE NOTE 4

1B

W C

B

JU

LY

1, C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L O

C

L O

C

LOC

L O

C

L O

C

L O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

L O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L O

C

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

O v e r a l l

S i t e

P l a n d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

N

O V

E R

A L

L

S

I T

E

P

L A

N

S H

E E

F

0 400' 800'200'

SCALE IN FEET

S

H

E

S

H

E

S

H

E

S

H

E

S

H

E

S

H

E

PROPOSED SEDIMENT REMOVAL.

SEE SHEETS 28 THRU 51.

R a n d e

R a n d e

C a n y

C a n a l R d

C a s t a n e d a

R d

P l a c i t s r o y o

Levee R d

F r a n k l t

U

S

I B

O

W

U

S

I

B

O

W

U

S

I B

O

W

U

S

I B

O

W

H a t a i n

SEE NOTE 1

SEE NOTE 3

L e v

C o r r a i l

C o r r a i l

M

A

T

E

SEE NOTE 3

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

NOTES:

1. Limits of Construction on the north side of the project shall correspond to the the USIBWC Right-of-Way. The Contractor shall not encroach onto the private property north of the USIBWC Right-of-Way.

2. Limits of Construction on the south side of the project shall correspond to the the USIBWC Right-of-Way. The Contractor shall not encroach onto the private property south of the USIBWC Right-of-Way.

3. The Limits of Construction shall extend along the existing access road out to

Highway 26 to the east, and to Highway 187 to the west to allow for Contractor access.

4. The Contractor shall use a limited number of access points to the river within the Limits of Construction as shown for the sediment removal work. The COR shall approve all access points.

SEE NOTE 2

SEE NOTE 2

LOC

LOC

Legend:

Limits of Construction

SEE NOTE 4

1B

W C

B

JU

LY

1, C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

LOC

LOC

LOC

LOC

LOC LOC LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

L

O

C

L

O

C

L

O

C

L

O

C

LOCLOC

LOC

L O

C L

O C

L O

C L

O C

L

O

C

L O

C L

O C

L O

C L

O C

L O

C L

O C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

LOC

LOC

LOC

LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L O

C

L O

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

E x i s t

S i t e

P l a n s d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

0 25' 50' 100'

SCALE IN FEET

N

T H

U R

M A

N

I

A

R R

O Y

O

E

X I S

T I N

G

S

I T

E

P

L A

N

RIO GRANDE

R

A

N

D

E

EXISTING DIRT ROAD

E

X

I S

T

I

A

D

EXISTING ARROYO OUTLET

PRIVATE

PROPERTY

U

S

I B

O

W

E

X

I

S

T

I

U

R

M

R

O

Y

O

F L O

W

F

L

O

W

EXISTING VEGETATION

EXISTING VEGETATION

EXISTING VEGETATION

EXISTING VEGETATION

E X

IS

T

IN

G

L E

V E

E

E X

I S

T I

R

T

R

O

A D

NOTES:

1. See Survey notes on General Notes Drawing No.4 for horizontal and vertical control.

EXISTING VEGETATION

E

X

I S

T I

G

E

T A

T I O

N

U S

IB

W

C R

O

W

USIBWC R-O-W

E

X

I

S

T

I

A

D

FLOW

F

L

O

W

EXISTING DIRT ROAD

1B

W C

B

JU

LY

1, LOC

LOC

LOC

LOC

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

THURMAN I ARROYO

SEDIMENT BASIN BEGIN

STA.1+62.00

OFFSET=0.00

N=613885.32

E=1355355.36

D=15°42'15"

R=980.00

L=268.61

T=135.15

STA. 4+50.00

SEDIMENT DEPTH

GAUGE. FOR DETAILS

SEE SHEET NO. 26.

END WALL, BEGINS

WL STA.0+00.00

OFFSET=0.00

N=613553.64

E=1355195.99

END WALL, ENDS

WL STA.2+00.00

OFFSET=0.00

N=613458.11

E=1355371.70

THURMAN I ARROYO

SEDIMENT BASIN

CL STA.5+50.00

WL STA.1+00.00

OFFSET=0.00

N=613505.88

E=1355283.84

4+00

A

A

N

E

A

A

N

E

STA. 3+00.00

SEDIMENT DEPTH

GAUGE. FOR DETAILS

SEE SHEET NO. 26.

E L E

V A

T I O

N

F

T

E L E

V A

T I O

N

F

T

PROFILE - THURMAN I ARROYO

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+50

0 20 40 80

HORIZ. SCALE IN FEET

0 2 4 8

VERT. SCALE IN FEET

EXISTING GROUND (FROM 2011 LIDAR)

STA.5+40.00

EL = 4052.75'

END SEDIMENT BASIN

STA.5+50.00

EL = 4052.75'

PROPOSED SEDIMENT

BASIN END WALL

CL STA.5+50.00

= WL STA.1+00.00

S T

A

E

RIO GRANDE

BOTTOM OF EXCAVATION

AREA OF EXCAVATION

THURMAN I ARROYO

SEDIMENT BASIN

PROPOSED SEDIMENT BASIN END WALL.

SEE SHEET NO.17 FOR PLAN AND PROFILE.

6" THICK REINFORCED

CONCRETE INLET FLUME.

SEE SHEET NO. 19.

24.0'

13'

20.0'

-0.32%

0.00%

0.00%

PROPOSED SEDIMENT BASIN

END WALL FOUNDATION.

30" THICK ROCK RIPRAP (D

=15").

FOR DETAILS SEE SHEET NO.27.

BEGIN INLET FLUME

STA:1+62.00

EL = 4057.23

S T

A

E

END INLET FLUME

STA.2+49.00

EL = 4053.67

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

P l a n P r o f i l e s d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

N

T H

U R

M A

N

I

A

R R

O Y

O

P L

O

F I L

E

0 40' 80'20'

SCALE IN FEET

CL PROPOSED SEDIMENT BASIN

THURMAN I ARROYO

PROPOSED SEDIMENT BASIN END WALL.

SEE SHEET NO. 17 FOR PLAN AND PROFILE.

NOTES:

1. See Sheet No. 3 for Abbreviations and Legend.

2. See Sheet No. 4 for General Notes.

3. See Sheet No. 11 for Cross-Sections.

4. See Sheet No. 15 for Typical Sections.

LIMITS OF EXCAVATION

LIMITS OF EXCAVATION

E

X

I

S

T

I

A

D

E

X

I S

T

I

A

D

ACCESS ROAD. FOR

DETAILS SEE SHEET NO.16

THURMAN I ARROYO

SEDIMENT BASIN

30" THICK ROCK RIPRAP (D

=15").

FOR DETAILS SEE SHEET NO. 27.

6" THICK REINFORCED

CONCRETE INLET FLUME.

SEE SHEET NO. 19.

ACCESS RAMP. FOR DETAILS

SEE SHEET NO. 16.

A

G

G

R

E

G

A

T

E

R

O

U

R

F

A

C

I

N

G

U

S

I B

O

W

U

S

I B

O

W

U

S

I

B

O

W

U

S

I

B

O

W

R

A

N

D

E

LIMITS OF CONSTRUCTION

USIBWC R-O-W NORTH SIDE

& LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

NOTE:

BOTTOM AND SIDE SLOPES OF THE SEDIMENT BASINS

SHALL BE FINISHED SMOOTH TO THE GRADES SHOWN

ON THE DRAWINGS AND COMPACTED 6" MIN. DEPTH

TO 95% PER ASTM D1557.

1B

W C

B

JU

LY

1, E

V A

T I O

N

F

T

CL

THURMAN I ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 2+00.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN I ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 2+50.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN I ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 3+00.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN I ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 3+50.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN I ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 4+00.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

SEDIMENT

BASIN

E L E

V A

T I O

N

F

T

STA. 4+50.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN I ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 5+00.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN I ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 5+50.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

S e c t i o n s d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

T H

U R

M A

N

I

A

R R

O Y

O

S

E D

I M

E N

T

B A

S

O

S S

S

E C

T I O

N S

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF

EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

0 10' 20' 40'

SCALE IN FEET

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

PROPOSED END WALL

FOR DETAILS, SEE SHEET 14.

1B

W C

B

JU

LY

1, LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

LOC

LOC

L

O

C

L O

C L

O C

L O

C

LOC

LOC

LOC

LOC LOC

LOC

LOC

LOC

L

O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC

LOC

LOC LOC LOC LOC

LOC LOC LOC

LOC

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

E x i s t

S i t e

P l a n s d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

T H

U R

M A

N

I I

A

R R

O Y

O

E

X I S

T I N

G

S

I T

E

P

L A

N

N

R

A

N

D

E

EXISTING DIRT ROAD

EXISTING ARROYO OUTLET

PRIVATE

PROPERTY

USIBWC R-O-W

R

A

N

D

E

E

X

I

S

T

I

U

R

M

R

O

Y

O

EXISTING DRAIN

F L O

W

F

L

O

W

EXISTING VEGETATION

EXISTING VEGETATION

EXISTING VEGETATION

E

X

I S

T

I

G

E

T

A

T

I O

N

EXISTING VEGETATION

EXISTING VEGETATION

EXISTING VEGETATION

E

X

I S

T

I

A

D

NOTES:

1. See Survey Notes on General Notes Drawing No.4 for horizontal and vertical control.

USIBWC R-O-W

F

L

O

W

F

L

O

W

EXISTING VEGETATION

EXISTING DIRT ROAD

0 25' 50' 100'

SCALE IN FEET

1B

W C

B

JU

LY

1, C

L O

C

L O

C

L O

C

L O

C

L O

C

L O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

L

O

C

END WALL, BEGINS

WL STA.-0+00.00

OFFSET=0.00

N=614116.69

E=1353282.95

END WALL, ENDS

WL STA.2+00.00

OFFSET=0.00

N=614098.38

E=1353482.11

THURMAN ARROYO II

SEDIMENT BASIN

CL STA.5+50.00

WL STA.1+00.00

OFFSET=0.00

N=614107.54

E=1353382.53

THURMAN II ARROYO

SEDIMENT BASIN BEGINS

STA.1+30.00

OFFSET=0.00

N=614499.49

E=1353218.59

D=43°41'04"

R=340.00

L=259.23

T=136.28

D=45°23'02"

R=244.77

L=193.89

T=102.35

STA. 4+50.00

SEDIMENT DEPTH

GAUGE. FOR DETAILS

SEE SHEET NO.26

STA. 3+00.00

SEDIMENT DEPTH

GAUGE. FOR DETAILS

SEE SHEET NO. 26

3+00

9 4

P

E L

E V

A T

I O

N

F

T

E L

E V

A T

I O

N

F

T

PROFILE - THURMAN II ARROYO

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+50

0 20 40 80

HORIZ. SCALE IN FEET

0 2 4 8

VERT. SCALE IN FEET

EXISTING GROUND (FROM 2011 LIDAR)

BOTTOM OF EXCAVATION

STA.5+40.00

EL = 4053.5'

END SEDIMENT BASIN

STA.5+50.00

EL = 4053.5'

PROPOSED SEDIMENT

BASIN END WALL

CL STA.5+50.00

=WL STA.1+00.00

RIO GRANDE

AREA OF EXCAVATION

THURMAN II ARROYO

SEDIMENT BASIN

PROPOSED SEDIMENT BASIN END WALL.

SEE SHEET NO.18 FOR PLAN AND PROFILE.

24.0'

20.0'

-0 .7

0.00%

-2.98%

30" THICK ROCK RIPRAP (D

=15").

FOR DETAILS SEE SHEET NO. 27.

20.0'

PROPOSED SEDIMENT BASIN

END WALL FOUNDATION

6" THICK REINFORCED

CONCRETE INLET FLUME.

SEE SHEET NO. 21.

BEGIN INLET FLUME

STA.1+30.00

EL = 4060.44

S T

A

S T

A

END INLET FLUME

STA.2+24.00

EL = 4055.80

N

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

P l a n P r o f i l e s d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

T H

U R

M A

N

I I

A

R R

O Y

O

P L

O

F I L

E

0 40' 80'20'

SCALE IN FEET

CL PROPOSED SEDIMENT BASIN

THURMAN II ARROYO CHANNEL

PROPOSED SEDIMENT BASIN END WALL.

SEE SHEET NO.18 FOR PLAN AND PROFILE.

U

S

I

B

O

W

U

S

I B

O

W

R

A

N

D

E

NOTES:

1. See Sheet No. 3 for Abbreviations and Legend.

2. See Sheet No. 4 for General Notes.

3. See Sheet No. 14 for Cross-Sections.

4. See Sheet No. 15 for Typical Sections.

E

X

I

S

T

I

A

D

THURMAN II ARROYO

SEDIMENT BASIN

LIMITS OF EXCAVATION

LIMITS OF EXCAVATION

E

X

I

S

T

I

A

D

ACCESS ROAD,

FOR DETAILS SEE

SHEET NO. 16

30" THICK ROCK RIPRAP (D

=15").

FOR DETAILS SEE SHEET NO.27.

ACCESS RAMP. FOR DETAILS

SEE SHEET NO. 16.

A

G

G

R

E

G

A

T

E

R

O

U

R

F

A

C

I

N

G

U

S

I

B

O

W

U

S

I

B

O

W

6" THICK REINFORCED

CONCRETE INLET FLUME.

SEE SHEET NO. 21.

LIMITS OF CONSTRUCTION

USIBWC R-O-W NORTH SIDE

& LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

NOTE:

BOTTOM AND SIDE SLOPES OF THE SEDIMENT BASINS

SHALL BE FINISHED SMOOTH TO THE GRADES SHOWN

ON THE DRAWINGS AND COMPACTED 6" MIN. DEPTH

TO 95% PER ASTM D1557.

1B

W C

B

JU

LY

1, E

V A

T I O

N

F

T

CL

THURMAN II ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 2+00.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN II ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 2+50.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN II ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 3+00.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN II ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 3+50.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN II ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 4+00.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN II ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 4+50.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN II ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 5+00.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E L E

V A

T I O

N

F

T

CL

THURMAN II ARROYO

SEDIMENT BASIN

E L E

V A

T I O

N

F

T

STA. 5+50.00

0 10 20 30 40 50 60 70 80 90 100 110 1200102030405060708090100110120

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

S e c t i o n s d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

T H

U R

M A

N

I I

A

R R

O Y

O

S

E D

I M

E N

T

B A

S

O

S S

S

E C

T I O

N S

EXISTING

GRADE

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

EXISTING

GRADE

LIMITS OF

EXCAVATION

1V:3H SLOPE

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

BOTTOM OF EXCAVATION

0 10' 20' 40'

SCALE IN FEET

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

EXCAVATION NO

FILL REPLACEMENT

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

LIMITS OF

EXCAVATION

1V:3H SLOPE

PROPOSED END WALL

FOR DETAILS, SEE SHEET 15.

1B

W C

B

JU

LY

1, CL

SEDIMENT

BASIN

CL

SEDIMENT

BASIN

D r a

D e s i g n e d b y

R e v i e w e d b y

D a t e

S u b m i t t e d b y

D e s c r i p t i o n

A p p r o v e d

D a t e

S o l i c i t a t i o n

N o

C o n t r a c t

N o

R e v

P l o t

D a t e

P l o t

S c a l e

S y m b o l

L A

G E

P r o j e c t s I N

F R i b w c I B g i n e e r i n g

S e r v i c e s T a s k

O r d e r

I B

M

T h a n n e l

M a i n t e n a n c e

A l t e r n a t i v e s C

A D

D A c t i v e

D e s i g n P l a n

S h e e t s I B

M T

T y p i c a l

S e c t i o n s d o t t e d

T u e s d a y

J u l y

P

M

C h a n n e l

M a i n t e n a n t e r n a t i v e s w i t h i n t h e

R a n d e

C a n a l i z a t i o n

P r o j e c t a t

T h u r m r r o u r m

A r r o y o

D o u n t y

N x i c o

U R

S

G r o u p

I n c b e r g l e n

B l v d

A u s t i n

T e x a s

P r o j e c t

N o

U S

I N

T E

R N

A T

I O

N A

L

B

O U

N D

A R

Y

A N

D

W

A T

M

M I S

S I O

N

E L

P

A S

O

T

X

1 2 3 4 5

D

C

A

B

DRAWING NO.:

S L

S

M J L

B

M J

M J W

M

L e n h e r r

R E

V I S

I O

N S

T Y

P I C

C

T I O

N S

VARIES

VARIES

NOTES:

1. See Sheet No. 3 for legend and abbreviations.

2. See Sheet No. 4 for general notes.

3. See Sheet No. 11 Thurman I Arroyo sediment basin cross-sections for distance and elevations.

4. See Sheet No. 14 Thurman II Arroyo sediment basin cross-sections for distance and elevations.

DISTANCE VARIES SEE NOTES 3 & 4 VARIESDISTANCE VARIES SEE NOTES 3 & 4

BOTTOM OF EXCAVATION

SEE NOTES 3 & 4.

MATCH EXISTING GRADE

EXCAVATION NO FILL

REPLACEMENT

LIMITS OF EXCAVATION

3H:1V SIDE SLOPE

LIMITS OF EXCAVATION

3H:1V SIDE SLOPE

MATCH EXISTING GRADE

EXISTING GROUND

EXISTING GROUND

UNDISTURBED EARTH

UNDISTURBED EARTH

SCALE:

EXISTING TYPICAL SEDIMENT BASIN SECTION

1" = 10'

SCALE:

PROPOSED TYPICAL SEDIMENT BASIN SECTION

1" = 10'

NOTE:

BOTTOM AND SIDE SLOPES OF THE SEDIMENT BASINS

SHALL BE FINISHED SMOOTH TO THE GRADES SHOWN

ON THE DRAWINGS AND COMPACTED 6" MIN. DEPTH

TO 95% PER ASTM D1557.

0 5' 10' 20'

SCALE IN FEET

0 5' 10' 20'

SCALE IN FEET

1B

W C

B

JU

LY

1, C L

O C

L O

C L

O C

L O

C L

O C

L O

C L

O C

L O

C L

O C

L O

C

LOC

LOC

LOC

LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC

LOC

LOC

L

O

C

L

O

C

L O

C L

O C

L O

C L

O C

L O

C L

O C

L O

C L

O C

L O

C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC LOC

LOC

LOC

LOC

LOC LOC LOC LOC

LOC

LOC

LOC

29 30

POINT TABLE

POINT #

NORTHING

613820.55

613825.40

613822.72

613827.29

613829.97

613832.41

613944.23

613963.17

613967.54

613972.03

613936.25

613971.00

EASTING

1355201.88

1355203.11

1355198.89

1355195.99

1355200.21

1355195.85

1355258.43

1355224.57

1355227.01

1355224.81

1355242.40

1355261.94

ELEVATION

4063.15

4063.14

4063.14

4063.18

4063.21

4063.22

4064.33

4064.25

4064.26

4064.30

4064.42

4064.33

POINT TABLE

POINT #

NORTHING

614017.95

613983.09

613963.56

613852.82

613845.01

613854.64

613852.20

613854.87

613814.16

613825.40

613805.04

613788.96

613804.40

EASTING

1355178.28

1355158.76

1355193.61

1355131.64

1355145.60

1355150.99

1355155.36

1355159.58

1355185.37

1355203.11

1355197.96

1355261.47

1355265.67

ELEVATION

4064.61

4064.19

4064.48

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.