J.17_IBWC_Form_245_Minimum_Quals_for_Award.pdf

PDF 112 KB Posted

Attached to
Thurman Arroyos I and II Federal contract opportunity
Solicitation number
191BWC18B0004
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

IBWC Form 245 Minimum Quals for Award

View the file

Other files for this federal contract opportunity

Other files attached to Thurman Arroyos I and II, newest first.
File Type Posted
J.30_Thurman_Amendment__Revised_Drawings_20180808.zip ZIP file
191BWC18B0004_0005.pdf PDF
J.29 22x34 Final Drawings USIBWC Sediment Basins 20180808.pdf PDF
J.28_11x17_Final_Drawings_USIBWC_Sediment_Basins_20180808.zip ZIP file
J.29_22x34_Final_Drawings_USIBWC_Sediment_Basins_20180808.zip ZIP file
J.28 11x17 Final Drawings USIBWC Sediment Basins 20180808.pdf PDF
J.27 Thurman Amendment Revised Drawings 20180807.pdf PDF
J.25_11x17_Final_Drawings_USIBWC_Sediment_Basins_20180807.zip ZIP file
J.26_22x34_Final_Drawings_USIBWC_Sediment_Basins_20180807.zip ZIP file
191BWC18B0004_0004.pdf PDF
J.25 11x17 Final Drawings USIBWC Sediment Basins 20180807.pdf PDF
J.26 22x34 Final Drawings USIBWC Sediment Basins 20180807.pdf PDF
191BWC18B0004_0003.pdf PDF
J.20_11x17_Final_Drawings_USIBWC_Sediment_Basins_2018-06-14(d).pdf PDF
J.22_191BWC18B0004_Thurman_Specs_20180731.zip ZIP file
J.21 22x34 Final Drawings USIBWC Sediment Basins 2018-06-14(d).pdf PDF
J.21_22x34_Final_Drawings_USIBWC_Sediment_Basins_2018-06-14(d).zip ZIP file
J.22 191BWC18B0004 Thurman Specs 20180731.pdf PDF
J.23 Thurman Add to Specs Mitigation Figures.pdf PDF
J.24 Thurman Amendment for changes to specifications and drawings 20180731.pdf PDF
191BWC18B0004_0002.pdf PDF
J.23_Thurman_Add_to_Specs_Mitigation_Figures.zip ZIP file
191BWC18B0004_0001.pdf PDF
J.16_IBWC_Form_117.pdf PDF
J.07_2017_03_01_NWP_NMED_cert.pdf PDF
J.10_2018_05_02_Mitigation_Plan_Thurman_I_and_II.pdf PDF
J.09_2017_12_06_EA_Thurman_I_and_II.pdf PDF
J.08_2017_08_16_BO_for_RGCP.pdf PDF
J.02_191BWC18B0004_Drawings_20180626_11x17.pdf PDF
J.04_2009_06_04_ROD_for_RGCP.pdf PDF
J.14_IBWC_Form_110.pdf PDF
191BWC18B0004.pdf PDF
J.06_2015_10_20_Channel_Maint_Alternatives.pdf PDF
J.19_NM180014_01052018_NM14.pdf PDF
J.05_2011_10_BA_for_RGCP.pdf PDF
J.03_191BWC18B0004_Drawings_20180626_22x34.pdf PDF
J.12_Geotech_Hatch_Final_VI_S&B_8-4-2008.pdf PDF
J.13_Geotech_Hatch_Final_VII_S&B_8-4-2008.pdf PDF
J.15_IBWC_Form_116.pdf PDF
J.11_2018_06_14_Thurman_Arroyos_Design_Report.pdf PDF
J.18_IBWC_Form_245B_Backup_Information.pdf PDF
J.01_Thurman_Specs_20180705.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERNATIONAL BOUNDARY & WATER COMMISSION

MINIMUM QUALIFICATIONS FOR AWARD

(Individual, Partnership, Company, or Corporation)

IBWC Form 245(ESD) Updated 2/28/2017 Page 1 of 2 www.ibwc.gov

Any 'No' answer disqualifies a Contractor from bidding on this Project.

Answer the following questions: YES NO

Do you have a minimum of 5 years of experience on construction projects similar in magnitude, scope, and complexity to that described in the solicitation?

Valid experience must have occurred within the last 15 years.

Do you have experience as a prime contractor with the Federal government on projects similar in both scope and magnitude to this project?

Valid experience must have occurred within the last 10 years.

Contractor must have had contract directly with a Federal agency.

Do you have experience as a prime contractor on at least 2 projects similar in scope and magnitude to this project?

Valid experience must have occurred within the last 10 years.

Do you have a minimum of 5 years of experience in heavy construction that included primarily cast-in-place concrete work?

Valid experience must have occurred within the last 15 years.

Do you have experience as a prime contractor in concrete drilled piers?

Valid experience must have occurred within the las 10 years.

6 Do you have experience in earthwork construction?

Valid earthwork experience must have occurred within the last 15 years.

7 Do you have a Dun & Bradstreet (D&B) Viability Score of 5 or better?

1-Best, 9-Worst 5 or better indicates score of 5, 4, 3, 2, or 1

Do you have a Dun & Bradstreet (D&B) Portfolio Comparison Score of 5 or better?

1-Best, 9-Worst 5 or better indicates score of 5, 4, 3, 2, or 1

Notes: Magnitude refers to dollar amount of work.

Scope refers to technical requirements of work.

Complexity refers to difficulty of performing work due to many varied interrelated parts.

Similar in magnitude refers to projects priced at 85% of your bid and above.

Similar in scope refers to the same type of work with comparable or greater quantities.

Complete the attached forms, IBWC Form 245B-Backup Information, for each project which supports your 'yes' answers above.

I certify that my answers to these questions are true and correct.

If additional backup information is required by the Contracting Officer to further aide in determining responsibility in accordance with the general standards under Federal Acquisition Regulation (FAR) 9.104-1, I certify I will be able to submit the information within twenty-four (24) hours of the request.

If backup information is not provided when requested by the Contracting Officer or if backup information fails to support the answer provided, the Bidder will be found to be ineligible for award.

INTERNATIONAL BOUNDARY & WATER COMMISSION

MINIMUM QUALIFICATIONS FOR AWARD

(Individual, Partnership, Company, or Corporation)

IBWC Form 245(ESD) Updated 2/28/2017 Page 2 of 2 www.ibwc.gov

Sign Date

File details come from the government source that posted it.