J.24 Thurman Amendment for changes to specifications and drawings 20180731.pdf

PDF 71 KB Posted

Attached to
Thurman Arroyos I and II Federal contract opportunity
Solicitation number
191BWC18B0004
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to Thurman Arroyos I and II, newest first.
File Type Posted
J.30_Thurman_Amendment__Revised_Drawings_20180808.zip ZIP file
191BWC18B0004_0005.pdf PDF
J.29 22x34 Final Drawings USIBWC Sediment Basins 20180808.pdf PDF
J.28_11x17_Final_Drawings_USIBWC_Sediment_Basins_20180808.zip ZIP file
J.29_22x34_Final_Drawings_USIBWC_Sediment_Basins_20180808.zip ZIP file
J.28 11x17 Final Drawings USIBWC Sediment Basins 20180808.pdf PDF
J.27 Thurman Amendment Revised Drawings 20180807.pdf PDF
J.25_11x17_Final_Drawings_USIBWC_Sediment_Basins_20180807.zip ZIP file
J.26_22x34_Final_Drawings_USIBWC_Sediment_Basins_20180807.zip ZIP file
191BWC18B0004_0004.pdf PDF
J.25 11x17 Final Drawings USIBWC Sediment Basins 20180807.pdf PDF
J.26 22x34 Final Drawings USIBWC Sediment Basins 20180807.pdf PDF
191BWC18B0004_0003.pdf PDF
J.20_11x17_Final_Drawings_USIBWC_Sediment_Basins_2018-06-14(d).pdf PDF
J.21 22x34 Final Drawings USIBWC Sediment Basins 2018-06-14(d).pdf PDF
J.21_22x34_Final_Drawings_USIBWC_Sediment_Basins_2018-06-14(d).zip ZIP file
J.22 191BWC18B0004 Thurman Specs 20180731.pdf PDF
J.23 Thurman Add to Specs Mitigation Figures.pdf PDF
J.22_191BWC18B0004_Thurman_Specs_20180731.zip ZIP file
191BWC18B0004_0002.pdf PDF
J.23_Thurman_Add_to_Specs_Mitigation_Figures.zip ZIP file
191BWC18B0004_0001.pdf PDF
J.16_IBWC_Form_117.pdf PDF
J.07_2017_03_01_NWP_NMED_cert.pdf PDF
191BWC18B0004.pdf PDF
J.06_2015_10_20_Channel_Maint_Alternatives.pdf PDF
J.19_NM180014_01052018_NM14.pdf PDF
J.05_2011_10_BA_for_RGCP.pdf PDF
J.03_191BWC18B0004_Drawings_20180626_22x34.pdf PDF
J.12_Geotech_Hatch_Final_VI_S&B_8-4-2008.pdf PDF
J.10_2018_05_02_Mitigation_Plan_Thurman_I_and_II.pdf PDF
J.09_2017_12_06_EA_Thurman_I_and_II.pdf PDF
J.08_2017_08_16_BO_for_RGCP.pdf PDF
J.02_191BWC18B0004_Drawings_20180626_11x17.pdf PDF
J.04_2009_06_04_ROD_for_RGCP.pdf PDF
J.14_IBWC_Form_110.pdf PDF
J.17_IBWC_Form_245_Minimum_Quals_for_Award.pdf PDF
J.13_Geotech_Hatch_Final_VII_S&B_8-4-2008.pdf PDF
J.15_IBWC_Form_116.pdf PDF
J.11_2018_06_14_Thurman_Arroyos_Design_Report.pdf PDF
J.18_IBWC_Form_245B_Backup_Information.pdf PDF
J.01_Thurman_Specs_20180705.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Thurman Amendment 0002 for changes to specifications & drawings and additional attachments Changes to specifications:

1. 01.11.00 paragraph 1.5.B.5 (p. 38/434) – “flexible base” has been replaced with “Aggregate Road Surfacing”

2. 01.11.00 p. 2 paragraph 1.5.B. (p. 38/434) - Added subparagraph 8. “Construction of reinforced concrete inlet flumes”

3. 01.11.00 para. 3.4 - added subparagraph D. – “Contractor shall coordinate with mitigation contractor. Sediment removal of vegetated islands shall be in coordination with the mitigation contractor. Mitigation of the islands will be done by mitigation contractor during December 2018 – January 15, 2019. Contractor will have to work around these areas if necessary during this time frame.”

4. 32.15.00 Paragraph 3.5.B – removed “with a compliance confirmed spreader”

5. 32.32.13 paragraph 2.2.C. – revised adding “with an AOS of 70 Sieve maximum” to the end of paragraph.

Changes to drawings

1. Page 10 reference to “flexbase paved area” replaced with “Aggregate Road Surfacing”

2. Page 13 reference to “flexbase paved area” replaced with “Aggregate Road surfacing”

3. Page 23 Weep Hole Notes revised

4. Sheet 24 – Corrected proper capitalization and reference in note 8. For SP-66(04): American

Concrete Institute (ACI) Detailing Manual-2004."

5. Sheet 26 Section A - #5 bars revised to #6 bars, to be spaced at 8” each face

6. Sheet 28 Note 3 revised to:

Removal of the vegetated islands will be in coordination with the Mitigation contractor.

Sediment removal of the islands timing will occur so that the mitigation contractor can perform necessary Mitigation during December – January 15th. Contractor will have to work around these areas if necessary during this time frame.

7. Sheet 28 notes 3.1, 3.2, and 3.3 deleted

8. Revised drawings bar scales and graphic scales throughout

9. Revised detail numbers and letters throughout

Additional Attachments:

1. Figures 3. And 4. Of Mitigation Statement of Work

Revisions to Amendment 0001 page 3 of 4

1. On page 28 of the project plans, specifically the Sediment Removal Notes – Note 3; describes handling existing vegetation on the vegetated islands within the river channel. This note discusses the removal and transplanting of willows and cottonwoods. There is not a specification section for this activity. Is the Contractor responsible for completing the transplanting of vegetation (i.e. willows and cottonwoods, etc.)? If so, how is this work measured (quantified)? How will this work be paid for? Please provide clarification.

Note 3 has been revised. Notes 3.1, 3.2, and 3.3 have been deleted.

2. Regarding Specification - Aggregate Road Surfacing, Section 32.15.00 - Part 3.5 Installation, Paragraph B – “Place the material on the prepared subgrade or subbase in layers of uniform thickness with a compliance confirmed spreader.” Can you please provide additional information on what would be considered a “compliance confirmed spreader”?

Specification Section will be revised. There is no requirement for a specific type of spreader.

4. Similar to the above described question – There is not a CLIN for the Galvanized Steel Angle. Is this an oversight, or should this be considered as incidental to CLIN 004 Concrete End Walls?

This item is incidental to CLIN 004 Concrete End Walls.

6. The unit for CLINs 002 and 006 show a unit of “CD”. Not sure of this unit. Should this be Cubic Yards or “CY”?

Unit to be changed to CY via amendment.

Thurman Amendment 0002 for changes to specifications & drawings and additional attachments
Changes to specifications:
Changes to drawings
Additional Attachments:
Revisions to Amendment 0001 page 3 of 4