This is a Technical Specifications document prepared by MGE Associates in July 2026 for the City of Chester Police Station's third-floor interior renovations project located at 160 East 7th Street, Chester, Pennsylvania 19013. The project encompasses approximately 1,500 square feet of interior renovations across five designated areas: IT Server Room (Room 301), Office Area (Room 302), Office Area (Room 303), Detective Offices (Room 304), and Interview Room (Room 305). The renovations are necessitated by water intrusion damage resulting from failed exterior insulation and finish systems (EIFS) and windows, with exterior repairs currently underway. The scope of work includes demolition, installation or replacement of gypsum wallboard, insulation, flooring, rubber cove base, ceiling tiles, doors, vertical blinds, lighting fixtures, and interior paint finishes. All work must be completed within 90 calendar days from the issuance of the Notice to Proceed, and the contractor must maintain the building permit and contractor license with the City of Chester. The project will be awarded as a single-prime contract with all work performed during normal working hours while coordinating to minimize disruption to Police Department operations.

The contractor is responsible for all demolition, removal, and disposal costs, which are included in the base bid with no separate payment provided for these services. The City of Chester's IT staff will disconnect and remove all electronic and IT equipment, while the contractor must remove and properly dispose of existing furniture. The contractor must anticipate potential mold growth along exterior walls and concealed spaces due to previous water intrusion, with mold removal required per specifications and no additional payment provided. Pennsylvania Prevailing Wage Project Rates apply to this renovation contract. The specifications reference the International Building Code (Latest Edition) for all materials and construction procedures, and pre-construction photographs are required. The contractor must restore any damaged areas to their pre-existing condition, and the project manager retains final authority over cleaning and contaminated material removal completion before work can proceed.

View the file

Other files

File Type Posted
16-Exhibit D PA Prevailing Wage Project Rates.pdf PDF
1-3. Supporting Documents 3 Consent of Surety Form.pdf PDF
11-5. Supporting Documents 5 Public Works Employment Verification Form.pdf PDF
10-4. Supporting Documents 4 Non Collusion Affidavit Form.pdf PDF
14-3. Acknowledgement 3 Debarment and Suspension.pdf PDF
7-7. Supporting Documents 7 Conflict of Interest Disclosure Form.pdf PDF
17-Exhibit A Drawings.pdf PDF
20-Bid Packet 2026-002 Chester Police Station 3rd Floor Interior Renovations Version 1.2 Dated 072726.pdf PDF
3-9. Supporting Documents 9 Subcontractor Declarations Form.pdf PDF
18-Exhibit C Environmental Report.pdf PDF
6-11. Supporting Documents 11 Certification of Non-Segregated Facilities.pdf PDF
5-12. Supporting Documents 12 Certificate as to Corporate Principal Form.pdf PDF
8-6. Supporting Documents 6 Campaign Contributions Disclosure Form.pdf PDF
4-1. Supporting Documnets 1 Lump Sum Contract.pdf PDF
13-1. Acknowledgement 1 Workers Compensation.pdf PDF
12-4. Acknowledgement 4 Quantities of Work.pdf PDF
9-2. Supporting Documents 2 Bid Bond Form.pdf PDF
15-2. Acknowledgement 2 Sexual Harassment Non-Discrimination.pdf PDF
2-10. Supporting Documents 10 Statement of Bidders Questionnare Responses.pdf PDF
9-4. Acknowledgement 4 Debarment and Suspension.pdf PDF
4-3. Supporting Documents 3 Non Collusion Affidavit Form.pdf PDF
11-Bid Packet 2026-003 Municipal Parking Management and Enforcement.pdf PDF
1-2. Supporting Documents 2 Consent of Surety Form.pdf PDF
7-5. Supporting Documents 5 Campaign Contributions Disclosure Form.pdf PDF
10-2. Acknowledgement 2 Workers Compensation.pdf PDF
2-4. Supporting Documents 4 Public Works Employment Verification Form.pdf PDF
3-8. Supporting Documents 8 Certificate as to Corporate Principal Form.pdf PDF
5-1. Supporting Documents 1 Bid Bond Form.pdf PDF
8-3. Acknowledgement 3 Sexual Harassment Non-Discrimation.pdf PDF
6-6. Supporting Documents 6 Conflict of Interest Disclosure Form.pdf PDF
8-Acknowledgements 4 Sexual Harassment Non-Discrimation.pdf PDF
5-Supporting Documents 1 Non-Collusion Affidavit.pdf PDF
7-Acknowledgements 3 Workers Compensation.pdf PDF
3-Supporting Documents 3 Campaign Contributions Disclosure Form.pdf PDF
1-Bid Packet On-Call Towing Services Version 1.2 Dated 092625.pdf PDF
9-Acknowledgements 5 Debarment and Suspension.pdf PDF
6-Supporting Documents 6 Certificate as to Corporate Principal Form.pdf PDF
2-Supporting Documents 4 Conflict of Interest Disclosure.pdf PDF
4-Supporting Documents 2 Public Works Employment Verification.pdf PDF
7-Acknowledgements 3 Debarment or Suspension.pdf PDF
15-Recording Notice Residential Refuse and Recycling 081325 RFB 2025-009.pdf PDF
11-Supporting Documents 2 Consent of Surety.pdf PDF
13-Addendum 02 Dated 072925 RFB 2025-009 072925 Residential Refuse and Recycling.pdf PDF
4-Supporting Documents 4 Public Works Employment Verification.pdf PDF
14-Addendum 03 Dated 073025 RFB 2025-009.pdf PDF
1-Acknowledgements 2 Sexual Harassment and Non-Discrimination.pdf PDF
12-Addendum 01 Dated 072925 RFB 2025-009 Residential Refuse and Recycling.pdf PDF
2-Acknowledgements 1 Workers Compensation.pdf PDF
5-Supporting Documents 3 Non-Collusion Affidavit.pdf PDF
8-Supporting Documents 5 Campaign Contributions Disclosure Form.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL

SPECIFICATIONS

FOR

CITY OF CHESTER

CHESTER POLICE STATION 3RD

FLOOR RENOVATIONS

Prepared By: MGE Associates

JULY 2026

TABLE OF CONTENTS

TECHNICAL SPECIFICATIONS

Section 00000 – Scope of Work Section 02010 – Cleaning and Restorations

OTHER

Mold Identification, Cleaning and Removal

PLANS

City of Chester Police Department – Third Floor Office Renovations,” dated July 24, 2026.

CUSD - Chester High School – Media Center Renovations

Section 00000 - Scope of Work Page 1 of 3

SECTION 00000 - SCOPE OF WORK

PART 1 - GENERAL

1.01 SITE LOCATION

A. The project will be bid as a single project for the following location:

a. Chester Police Station, 160 E. 7th Street Chester, PA 19013

1.02 PROJECT DESCRIPTION AND SCOPE OF WORK

Project Scope:

The work consists of interior renovations to designated areas on the third floor of the Chester Police Station. These renovations are required due to water intrusion resulting from failed exterior insulation and finish systems (EIFS) and windows. Repairs to the exterior EIFS and windows are currently underway to correct the sources of water intrusion.

The interior renovations will include the following areas:

IT Server Room (Room 301) Office Area (Room 302) Office Area (Room 303) Detective Offices (Room 304) Interview Room (Room 305) The proposed work will generally include the installation or replacement of gypsum wallboard, insulation, flooring, rubber cove base, ceiling tiles within the existing ceiling grid, doors, vertical blinds, lighting fixtures, and interior paint finishes.

All work shall be completed in accordance with the contract documents titled “City of Chester Police Department – Third Floor Office Renovations,” dated July 24, 2026.

The work will be performed within the existing occupied building and shall be coordinated to minimize disruption to Police Department operations and adjacent areas.

A more detailed summary of the proposed improvements is provided below.

Section 00000 - Scope of Work Page 2 of 3

Detailed Summary of Work:

The contractor shall make the following assumptions when preparing their bid.

1. The work areas will remain unoccupied during construction. All electronic and IT equipment will be disconnected and removed by the City of Chester’s IT staff. IT equipment in the server room will remain and be moved as necessary by Chester City IT Staff to facilitate new work.

2. The Contractor shall be responsible for removing and properly disposing of all existing furniture, except for electronic and IT equipment. New furniture will be procured under a separate contract.

3. Due to previous water intrusion within portions of the building, the Contractor shall anticipate the potential presence of mold growth along exterior walls and within concealed spaces. No separate or additional payment will be made for mold removal.

If mold is encountered, the Contractor shall perform the required removal in accordance with the mold removal specifications.

4. The Contractor shall assume that all work will be performed during normal working hours and shall coordinate its activities to minimize disruption to Police Department operations and adjacent areas.

5. The project will be awarded and constructed as a single-prime contract.

Demolition and Furniture Removal

The Contractor shall be responsible for completing all demolition indicated on the contract drawings. Demolition shall include, but is not limited to, the removal and disposal of gypsum wallboard, acoustical ceiling tiles, flooring, furniture, damaged metal studs, batt insulation, doors, and all other items indicated for removal.

Electronic and IT equipment is specifically excluded and will be disconnected and removed by the City of Chester’s IT staff. No separate or additional payment will be made for demolition, removal, or disposal work.

New Work

New work is proposed within Rooms 301, 302, 303, 304, and 305. The work shall include, but is not limited to:

Installation of new acoustical ceiling tiles within the existing ceiling grid;

Installation of new flooring and rubber cove base;

Replacement and/or repainting of doors, as indicated;

Installation of new gypsum wallboard;

Installation of new lighting fixtures, as depicted on the drawings;

Cleaning and repainting of all perimeter radiator covers; and

Section 00000 - Scope of Work Page 3 of 3

Replacement of batt insulation and damaged metal studs where indicated or as directed by the Engineer.

The Contractor shall remove and reinstall existing radiator covers as necessary to facilitate the work. The covers shall be returned to their original locations following completion of the adjacent improvements. No separate or additional payment will be made for the removal, storage, preparation, painting, or reinstallation of the radiator covers.

1.03 GENERAL REQUIREMENTS

A. Construction layout of all proposed elements of construction to the plans.

B. Removal of existing features as incidental to the contract work items.

1.04 ADDITIONAL REQUIREMENTS

A. All Base Bid work by the Contractor must be 100% complete within the contract time limit of 90 calendar days. The contract time limit shall begin once a written Notice to Proceed order has been issued to the contractor.

B. The cost of all related incidental work, dust control, cleaning and restorations shall will be measured for this project.

C. All materials, construction procedures shall be in accordance with the Internation

Building Code, Latest Edition.

D. The contractor is responsible for the construction layout of this project.

E. The contractor shall take care of existing utilities within the building during construction.

F. Any areas of the buildings occupied by the contractor that are damaged shall be replaced in kind. Pre-Construction photographs are required.

G. A building permit and contractor license (with the City of Chester) will be required.

Contractor is responsible for all costs.

H. The project plans are appended and hereby included with the project specifications.

PART 2 – PRODUCTS

Not Used

PART 3 – EXECUTION

Not Used

PART 4 – QUANTITY AND PAYMENT

Not Used

END OF SECTION

Section 02010 - Cleaning and Restorations Page 1 of 2

SECTION 02010

CLEANING AND RESTORATIONS

PART 1 - GENERAL

1.01 Description

A. The Contractor shall provide all equipment, labor, and materials required to clean and restore the site to at least the pre-existing condition.

B. The Contractor shall maintain premises free from accumulations of waste, debris, and rubbish caused by work operations.

C. At the completion of work, the Contractor shall remove waste materials, rubbish, tools, equipment, machinery, and surplus materials, clean all visually exposed surfaces, and leave project site clean and ready for occupancy.

D. At the completion of work, the Contractor shall restore or replace, where and as directed by the Owner, any public or private property disturbed or damaged by Contractor's work operations to a condition at least equal to that existing prior to beginning work, or as otherwise specified. Materials, equipment and methods shall be approved by the Owner.

PART 2 - PRODUCTS

2.01 Materials

A. All materials shall comply with the International Building Code and Project

Specifications.

B. All Other Materials: As approved by the Owner or authorities having jurisdiction.

PART 3 – EXECUTION

3.01 Methods of Conducting Work - Cleaning

A. Requirements of regulatory agencies:

All excess material shall be removed from the site and disposed of by the Contractor at his expense. The cost of removal is to be included in the Base Bid for the Project. The disposal site shall be a permanently established licensed landfill.

Section 02010 - Cleaning and Restorations Page 2 of 2

B. Cleaning during construction:

The Contractor shall provide periodic cleaning to keep the work site clean.

The Contractor shall provide on-site containers for the collection of waste materials, debris, and rubbish, and shall maintain the containers as required. The containers shall be covered, as required, to prevent unauthorized use.

C. Dust control during construction:

The contractor shall control dust and maintain required means and methods to keep work site secured during construction.

END OF SECTION

MOLD IDENTIFICATON, CLEANING AND REMOVAL

Chester Police Station 3rd Floor Renovation Project

Visual Mold Identification

The scope of work for the Chester City Police Station renovation project requires the Contractor to clean salvageable, mold-contaminated surfaces and materials encountered during demolition and renovation of the police station. The presence of mold is not currently known; however, concealed mold or microbial growth may be encountered within walls, ceilings, or other concealed building components during renovation activities.

Cleaning Methods

If visible mold growth or water-damaged materials exhibiting microbial growth are encountered immediately stop work in the affected area and notify the Project Manager to determine the next steps for cleanup of the affected area.

The Contractor should follow the cleaning methods and use the recommended cleaning agents outlined in the U.S. Environmental Protection Agency (EPA) publication – Mold Remediation in Schools and Commercial Buildings

Mold Cleanup Preparation

Isolate the affected work area and perform all work in a manner that prevents the spread of dust throughout the building, Workers should be equipped, at a minimum, with N95 dust respirators, gloves, and goggles to protect workers during cleaning operation. Bag any mold contaminated materials that are being removed. HEPA vacuum area prior to cleaning process.

Cleaning of Contaminated Surfaces

HEPA vacuum area of mold contamination prior to wet cleaning to remove any mold containing dust

Clean salvageable non porous and semi porous materials (concrete) using methods and cleaning agents recommended by EPA

Damp wipe the area with a mild detergent to clean any remaining dust, then wipe dry.

Removal of Contaminated Materials

Remove porous building materials exhibiting visible mold growth that cannot be effectively cleaned including but not limited to gypsum board, porous ceiling tile, insulation, carpet, and carpet padding.

Carefully remove contaminated materials to minimize dust generation

Place contaminated materials directly into sealed polyethylene bags before transporting from the area.

Final Cleaning Inspection

Notify the project manager when cleaning and contaminated material removal has been completed. The project manager will make the final determination in allowing work to proceed after cleaning. The project manager reserves the right to require additional cleaning if visible contamination remains.