16-Exhibit D PA Prevailing Wage Project Rates.pdf

PDF 33 KB Posted

Attached to
Chester Police Station - 3rd Floor Interior Renovations
Solicitation number
Not on record
Issued by
Delaware County, Pennsylvania

About this file

This is a Pennsylvania Department of Labor & Industry prevailing wage rate document issued by the Bureau of Labor Law Compliance for the Chester Police Station 3rd Floor Renovations project (Serial Number 26-06948) in Delaware County, under the City of Chester's authority. The project involves approximately 1,500 square feet of interior renovations on the third floor of the Chester Police Station, including demolition, new drywall, new carpet, new lighting, painting, and incidental improvements. The project was determined to be a building classification project on July 24, 2026, with contract award occurring on August 26, 2026. The scope of work represents a lump sum contract opportunity managed by the Philadelphia Field Office of the Pennsylvania Bureau of Labor Law Compliance. The document was issued on July 25, 2026, providing prevailing wage rates effective through various expiration dates ranging from 2025 through 2030.

The prevailing wage rates document establishes mandatory hourly rates and fringe benefits for all trade classifications applicable to the project, with rates varying by trade and effective date. Applicable trades include carpenters, electricians, painters, plumbers, drywall finishers, cement masons, laborers, equipment operators, and numerous other classifications, with total compensation rates ranging from approximately $41 to $119 per hour depending on the trade and effective period. The document provides separate prevailing wage schedules for building construction and heavy/highway work classifications. All contractors and subcontractors must comply with these prevailing wage requirements, which are mandatory for public works projects in Pennsylvania. The rates are subject to periodic increases, with many trades showing scheduled rate adjustments through 2030.

View the file

Other files

File Type Posted
19-Exhibit B Technical Specifications.pdf PDF
1-3. Supporting Documents 3 Consent of Surety Form.pdf PDF
11-5. Supporting Documents 5 Public Works Employment Verification Form.pdf PDF
10-4. Supporting Documents 4 Non Collusion Affidavit Form.pdf PDF
14-3. Acknowledgement 3 Debarment and Suspension.pdf PDF
7-7. Supporting Documents 7 Conflict of Interest Disclosure Form.pdf PDF
17-Exhibit A Drawings.pdf PDF
20-Bid Packet 2026-002 Chester Police Station 3rd Floor Interior Renovations Version 1.2 Dated 072726.pdf PDF
3-9. Supporting Documents 9 Subcontractor Declarations Form.pdf PDF
18-Exhibit C Environmental Report.pdf PDF
6-11. Supporting Documents 11 Certification of Non-Segregated Facilities.pdf PDF
5-12. Supporting Documents 12 Certificate as to Corporate Principal Form.pdf PDF
8-6. Supporting Documents 6 Campaign Contributions Disclosure Form.pdf PDF
4-1. Supporting Documnets 1 Lump Sum Contract.pdf PDF
13-1. Acknowledgement 1 Workers Compensation.pdf PDF
12-4. Acknowledgement 4 Quantities of Work.pdf PDF
9-2. Supporting Documents 2 Bid Bond Form.pdf PDF
15-2. Acknowledgement 2 Sexual Harassment Non-Discrimination.pdf PDF
2-10. Supporting Documents 10 Statement of Bidders Questionnare Responses.pdf PDF
9-4. Acknowledgement 4 Debarment and Suspension.pdf PDF
4-3. Supporting Documents 3 Non Collusion Affidavit Form.pdf PDF
11-Bid Packet 2026-003 Municipal Parking Management and Enforcement.pdf PDF
1-2. Supporting Documents 2 Consent of Surety Form.pdf PDF
7-5. Supporting Documents 5 Campaign Contributions Disclosure Form.pdf PDF
10-2. Acknowledgement 2 Workers Compensation.pdf PDF
2-4. Supporting Documents 4 Public Works Employment Verification Form.pdf PDF
3-8. Supporting Documents 8 Certificate as to Corporate Principal Form.pdf PDF
5-1. Supporting Documents 1 Bid Bond Form.pdf PDF
8-3. Acknowledgement 3 Sexual Harassment Non-Discrimation.pdf PDF
6-6. Supporting Documents 6 Conflict of Interest Disclosure Form.pdf PDF
8-Acknowledgements 4 Sexual Harassment Non-Discrimation.pdf PDF
5-Supporting Documents 1 Non-Collusion Affidavit.pdf PDF
7-Acknowledgements 3 Workers Compensation.pdf PDF
3-Supporting Documents 3 Campaign Contributions Disclosure Form.pdf PDF
1-Bid Packet On-Call Towing Services Version 1.2 Dated 092625.pdf PDF
9-Acknowledgements 5 Debarment and Suspension.pdf PDF
6-Supporting Documents 6 Certificate as to Corporate Principal Form.pdf PDF
2-Supporting Documents 4 Conflict of Interest Disclosure.pdf PDF
4-Supporting Documents 2 Public Works Employment Verification.pdf PDF
7-Acknowledgements 3 Debarment or Suspension.pdf PDF
15-Recording Notice Residential Refuse and Recycling 081325 RFB 2025-009.pdf PDF
11-Supporting Documents 2 Consent of Surety.pdf PDF
13-Addendum 02 Dated 072925 RFB 2025-009 072925 Residential Refuse and Recycling.pdf PDF
4-Supporting Documents 4 Public Works Employment Verification.pdf PDF
14-Addendum 03 Dated 073025 RFB 2025-009.pdf PDF
1-Acknowledgements 2 Sexual Harassment and Non-Discrimination.pdf PDF
12-Addendum 01 Dated 072925 RFB 2025-009 Residential Refuse and Recycling.pdf PDF
2-Acknowledgements 1 Workers Compensation.pdf PDF
5-Supporting Documents 3 Non-Collusion Affidavit.pdf PDF
8-Supporting Documents 5 Campaign Contributions Disclosure Form.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Chester Police Station - 3rd Floor Renovations

General Description: The project includes renovations to the detective offices and other offices on the third floor at the Chester City Police Station. Generally, the work includes demolition, drywall, ceiling tile, lighting fixtures, painting and other incidental improvements.

Project Locality City of Chester

Awarding Agency: City of Chester

Contract Award Date: 8/26/2026

Serial Number: 26-06948

Project Classification: Building

Determination Date: 7/24/2026

Assigned Field Office: Philadelphia

Field Office Phone Number: (215)560-1858

Toll Free Phone Number:

Project County: Delaware County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 7/25/2026 Page 1 of 7

Project: 26-06948 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 5/1/2025 $60.84 $48.71 $109.55

Asbestos & Insulation Workers 5/1/2026 $64.51 $50.26 $114.77

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2026 $41.34 $19.23 $60.57

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Boilermakers 1/1/2026 $58.00 $36.57 $94.57

Bricklayer 5/1/2025 $50.00 $32.57 $82.57

Bricklayer 5/1/2026 $51.15 $34.92 $86.07

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $54.59 $29.02 $83.61

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $47.47 $29.02 $76.49

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $23.74 $20.62 $44.36

Carpenters 5/1/2025 $47.47 $29.02 $76.49

Carpenters 5/1/2026 $48.55 $30.39 $78.94

Carpenters 5/1/2027 $50.46 $30.74 $81.20

Carpenters 5/1/2028 $52.43 $31.09 $83.52

Carpenters 5/1/2029 $54.46 $31.44 $85.90

Carpenters 5/1/2030 $56.55 $31.79 $88.34

Cement Finishers & Plasterers 5/1/2022 $38.57 $32.39 $70.96

Cement Masons 5/1/2024 $46.70 $32.46 $79.16

Cement Masons 5/1/2025 $48.70 $32.46 $81.16

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Drywall Finisher 5/1/2025 $40.14 $32.35 $72.49

Electricians 6/2/2025 $52.71 $40.07 $92.78

Electricians 6/1/2026 $55.25 $41.28 $96.53

Electricians 5/31/2027 $57.33 $42.80 $100.13

Electricians 5/29/2028 $59.49 $44.14 $103.63

Electricians 5/28/2029 $61.64 $45.49 $107.13

Elevator Constructor 1/1/2025 $71.85 $45.77 $117.62

Elevator Constructor 1/1/2026 $74.86 $46.86 $121.72

Floor Coverer 5/1/2025 $51.67 $31.69 $83.36

Floor Coverer 5/1/2026 $52.84 $32.86 $85.70

Glazier 5/1/2025 $49.96 $38.34 $88.30

Glazier 5/1/2026 $51.30 $39.37 $90.67

Interior Finish 5/1/2023 $34.60 $25.80 $60.40

Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21

Iron Workers (Riggers) 7/1/2025 $44.77 $36.27 $81.04

Iron Workers (Riggers) 7/1/2026 $48.84 $36.52 $85.36

Iron Workers (Rodman/Reinforcing) 7/1/2025 $47.80 $36.65 $84.45

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/25/2026 Page 2 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Iron Workers (Rodman/Reinforcing) 7/1/2026 $52.39 $36.90 $89.29

Laborers (Class 01 - See notes) 5/1/2025 $37.25 $26.10 $63.35

Laborers (Class 02 - See notes) 5/1/2025 $41.00 $27.70 $68.70

Laborers (Class 03 - See notes) 5/1/2025 $37.67 $26.28 $63.95

Laborers (Class 04 - See notes) 5/1/2025 $37.67 $26.28 $63.95

Laborers (Class 05 - See notes) 5/1/2025 $37.25 $26.10 $63.35

Landscape Laborer 5/1/2024 $30.70 $24.23 $54.93

Landscape Laborer 5/1/2025 $32.15 $24.30 $56.45

Marble Finisher 5/1/2025 $41.17 $30.75 $71.92

Marble Finisher 5/1/2026 $42.07 $31.85 $73.92

Marble Mason 5/1/2023 $47.20 $31.95 $79.15

Marble Setter 5/1/2026 $51.50 $33.80 $85.30

Mason Tender, Cement 5/1/2023 $35.02 $25.98 $61.00

Millwright 5/1/2025 $57.39 $35.81 $93.20

Millwright 5/1/2026 $60.20 $35.81 $96.01

Operators (Building, Class 01 - See Notes) 5/1/2025 $54.52 $34.49 $89.01

Operators (Building, Class 01 - See Notes) 5/1/2026 $55.67 $35.34 $91.01

Operators (Building, Class 01A - See Notes) 5/1/2025 $57.52 $35.38 $92.90

Operators (Building, Class 01A - See Notes) 5/1/2026 $58.68 $36.22 $94.90

Operators (Building, Class 02 - See Notes) 5/1/2025 $54.27 $34.42 $88.69

Operators (Building, Class 02 - See Notes) 5/1/2026 $55.43 $35.26 $90.69

Operators (Building, Class 02A - See Notes) 5/1/2025 $57.29 $35.29 $92.58

Operators (Building, Class 02A - See Notes) 5/1/2026 $58.44 $36.14 $94.58

Operators (Building, Class 03 - See Notes) 5/1/2025 $50.18 $33.22 $83.40

Operators (Building, Class 03 - See Notes) 5/1/2026 $51.34 $34.06 $85.40

Operators (Building, Class 04 - See Notes) 5/1/2025 $49.88 $33.13 $83.01

Operators (Building, Class 04 - See Notes) 5/1/2026 $51.04 $33.97 $85.01

Operators (Building, Class 05 - See Notes) 5/1/2025 $48.16 $32.62 $80.78

Operators (Building, Class 05 - See Notes) 5/1/2026 $49.32 $33.46 $82.78

Operators (Building, Class 06 - See Notes) 5/1/2025 $47.17 $32.33 $79.50

Operators (Building, Class 06 - See Notes) 5/1/2026 $48.34 $33.16 $81.50

Operators (Building, Class 07A- See Notes) 5/1/2025 $66.26 $39.55 $105.81

Operators (Building, Class 07A- See Notes) 5/1/2026 $67.73 $40.48 $108.21

Operators (Building, Class 07B- See Notes) 5/1/2025 $65.97 $39.46 $105.43

Operators (Building, Class 07B- See Notes) 5/1/2026 $67.44 $40.39 $107.83

Painters Class 1 (see notes) 5/1/2025 $44.38 $34.55 $78.93

Painters Class 1 (see notes) 5/1/2026 $45.71 $35.22 $80.93

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 4 (see notes) 5/1/2025 $46.47 $34.55 $81.02

Painters Class 4 (see notes) 5/1/2026 $48.45 $35.22 $83.67

Plasterers 5/1/2024 $39.88 $33.08 $72.96 plumber 5/1/2025 $70.53 $39.46 $109.99 plumber 5/1/2026 $73.73 $40.36 $114.09

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/25/2026 Page 3 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15

Pointers, Caulkers, Cleaners 5/1/2026 $53.35 $32.30 $85.65

Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90

Roofers (Composition) 5/1/2026 $47.53 $35.22 $82.75

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 5/1/2025 $62.62 $52.17 $114.79

Sheet Metal Workers 5/1/2026 $65.06 $54.48 $119.54

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39

Sprinklerfitters 1/1/2023 $62.23 $31.99 $94.22

Sprinklerfitters 5/1/2025 $70.37 $34.85 $105.22

Steamfitters 5/1/2024 $70.32 $43.09 $113.41

Steamfitters 5/1/2025 $72.52 $44.89 $117.41

Stone Masons 5/1/2025 $50.00 $32.80 $82.80

Stone Masons 5/1/2026 $51.50 $33.80 $85.30

Terrazzo Finisher 5/1/2025 $45.61 $29.41 $75.02

Terrazzo Finisher 5/1/2026 $47.78 $29.61 $77.39

Terrazzo Grinder 5/1/2025 $45.88 $29.41 $75.29

Terrazzo Grinder 5/1/2026 $47.78 $29.61 $77.39

Terrazzo Mechanics 5/1/2025 $52.21 $31.26 $83.47

Terrazzo Mechanics 5/1/2026 $53.36 $32.61 $85.97

Tile Finisher 5/1/2025 $41.17 $30.75 $71.92

Tile Finisher 5/1/2026 $42.07 $31.85 $73.92

Tile Setter 5/1/2025 $52.21 $31.26 $83.47

Tile Setter 5/1/2026 $53.36 $32.61 $85.97

Truckdriver class 1(see notes) 5/1/2024 $36.79 $22.54 $59.33

Truckdriver class 1(see notes) 5/1/2026 $38.57 $23.87 $62.44

Truckdriver class 2 (see notes) 5/1/2024 $36.89 $22.54 $59.43

Truckdriver class 2 (see notes) 5/1/2026 $38.67 $23.87 $62.54

Truckdriver class 3 (see notes) 5/1/2026 $38.92 $23.87 $62.79

Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

Window Film / Tint Installer 6/1/2026 $28.35 $15.60 $43.95

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/25/2026 Page 4 of 7

Project: 26-06948 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Bricklayer 5/1/2025 $50.00 $32.57 $82.57

Bricklayer 5/1/2026 $51.15 $34.92 $86.07

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $65.96 $30.09 $96.05

Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $67.52 $30.44 $97.96

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $58.39 $29.06 $87.45

Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $60.09 $29.06 $89.15

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $45.88 $23.19 $69.07

Carpenter - Rodman (Surveying & Layout) 5/1/2026 $46.97 $23.54 $70.51

Carpenter 5/1/2025 $57.36 $30.09 $87.45

Carpenter 5/1/2026 $58.71 $30.44 $89.15

Cement Masons 5/1/2023 $43.20 $32.91 $76.11

Cement Masons 5/1/2025 $46.55 $32.66 $79.21

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $60.31 $44.97 $105.28

Dockbuilder/Pile Driver Diver 5/1/2026 $61.88 $45.47 $107.35

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Electric Lineman 6/3/2024 $62.07 $33.96 $96.03

Electric Lineman 6/2/2025 $65.10 $34.45 $99.55

Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21

Iron Workers (Riggers) 7/1/2023 $42.53 $34.14 $76.67

Iron Workers (Rodman/Reinforcing) 7/1/2023 $45.70 $34.77 $80.47

Laborers (Class 01 - See notes) 5/1/2025 $40.20 $27.80 $68.00

Laborers (Class 01 - See notes) 5/1/2026 $41.65 $27.90 $69.55

Laborers (Class 02 - See notes) 5/1/2025 $40.40 $27.80 $68.20

Laborers (Class 02 - See notes) 5/1/2026 $41.85 $27.90 $69.75

Laborers (Class 03 - See notes) 5/1/2025 $40.40 $27.80 $68.20

Laborers (Class 03 - See notes) 5/1/2026 $41.85 $27.90 $69.75

Laborers (Class 04 - See notes) 5/1/2025 $35.00 $27.80 $62.80

Laborers (Class 04 - See notes) 5/1/2026 $36.45 $27.90 $64.35

Laborers (Class 05 - See notes) 5/1/2025 $41.05 $27.80 $68.85

Laborers (Class 05 - See notes) 5/1/2026 $42.50 $27.90 $70.40

Laborers (Class 06 - See notes) 5/1/2025 $41.10 $27.80 $68.90

Laborers (Class 06 - See notes) 5/1/2026 $42.55 $27.90 $70.45

Laborers (Class 07 - See notes) 5/1/2025 $40.95 $27.80 $68.75

Laborers (Class 07 - See notes) 5/1/2026 $42.40 $27.90 $70.30

Laborers (Class 08 - See notes) 5/1/2025 $40.70 $27.80 $68.50

Laborers (Class 08 - See notes) 5/1/2026 $42.15 $27.90 $70.05

Laborers (Class 09 - See notes) 5/1/2025 $40.55 $27.80 $68.35

Laborers (Class 09 - See notes) 5/1/2026 $42.00 $27.90 $69.90

Laborers (Class 10- See notes) 5/1/2025 $40.70 $27.80 $68.50

Laborers (Class 10- See notes) 5/1/2026 $42.15 $27.90 $70.05

Laborers (Class 11 -See Notes) 5/1/2025 $40.60 $27.80 $68.40

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/25/2026 Page 5 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Laborers (Class 11 -See Notes) 5/1/2026 $42.05 $27.90 $69.95

Laborers (Class 12 -See Notes) 5/1/2025 $42.30 $27.80 $70.10

Laborers (Class 12 -See Notes) 5/1/2026 $42.85 $27.90 $70.75

Laborers (Class 13 -See Notes) 5/1/2025 $44.33 $27.80 $72.13

Laborers (Class 13 -See Notes) 5/1/2026 $45.78 $27.90 $73.68

Laborers (Class 14 -See Notes) 5/1/2025 $40.90 $27.80 $68.70

Laborers (Class 14 -See Notes) 5/1/2026 $41.90 $27.90 $69.80

Laborers Utility (PGW ONLY) (Flagperson) 5/1/2025 $34.07 $19.73 $53.80

Laborers Utility (PGW ONLY) (Flagperson) 5/1/2026 $35.52 $19.83 $55.35

Laborers Utility (PGW ONLY) 5/1/2025 $41.10 $19.73 $60.83

Laborers Utility (PGW ONLY) 5/1/2026 $42.55 $19.83 $62.38

Landscape Laborer 5/1/2024 $30.28 $24.05 $54.33

Landscape Laborer 5/1/2025 $31.73 $24.15 $55.88

Millwright 5/1/2025 $57.39 $35.81 $93.20

Millwright 5/1/2026 $60.20 $35.81 $96.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2025 $54.52 $34.49 $89.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2026 $55.67 $35.34 $91.01

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2025 $57.52 $35.38 $92.90

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2026 $58.68 $36.22 $94.90

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2025 $54.27 $34.42 $88.69

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2026 $55.43 $35.26 $90.69

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2025 $57.29 $35.29 $92.58

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2026 $58.44 $36.14 $94.58

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2025 $50.18 $33.22 $83.40

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2026 $51.34 $34.06 $85.40

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2025 $49.88 $33.13 $83.01

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2026 $51.04 $33.97 $85.01

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2025 $48.16 $32.62 $80.78

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2026 $49.32 $33.46 $82.78

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2025 $47.17 $32.33 $79.50

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2026 $48.34 $33.16 $81.50

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2025 $66.26 $39.55 $105.81

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2026 $67.73 $40.48 $108.21

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/25/2026 Page 6 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2025 $65.97 $39.46 $105.43

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2026 $67.44 $40.39 $107.83

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 2/1/2025 $50.85 $33.91 $84.76

Painters Class 2 (see notes) 2/1/2026 $51.61 $35.00 $86.61

Painters Class 3 (see notes) 2/1/2025 $61.81 $33.95 $95.76

Painters Class 3 (see notes) 2/1/2026 $62.57 $35.04 $97.61

Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $68.89 $44.73 $113.62

Truckdriver class 1(see notes) 5/1/2024 $36.64 $22.54 $59.18

Truckdriver class 1(see notes) 5/1/2026 $38.42 $23.87 $62.29

Truckdriver class 2 (see notes) 5/1/2024 $36.74 $22.54 $59.28

Truckdriver class 2 (see notes) 5/1/2026 $38.52 $23.87 $62.39

Truckdriver class 3 (see notes) 5/1/2026 $38.77 $23.87 $62.64

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/25/2026 Page 7 of 7

File details come from the government source that posted it. Updated .