1883701 SAO SMA - PACU Replacement_Final Dwgs_2023.04.14.pdf
PDF 8 MB Posted
- Solicitation number
- 33330223RF0010042
- Issued by
-
Smithsonian Institution
About this file
This document package includes construction drawings and specifications for the replacement of the package air conditioning unit and associated fire alarm and fire protection systems at the Smithsonian Astrophysical Observatory's Submillimeter Array base facility in Mauna Kea Science Reserve, Hawaii. The project entails replacing the existing HVAC system and installing new fire alarm and fire suppression systems. Drawings cover demolition plans, new system layouts, schedules, details and sequences of operation. Specifications address requirements for mechanical, electrical, fire protection and alarm work. Proposed construction includes installing new chillers, air handlers, ductwork, controls and electrical components to condition the facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ChanVC Typewriter Appendix 1
NOEI
PH: (808) 536-2626 FAX: (808) 536-3926
HONOLULU, HAWAII 96813.1003 BISHOP STREET
PAUAHI TOWER, SUITE 2025
CONSULTING STRUCTURAL ENGINEERS
HONOLULU, HAWAII 96813.1003 BISHOP STREET
HONOLULU, HAWAII 96813.1003 BISHOP STREET
HONOLULU, HAWAII 96813.1003 BISHOP STREET
HONOLULU, HAWAII 96813.1003 BISHOP STREET
M
M www.coffman.com ph 808.687.8884
745 Fort Street, Suite 400 Honolulu, HI 96813
FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
DESCRIPTION
SMOKE DETECTOR, PHOTOELECTRICS P
NEW
1. DESIGN AND INSTALLATION OF THE CLEAN AGENT FK-S-1-12 (NOVEC 1230) FIRE
EXTINGUISHING SYSTEM MUST BE IN ACCORDANCE WITH NFPA 2001-2018, AND
SPECIFICATION SECTION 21 22 00.
2. DEVICES AND EQUIPMENT MUST BE UL LISTED OR FM APPROVED.
3. CLEAN AGENT EXTINGUISHING SYSTEM MUST PROVIDE COVERAGE IN THE DESIGNATED
ROOMS.
4. DEVICE LOCATIONS, PIPE AND CONDUIT ROUTINGS ARE CONCEPTUAL. FINAL QUANTITY
AND LAYOUT MUST BE IN ACCORDANCE WITH APPLICABLE CODES, MANUFACTURER'S
RECOMMENDATIONS AND EQUIPMENT LISTINGS. COORDINATE WITH MECHANICAL AND
ELECTRICAL EQUIPMENT AND RACEWAYS.
5. MINIMUM DESIGN CONCENTRATION MUST BE 4.5% AND THE MAXIMUM DESIGN
CONCENTRATION MUST BE 10%. THE DESIGN TEMPERATURE RANGE MUST BE 60 TO 90
DEGREES FAHRENHEIT. THE CONCENTRATION MUST BE MAINTAINED OVER THE
TEMPERATURE RANGE ABOVE FOR A MINIMUM OF 10 MINUTES. THE DESIGN ALTITUDE
MUST BE 13,400 FEET.
6. PIPING AND FITTINGS MUST COMPLY WITH NFPA 2001. PIPING MUST BE PROVIDED WITH
EARTHQUAKE PROTECTION. SYSTEM PIPING IN FINISHED AREAS MUST BE CONCEALED
FROM VIEW.
7. FIRE PROTECTION CONTRACTOR MUST SEAL ALL FIRE PROTECTION PENETRATIONS, SUCH
AS BUT NOT LIMITED TO, ALL PIPING, CONDUITS, JUNCTION BOXES, AND OPENINGS
REQUIRED FOR THE WORK IN ALL WALLS AND CEILINGS IN CLEAN AGENT PROTECTED
SPACES TO MAINTAIN ROOM INTEGRITY REQUIREMENTS OF NFPA 2001. WALLS INCLUDE
GYP BOARD PARTITIONS AND CONCRETE. CEILINGS AND FLOOR ARE CONCRETE.
FIRESTOP PENETRATIONS WITH SYSTEM RATED FOR ONE (1) HOUR.
8. FIRE PROTECTION CONTRACTOR MUST COORDINATE WITH THE GENERAL CONTRACTOR
TO SEAL ALL EXISTING PENETRATIONS INTO THE PROTECTED SPACE.
9. PROVIDE INSPECTION AND TESTS IN ACCORDANCE WITH NFPA 2001, CHAPTER 11 AND
ANNEX D, AND SPECIFICATION SECTION 21 20 00, INCLUDING A ROOM INTEGRITY TEST.
10. A ROOM INTEGRITY TEST MUST BE COMPLETED IN EACH ROOM FOR THE PRELIMINARY
AND FINAL ACCEPTABLE TESTING. A SECOND FINAL TEST MUST BE DONE AFTER THE
COMPLETION OF THE EXISTING SYSTEM REMOVAL. SEE SPEC SECTION 21 20 00 3.5 B.3 FOR
ADDITIONAL INFORMATION.
11. EXISTING SYSTEM MUST BE KEPT OPERATIONAL UNTIL THE NEW SYSTEMS ARE TESTED
AND ACCEPTED.
12. EXISTING CLEAN AGENT CYLINDERS AND AGENT SHALL BE RECYCLED AND CREDIT
PROVIDED BACK TO THE OWNER.
13. AIR SAMPLING PANELS FOR THE VAULT AND EQUIPMENT ROOM SHALL BE SECTOR
ADDRESSABLE (ABLE TO DISTINGUISH ALARM BY PIPE). AIR SAMPLING PANEL FOR THE
CORRELATOR ROOM SHALL BE ADDRESSABLE PER SAMPLING TUBE (ABLE TO IDENTIFY
ALARM BY SAMPLING TUBE).
14. PIPING AND NOZZLES SHOWN ARE ONLY CONCEPTUAL TO INDICATE THE ROUTING. FINAL
PIPING AND NOZZLE LAYOUT SHALL BE DONE BY THE CONTRACTOR.
ASSD AIR SAMPLING TYPE SMOKE DETECTOR, MOUNTED 5'-0" TO TOP OF PANEL
FSP CLEAN AGENT SUPPRESSION SYSTEM CONTROL PANEL, MOUNTED 5'-0" TO TOP OF PANEL
EPO EMERGENCY POWER OFF SWITCH
FACP FIRE ALARM CONTROL PANEL
CLEAN AGENT PRE-DISCHARGE AUDIO/VISUAL ALARM
P
CLEAN AGENT POST-DISCHARGE AUDIO/VISUAL ALARM
D
A
M
M/R
SV
LP
FP
CLEAN AGENT MANUAL ACTIVATION STATION
CLEAN AGENT MANUAL ABORT STATION
CLEAN AGENT STORAGE CYLINDER
LOW PRESSURE SWITCH
SOLENOID VALVE
PRESSURE SWITCH
MAIN RESERVE SWITCH
AIM
AOM
R
ADDRESSABLE INPUT MODULE
ADDRESSABLE OUTPUT MODULE
24 VOLT RELAY
ABOVE FINISHED FLOOR
TYPICAL
WEATHERPROOF
P
D
CLEAN AGENT PRE-DISCHARGE VISUAL ALARM
CLEAN AGENT POST-DISCHARGE VISUAL ALARM
CLEAN AGENT BELL
VISUAL OR AUDIO/VISUAL DEVICE AUDIO DEVICE
7' -6
6'
-8
PLAN VIEW
LP LP
TO NOZZLES 90 DEGREE ELBOW FOR
DISCHARGE HOSE
CONNECTION
CLEAN AGENT CYLINDERS MAIN
SUPPLY, NUMBER OF
CYLINDERS VARIES CYLINDER
RESERVE SUPPLY, NUMBER OF
CYLINDERS VARIES
ELEVATION VIEW
FP
SV SV
EXISTING
P
ASSD
FSP
EPO
FACP
P
D
A
M
M/R
SV
LP
FP
AIM
AOM
R
P
D
DUCT SMOKE DETECTORS P
2ND FLOOR
1ST FLOOR
BASEMENT
CLEAN AGENT
NOZZLE (TYPICAL)
CLEAN AGENT TANK
(TYPICAL)
1. INSTALL NEW FSP, ASSD, NOTIFICATION, CLEAN AGENT CYLINDERS, PIPING AND NOZZLES.
2. PERFORM PRELIMINARY TEST ON NEW SYSTEMS BEFORE CONNECTING TO SHUNT TRIPS,
DAMPERS AND AHU'S.
3. PERFORM FINAL ACCEPTANCE TESTS WITH SHUNT TRIPS, DAMPERS AND AHU'S
CONNECTED.
4. DECOMMISSION AND REMOVE EXISTING SYSTEMS AFTER NEW SYSTEMS ARE ACCEPTED.
SEE CYLINDER PHASING PLAN OR FX102.
5. PERFORM RETESTS ON CYLINDERS AND ROOM INTEGRITY TESTS.
http://www.coffman.com http://www.coffman.com http://www.coffman.com http://www.coffman.com
P
FS
P
A M
REMOVE TWO (2) EXISTING
FIKE 35 LB FM-200 CYLINDERS,
ASSOCIATED PIPING AND
NOZZLES
D
M/RSV SV
FP
REMOVE EXISTING CLEAN AGENT
VALVES AND SWITCHES (TYPICAL)
VAULT
REMOVE EXISTING FIKE
CONTROL PLAN AND ALL
EXISTING FIRE SUPPRESSION
DEVICES (TYPICAL)
FSP
FSP
M
D
A
A
M
D
A
P P
A
REMOVE TWELVE (12) EXISTING
350 CU.FT. INERGEN MAIN AND
CONNECTED RESERVE SUPPLY
CYLINDERS AND ASSOCIATED
PIPING
REMOVE TWO (2) EXISTING
FIKE 35 LB FM-200 CYLINDERS
AND ASSOCIATED PIPING
PIPE UP TO
SECOND FLOOR
M/R
SV SV
FP
M/RSV SV
FP
SV SV
FP
REMOVE EXISTING ANSUL
AUTOPULSE CONTROL PANEL
(TYPICAL)
REMOVE EXISTING INERGEN
NOZZLES AND PIPING (TYPICAL)
REMOVE EXISTING CLEAN
AGENT VALVES AND SWITCHES
(TYPICAL)
RECIEVER
LABORATORY
ELECTRONICS
LABORATORY CORRELATOR
DIGITAL
CORRELATOR
ANALOG
OFFICEVESTIBULE
STORAGE
TOILET
ECORRIDOR
REMOVE ALL EXISTING FIRE
SUPPRESSION DEVICES
CONNECTED TO ANSUL
AUTOPULSE CONTROL PANEL
(TYPICAL)
www.coffman.com ph 808.687.8884
745 Fort Street, Suite 400 Honolulu, HI 96813
NOTE: SEE FX102 FOR PHASING ON EXISTING CLEAN AGENT SUPPRESSION DEMOLITION
http://www.coffman.com http://www.coffman.com http://www.coffman.com
FSP
FA
C
P D
A
M
A P
PIPE DOWN TO
FIRST FLOOR
EXISTING FIRE ALARM
CONTROL PANEL
REMOVE EXISTING ANSUL
AUTOPULSE CONTROL PANEL
(TYPICAL)
REMOVE ALL EXISTING FIRE
SUPPRESSION DEVICES
CONNECTED TO ANSUL
AUTOPULSE CONTROL PANEL
(TYPICAL)
REMOVE EXISTING FM-200 NOZZLES
AND PIPING
OFFICE
CORRIDOR
BREAK ROOM
EQUIP ROOM
CORRIDOR
CONTROL ROOMSTORAGE
STORAGETOILET
www.coffman.com ph 808.687.8884
745 Fort Street, Suite 400 Honolulu, HI 96813 http://www.coffman.com http://www.coffman.com http://www.coffman.com
PROTECT THIS SPACE
WITH NOVEC 1230 SYSTEM
VAULT
P
D A M
D
ASSD
PROVIDE AIR
ASPIRATING SMOKE
DETECTION FOR
PROTECTED SPACE
R
DAMPER
CLEAN AGENT
PIPING UP
THRU FLOOR
S
PROTECT THIS SPACE
WITH NOVEC 1230 SYSTEM
RECIEVER
LABORATORY
ELECTRONICS
LABORATORY CORRELATOR
DIGITAL
CORRELATOR
ANALOG
OFFICE
VESTIBULE
STORAGETOILET
ECORRIDOR
P
D
A
M
P
D
A
M
D
FS
P
AS
SD
PROVIDE ADDRESSABLE
SAMPLING POINTS TYPE
OF DETECTION
SEE FX102 FOR ENLARGED
VIEW OF SUPPRESSION
SYSTEM AND INSTALLATION
PHASING
R
AHU-1
R
DAMPER
R
PANEL LP6
SHUNT TRIP
FA
C
P
PROVIDE NOVEC 1230
NOZZLE INSIDE DUCTWORK
PROVIDE A SAMPLING
PORT AT EACH RACK
(TYPICAL)
R
SHUNT TRIP
R
SHUNT TRIP
R
SHUNT TRIP
PROVIDE A SAMPLING
PORT AT CEILING
(TYPICAL OF 4)
CLEAN AGENT
PIPING ABOVE
CEILING
NOVEC 1230 NOZZLE
(TYPICAL)
CLEAN AGENT
PIPING DN
THRU FLOORCLEAN AGENT
PIPING UP
THRU FLOOR
R
PANEL DP
SHUNT TRIP
R
PANEL LP2
SHUNT TRIP
PANEL VAULT
www.coffman.com ph 808.687.8884
745 Fort Street, Suite 400 Honolulu, HI 96813 http://www.coffman.com http://www.coffman.com http://www.coffman.com
PROTECT THIS SPACE
WITH NOVEC 1230 SYSTEM
OFFICE
CORRIDOR
BREAK ROOM
EQUIP ROOM
CORRIDOR
CONTROL ROOM
STORAGE
STORAGETOILET
P
D
D
A M
AS
SD
PROVIDE AIR
ASPIRATING SMOKE
DETECTION FOR
PROTECTED SPACE
R
DAMPER
R
FCU-1
CLEAN AGENT
PIPING ABOVE
CEILING
NOVEC 1230 NOZZLE
CLEAN AGENT
PIPING DN
THRU FLOOR
R
DAMPER
R
DAMPER
R
DAMPER
S
SV LP FP
SV LP FP
SV LP FP
SV LP FP
SV LP FP
SV LP FP
SV
LP
MR
SV
LP
MR
SV
LP
MR
SV
LP
FP
SV
LP
FP
SV
LP
FP
SV
LP
MR
SV
LP
SV
LP
CORRELATOR VAULT
2ND FLOOR
EQUIPMENT
MR
MR
www.coffman.com ph 808.687.8884
745 Fort Street, Suite 400 Honolulu, HI 96813
TEMPORARILY INSTALL MAIN SUPPLY FOR EACH
ROOM
DEMOLISH EXISTING TANKS AND
INSTALL RESERVE SUPPLY IN
FINAL LOCATION AFTER
SYSTEMS ARE ACCEPTED
RELOCATE MAIN SUPPLY FROM
TEMPORARY LOCATION TO FINAL
LOCATION
REPIPE TO CORRELATOR
REPIPE TO 2ND FLOOR EQUIPMENT
ROOM
http://www.coffman.com http://www.coffman.com http://www.coffman.com
FSP
TVSS
PD
D D
VAULT EXTERIOR
A M
AOM
RASSD
AIM AIM AIM
PD
D D
CORRELATOR
ANALOG
EXTERIOR
A M
ELECTRONIC
LABORATORY
AIM A M
CORRELATOR
DIGITAL
CRAWL
SPACE
AOM
R
AOM
R
ASSD
AIM AIM AIM
PD
D D
CONTROL
ROOM
A M
STORAGE
ROOM
AIMAOM
R
EQUIP
ROOM
AOM
R
ASSD
AIM AIM AIMAIM
AOM
SV
AIM
LP
AIM
FP
ELECTRONIC LABORATORY
AOM
SV
AIM
LP
AOM
MR
AOM
SV
AIM
LP
AIM
FP
AOM
SV
AIM
LP
AOM
MR
AOM
SV
AIM
LP
AIM
FP
AOM
SV
AIM
LP
AOM
MR
VAULTCORRELATOREQUIP
ROOM
PD
D
AOM
R
AOM
R
AOMAOMAOMAOMAOMAOMAOMAOM
AIM
AIMAOM
R
AOM
R
FACP
AOM
R
AOM
R
AOM
R
AOM
R
AOM
R
S
S
AOM
www.coffman.com ph 808.687.8884
745 Fort Street, Suite 400 Honolulu, HI 96813
IN
TERRUPT TIM
E D
ELA
Y SEQUENCE AT FSP
OPERATION OF MAIN-TO-RESERVE TRANSFER SWITCH ON CLEAN AGENT SYSTEM
ACTIVATION OF LOW PRESSURE SWITCH ON CLEAN AGENT SYSTEM
OPEN CONDITION OF CLEAN AGENT SYSTEM RELEASING SOLENOID VALVE
ACTIVATION OF PRESSURE ALARM SWITCH ON CLEAN AGENT SYSTEM
COMPLETION OF CLEAN AGENT SYSTEM 30 SECOND TIME DELAY SEQUENCE
ACTIVATION OF CLEAN AGENT SYSTEM ABORT STATION DURING TIME DELAY SEQUENCE
ACTIVATION OF CLEAN AGENT SYSTEM MANUAL ACTUATION STATION
SYSTEM INPUT
FSP R
ELE
ASES C
LE
AN AGENT SYSTEM
ACTIVATE POST-D
ISCHARGE AUDIO
/VISUAL A
LA
RMS
X
X
X
X X
X
X
ANNUNCIATE SUPERVISORY ZONE AT FSP, S
END SIG
NAL T
O BUILD
IN
G FACP
ANNUNCIATE TROUBLE
ZONE AT FSP, S
END SIG
NAL T
O BUILD
IN
G FACP
FSP TO ACTIVATE PRE-D
ISCHARGE AUDIO
/VISUAL A
LA
RMS
SYSTEM OUTPUT
FSP TO IN
ITIATE 30
SECOND TIM
E D
ELA
Y SEQUENCE
SEQUENCE OF OPERATION
A
B
C
D
E
F
G
H
I
J
1 2 3 4 5 6 7 8 9 10 11 1312
TROUBLE CONDITION ON CLEAN AGENT SUPPRESSION SYSTEM CIRCUITS X
A
B
C
D
E
F
G
H
I
J
FSP TO STOP PRE-D
ISCHARGE AUDIO
/VISUAL A
LA
RMS AND
X
ACTIVATION OF SERVICE DISCONNECT SWITCH X
OVERRID
E R
ELE
ASE O
F C
LE
AN AGENT SYSTEM
X
FSP SHUT D
OWN ASSOCIATED AIR
H
ANDLIN
G U
NITS AFTER 10
SECOND D
ISCHARGE +
FSP TO ACTIVATE POST-D
ISCHARGE AUDIO
/VISUAL A
LA
RMS
XX
X
FSP TO C
LO
SE M
OTORIZED FIR
E/SMOKE D
AMPER AFTER A 10
SECOND D
ELA
Y
X
X
K K
X X * AIR SAMPLING SYSTEM SET POINTS SHALL BE AS FOLLOWS:
LOW LEVEL (MAXIMUM SENSITIVITY): 0.2%
OBSCURATION/FOOT
BASED ON AMBIENT
CONDITIONS OF THE SPACE
MEDIUM LEVEL (MINIMUM SENSITIVITY): 0.5%
FIRE 1 OBSCURATION/FOOT
HIGH LEVEL (SMOKE DETECTOR EQUIVALENT): 2.0%
FIRE 2 OBSCURATION/FOOT
NOTE:
AMBIENT CONDITIONS MUST BE DETERMINED IN ORDER TO
PROPERLY SELECT THE MAXIMUM SENSITIVITY SET POINT. THE
INSTALLED SYSTEM SHALL RUN FOR A MINIMUM OF ONE WEEK
TO CALIBRATE THE AMBIENT CONDITIONS, AND THE ALARM SET
POINTS SHALL BE SET ACCORDINGLY AS INDICATED ABOVE
** SYSTEM OUTPUT FUNCTION LIMITED TO THE SPACE
ASSOCIATED WITH THE SYSTEM INPUT DEVICE ACTIVATED
+ FOR EQUIPMENT ROOM SYSTEM: FCU-1 SHUTS DOWN IMMEDIATELY.
VERY EARLY WARNING SMOKE DETECTION SYSTEM ALARM ON FIRE 1
VERY EARLY WARNING SMOKE DETECTION SYSTEM SUPERVISORY
VERY EARLY WARNING SMOKE DETECTION SYSTEM TROUBLE
L LX
X
SHUNT TRIP U
PS/POWER TO R
OOM
VERY EARLY WARNING SMOKE DETECTION SYSTEM ALARM ON TWO PIPES AT FIRE 2 LEVELS
M
X X X
X
X
14 15
M
ANNUNCIATE ALA
RM AT FSP - S
END SMOKE D
ETECTIO
N ALA
RM TO
BUILD
IN
G FACP (E
ACH SYSTEM)
ANNUNCIATE ALA
RM AT FSP - S
END C
LE
AN AGENT R
ELE
ASE TO
BUILD
IN
G FACP (E
ACH SYSTEM)
NOTES:
1. CLEAN AGENT SEQUENCE IS TYPICAL FOR EACH SYSTEM. VAULT, CORRELATOR, AND EQUIPMENT ROOM SHALL FUNCTION AS SEPARATE SYSTEMS.
2. CORRELATOR SYSTEM SHALL DISCHARGE INTO THE ROOM AND RETURN DUCT. AHU SHALL OPERATE DURING THE DISCHARGE TO DISTRIBUTE CLEAN
AGENT INTO THE RACKS. AT THE END OF THE DISCHARGE AHU SHALL SHUT OFF AND DAMPERS SHALL CLOSE.
X
X
TRANSFER D
ISCHARGE C
IR
CUIT FROM M
AIN
TO R
ESERVE AT FSP
(R
ESERVE TO M
AIN
IN
R
ESERVE POSITIO
N)
X
DUCT SMOKE DETECTORN NX
FSP SHUT D
OWN ASSOCIATED AIR
H
ANDLIN
G U
NIT
X
X
CLE
AN AGENT SYSTEM ACTIVATIO
N SIG
NAL T
O D
DC
X
X
X http://www.coffman.com http://www.coffman.com http://www.coffman.com
ELECTRICAL LEGEND
DUPLEX RECEPTACLE, +18" UNLESS OTHERWISE NOTED
DUPLEX RECEPTACLE, GFCI TYPE, +18" UNLESS OTHERWISE NOTED
DUPLEX RECEPTACLE, GFCI TYPE, WITH WEATHERPROOF COVER +18" UNLESS
OTHERWISE NOTED
SPECIAL PURPOSE OUTLET, NEMA TYPE AS NOTED
DESCRIPTION
TELECOM CABINET, SIZE AS NOTED
EQUIPMENT CONNECTION
CEILING MOUNTED JUNCTION BOX, 4-11/16" SQUARE
WALL MOUNTED JUNCTION BOX, 4-11/16" SQUARE
JUNCTION BOX, SIZE AS NOTED
PANELBOARD
DISCONNECT SWITCH, SIZE AND RATING AS NOTED
COMBINATION DISCONNECT SWITCH/MOTOR STARTER. FURNISHED BY
MECHANICAL, INSTALL BY ELECTRICAL CONTRACTOR
RACEWAY AND CONDUCTORS BELOW FLOOR OR GRADE
RACEWAY AND CONDUCTORS CONCEALED ABOVE GRADE
CONDUIT STUB OUT
PANEL AND CIRCUIT DESIGNATION (PANEL '2PL', CIRCUIT '1' INDICATED)
FIRE ALARM MANUAL PULL STATION, +48"
VISIBLE NOTIFICATION APPLIANCE, WALL MOUNTED +80" TO BOTTOM OF LENS
COMBINATION AUDIBLE (HORN)/VISIBLE NOTIFICATION APPLIANCE, WALL MOUNTED
+80" TO BOTTOM OF LENS
SMOKE DETECTOR, ADDRESSABLE, PHOTOELECTRIC
HEAT DETECTOR, FIXED TEMPERATURE
FIRE ALARM CONTROL PANEL, +72" TO TOP OF CABINET
SHEET NOTE, SEE SAME SHEET
FLEX CONNECTION
SINGLE RECEPTACLE, +18" UNLESS OTHERWISE NOTED
WALL MOUNTED SPECIAL PURPOSE OUTLET, NEMA TYPE AS NOTED
EXISTING
TO
REMAIN
TOGGLE SWITCH SINGLE POLE, +48" MAX TO TOP OF DEVICE UNLESS OTHERWISE
NOTED
TELEDATA OUTLET PROVISION, +18" UNLESS OTHERWISE NOTED
WP
E
J
J
J
F P
P
P
FACP
REVISION DELTA
WALL MOUNTED SMOKE DETECTOR, 4"-12" DOWN FROM CEILING TO THE TOP OF THE
DETECTOR
COMBINATION AUDIBLE(HORN)/VISIBLE NOTIFICATION APPLIANCE, CEILING MOUNTED
VISIBLE NOTIFICATION APPLIANCE, CEILING MOUNTED
ABBREVIATIONS
AC ALTERNATING CURRENT
ACCU AIR-COOLED CONDENSING UNIT
AF AMPERES, FRAME
AHU AIR HANDLING UNIT
ASSD AIR SAMPLING TYPE SMOKE DETECTOR
AT AMPERES, TRIP
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAGE
BS BELL ALARM SWITCH
CH CHILLER
CHAN CHANNEL
COTR CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
DACT DIGITAL ALARM COMMUNICATOR TRANSMITTER
DC DIRECT CURRENT
DIST PNL DISTRIBUTION PANEL
DS DISCONNECT SWITCH
(E)/EXST EXISTING
ECB ENCLOSED CIRCUIT BREAKER
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EMT ELECTRICAL METALLIC TUBING
EOL END OF LINE RESISTOR
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FCU FAN-COIL UNIT
FP FIRE PROTECTION
F/SD FIRE/SMOKE DAMPER
FSP FIRE SUPPRESSION PANEL
GFI GROUND FAULT INTERRUPTING
GND GROUND
HELCO HAWAII ELECTRIC & LIGHT COMPANY
JB JUNCTION BOX
MCC MOTOR CONTROL CENTER
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
PACU PACKAGED AIR CONDITIONING UNIT
PD PROTECTIVE DEVICE
PNL PANEL
SAO SMITHSONIAN ASTROPHYSICAL OBSERVATORY
SF SUPPLY FAN
ST SHUNT TRIP
SYS SYSTEM
TELECOM TELECOMMUNICATIONS
TU TERMINAL UNIT
TYP TYPICAL
UFC UNIFORM FIRE CODE
UL UNDERWRITER'S LABORATORIES, INC.
VAV VARIABLE AIR VOLUME
VESDA VERY EARLY SMOKE DETECTION APPARATUS
RACEWAY AND CONDUCTORS EXPOSED ABOVE GRADE
ELECTRICAL ONE-LINE DIAGRAM LEGEND
DESCRIPTION
EXISTING
TO
REMAIN
POWER TRANSFORMER, SIZE AND RATINGS AS INDICATED. DELTA AND WYE-TYPE
CONNECTIONS SHOWN.
M
POTENTIAL TRANSFORMER
CURRENT TRANSFORMER
METER
GROUND
CIRCUIT BREAKER
DISCONNECT SWITCH
FUSE
G GENERATOR, SIZE AND RATINGS AS INDICATED
SPECIAL PURPOSE OUTLET
PLUG-IN LINE OR PULL-APART LOAD OR CONTROL TERMINAL
MOTOR, NUMBER INDICATES HORSEPOWER1
MCB
MCP
SELECTOR SWITCH
H - HAND
O - OFF
A - AUTO
COMBINATION MOLDED CASE CIRCUIT BREAKER AND MAGNETIC MOTOR CONTACTOR,
RATING AS INDICATED
COMBINATION MOTOR CIRCUIT PROTECTOR AND MAGNETIC MOTOR STARTER,
RATING AS INDICATED
3P 3A
3P 20A
NEW
2PL-1
WP
E
J
J
J
F P
P
P
FACP
NEW
M
G
MCB
MCP3P
3A
3P 20A
EXISTING
TO BE
DEMOLISHED
WP
E
J
J
J
F P
P
P
FACP
M
G
MCB
MCP3P
3A
3P 20A
EXISTING
TO BE
DEMOLISHED
X
X X
POTENTIAL TRANSFORMERX X
ELECTRICAL NOTES
PROJECT DESCRIPTION:
THE INTENT OF THIS PROJECT IS TO REPLACE THE HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) SYSTEM, AND THE FIRE ALARM AND FIRE PROTECTION SYSTEMS AT THE SMITHSONIAN SUMMIT FACILITY AT MAUNA KEA, HI. THE ELECTRICAL SCOPE OF WORK IS TO PROVIDE POWER TO NEW MECHANICAL EQUIPMENT, FIRE ALARM, AND FIRE SUPPRESSION EQUIPMENT. THE EXISTING FIRE ALARM SYSTEM SHALL BE EXISTING TO REMAIN AND SHALL NOT BE DEMOLISHED UNTIL THE NEW FIRE ALARM SYSTEM IS
INSTALLED AND FULLY OPERATIONAL.
GENERAL NOTES:
A. REFER TO COMPLETE CONTRACT DOCUMENTS FOR OTHER DETAILS AND REQUIREMENTS.
B. CONFORM TO THE BUILDING, FIRE, AND ELECTRICAL CODES OF THE COUNTY OF HAWAII, LAWS AND REGULATIONS OF THE
COUNTY OF HAWAII AND STATE OF HAWAII.
C. OBTAIN AND PAY FOR REQUIRED LICENSES, FEES, AND OTHER CHARGES. DELIVER CERTIFICATES OF COMPLETION AND
INSPECTION TO THE COTR. SUBCONTRACTORS SHALL BE LICENSED FOR THE WORK THEY PERFORM.
D. PROVIDE 4 COPIES OF DATA ON LUMINAIRES, ELECTRICAL EQUIPMENT, AND WIRING DEVICES THAT HAVE BEEN CHECKED BY
THE CONTRACTOR FOR COTR'S REVIEW AND APPROVAL. ALLOW TEN WORKING DAYS FOR REVIEW PROCESS. (IF SUBSTITUTE PRODUCTS ARE PROPOSED FOR USE, THE BIDDER SHALL, PRIOR TO BID OPENING, SUBMIT 4 COPIES OF SHOP DRAWINGS OR CATALOG CUTS FOR APPROVAL. SUBSTITUTIONS AFTER RECEIPT OF APPROVED SUBMITTALS SHALL NOT BE PERMITTED
UNLESS APPROVED IN WRITING BY THE COTR.)
E. FIRE ALARM, TELECOMMUNICATIONS, CABLE TELEVISION, AND FURNITURE SYSTEMS SHOP DRAWINGS (OBTAIN DRAWINGS
FROM COTR CONTRACTED VENDORS) ARE A PART OF THE CONTRACT DOCUMENTS.
F. MAINTAIN A SET OF CONTRACT DRAWINGS AT THE JOB SITE MARKING THEM TO SHOW VARIATIONS BETWEEN CONSTRUCTION ACTUALLY PROVIDED AND THAT INDICATED ON CONTRACT DOCUMENTS. PRIOR TO FINAL INSPECTION, TRANSFER THESE DATA
AND SUBMIT 1 SET OF CLEAN RECORD DRAWINGS TO THE COTR.
G. EXISTING CONDITIONS ARE SHOWN IN AN APPROXIMATE WAY AND HAVE NOT BEEN VERIFIED BY THE ENGINEER OR HIS REPRESENTATIVE. VISIT THE JOB SITE AND BECOME AWARE OF EXISTING CONDITIONS. CONTRACTOR SHALL DETERMINE THE EXACT CONDITION OF EXISTING WIRING BEFORE COMMENCING WORK, AND SHALL BE RESPONSIBLE FOR ANY DAMAGE
CAUSED BY THE CONTRACTOR'S FAILURE TO LOCATE AND PRESERVE CONDITIONS.
H. THE ELECTRICAL INSTALLATION SHALL BE GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY SAO. WHEN NOTIFIED BY SAO OF FAILURE OF ANY PART OF THE INSTALLATION DURING THE GUARANTEE PERIOD, THE CONTRACTOR SHALL REPAIR OR
REPLACE THE DEFECTIVE PART AT HIS OWN EXPENSE TO THE SATISFACTION OF SAO.
I. PROVIDE ALL COMPONENTS REQUIRED FOR A COMPLETE AND OPERABLE INSTALLATION.
J. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SAFETY ON THE JOBSITE.
K. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT FOR TEMPORARY CONSTRUCTION POWER AS REQUIRED.
L. DRAWINGS ARE OF SMALL SCALE AND ARE SCHEMATIC. LOCATIONS OF EQUIPMENT AND SYSTEM ELEMENTS ARE
APPROXIMATE. RELOCATE ANY DEVICE WITHIN 10 FEET PRIOR TO INSTALLATION, WITHOUT ADDITIONAL COST, AT THE
DIRECTION OF THE COTR.
M. CONSULT THE ARCHITECTURAL, MECHANICAL, AND FIRE PROTECTION DRAWINGS FOR DETAILS NOT SHOWN ON THE ELECTRICAL AND FIRE ALARM DRAWINGS. ANY CONFLICTS IN LOCATING EQUIPMENT SHALL BE BROUGHT TO THE COTR'S ATTENTION FOR RESOLUTION. IF DIRECTED BY THE COTR, THE CONTRACTOR SHALL MAKE REASONABLE MODIFICATION TO THE LAYOUT OF EQUIPMENT TO PREVENT CONFLICT WITH OTHER TRADES OR FOR THE PROPER EXECUTION OF THE WORK AT
NO EXTRA COST.
N. INSTALLATION AND WORKMANSHIP:
1. INSTALLATION SHALL CONFORM TO SEISMIC DESIGN REQUIREMENTS OF CHAPTER 16 OF THE 2021 INTERNATIONAL
BUILDING CODE. PROVIDE SEISMIC BRACING FOR WALL MOUNTED ENCLOSURES, LUMINAIRES, AND OTHER ELECTRICAL
EQUIPMENT.
2. COORDINATE OUTAGES ON ELECTRICAL SYSTEM IN WRITING WITH THE COTR 14 DAYS BEFORE DESIRED OUTAGE DATE.
OUTAGES SHALL BE KEPT TO A MINIMUM IN DURATION AND QUANTITY. OUTAGES WILL BE GRANTED AT THE SOLE
CONVENIENCE OF BUILDING MANAGEMENT.
3. WORK SHALL BE NEATLY EXECUTED, WORKMANLIKE IN APPEARANCE, SYMMETRICAL, PLUMB, UNIFORM, PROPERLY
ALIGNED AND SECURED IN PLACE.
4. LAY OUT WORK IN ADVANCE. EXERCISE CARE WHERE CUTTING, CHANNELING, CHASING OR DRILLING FLOORS, WALLS, PARTITIONS, CEILINGS, OR OTHER SURFACES. FLOOR PENETRATIONS SHALL BE ACCOMPLISHED BY A LICENSED CORING CONTRACTOR. CONCRETE FLOOR SLABS SHALL BE X-RAYED BEFORE ANY CORING. REPAIR DAMAGE TO BUILDINGS, PIPING, AND EQUIPMENT USING SKILLED CRAFTSMEN OF TRADES INVOLVED. CUTTING, REPAIRS AND REFINISHING SHALL
BE SUBJECT TO THE APPROVAL OF THE COTR.
5. FASTEN TO CONCRETE WITH EXPANSION BOLTS OR CONCRETE INSERTS; TO WOOD WITH WOOD SCREWS; AND TO LIGHT
STEEL CONSTRUCTION WITH SHEET METAL SCREWS.
6. VERIFY LOCATIONS OF FLOOR PENETRATIONS, IF ANY REQUIRED, AND OUTLET LOCATIONS IN RELATION TO STRUCTURAL AND OTHER ELEMENTS. NOTIFY THE COTR IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH ANY WORK.
7. REPAIR, PATCH, AND PAINT EXISTING CEILINGS AND WALLS AFFECTED BY ELECTRICAL WORK NOT COVERED BY GENERAL
CONTRACTOR.
E. WIRING METHOD:
1. USE ELECTRICAL METALLIC TUBING IN CONCEALED LOCATIONS AND SURFACE METAL RACEWAY IN EXPOSED LOCATIONS
AS INSTRUCTED BY THE COTR. INSTALL RACEWAY PARALLEL WITH OR AT RIGHT ANGLES TO CEILINGS, WALLS, AND
STRUCTURAL MEMBERS.
2. PROVIDE FLEXIBLE CONNECTION FOR EQUIPMENT SUBJECT TO VIBRATION AND LUMINAIRES MOUNTED ON ACCESSIBLE
CEILING PANELS OR GRID.
3. FIRE ALARM WIRING WILL BE IN CONDUIT SYSTEM. JUNCTION BOXES SHALL BE SPRAYED RED AND LABELED “FIRE ALARM”.
4. CONDUCTORS FOR 20 AMPERE BRANCH CIRCUITS OF 120 VOLTS MORE THAN 100 FEET LONG FROM PANEL TO CENTER OF
LOAD SHALL NOT BE SMALLER THAN NO. 10.
5. MULTI-WIRE BRANCH CIRCUITS: COMBINE UP TO THREE (3) 20A, 1 POLE BRANCH CIRCUITS IN A SINGLE CONDUIT HOMERUN.
SHARED NEUTRALS ARE NOT ALLOWED.
6. TELEPHONE AND DATA RACEWAY INSTALLATION SHALL BE IN ACCORDANCE WITH EIA/TIA 569.
7. BONDING. ALL METAL COMPONENTS SHALL BE BONDED TO PROVIDE A CONTINUOUS CONDUCTING PATH BACK TO THE
SERVICE GROUND OR DERIVED SYSTEM GROUND.
8. A GREEN EQUIPMENT GROUND CONDUCTOR, SIZED PER NEC TABLE 250-122, SHALL BE RUN WITH THE CONDUCTORS FOR
EACH FEEDER AND BRANCH CIRCUIT. CONDUIT ALONE AS EQUIPMENT GROUND CONDUCTOR IS NOT ACCEPTABLE.
9. PROVIDE AND INSTALL ALL JUNCTION BOXES AND PULL BOXES REQUIRED FOR INSTALLATION OF ELECTRICAL DEVICES AND
EQUIPMENT, WHETHER OR NOT SPECIFICALLY INDICATED ON THE PLANS. SIZING OF BOXES SHALL BE PER NEC.
10. LABEL ALL JUNCTION BOXES AND PULL BOXES INDICATION PANEL NAME AND CIRCUIT NUMBERS OF ALL BRANCH CIRCUIT
CONDUCTORS CONTAINED WITHIN THE BOX. INSTALL PULLSTRING (PLASTIC HAVING MINIMUM 200 POUND TENSILE
STRENGTH) IN EMPTY CONDUITS IN WHICH WIRE IS TO BE INSTALLED BY OTHERS.
F. PAINT ALL NEW CONDUITS, JUNCTION BOXES, AND PULL BOXES TO MATCH ADJACENT SURFACES.
G. SEAL OPENINGS AROUND NEW ELECTRICAL PENETRATIONS THROUGH FIRE RESISTANCE-RATED WALLS, PARTITIONS, FLOORS, OR CEILINGS TO MAINTAIN FIRE RESISTIVE INTEGRITY. WHERE AN EXISTING PENETRATION IS USED, SEAL PENETRATION
AFTER WORK IS COMPLETED.
H. COORDINATE ELECTRICAL WORK WITH OTHER TRADES AND WITH COTR.
I. FASTEN NAMEPLATES TO THE DEVICE WITH A MINIMUM OF TWO SHEETMETAL SCREWS OR TWO RIVETS.
J. PERFORM AN OPERATIONAL TEST AFTER COMPLETING THE INSTALLATION TO ASSURE PROPER OPERATION OF ITEMS OF THE
WORK.
K. CLEAN UP DEBRIS AT END OF EACH DAYS WORK. REMOVE MARKINGS FROM ELECTRICAL EQUIPMENT AND DEVICES.
DUCT SMOKE DETECTOR, ADDRESSABLE, PHOTOELECTRIC
FIRE SMOKE DAMPERF/SD F/SD F/SD
FSP FIRE SUPPRESSION PANEL, FURNISHED BY OTHERS, ELECTRICAL CONNECTION
BY ELECTRICAL CONTRACTOR
FSP FSP
CONDUIT RISER UP/DOWN/ / /
END OF LINE RESISTOREOLEOLEOL
FLOW SWITCH, INSTALLED BY SPRINKLER CONTRACTOR, FIRE ALARM CONNECTION
BY ELECTRICAL CONTRACTOR
TAMPER SWITCH, INSTALLED BY SPRINKLER CONTRACTOR, FIRE ALARM
CONNECTION BY ELECTRICAL CONTRACTOR
FS
TS
FS
TS
FS
TS
FIRE ALARM REMOTE ANNUNCIATOR, +72" TO TOP OF ENCLOSUREFAA FAA FAA
WALL MOUNTED AIR SAMPLING TYPE SMOKE DETECTOR
A A A
RELOCATED(R)
CIRCUIT RATING (EXAMPLE: 3 POLES, 20 AMP INDICATED)3P20A
QUAD RECEPTACLE, GFCI TYPE, WITH WEATHERPROOF COVER +18" UNLESS
OTHERWISE NOTED
WPWP WP
CIRCUIT AND SWITCH ID DESIGNATION, (CIRCUIT '1', SWITCH ID 'a' INDICATED)1a
2 x 4 FLUORESCENT LUMINAIRE
2 x 4 FLUORESCENT LUMINAIRE WITH EMERGENCY BATTERY PACK
2 x 2 FLUORESCENT LUMINAIRE
2 x 2 FLUORESCENT LUMINAIRE WITH EMERGENCY BATTERY PACK
TRACK LIGHTING
ELECTRICAL LEGEND AND NOTES
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
PROPOSED SEQUENCE OF WORK
TO MINIMIZE THE DURATION OF OUTAGES TO THE FACILITY, REFER TO THE FOLLOWING PROPOSED SEQUENCE OF WORK.
COORDINATE SEQUENCE AND ALL OUTAGES WITH OTHER DISCIPLINES AND COTR. SUBMIT ALTERNATIVE PROPOSED SEQUENCES
OF WORK TO COTR FOR APPROVAL PRIOR TO COMMENCING WORK.
ELECTRICAL:
1. REPLACEMENT OF CONTROL BUILDING SUPPLY FANS, EXHAUST FANS, ELECTRIC DUCT HEATERS, AND AIR CONDITIONING
SYSTEMS.
A. INSTALL FEEDER FROM DISTRIBUTION PANEL DP TO NEW PANEL LPM LOCATION, TERMINATE WIRING IN CEILING.
B. WHEN MECHANICAL CONTRACTOR IS READY TO DEMOLISH EXISTING MECHANICAL EQUIPMENT ON MOTOR CONTROL
CENTER MCC-CB (SUPPLY FANS, EXHAUST FANS, ELECTRIC DUCT HEATERS), DEMOLISH EXISTING MCC-CB AND
CONNECTIONS TO CORRESPONDING EXISTING LOADS.
C. WHILE MECHANICAL CONTRACTOR IS INSTALLING NEW SUPPLY FANS, EXHAUST FANS, AND ELECTRIC DUCT HEATERS, INSTALL NEW PANEL LPM. EXTEND FEEDER FROM CEILING TO CONNECT TO NEW PANEL LPM.
D. INSTALL BRANCH CIRCUIT CONNECTIONS TO INITIAL MECHANICAL EQUIPMENT SERVING SERVER EQUIPMENT ROOM (FCU-1
AND ACCU-1) FROM CIRCUITS INDICATED ON PLAN.
E. WHEN MECHANICAL CONTRACTOR IS READY TO DEMOLISH EXISTING ACCU'S AND FCU'S, DEMOLISH EXISTING ELECTRICAL
CONNECTIONS TO ACCU'S AND FCU'S.
F. INSTALL CONNECTIONS FROM CIRCUITS INDICATED ON PLAN TO REMAINING NEW AIR CONDITIONING EQUIPMENT (ACCU-2, REMAINING FAN COIL UNITS, SUPPLY FANS, EXHAUST FANS, AND ELECTRIC DUCT HEATERS).
2. REPLACEMENT OF PACU WITH NEW CHILLERS AND AHU'S
A. EXISTING PACU WILL BE REMOVED AND RELOCATED TO PROVIDE TEMPORARY AIR CONDITIONING. WHEN MECHANICAL
CONTRACTOR IS READY TO REMOVE PACU, DE-ENERGIZE FEEDER FROM MAIN SWITCHBOARD TO PACU AND DISCONNECT
WIRING FROM EXISTING DISCONNECT SWITCH MOUNTED ON PACU.
B. PER MECHANICAL SEQUENCE OF WORK, THE CONTRACTOR WILL HAVE A MAXIMUM OF FOUR CALENDAR WEEKS TO RELOCATE, RECONNECT, AND STARTUP PACU FOR TEMPORARY OPERATION. DURING THOSE FOUR CALENDAR WEEKS:
1) INTERCEPT EXISTING FEEDER TO EXISTING PULLBOX AT PACU WITH NEW PULLBOX. REMOVE EXISTING PULLBOX AT
PACU AND CORRESPONDING FEEDER WIRING BETWEEN NEW AND EXISTING PULLBOXES.
2) TAP EXISTING FEEDER WIRING AT NEW PULLBOX AND INSTALL NEW FEEDER CONDUIT AND WIRING FROM NEW
PULLBOX TO TEMPORARY PACU LOCATION.
3) INSTALL PANEL DM. TAP EXISTING FEEDER SERVING PACU AT NEW PULLBOX TO FEED PANEL DM. MAINTAIN PANEL DM
MAIN BREAKER IN THE 'OFF' POSITION. ALL BRANCH CIRCUIT BREAKERS SHALL BE MAINTAINED IN THE 'OFF' POSITION
AND DE-ENERGIZED UNTIL BRANCH CIRCUIT LOADS ARE READY TO BE ENERGIZED.
4) AFTER PACU HAS BEEN RELOCATED, CONNECT NEW FEEDER TO EXISTING DISCONNECT SWITCH MOUNTED ON PACU.
5) WHEN PACU IS READY FOR TEMPORARY OPERATION, RE-ENERGIZE FEEDER FROM MAIN SWITCHBOARD TO PACU.
C. WHILE PANEL DM IS STILL DE-ENERGIZED (MAIN BREAKER IS STILL 'OFF'), INSTALL BRANCH CIRCUIT CONNECTIONS TO NEW
MECHANICAL EQUIPMENT (AHU AND CHILLERS).
D. AFTER NEW MECHANICAL EQUIPMENT ARE INSTALLED AND READY FOR OPERATION, FIRST DE-ENERGIZE PACU, THEN SWITCH PANEL DM MAIN BREAKER AND CORRESPONDING BRANCH CIRCUIT BREAKERS TO THE 'ON' POSITION TO
ENERGIZE NEW MECHANICAL EQUIPMENT.
E. WHEN MECHANICAL CONTRACTOR IS READY TO REMOVE PACU, REMOVE TEMPORARY FEEDER CONDUIT AND WIRING SERVING PACU (FROM NEW PULLBOX TO PACU). MAINTAIN EXISTING FEEDER FROM MAIN SWITCHBOARD TO SERVE PANEL
DM.
FIRE ALARM:
1. INSTALL NEW FACP, ANNUNCIATOR PANEL, INITIATING AND NOTIFICATION APPLIANCES, AND FSP RELAY MODULES.
2. INSTALL NEW TELEPHONE AND DATA LINES TO CONNECT FIRE ALARM SYSTEM TO EXISTING TELEPHONE AND COMPUTER
SYSTEM, AND PROGRAM NEW FIRE ALARM SYSTEM FOR REMOTE MONITORING.
3. PRIOR TO DISCONNECTING EXISTING FIRE ALARM SYSTEM FROM SHUNT TRIP BREAKERS AND EXISTING ANTENNA VESDA
SYSTEM, PERFORM INITIAL TESTS AND INSPECTIONS OF NEW FIRE ALARM SYSTEM PER SPECIFICATIONS.
4. AFTER NEW FIRE ALARM SYSTEM HAS BEEN TESTED AND APPROVED AND IS OPERATIONAL, CONNECT NEW FIRE ALARM
SYSTEM TO EXISTING SHUNT TRIP BREAKERS AND EXISTING ANTENNA VESDA SYSTEM.
5. PERFORM FINAL TESTS AND INSPECTIONS OF NEW FIRE ALARM SYSTEM PER SPECIFICATIONS.
6. AFTER NEW FIRE ALARM SYSTEM HAS PASSED FINAL TESTS AND INSPECTIONS, COMPLETELY REMOVE EXISTING FIRE ALARM
SYSTEM INCLUDING, BUT NOT LIMITED TO, ALL PANELS, DEVICES, CONDUIT AND WIRING.
ELECTRICAL SEQUENCE OF WORK
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829
F G H IE
0.5
1.3
2.3
3.8
4.7
4.8
EEEE
EEEE
EEEE
(E)TO CIRCUIT
ON PANEL LP2
E
E
(E)VAV-2
(E)VAV-1
(E)MOTORIZED
DAMPER, TYP
EEEE
E E E E E
NORTH
ELECTRICAL DEMO PLAN - BASEMENT
FLOOR
0 2' 4' 8'
GRAPHIC SCALE
1/4" = 1'-0"
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
1/4" = 1'-0"
ELECTRICAL DEMO PLAN - BASEMENT FLOOR1
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK. SEE
PROPOSED SEQUENCE OF WORK ON SHEET E002 AND COORDINATE SEQUENCE
WITH OTHER DISCIPLINES AND WITH COTR.
SHEET NOTES:
VERIFY EXISTING CIRCUIT FEEDING EQUIPMENT. MAINTAIN EXISTING ELECTRICAL
CONNECTION, CONDUIT, AND WIRING.
MOTORIZED DAMPERS AND CORRESPONDING WIRING TO BE REMOVED BY OTHERS.
COORDINATE WITH MECHANICAL CONTRACTOR.
EXISTING VAV TO REMAIN. WIRING TO BE REMOVED BY OTHERS, COORDINATE WITH
MECHANICAL CONTRACTOR.
(E)MAIN
SWITCHBOARD
MSB WITH ATS
E E
E
E
E
E E E
TO DISTRIBUTION
SWITCHBOARD DSB
(E)PACU
(E)RAD-7
LP2-17,19
MCC-CB,
UNIT 1C
MCC-CB,
UNIT 1E
(E)SUPPLY
FAN SF-1
(E)ELECTRIC DUCT
HEATER EDH-1
MCC-CB,
UNIT 1B
(E)EXHAUST
FAN EF-1
(E)2"C, 4#3/0, 1#4 GND
(E)DISTRIBUTION
SWITCHBOARD
DSB
(E)ACCU 1
(E)PANEL FP
(E)PANEL LP1
LP6-32,34,36
LP5-25,27
(E)MOTOR CONTROL
CENTER MCC-CB
(E)PANEL LP2
JJ
(E)DIST PNL DP
LP1-1 LP1-1
LP1-1LP1-1
LP1-5
LP1-5
LP1-5
LP2-3 LP2-3
LP2-1LP2-1
LP2-3LP2-3
LP2-3 LP2-3
(E)PANEL D1
(E)PANEL LP
(E)PANEL "LP7"
(E)3/4"C, 2#12 FOR
SHUNT TRIP TO
EXSITING FACP
E E
E
E
(E)RAD-1
LP1-9,11
(E)RAD-4
LP2-5,7
(E)RAD-5
LP2-9,11
(E)RAD-6
(DISCONNECTED)
TYP
TYP
TYP
TYP
TYP
TYP
0 2' 4' 8'
GRAPHIC SCALE
1/4" = 1'-0"
NORTH
ELECTRICAL DEMO PLAN - GROUND FLOOR
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK. SEE PROPOSED SEQUENCE OF WORK ON SHEET E002 AND
COORDINATE SEQUENCE WITH OTHER DISCIPLINES AND WITH COTR.
SHEET NOTES:
VERIFY EXISTING CIRCUIT FEEDING EQUIPMENT. DEMOLISH EXISTING ELECTRICAL CONNECTION, CONDUIT, AND WIRING.
DEMOLISH EXISTING ELECTRICAL CONNECTION, MECHANICAL EQUIPMENT TO BE REMOVED AND STORED FOR RELOCATION BY OTHERS.
DEMOLISH EXISTING MCC-CB, MAINTAIN EXISTING FEEDER FROM DSB AND MAINTAIN EXISTING FEEDER TO ROLL-UP DOOR.
REMOVE EXISTING SHUNT TRIP WIRING, ABANDON EXISTING CONDUIT.
REMOVE AND STORE EXISTING LIGHT FIXTURES TO ACCOMMODATE DEMOLITION OF CEILING AND MECHANICAL WORK. MAINTAIN
EXISTING WIRING FOR RECONNECTION OF LIGHT FIXTURES IN NEW WORK.
DISCONNECT ELECTRICAL CONNECTION TO RADIANT HEATER TO ACCOMMODATE DEMOLITION OF CEILING AND MECHANICAL WORK.
MAINTAIN EXISTING WIRING FOR RECONNECTION OF RADIANT HEATER IN NEW WORK. RADIANT HEATER TO BE REMOVED BY OTHERS, COORDINATE WITH MECHANICAL CONTRACTOR.
CUT EXISTING FEEDER CONDUIT AND WIRING TO PACU, TO BE INTERCEPTED BY NEW PULLBOX.
1/4" = 1'-0"
ELECTRICAL DEMO PLAN - GROUND FLOOR1
(E)PANEL LP5
E
(E)PANEL LP6
(E)PANEL LP4
E
E
E
E
E
E
E
LP5-21
MCC-CB,
UNIT 2B
MCC-CB,
UNIT 2D
MCC-CB,
UNIT 2A
(E)SUPPLY
FAN SF-2
(E)ELECTRIC DUCT
HEATER EDH-2
(E)SUPPLY
FAN SF-3
(E)EXHAUST
FAN EF-2
(E)FCU
(E)FCU
(E)FCU
(E)FCU
LP6-17,19
LP6-13,15
LP5-26,28
E
(E)ROLL-UP DOOR
MCC-CB,
UNIT 2G
LP4-1 LP4-1
LP4-7
LP5-1 LP5-1 LP6-1 LP6-1
LP6-1LP6-1LP5-1
LP5-3
LP4-9
LP5-5
LP4-3
LP5-5 LP5-5LP5-5
2 2
E E E
EE
(E)RAD-15
LP4-20,22
5 (E)RAD-8
LP5-7,9
5 (E)RAD-9
LP6-5,7
(E)RAD-11
LP6-9,11
(E)RAD-10
LP5-11,13
TYP
TYP
TYP
TYP
TYP
0 2' 4' 8'
GRAPHIC SCALE
1/4" = 1'-0"
NORTH
ELECTRICAL DEMO PLAN - SECOND FLOOR
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK. SEE PROPOSED SEQUENCE OF WORK ON SHEET E002 AND
COORDINATE SEQUENCE WITH OTHER DISCIPLINES AND WITH COTR.
SHEET NOTES:
VERIFY EXISTING CIRCUIT FEEDING EQUIPMENT. DEMOLISH EXISTING ELECTRICAL CONNECTION, CONDUIT, AND WIRING.
VERIFY EXISTING CIRCUIT FEEDING TRACK LIGHT FIXTURES. REMOVE EXISTING FIXTURE AND CORRESPONDING CONDUIT AND WIRING.
MAINTAIN EXISTING ROLL-UP DOOR CONNECTION, DISCONNECT, AND MOTOR CONTROLLER. MAINTAIN EXISTING FEEDER FROM
MCC-CB.
REMOVE AND STORE EXISTING LIGHT FIXTURES TO ACCOMMODATE DEMOLITION OF CEILING AND MECHANICAL WORK. MAINTAIN
EXISTING WIRING FOR RECONNECTION OF LIGHT FIXTURES IN NEW WORK.
DISCONNECT ELECTRICAL CONNECTION TO RADIANT HEATER TO ACCOMMODATE DEMOLITION OF CEILING AND MECHANICAL WORK.
MAINTAIN EXISTING WIRING FOR RECONNECTION OF RADIANT HEATER IN NEW WORK. RADIANT HEATER TO BE REMOVED BY OTHERS, COORDINATE WITH MECHANICAL CONTRACTOR.
1/4" = 1'-0"
ELECTRICAL DEMO PLAN - SECOND FLOOR1
1.3
2.3
3.8
4.7
4.8
EEEE
EEEE
EEEE
TU-4TU-3TU-2TU-1
TU-8TU-7TU-6TU-5
TU-12TU-11TU-10TU-9
E
E
(E)VAV-2
(E)VAV-1
(E)TO CIRCUIT
ON PANEL LP2
J
12"X12"X4"D JB,
VAV & TU 24V
POWER SUPPLY
E E E E
E E E E E
MOTORIZED
DAMPER, TYP
NORTH
ELECTRICAL PLAN - BASEMENT FLOOR
0 2' 4' 8'
GRAPHIC SCALE
1/4" = 1'-0"
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK. SEE
PROPOSED SEQUENCE OF WORK ON SHEET E002 AND COORDINATE SEQUENCE
WITH OTHER DISCIPLINES AND WITH COTR.
SHEET NOTES:
INTERCEPT EXISTING WIRING WITH NEW PULLBOX. PROVIDE POWER SUPPLY
COMPATIBLE WITH NEW TU'S AND VAV'S. SEE MANUFACTURER INSTALLATION
INSTRUCTIONS AND CONSULT WITH MANUFACTURER FOR COMPATIBLE POWER
SUPPLIES. SIZE JB AS APPROPRIATE TO ACCOMMODATE POWER SUPPLY.
CONNECT NEW CONDUIT AND WIRING TO EXISTING VAV.
1/4" = 1'-0"
ELECTRICAL PLAN - BASEMENT FLOOR1
(E)MAIN
SWITCHBOARD
MSB WITH ATS
(E)PANEL LP2E
E
E
(E)PANEL FP
E
AHU-1
480V, 3PH, 71MCA
3P100A DS, NEMA 4X
RAD-7
LP2-17,19
SF-1
120V, 1PH, 3/4HP
1P20A DS, NEMA 1
(E)DISTRIBUTION
SWITCHBOARD
DSB
ACCU-2
208V, 1PH, 36.3MCA
2P60A DS, NEMA 4X
E E
CH-2
480V, 3PH, 61.5MCA
3P100A DS, NEMA 4X
CH-1
480V, 3PH, 61.5MCA
3P100A DS, NEMA 4X
LPM-6,8
E
ACCU-1
208V, 1PH, 30MCA
2P60A DS, NEMA 4X
LPM-5,7
E
EDH-1
120V, 1PH, 3.75KW
1P60A DS, NEMA 1
LPM-1,3
PANEL DM
(R)
DM-7,9,11
DM-2,4,6
DM-1,3,5
LPM-2,10,12
TO DISTRIBUTION
SWITCHBOARD DSB
J
WP
PANEL LPM
(E)DIST PNL DP
TO DIST
PNL DP
LP1-1 LP1-1
LP1-1LP1-1
LP1-5
LP1-5
LP1-5
LP2-3 LP2-3
LP2-1LP2-1
LP2-3LP2-3
LP2-3 LP2-3
ECB-RU 5
(E)2"C, 4#3/0, 1#4 GND
(E)PANEL D1
(E)PANEL LP
(E)PANEL "LP7"
(E)PANEL LP1
E E
E
E
(E)RAD-1
LP1-9,11
(E)RAD-4
LP2-5,7
(E)RAD-5
LP2-9,11
(E)RAD-6
(DISCONNECTED)
TYP
TYP
TYP
TYP
TYP
WP
LPM-2
J 7
LPM-4
J
PARTICULATE
MONITOR, PM-1
J
E
DDC CONTROL
PANEL
HEAT TRACE
0 2' 4' 8'
GRAPHIC SCALE
1/4" = 1'-0"
NORTH
ELECTRICAL PLAN - GROUND FLOOR
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK. SEE PROPOSED SEQUENCE OF WORK ON SHEET E002 AND
COORDINATE SEQUENCE WITH OTHER DISCIPLINES AND WITH COTR.
SHEET NOTES:
INSTALL PANEL DM, CONNECT TO EXISTING FEEDER TO PACU VIA NEARBY PULLBOX. PANEL DM SHALL REMAIN DE-ENERGIZED UNTIL
EXISTING PACU IS DISCONNECTED AND DEMOLISHED.
CONNECT TO FACTORY-MOUNTED DISCONNECT SWITCH, PROVIDED BY OTHERS. CONFIRM LOCATION OF DISCONNECT SWITCH PRIOR
TO ROUGH-IN.
CONFIRM WITH AHU MANUFACTURER IF ACCEPTABLE TO MOUNT SERVICE RECEPTACLE TO SURFACE OF EQUIPMENT. OTHERWISE, INSTALL UNISTRUT FRAME TO MOUNT SERVICE RECEPTACLE.
INSTALL FEEDER TO NEW PANEL LPM PRIOR TO DEMOLITION OF MCC-CB AND TERMINATE IN CEILING. INSTALL PANEL LPM AND EXTEND
FEEDER DOWN TO PANEL.
1/4" = 1'-0"
ELECTRICAL PLAN - GROUND FLOOR1
EXTEND EXISTING FEEDER REMAINING FROM DEMOLITION TO NEW ENCLOSED CIRCUIT BREAKER ECB-RU, CONDUIT AND WIRING SIZE TO MATCH EXISTING. CONNECT ECB-RU TO EXISTING FEEDER TO ROLL-UP DOOR. SEE SHEET E103 FOR CONTINUATION.
AFTER COMPLETION OF MECHANICAL WORK AND DURING REINSTALLATION OF CEILING, REINSTALL EXISTING LIGHT FIXTURES AND RECONNECT RADIANT HEATERS REMAINING FROM DEMOLITION. RECONNECT TO EXISTING WIRING REMAINING FROM DEMOLITION.
INSTALL JUNCTION BOX CONCEALED IN CEILING FOR CONNECTION TO HEAT TRACE CONDUCTORS. INSTALL CONNECTION TO HEAT
TRACE PER MANUFACTURER INSTRUCTIONS.
PROVIDE POWER SUPPLY COMPATIBLE WITH PARTICULATE MONITOR. SEE MANUFACTURER INSTALLATION INSTRUCTIONS AND CONSULT WITH MANUFACTURER FOR COMPATIBLE POWER SUPPLIES. SIZE JB AS APPROPRIATE TO ACCOMMODATE POWER SUPPLY.
INTERCEPT EXISTING PACU FEEDER CONDUIT AND WIRING REMAINING FROM DEMOLITION WITH NEW 24"X24"X12" PULLBOX.
(E)PANEL LP6
(E)PANEL LP4
E
E
FCU-2C
208V, 1PH, 0.79MCA
2P30A DS, NEMA 1
FCU-2A
208V, 1PH, 0.60MCA
2P30A DS, NEMA 1
E
FCU-1
208V, 3PH, 3HP
3P30A DS, NEMA 1
ESF-2
120V, 1PH, 3/4HP
1P20A DS, NEMA 1
E
LP5-19,21
EDH-2
120V, 1PH, 3.75KW
1P60A DS, NEMA 1
LP6-31,33,35
E
LP4-13DDC CONTROL
PANEL
E
LP6-17,19
FCU-2B
208V, 1PH, 0.60MCA
2P30A DS, NEMA 1
E
TO ECB-RU
(E)ROLL-UP DOOR
LP4-1 LP4-1
LP4-7
LP5-1 LP5-1 LP6-1 LP6-1
LP6-1LP6-1LP5-1
LP4-9
LP5-5
LP4-3
LP5-5 LP5-5LP5-5
LP5-3
(E)PANEL LP5
E E E
EE
(E)RAD-15
LP4-20,22
3 (E)RAD-8
LP5-7,9
3 (E)RAD-9
LP6-5,7
(E)RAD-11
LP6-9,11
(E)RAD-10
LP5-11,13
TYP
TYP
TYP
TYP
TYP
J
LP6-15
J
LP6-13
E
LP5-25,27
HEAT TRACE
HEAT TRACE
0 2' 4' 8'
GRAPHIC SCALE
1/4" = 1'-0"
NORTH
ELECTRICAL PLAN - SECOND FLOOR
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK. SEE PROPOSED SEQUENCE OF WORK ON SHEET E002 AND
COORDINATE SEQUENCE WITH OTHER DISCIPLINES AND WITH COTR.
SHEET NOTES:
AFTER COMPLETION OF MECHANICAL WORK AND DURING REINSTALLATION OF CEILING, REINSTALL EXISTING LIGHT FIXTURES REMAINING FROM DEMOLITION. RECONNECT TO EXISTING WIRING REMAINING FROM DEMOLITION.
EXISTING FEEDER FROM NEW ECB-RU, SEE SHEET E102 FOR CONTINUATION.
AFTER COMPLETION OF MECHANICAL WORK AND DURING REINSTALLATION OF CEILING, REINSTALL RADIANT HEATERS REMAINING
FROM DEMOLITION. RECONNECT TO EXISTING WIRING REMAINING FROM DEMOLITION.
INSTALL JUNCTION BOX CONCEALED IN CEILING FOR CONNECTION TO HEAT TRACE CONDUCTORS. INSTALL CONNECTION TO HEAT
TRACE PER MANUFACTURER INSTRUCTIONS.
1/4" = 1'-0"
ELECTRICAL PLAN - SECOND FLOOR1
DISTRIBUTION SWITCHBOARD - DSB
480V, 3PH, 3W, 60HZ, 1200A MAIN, GND BUS, 65KA SC BRACING
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21, 22 23 24
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P110AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
250AF
GFI
3P30AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P150AT
250AF
GFI
3P250A
NON-GFI
3P110AT
250AF
GFI
3P110AT
250AF
GFI
3P50A
NON-GFI
3P80AT
150AF
NON-GFI
C2
/K
3 [ 3#
6 W /G
ND
C2
/K
2 [ 3#
6 W /G
ND
C2
/K
1 [ 3#
6 W /G
ND
C2
/K
5 [ 3#
6 W /G
ND
CT
C2
/K
8 [ 3#
2 W /G
ND
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
EH
H1
C2
/K
4 [ 3#
6 W /G
ND
C2
/K
8 [ 3#
6 W /G
ND
C2
/K
7 [ 3#
6 W /G
ND
IF
A
FE
ED
ER
KV
A
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
3# 6 &
1# 8 G
ND
C2
/K
1 [ 3#
0 K
CM
IL
W /G
ND
K2
[3 #3
/0 W
/G
ND
1-
3/C #6
1#
8 G
ND
C2
/K
6 [ 3#
6 W /G
ND
1- 3/C
#6
1# 8 G
ND
C2
/K
4 [ 3#
0K
CM
IL
W /G
ND
3P60A
K2
[3 #4
/0 W
/G
ND
3# 6 &
1# 8 G
ND C2
/K
9 [ 3#
3/0 W
/G
ND
K2
[3
#6 W
/G
ND
EHH11
3# 6 &
1# 8 G
ND
3P60A
PA
D
9 &
RE
CE
PT
AC
LE
S
3# 6 &
1# 8 G
ND
PA
D
RE
CE
PT
AC
LE
C2
/K
3 [ 3#
2 W /G
ND
3P60A 3P60A
3# 6 &
1# 8 G
ND
3/C #6
1#
8 G
ND
3# 6 &
1# 8 G
NDC2
/K
6 [ 3#
0 K
CM
IL
W /G
ND
C2
/K
9 [ 3#
0K
CM
IL
W /G
ND
C2
/K
1 [ 3#
0K
CM
IL
W /G
ND
K2
[3 #4
/0 W
/G
ND
K2
[3 #3
/0 W
/G
ND
3P60A
K2
[3 #1
/0 W
/G
ND
PA
D
RE
CE
PT
AC
LE
S
PA
D
RE
CE
PT
AC
LE
S
PA
D
RE
CE
PT
AC
LE
S
3# 6 &
1# 8 G
ND
3# 6 &
1# 8 G
ND
C2
/K
3 [ 3#
6 W /G
ND
C2
/K
[3#
3/0 W
/G
ND
K2
[3
#1 /0
W /G
ND
3/# 6 &
1# 8 G
ND
3P60A
PA
D
RE
CE
PT
AC
LE
S
3# 6 &
1# 8 G
ND
3P500A
2 1/2(64)C, 3#250
KCMIL & 1#2 GND
TR1
150KVA
480V- 208Y/120V
2 SETS - 3"(76)C,
4#350 KCMIL,
2#2 GND
2"(51)C, 4#3/0, 1#4 GND
MC
C-
CB
SE
E
SH
T
ED
NEW GEN JB
IN-LINE SPLICE
CONTROL
PNL
100%
3P1600AF
1200AT
EMERGENCY GENERATOR
800KW, 1000KVA, 0.8PF,
480/277V,3PH, 3W, 1800 RPM
GFI PROTECTION: INTEGRAL WITHIN GENERATOR
DERATING FACTORS:
ALTITUDE: 70.0% x 800KW = 561KW, 701KVA FUEL: 93.7% x 561KW = 518KW, 648KVA
2"(51)C, 3#4/0 &
1#2 GND
1 1/4"(32)C, 3#2 &
1#6 GND
3/4"(19)C, 2#12
TO FACP
3/4"(19)C, 3#12
& 1#12 GND
MILLING MACHINE
4 KVA,3PH,480V
1#8 GND, BOND TO
BLDG. STRUCTURE
PANEL D1
2 SETS - 3-600 KCMIL
HELCO 12.47KV
UG DISTRIBUTION
PRIMARY WIRING
BY HELCO IN 2-5"(127)C
HELCO TRANSFORMER
750KVA (660KVA AT ALTITUDE)
12.47KV-480Y/277V, 5.75%Z
3-4"(102)C, SERVICE ENTRANCE
CONDUCTORS BY HELCO
PT'S
CT'S
HELCO
KWH METER
GFI 100%
RATED
3P1000A
3P1200A
ATS
3P175AT
GFI
3P125AT
GFI
3P250AT
ST/GFI
MAIN SWITCHBOARD MSB
SECTION 3, DISTRIBUTION
PACU
BRIDGE CRANE
TROLLEY DUCT
SLEEVES
1"(25)C, CONTROLS
4"(102)C, POWER
4"(102)C WITH ATS/GENERATOR CONTROL WIRES
3 SETS - 4"(102)C,
3-750 KCMIL & 1#3/0 GND
GENERATOR ROOM PIT
3 SETS -
4"(102)C, 3-750 KCMIL
& 1#3/0 GND
480Y/277V, 3PH, 4W
, 60HZ, 1200A
PF
B
PA
D
RE
CE
PT
AC
LE
TR3
30KVA
480V-208Y/120V
52C, 4#2, 1#6 GND
3P500A
3P100A 3P150A 3P200A 3P50A 3P125A
3/4"(19)C, 2#12
2P40A
DISTRIBUTION PANELBOARD (PANEL DP)
208Y/120V, 3PH, 4W, 600A MAINS, EQPT GND BUS, ISOLATED GROUND, 42KA SC BRACING
3/4"C, 3#6, 1#8 GND
PANEL FP
120/208V, 1 PH, 3W, 100A, GND BUS
1P20A 1P20A 1P20A 1P20A
FACP AT
MODULE 5
1 1 /4"
(3 2)
C, 4#
2, 2#
8 G
ND
1 1 /2"
(3 8)
C, 4#
1, 2#
8 G
ND
F 4P200A
3" (7
6) C, 4#
0 K
CM
IL,
2#
2 G
ND
1" (2
5) C, 4# 6, 2# 8 G
ND
1 1 /2"
(3 8)
C, 4#
1, 2#
8 G
ND
250A
NA
ST
J
PANEL LP1
AT MODULE 1
PANEL LP2
AT MODULE 2
PANEL LP3B
AT MODULE 3
PANEL LP3A
AT MODULE 3
PANEL LP4
AT MODULE 4
PANEL LP5
AT MODULE 5
PANEL LP6
AT MODULE 6
FA CONTROL
PANEL
TO INERT GAS
FIRE PROTECTION
PANELS 1 & 2
3/4"(19)C, 4#12
3P60A
TR2
75KVA
480V- 208Y/120V
2"(52)C, 4#3/0, 1#6 GND
3P175A
PA
NE
L L P
1"(25)C, 3#4, 1#8 GND
52C, 3#6, 1#8 GND
3/4"(19)C, 2#12 & 1#12 GND
INERT GAS
FP SYSTEM
PANEL FSP-1
3P125A
PA
NE
L
GE
N
3P60A PA
NE
L
LP
52C, 4#6, 1#8 GND
3P800AT
non-GFI
3 SETS -
5"(127)C, 3-750 KCMIL
& 1#2/0 GND
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
S
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
S
TO GENERATOR
ANNUNCIATOR
3P200A
3" (7
6) C, 4#
0 K
CM
IL,
2#
2 G
ND
52C, 3#6, 1#8 GND
2 SETS - 3"(76)C,
4#350 KCMIL,
2#2 GND
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK.
SEE PROPOSED SEQUENCE OF WORK ON SHEET E002 AND
COORDINATE SEQUENCE WITH OTHER DISCIPLINES AND WITH COTR.
B. UNIT MEASUREMENTS IN PARENTHESES ARE IN MILLIMETERS.
SHEET NOTES:
DISCONNECT EXISTING ELECTRICAL CONNECTION TO PACU IN
COORDINATION WITH WHEN MECHANICAL CONTRACTOR IS READY TO
REMOVE AND RELOCATE PACU.
DEMOLISH EXISTING ELECTRICAL POWER CONNECTION TO FIRE
SUPPRESSION PANEL. FIRE SUPPRESSION PANEL TO BE DEMOLISHED
BY OTHERS. SEE FIRE PROTECTION DRAWINGS FOR DETAILS AND
COORDINATE WITH FIRE PROTECTION CONTRACTOR.
REMOVE EXISTING SHUNT TRIP WIRING, ABANDON EXISTING CONDUIT.
DEMOLISH EXISTING CONNECTION TO MCC-CB, STUB EXISTING
CONDUIT AND MAINTAIN EXISTING WIRING.
PARTIALLY DEMOLISH EXISTING FEEDER TO PACU AND
CORRESPONDING PULLBOX, STUB EXISTING CONDUIT AND CUT
EXISTING WIRING.
PANEL V
AT VAULT
3P90A
ST
INERT GAS
FP SYSTEM
PANEL FSP-2
INERT GAS
FP SYSTEM
PANEL FSP-3
1P20A
VAULT FIKE
RELEASING
PANEL FSP-4
2 2 2 2
MAIN SWITCHBOARD
MSB SECTION 1, METER
UNINTERRUPTIBLE POWER SUPPLY
(INSTALLED UNDER SEPARATE PROJECT)
750KVA, 480/277V, 3PH, 3W, 65KAIC
DERATING FACTORS:
ALTITUDE: 84.0% x 750KVA = 630KVA
UPS
3 SETS - 4"(102)C,
3-500 KCMIL & 1#3/0 GND
G M ROTARY ENERGY
STORAGE SYSTEM
SYNCHRONOUS
MOTOR-GENERATOR
3 SETS - 4"(102)C,
3-500 KCMIL & 1#3/0 GND
MAIN SWITCHBOARD
MSB SECTION 2, ATS
3P1000A
3P1000A
MAINTENANCE BYPASS
(INSTALLED UNDER
SEPARATE PROJECT)
480/277V, 3PH, 3W, 1200A, 65KAIC
N.O.
N.C.
3P1000A
N.C.
24"X24"X12"D
PULLBOX
3"(78)C, 3-350KCM,
1#4 GND
M 3
2"(51)C, 4#3/0, 1#4 GND
NOT TO SCALE
ELECTRICAL SINGLE-LINE DIAGRAM - MAIN DEMO1
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
ELECTRICAL SINGLE-LINE
DIAGRAM - MAIN DEMO
3P150A
ST
BS
TO DISTRIBUTION
SWITCHBOARD,
SEE SHEET ED401
2"(51)C, 4#3/0, 1#4 GND
TO FA CONTROL PANEL
3/4"(19)C, 2#19
1A
1B 1C 1D 1E 1F 2A 2B 2C 2D 2E 2F 2G 2H 3A 3B 3C 3D 3E 3F
3P15A3P15A3P15A3P25A
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
J J
16KW 6KW
MCP MCP
3P7A
T 3P7A
T
3/4"C, 4#14
A/C-1
DDC
CONTROL
PANEL
SP
AC
E
SP
AC
E
SP
AC
E
SP
AC
E
J J
3P30A 3P30A
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
3P30A
SF
-4
SF
-3
SP
AC
E
RO
LL
-U P
DO
OR
3P30A3P30A3P30A3P30A
MCB
C
MCB
CH
O A
3P25A T
3P20A T
3P3A T
3P7A
T MCP MCP
3P70A
MCB
C
3P25A
TMCB
C
3P20A T
3P3A
T MCP
3P3A
T MCP
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
2 1
16KW11.4KW
ED
H-
ED
H-
ED
H-
HU
-2
EF
-3
SF
-2
SP
AC
E
ED
H-
HU
-1
SF
-1
EF
-1
3P30A3P30A3P30A3P30A
2 1
11.4KW
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
3/4 "C
, 3 #1
1#
G
ND
16KW
CONTROL
BUILDING
HVAC SYSTEM
MASTER
TIME
CLOCK
CABINET
1"C, 16#14
3/4 "C
2#
3/4 "C
2#
3/4 "C
2#
3/4 "C
2#
MCC-CB
480V, 3PH, 3W, 60HZ, 600A MAINS. GND BUS, 22KA SC BRACING
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK.
SEE PROPOSED SEQUENCE OF WORK ON SHEET E002 AND
COORDINATE SEQUENCE WITH OTHER DISCIPLINES AND WITH COTR.
B. UNIT MEASUREMENTS IN PARENTHESES ARE IN MILLIMETERS.
SHEET NOTES:
MAINTAIN EXISTING CONDUIT AND WIRING TO ROLL-UP DOOR.
3P30A 3P30A
H O A
H O A
H O A
H O A
H O A
H O A
H O A
H O A
H O A
NOT TO SCALE
ELECTRICAL SINGLE-LINE DIAGRAM - MCC-CB DEMO1
Smithsonian Facilities
Washington DC 20560 600 Maryland Avenue S.W. Suite 5001
Institution Smithsonian
WSP USA Buildings Inc.
1001 Bishop Street Suite 2400 Honolulu Hawaii 96813 USA
Telephone 808 536 1737 Facsimile 808 537 5829 honolulu@wsp.com
DIAGRAM - MCC-CB DEMO
DISTRIBUTION SWITCHBOARD - DSB
480V, 3PH, 3W, 60HZ, 1200A MAIN, GND BUS, 65KA SC BRACING
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P110AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
250AF
GFI
3P30AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P60AT
150AF
GFI
3P150AT
250AF
GFI
3P110AT
250AF
GFI
3P110AT
250AF
GFI
C2
/K
3 [ 3#
6 W /G
ND
C2
/K
2 [ 3#
6 W /G
ND
C2
/K
1 [ 3#
6 W /G
ND
C2
/K
5 [ 3#
6 W /G
ND
CT
C2
/K
8 [ 3#
2 W /G
ND
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
EH
H1
C2
/K
4 [ 3#
6 W /G
ND
C2
/K
8 [ 3#
6 W /G
ND
C2
/K
7 [ 3#
6 W /G
ND
IF
A
FE
ED
ER
KV
A
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
3# 6 &
1# 8 G
ND
C2
/K
1 [ 3#
0 K
CM
IL
W /G
ND
K2
[3 #3
/0 W
/G
ND
1-
3/C #6
1#
8 G
ND
C2
/K
6 [ 3#
6 W /G
ND
1- 3/C
#6
1# 8 G
ND
C2
/K
4 [ 3#
0K
CM
IL
W /G
ND
3P60A
K2
[3 #4
/0 W
/G
ND
3# 6 &
1# 8 G
ND C2
/K
9 [ 3#
3/0 W
/G
ND
K2
[3
#6 W
/G
ND
EHH11
3# 6 &
1# 8 G
ND
3P60A
PA
D
9 &
RE
CE
PT
AC
LE
S
3# 6 &
1# 8 G
ND
PA
D
RE
CE
PT
AC
LE
C2
/K
3 [ 3#
2 W /G
ND
3P60A 3P60A
3# 6 &
1# 8 G
ND
3/C #6
1#
8 G
ND
3# 6 &
1# 8 G
NDC2
/K
6 [ 3#
0 K
CM
IL
W /G
ND
C2
/K
9 [ 3#
0K
CM
IL
W /G
ND
C2
/K
1 [ 3#
0K
CM
IL
W /G
ND
K2
[3 #4
/0 W
/G
ND
K2
[3 #3
/0 W
/G
ND
3P60A
K2
[3 #1
/0 W
/G
ND
PA
D
RE
CE
PT
AC
LE
S
PA
D
RE
CE
PT
AC
LE
S
PA
D
RE
CE
PT
AC
LE
S
3# 6 &
1# 8 G
ND
3# 6 &
1# 8 G
ND
C2
/K
3 [ 3#
6 W /G
ND
C2
/K
[3#
3/0 W
/G
ND
K2
[3
#1 /0
W /G
ND
3/# 6 &
1# 8 G
ND
3P60A
PA
D
RE
CE
PT
AC
LE
S
3# 6 &
1# 8 G
ND
NEW GEN JB
IN-LINE SPLICE
CONTROL
PNL
100%
3P1600AF
1200AT
EMERGENCY GENERATOR
800KW, 1000KVA, 0.8PF,
480/277V,3PH, 3W, 1800 RPM
GFI PROTECTION: INTEGRAL WITHIN GENERATOR
DERATING FACTORS:
ALTITUDE: 70.0% x 800KW = 561KW, 701KVA FUEL: 93.7% x 561KW = 518KW, 648KVA
2"(51)C, 3#4/0 &
1#2 GND
1 1/4"(32)C, 3#2 &
1#6 GND
3/4"(19)C, 3#12
& 1#12 GND
MILLING MACHINE
4 KVA,3PH,480V
1#8 GND, BOND TO
BLDG. STRUCTURE
PANEL D1
2 SETS - 3-600 KCMIL
HELCO 12.47KV
UG DISTRIBUTION
PRIMARY WIRING
BY HELCO IN 2-5"(127)C
HELCO TRANSFORMER
750KVA (660KVA AT ALTITUDE)
12.47KV-480Y/277V, 5.75%Z
3-4"(102)C, SERVICE ENTRANCE
CONDUCTORS BY HELCO
MAIN SWITCHBOARD
MSB SECTION 1, METER
PT'S
CT'S
HELCO
KWH METER
GFI 100%
RATED
3P1000A
3P1200A
ATS
3P175AT
GFI
3P125AT
GFI
MAIN SWITCHBOARD MSB
SECTION 3, DISTRIBUTION
BRIDGE CRANE
TROLLEY DUCT
SLEEVES
1"(25)C, CONTROLS
4"(102)C, POWER
4"(102)C WITH ATS/GENERATOR CONTROL WIRES
3 SETS - 4"(102)C,
3-750 KCMIL & 1#3/0 GND
GENERATOR ROOM PIT
3 SETS -
4"(102)C, 3-750 KCMIL
& 1#3/0 GND
480Y/277V, 3PH, 4W
, 60HZ, 1200A
PA
D
RE
CE
PT
AC
LE
3P500A
3P100A 3P150A 3P200A 3P50A 3P125A
DISTRIBUTION PANELBOARD (PANEL DP)
208Y/120V, 3PH, 4W, 600A MAINS, EQPT GND BUS, ISOLATED GROUND, 42KA SC BRACING
3/4"C, 3#6, 1#8 GND
1 1 /4"
(3 2)
C, 4#
2, 2#
8 G
ND
3" (7
6) C, 4#
0 K
CM
IL,
2#
2 G
ND
1" (2
5) C, 4# 6, 2# 8 G
ND
1 1 /2"
(3 8)
C, 4#
1, 2#
8 G
ND
PANEL LP1
AT MODULE 1
PANEL LP3B
AT MODULE 3
PANEL LP3A PANEL LP4
AT MODULE 4
PANEL LP5
AT MODULE 5
PANEL LP6
AT MODULE 6
TO INERT GAS FIRE
PROTECTION PANEL
FSP-0 (BY OTHERS)
3P800AT
non-GFI
3 SETS -
5"(127)C, 3-750 KCMIL
& 1#2/0 GND
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
S
PA
D
RE
CE
PT
AC
LE
PA
D
RE
CE
PT
AC
LE
S
TO GENERATOR
ANNUNCIATOR
3P200A
3" (7
6) C, 4#
0 K
CM
IL,
2#
2 G
ND
20 21, 22 23 24
3P250A
NON-GFI
3P50A
NON-GFI
3P80AT
150AF
NON-GFI
3P500A
2 1/2(64)C, 3#250
KCMIL & 1#2 GND
TR1
150KVA
480V- 208Y/120V
2 SETS - 3"(76)C,
4#350 KCMIL,
2#2 GND
TR3
30KVA
480V-208Y/120V
52C, 4#2, 1#6 GND
3P60A
TR2
75KVA
480V- 208Y/120V
2"(52)C, 4#3/0, 1#6 GND
3P175A
PA
NE
L L P
1"(25)C, 3#4, 1#8 GND
52C, 3#6, 1#8 GND
3P125A
PA
NE
L
GE
N
3P60A PA
NE
L
LP
52C, 4#6, 1#8 GND
52C, 3#6, 1#8 GND
2 SETS - 3"(76)C,
4#350 KCMIL,
2#2 GND
3P250AT
ST/GFI
PANEL LP2
AT MODULE 2
PANEL V
AT VAULT
3P90A
ST
PANEL LP3C
3P100A
PANEL LPM
AT MODULE 2
1 1 /4"
(3 2)
C, 4#
2, 2#
8 G
ND
UNINTERRUPTIBLE POWER SUPPLY
(INSTALLED UNDER SEPARATE PROJECT)
750KVA, 480/277V, 3PH, 3W, 65KAIC
DERATING FACTORS:
ALTITUDE: 84.0% x 750KVA = 630KVA
UPS
3 SETS - 4"(102)C,
3-500 KCMIL & 1#3/0 GND
G M ROTARY ENERGY
STORAGE SYSTEM
SYNCHRONOUS
MOTOR-GENERATOR
3 SETS - 4"(102)C,
3-500 KCMIL & 1#3/0 GND
3P1000A
3P1000A
MAINTENANCE BYPASS
(INSTALLED UNDER
SEPARATE PROJECT)
480/277V, 3PH, 3W, 1200A, 65KAIC
N.O.
N.C.
3P1000A
N.C.
MAIN SWITCHBOARD
MSB SECTION 2, ATS
PANEL DM
24"X24"X12"D
PULLBOX
3(78)C, 3-350KCM,
1#4 GND
GENERAL NOTES:
A. COORDINATE ALL OUTAGES WITH COTR PRIOR TO COMMENCING WORK.
SEE PROPOSED SEQUENCE OF WORK ON SHEET E002 AND
COORDINATE SEQUENCE WITH OTHER DISCIPLINES AND WITH COTR.
B. UNIT MEASUREMENTS IN PARENTHESES ARE IN MILLIMETERS.
SHEET NOTES:
SHUNT TRIP BREAKER. WIRING CONNECTION TO SHUNT TRIP RELAY
AND FIRE SUPPRESSION PANEL BY OTHERS. SEE FIRE PROTECTION
DRAWINGS FOR MORE INFORMATION.
INTERCEPT EXISTING CONDUIT STUB REMAINING FROM DEMOLITION
WITH JUNCTION BOX AS REQUIRED, EXTEND CONDUIT AND WIRING TO
NEW ECB-RU.
INTERCEPT EXISTING CONDUIT STUB REMAINING FROM DEMOLITION
WITH PULLBOX. TAP WIRING IN NEW PULLBOX FOR PANEL DM AND
TEMPORARY PACU CONNECTION.
2P40A
PANEL FP
120/208V, 1 PH, 3W, 100A, GND BUS
1P20A 1P20A 1P20A 1P20A
3/4"(19)C, 2#12 & 1#12 GND
FACP AT
MODULE 2
INERT GAS
FP SYSTEM
PANEL FSP-0
FIRE ALARM
ANNUNCIATOR
PANEL
POWER
SUPPLY TO
ASSD, F/SD
3P200A
ST
1 1
TO INERT GAS FIRE
This is the start of the file's text. The full file is on GovTribe.