1883701 HILO Replace PACU Bidders Bid Sch.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- 33330223RF0010042
- Issued by
-
Smithsonian Institution
About this file
This document contains a bid summary template for a federal construction contract opportunity to replace the post-anesthesia care unit (PACU) at the Smithsonian Astrophysical Observatory's Submillimeter Array base facility in Mauna Kea Science Reserve, Hawaii. The template includes line items for materials, labor, equipment, and total costs across various construction divisions. It also lists the solicitation number, project name and location, and indicates the contractor will be responsible for all associated mechanical, electrical, plumbing, and fire protection work as described in the specifications and drawings dated March 15, 2023.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank bid summary
| Title : | HILO Replace PACU | Prepared by : |
| Facility : | HILO | Date : |
| Project Number : | 1883701 | Company: |
| Base Bid | ||||
| BASE BID: All work associated with mechanical, electrical, and plumbing work, and fire protection systems as described in the specifications and drawings both dated March 15, 2023. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | |
| A. North Support of Excavation | $ - 0 | $ - 0 | $ - 0 | |
| B. South Support of Excavation | $ - 0 | $ - 0 | $ - 0 | |
| C. East Support of Excavation | $ - 0 | $ - 0 | $ - 0 | |
| D. West Support of Excavation | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 |
BASE BID SUBTOTAL
| Overhead and Profit |
| Performance Bond |
Total
BASE BIDTotal
B-&P
Sheet1
File details come from the government source that posted it. Updated .