Industry Outreach Briefing April 2014.pdf

PDF 311 KB Posted

Attached to
Draft Screening Information Request (SIR)/ Request for Information (RFI) - TRAFFIC FLOW MANAGEMENT 2 (TFM2)
Solicitation number
18221
Issued by

About this file

Industry Outreach Briefing April 2014 (pdf)

View the file

Other files

File Type Posted
Draft Section J-6.zip ZIP file
Industry Outreach Briefing and Q A Oct 2014.pdf PDF
Draft Section D.docx DOCX document
Industry Outreach Q A April 2014.pdf PDF
Draft Section J-5.zip ZIP file
Draft Section B.xlsx XLSX spreadsheet
Draft Section J-4.zip ZIP file
Draft Section F.doc DOC document
Draft Section M.docx DOCX document
Draft Section C.docx DOCX document
Draft Section J-1.doc DOC document
Draft Section J Cover Page.doc DOC document
Draft Section J-9.zip ZIP file
Draft Section G.docx DOCX document
Draft Section J-2.zip ZIP file
Draft Section E.docx DOCX document
Draft Section I.docx DOCX document
Draft Section J-8.doc DOC document
Draft Section H.doc DOC document
Draft Section J-3.zip ZIP file
Draft Section L.docx DOCX document
Draft Section K.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Presented to:

By:

Date:

Federal Aviation Administration Traffic Flow

Management

Acquisition (TFM2)

Industry Forum

April 2014

Industry Forum

Sharonda Holmes

April 24, 2014

Federal Aviation Administration

TFM2 Scope

• Operations & Maintenance of all TFMS products & services

– System monitoring & control

– Helpdesk and ATCSCC onsite support

– Continuity of ops and security assurance

– 2nd-level engineering (e.g. PTR analysis, 56-day and weekly adaptation)

– Logistics support

– Deploy software releases and patches

• Program Management

– Resource allocation and tracking, scheduling, metrics, EVM, CM, QA

Industry Forum – April 2014 “Please note the information provided may be subject to change”

TFM2 Scope (cont.)

• Systems Engineering

– Analysis, estimates, requirements, design

• Implementation of TFMS enhancements

– Detailed design

– Software code & test

– Formal acceptance testing support (WSAT, OT, KSAT)

– Transition planning and site surveys

– Training material and conduct

– Deployment support

Anticipated Acquisition Approach

• New 12 year contract (current ends June 2016)

– Full and open competition

– Award decision based on best-value proposal

– Three-year base with remaining sub-CLINs optional

• CPFF for operations

• CPIF for development

• T&M for engineering services

• Market Survey released March 20, 2013

• SIR/RFP release by October 30, 2014

– Offerors will be permitted six weeks to respond

• Contract award by November 13, 2015

Questions & Answers

• FAA Contract Opportunities

– https://faaco.faa.gov

– May subscribe to email announcements

• Questions should be submitted in writing to:

Sharonda Holmes, Contracting Officer sharonda.holmes@faa.gov

Industry Forum – April 2014 https://faaco.faa.gov/

File details come from the government source that posted it. Updated .