Industry Outreach Briefing April 2014.pdf
PDF 311 KB Posted
- Attached to
- Draft Screening Information Request (SIR)/ Request for Information (RFI) - TRAFFIC FLOW MANAGEMENT 2 (TFM2)
- Solicitation number
- 18221
About this file
Industry Outreach Briefing April 2014 (pdf)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft Section J-6.zip | ZIP file | |
| Industry Outreach Briefing and Q A Oct 2014.pdf | ||
| Draft Section D.docx | DOCX document | |
| Industry Outreach Q A April 2014.pdf | ||
| Draft Section J-5.zip | ZIP file | |
| Draft Section B.xlsx | XLSX spreadsheet | |
| Draft Section J-4.zip | ZIP file | |
| Draft Section F.doc | DOC document | |
| Draft Section M.docx | DOCX document | |
| Draft Section C.docx | DOCX document | |
| Draft Section J-1.doc | DOC document | |
| Draft Section J Cover Page.doc | DOC document | |
| Draft Section J-9.zip | ZIP file | |
| Draft Section G.docx | DOCX document | |
| Draft Section J-2.zip | ZIP file | |
| Draft Section E.docx | DOCX document | |
| Draft Section I.docx | DOCX document | |
| Draft Section J-8.doc | DOC document | |
| Draft Section H.doc | DOC document | |
| Draft Section J-3.zip | ZIP file | |
| Draft Section L.docx | DOCX document | |
| Draft Section K.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Presented to:
By:
Date:
Federal Aviation Administration Traffic Flow
Management
Acquisition (TFM2)
Industry Forum
April 2014
Industry Forum
Sharonda Holmes
April 24, 2014
Federal Aviation Administration
TFM2 Scope
• Operations & Maintenance of all TFMS products & services
– System monitoring & control
– Helpdesk and ATCSCC onsite support
– Continuity of ops and security assurance
– 2nd-level engineering (e.g. PTR analysis, 56-day and weekly adaptation)
– Logistics support
– Deploy software releases and patches
• Program Management
– Resource allocation and tracking, scheduling, metrics, EVM, CM, QA
Industry Forum – April 2014 “Please note the information provided may be subject to change”
TFM2 Scope (cont.)
• Systems Engineering
– Analysis, estimates, requirements, design
• Implementation of TFMS enhancements
– Detailed design
– Software code & test
– Formal acceptance testing support (WSAT, OT, KSAT)
– Transition planning and site surveys
– Training material and conduct
– Deployment support
Anticipated Acquisition Approach
• New 12 year contract (current ends June 2016)
– Full and open competition
– Award decision based on best-value proposal
– Three-year base with remaining sub-CLINs optional
• CPFF for operations
• CPIF for development
• T&M for engineering services
• Market Survey released March 20, 2013
• SIR/RFP release by October 30, 2014
– Offerors will be permitted six weeks to respond
• Contract award by November 13, 2015
Questions & Answers
• FAA Contract Opportunities
– https://faaco.faa.gov
– May subscribe to email announcements
• Questions should be submitted in writing to:
Sharonda Holmes, Contracting Officer sharonda.holmes@faa.gov
Industry Forum – April 2014 https://faaco.faa.gov/
File details come from the government source that posted it. Updated .