Industry Outreach Briefing and Q A Oct 2014.pdf

PDF 881 KB Posted

Attached to
Draft Screening Information Request (SIR)/ Request for Information (RFI) - TRAFFIC FLOW MANAGEMENT 2 (TFM2)
Solicitation number
18221
Issued by

About this file

Industry Outreach Briefing and Q A Oct 2014 (pdf)

View the file

Other files

File Type Posted
Draft Section J-6.zip ZIP file
Draft Section D.docx DOCX document
Industry Outreach Q A April 2014.pdf PDF
Draft Section J-5.zip ZIP file
Draft Section B.xlsx XLSX spreadsheet
Draft Section J-4.zip ZIP file
Draft Section F.doc DOC document
Draft Section M.docx DOCX document
Draft Section C.docx DOCX document
Draft Section J-1.doc DOC document
Draft Section J Cover Page.doc DOC document
Draft Section J-9.zip ZIP file
Draft Section G.docx DOCX document
Draft Section J-2.zip ZIP file
Draft Section E.docx DOCX document
Draft Section I.docx DOCX document
Draft Section J-8.doc DOC document
Industry Outreach Briefing April 2014.pdf PDF
Draft Section H.doc DOC document
Draft Section J-3.zip ZIP file
Draft Section L.docx DOCX document
Draft Section K.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Aviation Administration

Omar Baradi, TFM Deputy Program Manager

Sharonda Holmes, Contracting Officer

Industry Outreach Traffic Flow Management System (TFMS)

FAA Industry Outreach

October 2, 2014

Agenda

• TFMS Overview

– Omar Baradi, TFM Deputy Program Manager

• TFM2 Acquisition Status

– Sharonda Holmes, Contracting Officer

FAA Industry Outreach

October 2, 2014

Monitors demand and capacity for primary NAS resources

Monitors demand and capacity for primary NAS resources

Implements the NAS strategic plan to balance demand with available capacity

Implements the NAS strategic plan to balance demand with available capacity

Assesses the impact of NAS disruptions and provides alerts

Assesses the impact of NAS disruptions and provides alerts

Receives updates from other NAS systems and makes adjustments to this plan as needed

Focusing on efficiently improving the “greater NAS”TFMS:

FAA Industry Outreach

October 2, 2014

Traffic Flow Management

• Traffic Flow Management (TFM) predicts system constraints and facilitates the collaboration and execution of mitigation initiatives with stakeholders, using common information displays and tools to minimize NAS delays.

• Traffic Flow Management System (TFMS) is:

– A major NAS system and primary tool suite for the Traffic Management Unit

(TMU)

– Backbone for Collaborative Decision Making (CDM) at the FAA

• TFMS architecture is composed of:

– COTS hardware and software infrastructure

– TFMS Processing Center (TPC) at WJHTC and field sites at all TMU locations, called TFMS Remote Site (TRS)

• Classified as Mission Efficiency Critical

– Designed for 99.9% service availability

FAA Industry Outreach

October 2, 2014

TFMS Infrastructure

ATCSCC ARTCC TRACON /Towers Other

ATCSCC – Vint Hill, VA TFM TPC – Technical Center – FAA Disaster Recovery Center (DRC) FAA HQ and Academy Contractor Sites (3) R&D (4) Traffic Management Units at:

ARTCCs (21) TRACONs (35) CERAPs (3) Regional Offices (5) Towers (19)

Airlines (24) & AOCs Military (9) International Sites (17) U.S. Government Locations (7)

TFMS Operational Locations and Service Delivery Points

TFMS Users

- Supports 800 FAA users (200 web-based)

- Installed at 88 FAA sites and

125 total sites

Collaborative Decision Making (CDM Tools)

- Traffic Situation Display (TSD)

- Flight Schedule Monitor (FSM)

- Flight Schedule Analyzer (FSA)

- National Traffic Management Log (NTML)

TFM Processing Center (TPC)

London Control

NAVCANADA

Honduras COCESNA

Mexico Control

FAA Industry Outreach

October 2, 2014

TFMS Continued

Enhanced Status Info System fly.faa.gov

Flight Schedule MonitorTraffic Situation Display National Traffic Management Log

Operational Info System

30+ user/data interfaces

Departure Spacing Program

Playbook

FAA Industry Outreach

October 2, 2014

CATMT Work Package History

• CATMT WP4 is the fourth in a series of work packages that provides beneficial capabilities and enhancements to the Traffic Flow Management System (TFMS)

TFM 1st Useful Segment JRC approved August 2005

Infrastructure (TFM-M)

• Modernized and relocated the

TFM central processing hub from Volpe to WJHTC

Software Enhancements

(CATMT WP1)

• Added beneficial capabilities to the system such as:

– Airspace Flow Program (AFP)

– Adaptive Compression (AC)

– RRIA

– XFS

CATMT WP3

JRC approved January 2010

SW Infrastructure

• Modernizes SW infrastructure of the decision support tool suite used by Traffic Managers in the field (remote site)

Software Enhancements

• Collaborative Information

Exchange (CIX)

CATMT WP2

JRC approved September 2008

Software Enhancements

• Adds new, beneficial capabilities to the system

• Unified Delay Program

(UDP)

• Wx Integration

• Collaborative Airspace

Congestion Resolution

(CACR)

• Airborne Reroute (ABRR)

FAA Industry Outreach

October 2, 2014

TFM2 Acquisition Status

FAA Industry Outreach

October 2, 2014

TFM2 Scope

• Operations & Maintenance of all TFMS Products & Services

– System monitoring & control

– Helpdesk and ATCSCC onsite support

– Continuity of ops and security assurance

– 2nd-level engineering (e.g. PTR analysis, 56-day and weekly adaptation)

– Logistics support

– Deploy software releases and patches

• Program Management

– Resource allocation and tracking, scheduling, metrics, EVM, CM, QA

FAA Industry Outreach

October 2, 2014

TFM2 Scope (cont.)

• Systems Engineering

– Analysis, estimates, requirements, design

• Implementation of TFMS Enhancements

– Detailed design

– Software code & test

– Formal acceptance testing support (WSAT, OT, KSAT)

– Transition planning and site surveys

– Training material and conduct

– Deployment support

FAA Industry Outreach

October 2, 2014

TFM2 Anticipated Acquisition Approach

• New 12 Year Contract (current ends June 2016)

– Award decision based on best-value proposal

– Three-year base with remaining sub-CLINs optional

• CPFF for operations

• CPIF for development

• T&M for engineering services

• Market Survey released March 20, 2013

• Draft SIR/RFP

• Final SIR/RFP

• Contract award by November 2015

FAA Industry Outreach

October 2, 2014

For More TFM2 Information

• FAA Contract Opportunities

– https://faaco.faa.gov

– May subscribe to email announcements

• Please Direct Questions on TFM2 in Writing to:

– Sharonda.Holmes@faa.gov

FAA Industry Outreach

October 2, 2014

Questions & Answers

TFMS Questions/Comments:

1. Question: How do you envision what happens between the contract award date on 11/15 and the completion of the current contract?

FAA Answer: The government has budgeted time to allow for up to 6 months for transition; during this time, there will be some overlap of period(s) of performance between the incumbent contract and the newly awarded contract.

2. Question: Integration of TFDM and TFMS. Is there a disconnect between these two systems? Have the requirements of both systems been considered FAA Answer: TFDM and TFM programs are working together on requirements that are to be integrated. These requirements will be included and released in the respective SIRs.

3. Question: What is the status of the Performance-Based Acquisition emphasis?

FAA Answer: The initial approach was to structure a portion of the procurement around a performance based approach, but now it is structured around requirements based procurement.

Note: This slide has been updated to include Questions and Answers - 10/10/2014