About this file

Draft Section D (docx)

View the file

Other files

File Type Posted
Draft Section J-6.zip ZIP file
Industry Outreach Briefing and Q A Oct 2014.pdf PDF
Industry Outreach Q A April 2014.pdf PDF
Draft Section J-5.zip ZIP file
Draft Section B.xlsx XLSX spreadsheet
Draft Section J-4.zip ZIP file
Draft Section F.doc DOC document
Draft Section M.docx DOCX document
Draft Section C.docx DOCX document
Draft Section J-1.doc DOC document
Draft Section J Cover Page.doc DOC document
Draft Section J-9.zip ZIP file
Draft Section G.docx DOCX document
Draft Section J-2.zip ZIP file
Draft Section E.docx DOCX document
Draft Section I.docx DOCX document
Draft Section J-8.doc DOC document
Industry Outreach Briefing April 2014.pdf PDF
Draft Section H.doc DOC document
Draft Section J-3.zip ZIP file
Draft Section L.docx DOCX document
Draft Section K.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TFM-2 DRAFT SIR Section D

PART I - SECTION D: PACKAGING AND MARKING

D.1 PRESERVATION, PACKING, AND PACKAGING

Preservation, packing, and packaging for all items delivered hereunder shall be in accordance with the best commercial practices to ensure arrival at the specified destination(s) in an undamaged condition.

D.2 MARKING

In addition to information provided with shipping instructions, all deliverables shall be marked with the following:

(a) FAA contract number;

(b) Contractor's name and address; and

(c) List of contents.

D.3 DESTINATION

As applicable, all contractor deliverables (reports, studies, or briefings) shall be shipped F.O.B. destination.

File details come from the government source that posted it. Updated .