18-Substitution Request Fire Alarm System Upgrade.pdf
PDF 67 KB Posted
- Solicitation number
- PW-F-26-611802-2029
- Issued by
- Ada County, Idaho
About this file
This is a Substitution Request Form for the Renaissance High School and District Service Center Fire Alarm Upgrade project being conducted by the West Ada School District in Idaho under Bid PW-F-26-611802-2029. The form permits contractors and bidders to request approval for substituting specified products with comparable alternatives during the bidding process. Substitution requests must be submitted through Bonfire by April 16, 2026, at 4:00 PM Mountain Daylight Time. The project has a substantial completion date of August 7, 2026. Contractors requesting substitutions must provide comprehensive supporting documentation, including product data sheets, technical specifications, performance data, drawings, electrical requirements, utility requirements, physical dimensions, clearance requirements, code compliance information, and warranty details.
The form requires contractors to certify that proposed substitute products meet or exceed all specification requirements, fit within available spaces with proper clearances, coordinate with affected trades, and include all associated costs within the bid amount. Contractors assume full responsibility for any changes required to mechanical, plumbing, electrical, structural, or architectural systems resulting from the substitution and must present these changes to the Design Team for review. The form stipulates that substitutions are not permitted without prior written approval from the Architect/Engineer, and contractors remain fully responsible for removal, replacement, and remediation of any equipment installed without approval or found non-compliant with specifications. The Design Team retains authority to approve, approve as noted, or reject substitution requests.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBSTITUTION REQUEST FORM
*Due in Bonfire on 4/16/2026 @ 4PM MDT*
Project: Renaissance High School and District Service Center Fire Alarm Upgrade Bid: PW-F-26-611802-2029
Date of Request: ____________________
Request No.: ____________________
1. REQUESTING PARTY INFORMATION
Contractor / Bidder Name: __________________________________________
Contact Person: __________________________________________
Phone: ____________________ Email: ____________________
2. SPECIFIED PRODUCT (BASIS OF DESIGN)
Specification Section No.: ____________________
Manufacturer: ____________________
Model / Catalog No.: ____________________
3. PROPOSED SUBSTITUTE / COMPARABLE PRODUCT
Manufacturer: ____________________
Model / Catalog No.: ____________________
Country of Origin (if applicable): ____________________ ☐ Product by a listed acceptable manufacturer ☐ Substitution request (non-listed manufacturer)
4. REQUIRED SUPPORTING DOCUMENTATION
(Attach.all.applicable.documentation¡.Incomplete.submittals.will.not.be.reviewed¡) ☐ Product data sheets and technical specifications ☐ Performance data demonstrating compliance with specifications ☐ Drawings, details, and installation requirements ☐ Electrical requirements (voltage, phase, amperage, load) ☐ Utility requirements (power, communications, other) ☐ Weight and physical dimensions ☐ Clearance and access requirements ☐ Code compliance and listing information ☐ Warranty information ☐ Any additional data necessary for complete evaluation
5. CONTRACTOR CERTIFICATIONS
By submitting this request, the Contractor certifies and acknowledges the following:
• The proposed product meets or exceeds all specification requirements and scheduled performance criteria.
• The proposed product will fit within the space available, including all required clearances for installation, access, maintenance, and code compliance.
• Any variance from the basis-of-design, including but not limited to weight, electrical requirements, or other utility requirements, has been identified and coordinated with all affected trades.
• All costs associated with the use of the proposed product, including changes required to the work of the prime bidder and any subcontractors, are included in the bid or proposal.
• The Contractor accepts full responsibility for any changes required to mechanical, plumbing, electrical, structural, or architectural systems resulting from the proposed substitution.
• All such changes have been clearly identified and presented to the Design Team for review.
6. ACKNOWLEDGMENT OF RISK AND RESPONSIBILITY
The Contractor understands and agrees that:
• Substitutions are not permitted without prior written approval of the Architect/Engineer.
• The Contractor shall be fully responsible for the removal, replacement, and remedy of any system or equipment installed without approval or found not to comply with the specifications or required performance.
• Approval of a substitution does not relieve the Contractor of responsibility for proper coordination, performance, or compliance with contract documents.
7. IMPACT STATEMENT
(Describe.any.impacts.to.schedule?.cost?.coordination?.or.other.trades¡.Attach.additional.sheets.if.necessary¡)
☐ No impacts to cost, schedule, or coordination ☐ Impacts identified (see above and attachments)
8. CONTRACTOR SIGNATURE
I certify that the information provided is accurate and complete.
Authorized Representative (Print Name): ______________________________
Signature: ____________________________________ Date: ___________
9. DESIGN TEAM REVIEW (FOR OWNER/AE USE ONLY)
☐ Approved ☐ Approved as Noted ☐ Rejected Comments:
Architect/Engineer: _________________________________________________
Signature: ____________________________________ Date: ___________