17 SPECIFICATIONS PART II of II - (MWD) New Kennel.pdf

PDF 3 MB Posted

Attached to
B649-2 Construct New Kennel for Military Working Dogs
Solicitation number
FA441823F0008
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Military Working Dog Area

Building 649 at

Joint Base Charleston – Air Base North Charleston, South Carolina

Charleston County

Specifications Part II

September 20, 2018 Final Design

Project Manager: Patrick Buhler, P.E.

patrickb@adcengineering.com JBC Project No. DKFX 13-1010 ADC Project No. 15307

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 628TH AIR BASE WING (AMC)

JOINT BASE CHARLESTON SC

04 Nov 2022

MEMORANDUM FOR Record

FROM: 628 CES/CENMP

210 W. Stewart Avenue Joint Base Charleston SC 29404

SUBJECT: Notice of Document Edits

1. This document has been edited after original production and stamp, with permission of the Designer of Record (DOR), Greg Jones, PE.

2. The following specification sections were included in the original specifications produced by ADC Engineering but have been replaced by the Joint Base Charleston Project Manager to reflect current installation standards at the time of solicitation:

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 00 PROJECT SCHEDULE Previously numbered 01 32 16.00 20

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 QUALITY CONTROL

01 78 00 CLOSEOUT REQUIREMENTS’

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

3. Please direct any questions to the Alex Smith, at (843) 963-1477 or alexander.smith.47@us.af.mil.

Alex Smith, RA Architect / Project Manager 628th Civil Engineer Squadron

Repai r Mi l i t ar y Wor ki ng Dog Ar ea, Bl dg. 649 Fi nal Desi gn JBC Pr oj ect No. DKFX 13- 1010 Sept ember 20, 2018

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 16. 00 20 PROJECT SCHEDULE AND PROGRESS DOCUMENTATI ON

01 33 00 SUBMI TTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00 QUALI TY CONTROL FOR MI NOR CONSTRUCTI ON

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 54 00. 00 31 GREEN PROCUREMENT

01 57 19. 00 31 TEMPORARY ENVI RONMENTAL CONTROLS ( JB CHS- 7/ 2014)

01 57 20. 00 31 ENVI RONMENTAL PROTECTI ON

01 73 29 CUTTI NG AND PATCHI NG

01 74 19. 00 31 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT ( JB CHS)

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 01 00. 00 GEOTECHNI CAL DATA

02 01 00. 00 10 ENVI RONMENTAL ASSESSMENT

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

03 39 00. 00 10 CONCRETE CURI NG

DI VI SI ON 04 - MASONRY

04 20 00 MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 20 00 FI NI SH CARPENTRY

06 41 16. 00 10 LAMI NATE CLAD ARCHI TECTURAL CASEWORK

06 61 16 SOLI D POLYMER ( SOLI D SURFACI NG) FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 24 00 EXTERI OR I NSULATI ON AND FI NI SH SYSTEMS

07 60 00 FLASHI NG AND SHEET METAL

07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG

PROJECT TABLE OF CONTENTS Page 1 jenniferp Typewritten Text

PART I

07 84 00 FIRESTOPPING

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 51 13 ALUMI NUM WI NDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMI C TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 67 23. 13 RESI NOUS FLOORI NG

09 77 30 SANI TARY WALL FI NI SHES

09 84 30 SOUND- ABSORBI NG UNI TS

09 90 00 PAI NTS AND COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 10 00 VI SUAL COMMUNI CATI ONS SPECI ALTI ES

10 14 00. 20 I NTERI OR SI GNAGE

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHERS

DI VI SI ON 12 - FURNI SHI NGS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES ( BI D OPTI ON 2)

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 19 13 KENNEL ENCLOSURES AND GATES

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13. 00 20 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS

23 05 48. 00 40 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND

EQUIPMENT

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG

CONTROL SYSTEMS

23 81 00. 00 20 UNI TARY AI R CONDI TI ONI NG EQUI PMENT

PROJECT TABLE OF CONTENTS Page 2 jenniferp Typewritten Text

PART II

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 09 23. 00 40 LI GHTI NG CONTROL DEVI CES

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 24 16. 00 40 PANELBOARDS

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 51 00 I NTERI OR LI GHTI NG

26 56 00 EXTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 FI RE DETECTI ON AND ALARM SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXI BLE PAVEMENT

32 12 10 BI TUMI NOUS TACK AND PRI ME COATS

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS

32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS

32 31 13 CHAI N LI NK FENCES AND GATES

32 84 24 I RRI GATI ON SPRI NKLER SYSTEMS

32 92 23 SODDING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 30 00 SANI TARY SEWERS

33 40 00 STORM DRAI NAGE UTI LI TI ES

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 3

SECTI ON 21 13 13. 00 20

WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

04/08

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM D709 (201 6) Lami nat ed Ther moset t i ng Mat er i al s

FM GLOBAL ( FM)

FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 13 ( 2013; TI A 10- 1; TI A 11- 2; ERTA 2014; TI A

14- 3) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems

NFPA 1963 ( 2014) St andar d f or Fi r e Hose Connect i ons

NFPA 24 ( 2013) St andar d f or t he I nst al l at i on of Pr i vat e Fi r e Ser vi ce Mai ns and Thei r Appurtenances

UNDERWRI TERS LABORATORI ES ( UL)

UL 668 ( 2004; Repr i nt Dec 2012) Hose Val ves f or Fi r e- Pr ot ect i on Ser vi ce

UL Fi r e Pr ot Di r ( 2012) Fi r e Pr ot ect i on Equi pment Di r ect or y

1. 2 SYSTEM DESCRI PTI ON

Desi gn and pr ovi de new and modi f y exi st i ng aut omat i c wet pi pe f i r e ext i ngui shi ng spr i nkl er syst ems f or compl et e f i r e pr ot ect i on cover age throughout new kennel and t he r enovat ed bui l di ng r espect i vel y.

1. 3 SPRI NKLER SYSTEM DESI GN

Except as modi f i ed her ei n, desi gn aut omat i c wet pi pe f i r e ext i ngui shi ng spr i nkl er syst ems i n accor dance wi t h t he r equi r ed and advi sor y pr ovi s i ons of NFPA 13, i ncl udi ng al l r ecommendat i ons and advi sor y por t i ons, whi ch shal l be consi der ed mandat or y; t hi s i ncl udes advi sor y pr ovi s i ons l i s t ed i n t he appendi ces of such st andar d( s) , as t hough t he wor d " shal l " had been subst i t ut ed f or t he wor d " shoul d" wher ever i t appear s. Desi gn syst em by hydr aul i c cal cul at i ons f or uni f or m di st r i but i on of wat er over t he desi gn ar ea. Hydr aul i c cal cul at i ons shal l assume a 12 psi pr essur e l oss f or t he backf l ow pr event er assembl y. Locat e spr i nkl er s i n a consi st ent pat t er n wi t h

SECTI ON 21 13 13. 00 20 Page 1 cei l i ng gr i d, l i ght s, and ai r suppl y di f f user s. Pr ovi de spr i nkl er s and pi pi ng syst em l ayout . Al l Devi ces and equi pment f or f i r e pr ot ect i on ser vi ce shal l be UL Fi r e Pr ot Di r l i s t ed or FM APP GUI DE appr oved f or use i n wet pi pe spr i nkl er syst ems. Pr ovi de sei smi c pr ot ect i on f or t he spr i nkl er syst em. Desi gn and i nst al l sei smi c pr ot ect i on i n accor dance wi t h t he r equi r ement s of NFPA 13 sect i on t i t l ed " Pr ot ect i on of Pi pi ng Agai nst Damage Wher e Subj ect t o Ear t hquakes. "

1. 3. 1 Locat i on of Spr i nkl er s

Spr i nkl er s i n r el at i on t o t he cei l i ng and t he spaci ng of spr i nkl er s shal l not exceed t he hazar ds i ndi cat ed on t he cont r act dr awi ngs. Uni f or ml y space spr i nkl er s on t he br anch pi pi ng. Spr i nkl er s shal l pr ovi de cover age t hr oughout 100 per cent of t he bui l di ng. Thi s i ncl udes, but i s not l i mi t ed t o, t el ephone r ooms, el ect r i cal equi pment r ooms, boi l er r ooms, swi t chgear r ooms, t r ansf or mer r ooms, and ot her el ect r i cal and mechani cal spaces.

1. 3. 2 Wat er Di st r i but i on

Di st r i but i on shal l be uni f or m t hr oughout t he ar ea i n whi ch t he spr i nkl er s wi l l open. Di schar ge f r om i ndi v i dual spr i nkl er s i n hydr aul i cal l y most r emot e ar ea shal l be bet ween 100 per cent and 120 per cent of t he speci f i ed density.

1. 3. 3 Densi t y of Appl i cat i on of Wat er

Si ze pi pe t o pr ovi de t he speci f i ed densi t y when t he syst em i s di schar gi ng t he speci f i ed t ot al maxi mum r equi r ed f l ow. Appl i cat i on t o hor i zont al sur f aces bel ow t he spr i nkl er s shal l be as i ndi cat ed on t he cont r act drawings. Si ze pi pe t o pr ovi de t he speci f i ed densi t y when t he syst em i s di schar gi ng t he speci f i ed t ot al maxi mum r equi r ed f l ow. Appl i cat i on t o hor i zont al sur f aces bel ow t he spr i nkl er s shal l be as i ndi cat ed on t he cont r act dr awi ngs.

1. 3. 4 Spr i nkl er Di schar ge Ar ea

The hydr aul i cal l y most r emot e ar ea shal l be cal cul at ed per NFPA 13.

1. 3. 5 Out si de Hose Al l owances

Hydr aul i c cal cul at i ons shal l i ncl ude a hose al l owance of 250 gpm f or out s i de hose st r eams

1. 3. 6 Wat er Suppl y

Conduct a f i r e f l ow t est t o base hydr aul i c cal cul at i ons from.

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .

Par t i al submi t t al s and submi t t al s not f ul l y compl y i ng wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13 and t hi s speci f i cat i on sect i on shal l be r et ur ned di sappr oved wi t hout r evi ew. Thi s cont r act st i pul at i on i s non-negotiable.

SECTI ON 21 13 13. 00 20 Page 2

SD- 02 Shop Dr awi ngs

Shop Dr awi ngs; G

Prepare 24 by 36 i nch det ai l wor ki ng dr awi ngs of spr i nkl er s and pi pi ng. Fl oor pl ans shal l be dr awn t o a scal e not l ess t han 1/ 8" = 1' - 0" . Show dat a essent i al f or pr oper i nst al l at i on of each syst em. Show det ai l s , pl an v i ew, el evat i ons and sect i ons of t he syst ems suppl y and pi pi ng. Show pi pi ng schemat i c of syst ems suppl y, devi ces, val ves, pi pe and f i t t i ngs. Show poi nt t o poi nt el ect r i cal wi r i ng di agr ams. Submi t dr awi ngs s i gned by a r egi st er ed f i r e pr ot ect i on engi neer . Pr ovi de t hr ee copi es of t he Spr i nkl er Syst em Shop Dr awi ngs, no l at er t han 21 days pr i or t o t he st ar t of spr i nkl er syst em i nst al l at i on.

SD- 03 Pr oduct Dat a

Pipe ; G Fittings ; G Valves , i ncl udi ng gat e, check, and gl obe ; G Sprinklers ; G Pi pe hanger s and suppor t s; G Spr i nkl er Al ar m Swi t ches; G Fi r e depar t ment connect i ons; G Mechani cal coupl i ngs; G Backf l ow Pr event i on Assembl y; G Sei smi c Br aci ng; G

Annot at e descr i pt i ve dat a t o show t he speci f i c model , t ype, and si ze of each i t em. Cat al og cut s shal l al so i ndi cat e UL Li st i ng/ FM Appr oval and count r y of manuf act ur e.

SD- 05 Desi gn Dat a

Hydr aul i c Cal cul at i ons; G

Submi t comput er pr ogr am gener at ed hydr aul i c cal cul at i ons t o subst ant i at e compl i ance wi t h hydr aul i c desi gn r equi r ement s.

Cal cul at i ons shal l be per f or med by comput er usi ng sof t war e i nt ended speci f i cal l y f or f i r e pr ot ect i on syst em desi gn.

Cal cul at i ons shal l i ncl ude i somet r i c di agr am i ndi cat i ng hydr aul i c nodes and pi pe segment s. Submi t name of sof t war e pr ogr am used.

SD- 06 Test Repor t s r equest t o schedul e Pr el i mi nar y Test s; G

Pr el i mi nar y Test Repor t ; G

Pr ovi de Thr ee copi es of t he compl et ed Pr el i mi nar y Test Repor t , no l at er t han 7 days af t er t he compl et i on of t he Pr el i mi nar y Test s.

The Pr el i mi nar y Test s Repor t shal l i ncl ude bot h t he Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Under gr ound Pi pi ng and t he Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Abovegr ound Pi pi ng. Al l i t ems i n t he Pr el i mi nar y Test s Repor t shal l be s i gned by t he Fi r e Pr ot ect i on Engi neer .

SECTI ON 21 13 13. 00 20 Page 3 r equest t o schedul e Fi nal Accept ance Test ; G

Fi nal Accept ance Test Repor t ; G

Pr ovi de Thr ee copi es of t he compl et ed Fi nal Accept ance Test s Repor t s, no l at er t han 7 days af t er t he compl et i on of t he Fi nal Accept ance Test s. Al l i t ems i n t he Fi nal Accept ance Repor t shal l be s i gned by t he Fi r e Pr ot ect i on Engi neer .

SD- 07 Cer t i f i cat es

I nspect i on by Fi r e Pr ot ect i on Engi neer ; G

Concur r ent wi t h t he Fi nal Accept ance Test Repor t , cer t i f i cat i on by t he Fi r e Pr ot ect i on Engi neer t hat t he spr i nkl er syst em i s i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s, i ncl udi ng s i gned appr oval of t he Pr el i mi nar y and Fi nal Accept ance Test Reports.

Fi r e Pr ot ect i on Engi neer ; G

The name and document at i on of cer t i f i cat i on of t he pr oposed Fi r e Pr ot ect i on Engi neer , no l at er t han 14 days af t er t he Not i ce t o Pr oceed and pr i or t o t he submi t t al of t he spr i nkl er syst em dr awi ngs and hydr aul i c cal cul at i ons.

Spr i nkl er Syst em I nst al l er ; G

Submi t dat a showi ng t he Spr i nkl er Syst em I nst al l er has successf ul l y i nst al l ed syst ems of t he same t ype and desi gn as speci f i ed her ei n, Dat a shal l i ncl ude names and l ocat i ons of at l east t wo i nst al l at i ons wher e t he Cont r act or , or t he subcont r act or r ef er r ed t o above, has i nst al l ed such syst ems. I ndi cat e t ype and desi gn of each syst em and cer t i f y t hat each syst em has per f or med sat i sf act or i l y i n t he manner i nt ended f or not l ess t han 18 mont hs. Pr ovi de NI CET cer t i f i cat i on of t he syst em t echni c i an.

Cont r act or shal l submi t dat a al ong wi t h submi t t al of t he Fi r e Pr ot ect i on Engi neer Qual i f i cat i ons.

SD- 10 Oper at i on and Mai nt enance Dat a

Oper at i ng and Mai nt enance I nst r uct i ons

Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA as suppl ement ed and modi f i es by t hi s speci f i cat i on sect i on.

Pr ovi de s i x manual s i n accor dance wi t h NFPA 13. The manual s shal l i ncl ude t he manuf act ur er ' s name, model number , par t s l i s t , l i s t of par t s and t ool s t hat shoul d be kept i n st ock by t he owner f or r out i ne mai nt enance i ncl udi ng t he name of a l ocal suppl i er , s i mpl i f i ed wi r i ng and cont r ol s di agr ams, t r oubl eshoot i ng gui de, and r ecommended ser vi ce or gani zat i on ( i ncl udi ng addr ess and t el ephone number ) f or each i t em of equi pment . Each ser vi ce or gani zat i on submi t t ed shal l be capabl e of pr ovi di ng 4 hour on- si t e r esponse t o a ser vi ce cal l on an emer gency basi s.

SD- 11 Cl oseout Submi t t al s

SECTI ON 21 13 13. 00 20 Page 4

As- bui l t dr awi ngs

As- bui l t shop dr awi ngs, at no l at er t han 14 days af t er compl et i on of t he Fi nal Test s. The Spr i nkl er Syst em Dr awi ngs shal l be updat ed t o r ef l ect as- bui l t condi t i ons af t er al l r el at ed wor k i s compl et ed. Pr ovi de el ect r oni c dr awi ngs i n dwg or pdf f or mat .

On- si t e t r ai ni ng

1. 5 QUALIFICATIONS

1. 5. 1 Fi r e Pr ot ect i on Engi neer

A Fi r e Pr ot ect i on Engi neer i s a r egi st er ed pr of essi onal engi neer ( P. E. ) who has passed t he f i r e pr ot ect i on engi neer i ng wr i t t en exami nat i on admi ni st er ed by t he Nat i onal Counci l of Exami ner s f or Engi neer i ng and Sur veys ( NCEES)

1. 5. 2 Spr i nkl er Syst em I nst al l er

The Spr i nkl er Syst em I nst al l er shal l be r egul ar l y engaged i n t he i nst al l at i on of t he t ype and compl exi t y of syst em speci f i ed i n t he Cont r act document s, and shal l have ser ved i n a s i mi l ar capaci t y f or at l east t hr ee syst ems t hat have per f or med i n t he manner i nt ended f or a per i od of not l ess t han 6 mont hs. I nst al l at i on dr awi ngs, shop dr awi ngs and as- bui l t dr awi ngs shal l be pr epar ed, by or under t he super vi s i on of , an syst em t echni c i an who i s exper i enced wi t h t he t ypes of wor ks speci f i ed her ei n, and i s cur r ent l y cer t i f i ed by t he Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) as an engi neer i ng t echni c i an wi t h mi ni mum Level I V cer t i f i cat i on i n Aut omat i c Spr i nk l er Syst em pr ogr am or by a f i r e pr ot ect i on engineer.

1. 6 QUALI TY ASSURANCE

1. 6. 1 Mat er i al and Equi pment Qual i f i cat i ons

Pr ovi de mat er i al s and equi pment t hat ar e st andar d pr oduct s of manuf act ur er s r egul ar l y engaged i n t he manuf act ur e of such pr oduct s, whi ch ar e of a s i mi l ar mat er i al , desi gn and wor kmanshi p. St andar d pr oduct s shal l have been i n sat i sf act or y commer ci al or i ndust r i al use f or 2 year s pr i or t o bi d openi ng. The 2- year use shal l i ncl ude appl i cat i ons of equi pment and mat er i al s under s i mi l ar c i r cumst ances and of s i mi l ar s i ze. The pr oduct shal l have been f or sal e on t he commer ci al mar ket t hr ough adver t i sement s, manuf act ur er s ' cat al ogs, or br ochur es dur i ng t he 2 year per i od.

1. 6. 2 Al t er nat i ve Qual i f i cat i ons

Pr oduct s havi ng l ess t han a t wo- year f i el d ser vi ce r ecor d wi l l be accept abl e i f a cer t i f i ed r ecor d of sat i sf act or y f i el d oper at i on f or not l ess t han 6000 hour s, excl usi ve of t he manuf act ur er ' s f act or y or l abor at or y t est s, can be shown.

1. 6. 3 Manuf act ur er ' s Namepl at e

Each i t em of equi pment shal l have a namepl at e bear i ng t he manuf act ur er ' s name, addr ess, model number , and ser i al number secur el y af f i xed i n a conspi cuous pl ace; t he namepl at e of t he di st r i but i ng agent wi l l not be acceptable.

SECTI ON 21 13 13. 00 20 Page 5

1. 6. 4 Fi el d Fabr i cat ed Namepl at es

ASTM D709. Pr ovi de l ami nat ed pl ast i c namepl at es f or each equi pment encl osur e, r el ay, swi t ch, and devi ce; as speci f i ed i n t he t echni cal sect i ons or as i ndi cat ed on t he dr awi ngs. Each namepl at e i nscr i pt i on shal l i dent i f y t he f unct i on and, when appl i cabl e, t he posi t i on. Namepl at es shal l be mel ami ne pl ast i c, 0. 125 i nch t hi ck, whi t e wi t h bl ack cent er cor e.

Sur f ace shal l be mat t e f i ni sh. Cor ner s shal l be squar e. Accur at el y al i gn l et t er i ng and engr ave i nt o t he cor e. Mi ni mum si ze of namepl at es shal l be one by 2. 5 i nches. Let t er i ng shal l be a mi ni mum of 0. 25 i nch hi gh nor mal bl ock st y l e.

1. 7 ACCESSIBILITY

I nst al l al l wor k so t hat par t s r equi r i ng per i odi c i nspect i on, oper at i on, mai nt enance, and r epai r ar e r eadi l y accessi bl e. I nst al l conceal ed val ves, expansi on j oi nt s, cont r ol s, damper s, and equi pment r equi r i ng access, i n l ocat i ons f r eel y accessi bl e t hr ough access door s.

1. 8 DELI VERY, STORAGE AND HANDLI NG

Al l equi pment del i ver ed and pl aced i n st or age shal l be housed i n a manner t o pr ecl ude any damage f r om t he weat her , humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s. Addi t i onal l y, al l pi pes shal l ei t her be capped or pl ugged unt i l i nst al l ed.

PART 2 PRODUCTS

2. 1 UNDERGROUND PI PI NG COMPONENTS

2. 1. 1 Pipe

Pi pe shal l compl y wi t h NFPA 24. Mi ni mum pi pe s i ze shal l be 6 i nches.

Pi pi ng mor e t han 5 f eet out s i de t he bui l di ng wal l s shal l be coor di nat ed wi t h t he c i v i l engi neer .

2. 1. 2 Bur i ed Ut i l i t y War ni ng and I dent i f i cat i on Tape

Pr ovi de det ect abl e al umi num f oi l pl ast i c backed t ape or det ect abl e magnet i c pl ast i c t ape manuf act ur ed speci f i cal l y f or war ni ng and i dent i f i cat i on of bur i ed pi pi ng. Tape shal l be det ect abl e by an el ect r oni c det ect i on i nst r ument . Pr ovi de t ape i n r ol l s , 3 i nches mi ni mum wi dt h, col or coded f or t he ut i l i t y i nvol ved wi t h war ni ng and i dent i f i cat i on i mpr i nt ed i n bol d bl ock l et t er s cont i nuousl y and r epeat edl y over t he ent i r e t ape l engt h.

War ni ng and i dent i f i cat i on shal l r ead " CAUTI ON BURI ED WATER PI PI NG BELOW" or s i mi l ar wor di ng. Use per manent code and l et t er col or i ng unaf f ect ed by moi st ur e and ot her subst ances cont ai ned i n t r ench backf i l l mat er i al .

2. 2 ABOVEGROUND PI PI NG COMPONENTS

Al l component s of t he abovegr ound pi pi ng shal l f ul l y compl y wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13 and t hi s speci f i cat i on sect i on. Abovegr ound pi pi ng shal l be st eel .

2. 2. 1 Steel Pipe

Pi pe shal l bebl ack st eel . St eel pi pi ng shal l be Schedul e 10 or 40 f or s i zes l ess t han 8 i nches and Schedul e 40 f or s i zes 8 i nches or l ar ger . Fittings i nt o whi ch spr i nkl er s, spr i nkl er r i ser ni ppl es, or dr op ni ppl es ar e

SECTI ON 21 13 13. 00 20 Page 6 t hr eaded shal l be wel ded, t hr eaded, or gr ooved- end t ype. Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs, f i t t i ngs t hat use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe and segment ed wel ded f i t t i ngs shal l not be per mi t t ed. Rubber gasket ed gr ooved- end pi pe and f i t t i ngs wi t h mechani cal coupl i ngs shal l be per mi t t ed i n pi pe s i zes 1. 5 i nches and l ar ger . Fi t t i ngs, mechani cal coupl i ngs, and r ubber gasket s shal l be suppl i ed by t he same manuf act ur er .

St eel pi pi ng wi t h wal l t hi ckness l ess t han Schedul e 30 shal l not be threaded.

2. 2. 2 Gr ooved Mechani cal Joi nt s and Fi t t i ngs

Gr ooved coupl i ngs, f i t t i ngs and gr oovi ng t ool s shal l be pr oduct s of t he same manuf act ur er .

2. 2. 3 Fl exi bl e Spr i nkl er Hose

The use of f l exi bl e spr i nkl er hose i s per mi ssi bl e.

2. 2. 4 Sprinklers

Pr ovi de nomi nal 0. 50 i nch or 0. 53 i nch or i f i ce spr i nkl er s. Spr i nkl er s wi t h i nt er nal O- r i ngs shal l not be used. Spr i nkl er s shal l be used i n accor dance wi t h t hei r l i s t ed cover age l i mi t at i ons. Pr ovi de concealed , upright , and dry-type s idewall qui ck r esponse spr i nkl er s as i ndi cat ed on Dr awi ngs.

Spr i nkl er s shal l have a br ass f i ni sh. Temper at ur e c l assi f i cat i on shal l be as i ndi cat ed. Spr i nkl er s i n hi gh heat ar eas i nc l udi ng at t i c spaces or i n c l ose pr oxi mi t y t o uni t heat er s shal l have t emper at ur e c l assi f i cat i on i n accor dance wi t h NFPA 13. Ext ended cover age spr i nkl er s shal l not be used.

Def l ect or shal l not be mor e t han 3 i nches bel ow suspended cei l i ngs.

Cei l i ng pl at es shal l not be mor e t han 0. 5 i nch deep. Cei l i ng cups shal l not be per mi t t ed.

2. 2. 5 Valves

Pr ovi de val ves of t ypes appr oved f or f i r e ser vi ce. Val ves shal l open by count er cl ockwi se r ot at i on. Pr ovi de an OS&Y val ve beneat h each al ar m.

Check val ves shal l be c l ear openi ng swi ng- check t ype wi t h i nspect i on and access cover pl at e f or s i zes 8 i nches and l ar ger . Each cont r ol val ve shal l be el ect r i cal l y super vi sed; mi ni mum cont act r at i ngs shal l be 2. 5 amps at 24 vol t s DC. Pr ovi de super vi s i on agai nst val ve c l osur e or t amper i ng of val ve.

2. 2. 6 Pi pe Suppor t s

Provide Pi pe hanger s and suppor t s and Sei smi c Br aci ng i n accor dance wi t h

NFPA 13.

2. 2. 7 Fi r e Depar t ment Connect i ons

Fi r e depar t ment connect i on shal l be pr oj ect i ng t ype wi t h cast br ass body, mat chi ng wal l escut cheon l et t er ed " Aut o Spkr " wi t h a pol i shed br ass f i ni sh. The connect i on shal l have t wo i nl et s wi t h i ndi v i dual sel f - c l osi ng c l apper s, caps wi t h dr i p dr ai ns and chai ns. Femal e i nl et s shal l have 2- 1/ 2 inch di amet er Amer i can Nat i onal Fi r e Hose Connect i on Scr ew Thr eads ( NH) per

NFPA 1963.

2. 2. 8 Backf l ow Pr event i on Assembl y

Pr ovi de l i s t ed doubl e check val ve assembl y backf l ow pr event er . Each check val ve shal l have a dr ai n. Backf l ow pr event i on assembl i es shal l have

SECTI ON 21 13 13. 00 20 Page 7 cur r ent " Cer t i f i cat e of Appr oval f r om t he Foundat i on f or Cr oss- Connect i on Cont r ol and Hydr aul i c Resear ch, FCCCHR Li st . Li st i ng of t he speci f i c make, model , desi gn, and si ze i n t he FCCCHR Li st shal l be accept abl e as t he r equi r ed document at i on. "

2. 3 ALARM I NI TI ATI NG AND SUPERVI SORY DEVI CES

2. 3. 1 Spr i nkl er Al ar m Swi t ches

Pr ovi de pr essur e t ype f l ow swi t ch( es) wi t h c i r cui t opener or c l oser f or t he aut omat i c t r ansmi t t al of an al ar m over t he f aci l i t y f i r e al ar m syst em.

2. 3. 2 Val ve Super vi sor y ( Tamper ) Swi t ch

Swi t ch shal l be sui t abl e f or mount i ng t o t he t ype of cont r ol val ve t o be super vi sed open. The swi t ch shal l be t amper r esi st ant and cont ai n one set of SPDT ( For m C) cont act s ar r anged t o t r ansf er upon r emoval of t he housi ng cover or c l osur e of t he val ve of mor e t han t wo r ot at i ons of t he val ve st em.

2. 4 ACCESSORIES

2. 4. 1 Spr i nkl er Cabi net

Pr ovi de met al cabi net wi t h ext r a spr i nkl er s, i ncl udi ng a r epr esent at i ve sampl e of dr y pendent t ype spr i nk l er s and spr i nkl er wr ench adj acent t o each al ar m val ve. The number and t ypes of ext r a spr i nk l er s shal l be as speci f i ed i n NFPA 13.

2. 4. 2 Pi pe Escut cheon

Pr ovi de spl i t hi nge met al pl at es f or pi pi ng ent er i ng wal l s, f l oor s, and cei l i ngs i n exposed spaces. Pr ovi de pol i shed st ai nl ess st eel pl at es or chr omi um- pl at ed f i ni sh on copper al l oy pl at es i n f i ni shed spaces. Pr ovi de pai nt f i ni sh on met al pl at es i n unf i ni shed spaces.

PART 3 EXECUTI ON

3. 1 I NSPECTI ON BY FI RE PROTECTI ON ENGI NEER

The Fi r e Pr ot ect i on Engi neer shal l i nspect t he spr i nkl er syst em per i odi cal l y dur i ng t he i nst al l at i on t o assur e t he spr i nkl er syst em i s bei ng pr ovi ded and i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s and t he appr oved spr i nkl er syst em submi t t al ( s) . The Fi r e Pr ot ect i on Engi neer shal l at t end bot h t he pr el i mi nar y and f i nal t est s, and shal l s i gn t he t est r esul t s . Af t er t he pr el i mi nar y t est i ng has been compl et ed, t he Fi r e Pr ot ect i on Engi neer , shal l cer t i f y i n wr i t i ng t he syst em i s r eady f or t he f i nal i nspect i ons and t est s. Thi s r epor t shal l document any di scr epanci es f ound and what act i ons wi l l be t aken t o cor r ect . Any di scr epancy not ed dur i ng t he per i odi c s i t e v i s i t s or t he pr el i mi nar y t est i ng shal l be br ought t o t he at t ent i on of t he Cont r act i ng Of f i cer i n wr i t i ng, no l at er t han t hr ee wor ki ng days af t er t he di scr epancy i s discovered.

3. 2 UNDERGROUND PI PI NG I NSTALLATI ON

The met hods of f abr i cat i on and i nst al l at i on of t he under gr ound pi pi ng shal l f ul l y compl y wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13, NFPA 24 and t he cont r act dr awi ngs.

SECTI ON 21 13 13. 00 20 Page 8

3. 3 ABOVEGROUND PI PI NG I NSTALLATI ON

The met hods of f abr i cat i on and i nst al l at i on of t he abovegr ound pi pi ng shal l f ul l y compl y wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13 and t hi s speci f i cat i on sect i on.

3. 3. 1 Pi pi ng i n Fi ni shed Ar eas

I n ar eas wi t h suspended or dr opped cei l i ngs and i n ar eas wi t h conceal ed spaces above t he cei l i ng, pi pi ng shal l be conceal ed above cei l i ngs. Pi pi ng shal l be i nspect ed, t est ed and appr oved bef or e bei ng conceal ed. Ri ser s and si mi l ar ver t i cal r uns of pi pi ng i n f i ni shed ar eas shal l be conceal ed.

3. 3. 2 Pendent Spr i nkl er s

Wher e spr i nkl er s ar e i nst al l ed bel ow suspended or dr opped cei l i ngs, dr op ni ppl es shal l be cut such t hat spr i nkl er cei l i ng pl at es or escut cheons ar e of a uni f or m dept h t hr oughout t he f i ni shed space. The out l et of t he r educi ng coupl i ng shal l not ext end mor e t han 1 i nch bel ow t he under si de of t he cei l i ng. Pendent spr i nkl er s i n suspended cei l i ngs shal l be a mi ni mum of 6 i nches f r om cei l i ng gr i ds.

3. 3. 3 Pi pe Joi nt s

Pi pe j oi nt s shal l conf or m t o NFPA 13, except as modi f i ed her ei n. Wel ded j oi nt s wi l l be per mi t t ed, onl y i f wel di ng oper at i ons ar e per f or med as r equi r ed by NFPA 13 at t he Cont r act or ' s f abr i cat i on shop, not at t he pr oj ect const r uct i on s i t e. Fl anged j oi nt s shal l be pr ovi ded wher e i ndi cat ed or r equi r ed by NFPA 13. Gr ooved pi pe and f i t t i ngs shal l be pr epar ed i n accor dance wi t h t he manuf act ur er ' s l at est publ i shed speci f i cat i on accor di ng t o pi pe mat er i al , wal l t hi ckness and si ze. Gr ooved coupl i ngs, f i t t i ngs and gr oovi ng t ool s shal l be pr oduct s of t he same manuf act ur er . The di amet er of gr ooves made i n t he f i el d shal l be measur ed usi ng t he met hod speci f i cal l y appr oved by t he coupl i ng manuf act ur er f or t he i nt ended appl i cat i on. Gr oove wi dt h and di mensi on of gr oove f r om end of pi pe shal l be measur ed and r ecor ded f or each change i n gr oovi ng t ool set up t o ver i f y compl i ance wi t h coupl i ng manuf act ur er ' s t ol er ances. A r epr esent at i ve of t he gr ooved coupl i ngs and f i t t i ngs manuf act ur er shal l conduct at l east one onsi t e i nspect i on of t he pi pi ng i nst al l at i on t o ensur e t he met hod of i nst al l at i on i s i n accor dance wi t h t he manuf act ur er ' s r equi r ement s and r ecommended pr act i ces.

3. 3. 4 Reducers

Reduct i ons i n pi pe s i zes shal l be made wi t h one- pi ece t aper ed r educi ng f i t t i ngs. Bushi ngs ar e pr ohi bi t ed.

3. 3. 5 Pi pe Penet r at i ons

Cut t i ng st r uct ur al member s f or passage of pi pes or f or pi pe- hanger f ast eni ngs wi l l not be per mi t t ed. Pi pes t hat must penet r at e concr et e or masonr y wal l s or concr et e f l oor s shal l be cor e- dr i l l ed and pr ovi ded wi t h pi pe s l eeves. Each sl eeve shal l be Schedul e 40 gal vani zed st eel , duct i l e i r on or cast i r on pi pe and shal l ext end t hr ough i t s r espect i ve wal l or f l oor and be cut f l ush wi t h each wal l sur f ace. Sl eeves shal l pr ovi de r equi r ed c l ear ance bet ween t he pi pe and t he s l eeve per NFPA 13. The space bet ween t he s l eeve and t he pi pe shal l be f i r ml y packed wi t h mi ner al wool i nsul at i on. Wher e pi pes penet r at e f i r e wal l s, f i r e par t i t i ons, or f l oor s, pi pes shal l be f i r e st opped i n accor dance wi t h Sect i on 07 84 00

SECTI ON 21 13 13. 00 20 Page 9

FI RESTOPPI NG. I n penet r at i ons t hat ar e not f i r e- r at ed or not a f l oor penet r at i on, t he space bet ween t he s l eeve and t he pi pe shal l be seal ed at bot h ends wi t h pl ast i c wat er pr oof cement t hat wi l l dr y t o a f i r m but pl i abl e mass or wi t h a mechani cal l y adj ust abl e segment ed el ast omer seal .

3. 3. 6 I nspect or ' s Test Connect i on

Pr ovi de t est connect i ons appr oxi mat el y 6 f eet above t he f l oor f or each spr i nkl er syst em or por t i on of each spr i nkl er syst em equi pped wi t h an al ar m devi ce. Pr ovi de t est connect i on pi pi ng t o a dr ai n l ocat i on t hat can accept f ul l f l ow wher e t he di schar ge wi l l be r eadi l y v i s i bl e and wher e wat er may be di schar ged wi t hout pr oper t y damage. Di schar ge t o f l oor dr ai ns, j ani t or s i nks or s i mi l ar f i x t ur es shal l not be per mi t t ed. Pr ovi de di schar ge or i f i ce of same si ze as cor r espondi ng spr i nkl er or i f i ce. The penet r at i on of t he ext er i or wal l shal l be no gr eat er t han 2 f eet above f i ni shed gr ade.

3. 3. 7 Backf l ow Pr event er Test Connect i on

Pr ovi de downst r eam of t he backf l ow pr event i on assembl y UL 668 hose val ves with 2. 5 i nch Nat i onal St andar d mal e hose t hr eads wi t h cap and chai n.

Pr ovi de one val ve f or each 250 gpm of syst em demand or f r act i on t her eof .

Pr ovi de a per manent s i gn i n accor dance wi t h par agr aph ent i t l ed " I dent i f i cat i on Si gns" whi ch r eads, " Test Val ve. "

3. 3. 8 Drains

Mai n dr ai n pi pi ng shal l be pr ovi ded t o di schar ge at a saf e poi nt out s i de t he bui l di ng. Auxi l i ar y dr ai ns shal l be pr ovi ded as r equi r ed by NFPA 13.

3. 3. 9 I nst al l at i on of Fi r e Depar t ment Connect i on

Connect i on shal l be mount ed on t he ext er i or wal l appr oxi mat el y 3 f eet above f i ni shed gr ade. The pi pi ng bet ween t he connect i on and t he check val ve shal l be pr ovi ded wi t h an aut omat i c dr i p i n accor dance wi t h NFPA 13 and ar r anged t o dr ai n t o t he out s i de.

3. 3. 10 I dent i f i cat i on Si gns

Si gns shal l be af f i xed t o each cont r ol val ve, i nspect or t est val ve, mai n dr ai n, auxi l i ar y dr ai n, t est val ve, and si mi l ar val ves as appr opr i at e or as r equi r ed by NFPA 13. Val ve i dent i f i cat i on s i gns shal l be mi ni mum 6 i nches wi de by 2 i nches hi gh wi t h enamel baked f i ni sh on mi ni mum 18 gauge st eel or

0. 024 i nch al umi num wi t h r ed l et t er s on a whi t e backgr ound or whi t e l et t er s on r ed backgr ound. Hydr aul i c desi gn dat a namepl at es shal l be per manent l y af f i xed t o each spr i nkl er r i ser as speci f i ed i n NFPA 13.

3. 4 ELECTRI CAL WORK

Except as suppl ement ed and modi f i ed her ei n, el ect r i c equi pment and wi r i ng shal l be i n accor dance wi t h Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM.

3. 5 PI PE PAI NTI NG AND COLOR CODE MARKI NG

Pai nt and col or code mar k spr i nkl er pi pi ng syst em as speci f i ed i n Sect i on

09 90 00 PAI NTS AND COATI NGS.

3. 6 PRELI MI NARY TESTS

The syst em, i ncl udi ng t he under gr ound wat er mai ns, and t he abovegr ound

SECTI ON 21 13 13. 00 20 Page 10 pi pi ng and syst em component s, shal l be t est ed t o assur e t hat equi pment and component s f unct i on as i nt ended. The under gr ound and abovegr ound i nt er i or pi pi ng syst ems and at t ached appur t enances subj ect ed t o syst em wor ki ng pr essur e shal l be t est ed i n accor dance wi t h NFPA 13 and NFPA 24.

Submit r equest t o schedul e Pr el i mi nar y Test s, no l at er t han 14 days pr i or t o t he pr oposed st ar t of t he t est s. Upon compl et i on of speci f i ed t est s, t he Cont r act or shal l submi t f or appr oval a Pr el i mi nar y Test Repor t .

3. 6. 1 Under gr ound Pi pi ng

3. 6. 1. 1 Flushing

Under gr ound pi pi ng shal l be f l ushed i n accor dance wi t h NFPA 24.

3. 6. 1. 2 Hydr ost at i c Test i ng

New under gr ound pi pi ng shal l be hydr ost at i cal l y t est ed i n accor dance wi t h

NFPA 24.

3. 6. 2 Abovegr ound Pi pi ng

3. 6. 2. 1 Hydr ost at i c Test i ng

Abovegr ound pi pi ng shal l be hydr ost at i cal l y t est ed i n accor dance wi t h

NFPA 13.

3. 6. 2. 2 Backf l ow Pr event i on Assembl y For war d Fl ow Test

Each backf l ow pr event i on assembl y shal l be t est ed at syst em f l ow demand, i ncl udi ng al l appl i cabl e hose st r eams, as speci f i ed i n NFPA 13. The Cont r act or shal l pr ovi de al l equi pment and i nst r ument s necessar y t o conduct a compl et e f or war d f l ow t est , i nc l udi ng 2. 5 i nch di amet er hoses, pl aypi pe nozzl es, cal i br at ed pr essur e gauges, and pi t ot t ube gauge. The Cont r act or shal l pr ovi de al l necessar y suppor t s t o saf el y secur e hoses and nozzl es dur i ng t he t est . At t he syst em demand f l ow, t he pr essur e r eadi ngs and pr essur e dr op ( f r i c t i on) acr oss t he assembl y shal l be r ecor ded. A met al pl acar d shal l be pr ovi ded on t he backf l ow pr event i on assembl y t hat l i s t s t he pr essur e r eadi ngs bot h upst r eam and downst r eam of t he assembl y, t ot al pr essur e dr op, and t he syst em t est f l ow r at e det er mi ned dur i ng t he pr el i mi nar y t est i ng. The pr essur e dr op shal l be compar ed t o t he manuf act ur er ' s dat a and t he r eadi ngs obser ved dur i ng t he f i nal i nspect i ons and t est s.

3. 7 FI NAL ACCEPTANCE TEST

Fi nal Accept ance Test shal l begi n onl y when t he Pr el i mi nar y Test Repor t has been appr oved. Submi t r equest t o schedul e Fi nal Accept ance Test , no l at er t han 14 days pr i or t o t he pr oposed st ar t of t he t est s. Not i f i cat i on shal l i ncl ude a copy of t he Cont r act or ' s Mat er i al & Test Cer t i f i cat es.

The Fi r e Pr ot ect i on Engi neer shal l conduct t he Fi nal Accept ance Test and shal l pr ovi de a compl et e demonst r at i on of t he oper at i on of t he syst em.

Thi s shal l i ncl ude oper at i on of cont r ol val ves and f l owi ng of i nspect or ' s t est connect i ons t o ver i f y oper at i on of associ at ed wat er f l ow al ar m swi t ches. Af t er oper at i on of cont r ol val ves has been compl et ed, t he mai n dr ai n t est shal l be r epeat ed t o assur e t hat cont r ol val ves ar e i n t he open posi t i on. I n addi t i on, t he r epr esent at i ve shal l have avai l abl e copi es of as- bui l t dr awi ngs and cer t i f i cat es of t est s pr evi ousl y conduct ed. The i nst al l at i on shal l not be consi der ed accept ed unt i l i dent i f i ed

SECTI ON 21 13 13. 00 20 Page 11 di scr epanci es have been cor r ect ed and t est document at i on i s pr oper l y compl et ed and r ecei ved. The Cont r act or shal l submi t t he Fi nal Accept ance Test Repor t as speci f i ed i n t he Submi t t al s par agr aph.

An exper i enced t echni c i an r egul ar l y empl oyed by t he syst em i nst al l er shal l be pr esent dur i ng t he i nspect i on. The Fi r e Pr ot ect i on Engi neer shal l at t end t he f i nal i nspect i ons and t est s. At t hi s i nspect i on, r epeat any or al l of t he r equi r ed t est s as di r ect ed. Cor r ect def ect s i n wor k pr ovi ded by t he Cont r act or , and make addi t i onal t est s unt i l t he syst ems compl y wi t h cont r act r equi r ement s. Fur ni sh appl i ances, equi pment , el ect r i c i t y , i nst r ument s, connect i ng devi ces, and per sonnel f or t he t est s. The Division, JBCHS FES AHJ, wi l l wi t ness f or mal t est s and appr ove syst ems bef or e t hey ar e accept ed.

3. 8 ON- SI TE TRAI NI NG

Submi t r equest t o schedul e t he On- si t e Tr ai ni ng, at l east 14 days pr i or t o t he st ar t of r el at ed t r ai ni ng but pr i or t o t he f i nal i nspect i ons and t est s. The spr i nkl er cont r act or shal l conduct a t r ai ni ng cour se f or oper at i ng and mai nt enance per sonnel as desi gnat ed by t he Cont r act i ng Of f i cer . Tr ai ni ng shal l be pr ovi ded f or a per i od of 3 hour s of nor mal wor ki ng t i me and shal l s t ar t af t er t he syst em i s f unct i onal l y compl et e and af t er t he Fi nal Accept ance Test . The On- Si t e Tr ai ni ng shal l cover al l of t he i t ems cont ai ned i n t he appr oved Oper at i ng and Mai nt enance I nst r uct i ons.

- - End of Sect i on - -

SECTI ON 21 13 13. 00 20 Page 12

SECTI ON 22 00 00

PLUMBI NG, GENERAL PURPOSE

11/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AI R- CONDI TI ONI NG, HEATI NG AND REFRI GERATI ON I NSTI TUTE ( AHRI )

AHRI 1010 ( 2002) Sel f - Cont ai ned, Mechani cal l y Ref r i ger at ed Dr i nki ng- Wat er Cool er s

AMERI CAN NATI ONAL STANDARDS I NSTI TUTE ( ANSI )

ANSI Z21. 22/ CSA 4. 4 ( 2015) Rel i ef Val ves f or Hot Wat er Suppl y Systems

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG

ENGI NEERS ( ASHRAE)

ASHRAE 189. 1 ( 2011) St andar d f or t he Desi gn of Hi gh- Per f or mance Gr een Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs

ASHRAE 90. 1 - I P ( 2010) Ener gy St andar d f or Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs

AMERI CAN SOCI ETY OF SANI TARY ENGI NEERI NG ( ASSE)

ASSE 1001 ( 2008) Per f or mance Requi r ement s f or At mospher i c Type Vacuum Br eaker s ( ANSI appr oved 2009)

ASSE 1010 ( 2004) Per f or mance Requi r ement s f or Wat er Hammer Ar r est er s ( ANSI appr oved 2004)

ASSE 1011 ( 2004; Er r at a 2004) Per f or mance Requi r ement s f or Hose Connect i on Vacuum Br eaker s ( ANSI appr oved 2004)

ASSE 1012 ( 2009) Per f or mance Requi r ement s f or Backf l ow Pr event er wi t h an I nt er medi at e At mospher i c Vent - ( ANSI appr oved 2009)

ASSE 1013 ( 2011) Per f or mance Requi r ement s f or Reduced Pr essur e Pr i nci pl e Backf l ow Pr event er s and Reduced Pr essur e Fi r e Pr ot ect i on Pr i nc i pl e Backf l ow Pr event er s - ( ANSI appr oved 2010)

ASSE 1018 ( 2001) Per f or mance Requi r ement s f or Tr ap Seal Pr i mer Val ves - Pot abl e Wat er

SECTI ON 22 00 00 Page 1

Suppl i ed ( ANSI Appr oved 2002

ASSE 1019 ( 2011) Per f or mance Requi r ement s f or Vacuum Br eaker Wal l Hydr ant s, Fr eeze Resi st ant , Aut omat i c Dr ai ni ng Type ( ANSI Appr oved 2004)

ASSE 1020 ( 2004; Er r at a 2004; Er r at a 2004) Per f or mance Requi r ement s f or Pr essur e Vacuum Br eaker Assembl y ( ANSI Appr oved 2004)

AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)

AWWA B300 ( 2010; Addenda 2011) Hypochl or i t es

AWWA B301 ( 2010) Li qui d Chl or i ne

AWWA C203 ( 2008) Coal - Tar Pr ot ect i ve Coat i ngs and Li ni ngs f or St eel Wat er Pi pel i nes - Enamel and Tape - Hot - Appl i ed

AWWA C606 ( 2015) Gr ooved and Shoul der ed Joi nt s

AWWA C651 ( 2014) St andar d f or Di s i nf ect i ng Wat er Mains

AWWA C652 ( 2011) Di s i nf ect i on of Wat er - St or age Facilities

AMERI CAN WELDI NG SOCI ETY ( AWS)

AWS A5. 8/ A5. 8M ( 2011; Amendment 2012) Speci f i cat i on f or Fi l l er Met al s f or Br azi ng and Br aze Wel di ng

AWS B2. 2/ B2. 2M ( 2010) Speci f i cat i on f or Br azi ng Pr ocedur e and Per f or mance Qual i f i cat i on

ASME I NTERNATI ONAL ( ASME)

ASME A112. 1. 2 ( 2012) St andar d f or Ai r Gaps i n Pl umbi ng Syst ems ( For Pl umbi ng Fi xt ur es and Wat er - Connect ed Recept or s)

ASME A112. 14. 1 ( 2003; R 2012) Backwat er Val ves

ASME A112. 19. 2/ CSA B45. 1 ( 2013) St andar d f or Vi t r eous Chi na Pl umbi ng Fi xt ur es and Hydr aul i c Requi r ement s f or Wat er Cl oset s and Ur i nal s

ASME A112. 19. 3/ CSA B45. 4 ( 2008; R 2013) St ai nl ess St eel Pl umbi ng Fixtures

ASME A112. 36. 2M ( 1991; R 2012) Cl eanout s

ASME A112. 6. 1M ( 1997; R 2012) Fl oor Af f i xed Suppor t s f or Of f - t he- Fl oor Pl umbi ng Fi xt ur es f or Publ i c Use

SECTI ON 22 00 00 Page 2

ASME A112. 6. 3 ( 2001; R 2007) St andar d f or Fl oor and Tr ench Dr ai ns

ASME B1. 20. 1 ( 2013) Pi pe Thr eads, Gener al Pur pose ( I nch)

ASME B16. 18 ( 2012) Cast Copper Al l oy Sol der Joi nt Pr essur e Fi t t i ngs

ASME B16. 21 ( 2011) Nonmet al l i c Fl at Gasket s f or Pi pe Flanges

ASME B16. 22 ( 2013) St andar d f or Wr ought Copper and Copper Al l oy Sol der Joi nt Pr essur e Fi t t i ngs

ASME B16. 34 ( 2013) Val ves - Fl anged, Thr eaded and Wel di ng End

ASME B16. 5 ( 2013) Pi pe Fl anges and Fl anged Fi t t i ngs:

NPS 1/ 2 Thr ough NPS 24 Met r i c/ I nch St andar d

ASME B16. 50 ( 2013) Wr ought Copper and Copper Al l oy Br aze- Joi nt Pr essur e Fi t t i ngs

ASME B31. 1 ( 2014; I NT 1- 47) Power Pi pi ng

ASME B31. 5 ( 2013) Ref r i ger at i on Pi pi ng and Heat Tr ansf er Component s

ASME B40. 100 ( 2013) Pr essur e Gauges and Gauge Attachments

ASME BPVC SEC I V ( 2010) BPVC Sect i on I V- Rul es f or Const r uct i on of Heat i ng Boi l er s

ASME BPVC SEC I X ( 2010) BPVC Sect i on I X- Wel di ng and Br azi ng Qualifications

ASME CSD- 1 ( 2012) Cont r ol and Saf et y Devi ces f or Aut omat i cal l y Fi r ed Boi l er s

ASTM I NTERNATI ONAL ( ASTM)

ASTM A105/ A105M ( 2014) St andar d Speci f i cat i on f or Car bon St eel For gi ngs f or Pi pi ng Appl i cat i ons

ASTM A183 ( 2014) St andar d Speci f i cat i on f or Car bon St eel Tr ack Bol t s and Nut s

ASTM A193/ A193M ( 2015a) St andar d Speci f i cat i on f or Al l oy- St eel and St ai nl ess St eel Bol t i ng Mat er i al s f or Hi gh- Temper at ur e Ser vi ce and Ot her Speci al Pur pose Appl i cat i ons

ASTM A47/ A47M ( 1999; R 2014) St andar d Speci f i cat i on f or Fer r i t i c Mal l eabl e I r on Cast i ngs

ASTM A515/ A515M ( 2010) St andar d Speci f i cat i on f or Pr essur e Vessel Pl at es, Car bon St eel , f or I nt er medi at e- and Hi gher - Temper at ur e

SECTI ON 22 00 00 Page 3

Service

ASTM A516/ A516M ( 2010) St andar d Speci f i cat i on f or Pr essur e Vessel Pl at es, Car bon St eel , f or Moder at e-and Lower - Temper at ur e Ser vi ce

ASTM A536 ( 1984; R 2014) St andar d Speci f i cat i on f or Duct i l e I r on Cast i ngs

ASTM A74 ( 2016) St andar d Speci f i cat i on f or Cast I r on Soi l Pi pe and Fi t t i ngs

ASTM A888 ( 2013a) St andar d Speci f i cat i on f or Hubl ess Cast I r on Soi l Pi pe and Fi t t i ngs f or Sani t ar y and St or m Dr ai n, Wast e, and Vent Pi pi ng Appl i cat i ons

ASTM B117 ( 2011) St andar d Pr act i ce f or Oper at i ng Sal t Spr ay ( Fog) Appar at us

ASTM B32 ( 2008; R 2014) St andar d Speci f i cat i on f or Sol der Met al

ASTM B370 ( 2012) St andar d Speci f i cat i on f or Copper Sheet and St r i p f or Bui l di ng Const r uct i on

ASTM B813 ( 2010) St andar d Speci f i cat i on f or Li qui d and Past e Fl uxes f or Sol der i ng of Copper and Copper Al l oy Tube

ASTM B88 ( 2014) St andar d Speci f i cat i on f or Seaml ess Copper Wat er Tube

ASTM C564 ( 2014) St andar d Speci f i cat i on f or Rubber Gasket s f or Cast I r on Soi l Pi pe and Fittings

ASTM C920 ( 2014a) St andar d Speci f i cat i on f or El ast omer i c Joi nt Seal ant s

ASTM D1004 ( 2013) I ni t i al Tear Resi st ance of Pl ast i c Fi l m and Sheet i ng

ASTM D2000 ( 2012) St andar d Cl assi f i cat i on Syst em f or Rubber Pr oduct s i n Aut omot i ve Appl i cat i ons

ASTM D2235 ( 2004; R 2011) St andar d Speci f i cat i on f or Sol vent Cement f or Acr yl oni t r i l e- But adi ene- St yr ene ( ABS) Pl ast i c Pi pe and Fi t t i ngs

ASTM D2564 ( 2012) St andar d Speci f i cat i on f or Sol vent Cement s f or Pol y( Vi nyl Chl or i de) ( PVC) Pl ast i c Pi pi ng Syst ems

ASTM D2822/ D2822M ( 2005; E 2011; R 2011) Asphal t Roof Cement

ASTM D2855 ( 2015) St andar d Pr act i ce f or Maki ng Sol vent - Cement ed Joi nt s wi t h Pol y( Vi nyl

SECTI ON 22 00 00 Page 4

Chl or i de) ( PVC) Pi pe and Fi t t i ngs

ASTM D3122 ( 1995; R 2009) Sol vent Cement s f or St yr ene- Rubber ( SR) Pl ast i c Pi pe and Fittings

ASTM D3138 ( 2004; R 2011) Sol vent Cement s f or Tr ansi t i on Joi nt s Bet ween Acr yl oni t r i l e- But adi ene- St yr ene ( ABS) and Pol y( Vi nyl Chl or i de) ( PVC) Non- Pr essur e Pi pi ng Component s

ASTM D3139 ( 1998; R 2011) Joi nt s f or Pl ast i c Pr essur e Pi pes Usi ng Fl exi bl e El ast omer i c Seal s

ASTM D3212 ( 2007; R 2013) St andar d Speci f i cat i on f or Joi nt s f or Dr ai n and Sewer Pl ast i c Pi pes Usi ng Fl exi bl e El ast omer i c Seal s

ASTM D3311 ( 2011; R 2016) Dr ai n, Wast e, and Vent ( DWV) Pl ast i c Fi t t i ngs Pat t er ns

ASTM D4551 ( 2012) Pol y( Vi nyl Chl or i de) ( PVC) Pl ast i c Fl exi bl e Conceal ed Wat er - Cont ai nment Membrane

ASTM D638 ( 2014) St andar d Test Met hod f or Tensi l e Pr oper t i es of Pl ast i cs

ASTM E1 ( 2014) St andar d Speci f i cat i on f or ASTM Li qui d- i n- Gl ass Ther momet er s

ASTM E96/ E96M ( 2014) St andar d Test Met hods f or Wat er Vapor Tr ansmi ssi on of Mat er i al s

ASTM F2389 ( 2010) St andar d Speci f i cat i on f or Pr essur e- r at ed Pol ypr opyl ene ( PP) Pi pi ng Systems

ASTM F477 ( 2014) St andar d Speci f i cat i on f or El ast omer i c Seal s ( Gasket s) f or Joi ni ng Pl ast i c Pi pe

ASTM F493 ( 2014) Sol vent Cement s f or Chl or i nat ed Pol y ( Vi nyl Chl or i de) ( CPVC) Pl ast i c Pi pe and Fi t t…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .