17-004 Proposal Form.pdf
PDF 393 KB Posted
- Attached to
- 25006665 RFP Beal Park Phase ll
- Solicitation number
- 25006665
- Issued by
- Mason County, Texas
About this file
This is a proposal form for a Construction Manager-at-Risk contract for the Beal Park Phase 2 Project in Midland, Texas. The project involves providing construction management services with an estimated construction budget of approximately $15,630,000. The anticipated schedule includes eight months for preconstruction and eighteen months for construction phases. Offerors must provide pricing for three main components: a Pre-Construction Phase Fee covering personnel expenses, project estimates, schedules, value engineering, constructability reviews, overhead and profit; a Construction Phase Fee expressed as both a percentage and dollar amount for home office expenses and overhead not included in general conditions; and Not-To-Exceed General Conditions costs based on the eighteen-month construction schedule.
The pricing structure requires detailed breakdown of allowable general conditions including on-site management staff, bonds and insurance, temporary project utilities, and field office supplies. Offerors must provide specific staffing plans with quantities, duration, and monthly salary rates for positions including project executives, managers, superintendents, engineers, schedulers, and safety coordinators. The form includes space for acknowledging up to five addenda and requires authorized signature and certification. All fees and costs are calculated as percentages and dollar amounts based on the total construction budget, with specific emphasis on transparent cost allocation between preconstruction services, construction phase management, and field operations support.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL FORM
Construction Manager-at-Risk for Midland, Texas – Beal Park Phase 2 Project
Submitted by: ________________________________
Having carefully examined the Request for Proposal, the offeror proposes to furnish Construction Management-At-Risk services as required for this Project as follows:
Pre-Construction Phase Fee, Construction Phase Fee and General Conditions shall be based on the following project construction budget of approximately: $15,630,000.00
Pre-Construction Phase Fee, Construction Phase Fee and General Conditions shall be based on the following project schedule:
Preconstruction _______ months
Construction ________ months
1. Pre-Construction Phase Fee: The offeror shall identify a Pre- Construction Phase Fee, to include personnel expense, project estimates, preliminary project schedules, value engineering, constructability reviews, pre-planning, overhead and profit, miscellaneous printing and travel costs, etc. and other services through the Pre-Construction phase of the Project. (estimated to be a duration of eight (8) months).
Pre-Construction Phase Fee: $ ____________________.
2. Construction Phase Fee: The offeror shall identify a Construction Phase Fee Percentage and dollar amount of the construction budget for all home office expenses and any other expenses not included in the Allowable General Conditions Costs identified in Exhibit ‘A’, including all overhead and profit.
Construction Phase Fee Percentage: ______%
Construction Phase Fee Dollars: $________________
3. Not-To-Exceed General Conditions Costs: General Conditions Percentage: Using the
Project Construction Schedule duration of eighteen (18) months, offeror shall identify a General Conditions not-to-exceed percentage and dollar amount of the construction budget. (Allowable General Conditions are identified in Exhibit A)
General Conditions Percentage: ____________%
General Conditions Dollars: $ _______________
Using the not-to-exceed General Conditions identified above, offeror shall identify all project management, bonds, insurance, field office and office supplies costs for the Project(s).
Allowable General Conditions Line Items (see list below):
On Site Management Staff: subtotal $ ____________________ Bonds and Insurance subtotal $ ____________________ Temporary Project Utilities subtotal $ ____________________ Field Office & Office Supplies subtotal $ ____________________ Total $ ____________________
Estimated On-Site Project Management Staff and Rates:
Position Quantity Months Monthly Salary Rate Project Executive $ Project Manager $ Superintendent(s) $ Asst. Superintendents $ Project Engineer(s) $ Fields/Office Engineers(s) $ Field Office Support Staff $ CPM Scheduler $ Safety Coordinator $ Manager/Assistants Quality Assurance/Control Manager/Coordinator
4. Addenda: Acknowledgement of Addenda to this RFP (if applicable).
No. 1 __________________________________
No. 2 __________________________________
No. 3 __________________________________
No. 4 __________________________________
No. 5 __________________________________
Respectfully Submitted and Certified By:
(Printed Name) (Title)
(Authorized Signature) (Date)