J_pages_1630J2-18-R-00007.docx
DOCX document 3 MB Posted
- Attached to
- Woodstock Job Corps Center
- Solicitation number
- 1630J2-18-R-00007
About this file
J Attachements
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART III. LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J. LIST OF ATTACHMENTS
| NUMBER |
| TITLE |
The following documents are available as electronic attachments and may be downloaded.
| J-1 |
| Price Detail Template |
Will be provided by Amendment at a later date
| J-2 |
| Statement of Financial Capability (ETA 8554) |
| J-3 |
| RESERVED |
| J-4 |
| Staffing Chart |
| J-5 |
| List of Career Technical Skills Training (CTST) Slots |
| J-6 |
| Subcontracting Plan Summary Sheet |
| J-7 |
| Past Performance Questionnaire |
| J-8 |
| Standard Form 1413 – Statement and Acknowledgement |
| J-9 |
| Facility Survey, including: |
· Site Map
· Square foot facility utilization table
| J-10 |
| Electronic Property Management Listing (serialized and non-serialized) |
| J-11 |
| Inventory Estimate - Estimate of inventory value to be turned over by the |
incumbent Contractor by category
| J-12 |
| Utilities and Fuel Usage for last Contract Year |
| J-13 |
| RESERVED |
The following applicable documents are available at the websites listed below:
| NUMBER |
| TITLE |
| J-15 |
| Performance Report Cards available at: https://www.jobcorps.gov/job-corps-reports |
· OMS 10 Center Report Card
· OA OMS 10 – Outreach/Admissions Report Card (if applicable)
· POMS 10 – Career Transition Services Report Card (if applicable)
| J-16 |
| Construction Wage Rate Requirements Determination |
Applicable wage determinations are available at https://www.wdol.gov found under State of Maryland Howard County:
Building: General Decision Number: MD180049 dated 07/20/2018
Residential: General Decision Number: MD180079 dated 01/05/2018
Highway: General Decision Number: MD180013 dated 01/05/2018
Heavy: General Decision Number: ___MD180013__dated 01/05/2018 _______
| J-17 |
| Service Contract Labor Standards |
Applicable wage determinations are available on the DOL Wage and Hour website https://www.wdol.gov, and found under the State of Maryland_, Howard County.
Wage Determination No. 2015-4265, Dated 07/03/2018
| J-18 |
| CBA |
State of Maryland Workforce Investment Goals: https://www.doleta.gov/performance//goals/st_neg_perf_level.cfm
Attachment J.4.docx
ATTACHMENT J-4 – STAFFING CHART
Instructions for Completing the Staffing Chart:
To ensure that all cost and staffing proposals are evaluated fairly, it is imperative that proposals be presented as clearly and as consistently as possible.
In addition to the presentation of staff resources by cost groups under the ETA 2110 format, it is necessary to display, for the purpose of evaluation, the number of staff by functional groups in accordance with the outline of the Statement of Work, Part I, Section C.
The following Staffing Chart shall be completed. The number of staff in each function shall be shown on this chart. The costs of each staff position shall be shown in the narrative justification for each ETA 2110 line of your cost proposal. Each contractor has its own manner of organizing its staff; however, for the purposes of this proposal, follow the outline of this Staffing Chart. Also, to assure cost proposal consistency, please allocate each staff member cost in your cost proposal in accordance with the ETA 2110 Line Number and Cost Code, as detailed in PRH Chapter 5, for each separate position.
Different contractors have different position titles for similar functions. However, for purposes of evaluation, offerors may not change position titles in column 1. Where offeror’s position titles differ, actual titles should be entered in the “Remarks” column. The Staffing Chart describes functions. In the event that a position is so unique that it does not fit any title on the chart, place the position in the appropriate place on the chart and indicate by Line Number and/or Cost Code where it can be found in your cost proposal.
Definitions.
1. Standard Position Title
2. The number of staff at each position title. If none are proposed, leave the line blank. If one person performs more than one function or one person performs the same function in two or more different functional areas, show the allocation of that person's time as a decimal (e.g., .5) allocation to the proper line.
3. If a position is subcontracted, show the number in the appropriate column.
4. Remarks. The center title, if different from the title shown in the left-hand column, and any comments you wish to make.
Full-Time Equivalent
Line 01 Academic Personnel
Prime Contractor
Subcontractor
Remarks
Career Training Services Director
Academic Manager
Academic Supervisor
Instructors: Please list by Academic Program
Reading Instructor
Math Instructor
Applied Academics Instructor
HSE Instructor
High School Diploma Instructor
English as a Second Language Instructor
Driver’s Education Instructor
Communications Instructor
Wellness/Safety Instructor
Information Technology Instructor
Instructor Substitute
Support:
Testing Coordinator
ACT/OCT Coordinator
Administrative Assistant
Secretary
Clerical
Other Academic Positions (Specify)
Subtotal Academic Personnel
TOTAL Academic Personnel
Full-Time Equivalent
Line 03 Career Technical Training (CTT) Personnel
Prime Contractor
Subcontractor
National Training Contractor
Remarks
Career Training Services Director
CTT Manager
CTT Supervisor
Instructors: Please list by CTT Offering
Career Exploration Instructor
Instructor Substitute
Support:
CTST Coordinator
WBL Coordinator
Testing Coordinator
Administrative Assistant
Secretary
Clerical
Other CTT Positions (Specify)
Subtotal CTT Personnel
TOTAL CTT Personnel
Full-Time Equivalent
Line 05 Career Success Personnel
Prime Contractor
Subcontractor
Remarks
Career Success Director
Residential Living Manager
Residential Living Supervisor
Center Shift Manager
Counseling Manager
Counseling Supervisor
Recreation Manager
Recreation Supervisor
Student Personnel Officer
Residential Advisors
Senior Residential Advisor
Day RA
Duty Officer
Substitute Residential Advisor
Counselor
Senior Counselor
ACT/OCT Counselor
Senior Recreation Specialist
Recreation Specialist
Recreation Coordinator
Recreation Aide
Arts & Crafts Instructor
Leadership Coordinator
Diversity Coordinator
Student Government Advisor
Women’s Program Coordinator
Student Safety Advisor/Coordinator
Evening Studies Coordinator
Assistant Student Personnel Officer
Student Personnel Officer Clerk
Support:
Student Store Specialist
Librarian
Administrative Assistant
Secretary
Clerk
Line 05 Career Success Personnel
(cont’d)
Prime Contractor
Subcontractor
Remarks
Other Career Success Positions (Specify)
Subtotal Career Success Personnel
TOTAL Career Success Personnel
Full-Time Equivalent
Line 09 Support Service Personnel
Prime Contractor
Subcontractor
Remarks
Dining Hall Manager
Food Service Supervisor
Assistant Food Service Manager
Transportation Manager
Transportation Supervisor
Vehicle Fleet Manager
Child Care Manager
Child Care Supervisor
Laundry Manager
Senior/Lead Cook
Cook
Cook Helper/Assistant
Culinary Worker
Transportation Coordinator
Driver
Substitute Driver
Child care Teacher
Child Care Specialist
Child Care Aide
Laundry Operator
Incidental OA/CTS staff
Support:
Student Intern/WBL
Administrative Assistant
Secretary
Clerical
Other Support Positions (Specify)
Subtotal Support Service Personnel
TOTAL Support Service Personnel
Full-Time Equivalent
Line 11 Medical/Dental Personnel
Prime Contractor
Subcontractor
Remarks
Medical Services Director
Health Services Manager
Health Services Administrator
Wellness Supervisor
Physician
Optometrist
Mental Health Consultant
Psychiatrist/Psychologist
TEAP Specialist
TEAP Coordinator
TEAP Assistant
Dentist
Dental Hygienist
Dental Technician
Dental Assistant
Pharmacist
Registered Nurse (RN)
Vocational/Practical Nurse (LVN/LPN)
Physician’s Assistant/Nurse Practitioner (PA/NP)
Medical Assistant
Physician Assistant
Lab Technician
X-Ray Technician
Reproductive Health Specialist
Support:
Administrative Assistant
Secretary
Clerical
Other Medical/Dental Positions (Specify)
Subtotal Medical/Dental Personnel
TOTAL Medical/Dental Personnel
Full-Time Equivalent
Line 13 Career Prep/Career Transition Readiness Personnel
Prime Contractor
Subcontractor
Remarks
CP/CTR Manager
Career Preparation Manager
Career Preparation Supervisor
Career Transition Readiness Manager
Career Transition Readiness Supervisor
Career Preparation Specialist
Career Preparation Instructor
Career Preparation Coordinator
Career Preparation Advisor
Career Transition Readiness Specialist
Career Transition Readiness Instructor
Career Transition Readiness Coordinator
Employability Specialist
Substitute Instructor
Support:
Administrative Assistant
Secretary
Clerical
Other CP/CTR Positions (Specify)
Subtotal CP/CTR Personnel
TOTAL CP/CTR Personnel
Full-Time Equivalent
Line 15 Administrative Personnel
Prime Contractor
Subcontractor
Remarks
Center Director
Deputy Center Director
Training/Program Director
Administration Director
Administration Manager
Finance Manager
Finance Supervisor
Senior Accountant
Accountant
Accounting Clerk
Bookkeeper
Procurement Manager
Procurement Specialist
Procurement Clerk
Purchasing Agent/Buyer
Human Resources (HR) Manager
HR Specialist
Personnel Specialist
Personnel Assistant
EEO Coordinator
Staff Training Coordinator
Business & Community Liaison
Student Records Manager
Student Records Supervisor
Scheduling Clerk
Student Records Specialist
Student Records Clerk
Data Integrity/Quality Assurance Supervisor
Data Integrity Specialist
Data Integrity Clerk
Student Accountability Officer/Duty Officer
Property/Supply Manager
Property/Supply Officer
Property/Supply Specialist
Property/Supply Clerk
Line 15 Administrative Personnel (cont’d)
Prime Contractor
Subcontractor
Remarks
Warehouse Worker
Payroll/Clothing Clerk
IT Systems Administrator
Information Technology Specialist
IT Assistant
Postmaster
Mail Clerk
Receptionist
PBX Operator
Student Intern/WBL
Support:
Executive Assistant (CD)
Administrative Assistant
Secretary
Clerical
Other Administrative Positions (Specify)
Subtotal Administrative Personnel
TOTAL Administrative Personnel
Full-time Equivalent
Line 18 Facilities Maintenance
Prime Contractor
Subcontractor
Remarks
Maintenance Manager
Maintenance Supervisor
Maintenance Engineer
Maintenance Technician
Maintenance Mechanic
Maintenance Worker
Maintenance Helper
Maintenance Custodian
Senior Custodian
Utility Worker
Groundskeeper
Janitor
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerical
Other Facility Maintenance Positions (Specify)
Subtotal Facilities Maintenance Personnel
TOTAL Facilities Maintenance Personnel
Full-time Equivalent
Line 20 Security Personnel
Prime Contractor
Subcontractor
Remarks
Security Manager
Security Supervisor
Safety/Security Manager
Safety/Security Supervisor
Senior/Lead Security Officer
Security Officer
Security Guard
Front Gate Officer
Substitute Security Officer
Safety Officer
Fire Chief
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerical
Other Security Positions (Specify)
Subtotal Security Personnel
TOTAL Security Personnel
TOTAL FULL-TIME EQUIVALENT STAFF
Total Contractor Staff
Total Subcontracted Staff
Total National Training Contractor Staff
TOTAL FTE
OUTREACH, ADMISSIONS, and CAREER TRANSITION SERVICES
Full-Time Equivalent
Prime Contractor
Subcontractor
Remarks
OA/CTS Director
Outreach & Admissions Manager
Outreach & Admissions Supervisor
Career Transition Services Manager
Career Transition Services Supervisor
OA Coordinator
Admissions Counselor
Quality Assurance Specialist
Career Transition Services Specialist
Job Developer
Transition Counselor
WBL Specialist/Coordinator
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerk
Other OA/CTS Positions (Specify)
Subtotal OA & CTS Personnel
TOTAL OA & CTS Personnel image3.emf
Attachment J.5.docx
MODEL CENTER WRITTEN TECHNICAL RFP
Attachment J-5 - CAREER TECHNICAL SKILLS TRAINING (CTST)
The following Career Technical Training programs qualify for CTST funding.
Career Technical Training Program*
Training Slots
Total
*Training provided by National Training Contractors image4.emf
Attachment J.6.docx
ATTACHMENT J-6 - SUBCONTRACTING PLAN SUMMARY SHEET
Contract Name:
RFP/Contract No.:
Contractor:
Name of Subcontract Administrator:
Total Dollar Value of Contract (5 Years):
Contract Period Covered By Plan:
1st Year
2nd Year
3rd Year
4th Year
5th Year
Total
A. Total Contract Value
B. Total dollars to be subcontracted:
(% of line A)
C. Subcontracted to:
(% of line B)
(1) Small Business
(2) Small Disadvantaged Business
(3) Women-Owned Small Business
(4) HUB Zone Small Business
(5) Veteran-Owned Small Business (Including Service-Disabled)
(6) Service Disabled Veteran-Owned Small Business
Item A: Enter the total proposed value of the contract for each year.
Item B: Enter the total amount to be subcontracted for each contract year. Calculate the percentage of line A.
Item C: For categories (1) thru (6), enter the dollar amounts to be subcontracted to each category of small business. Small business categories are not mutually exclusive; subcontract dollars may be attributed to as many categories as are applicable. For example, the dollars subcontracted to a self-certified woman-owned and service-disabled veteran –owned small business that is also certified by SBA (on SAM) as a small disadvantaged and HUBZone business should be counted in each of the six categories. Calculate the percentage of line B.
image5.emf
Attachment J.7 Past Performance.docx ATTACHMENT J-7 - Past Performance Questionnaire
To Whom it May Concern:
_______________ Company is currently responding to the U. S. Department of Labor RFP #DOL_____________ for the procurement of the continued operation of the ________Job Corps Center.
The U. S. Department of Labor is placing increased emphasis in their procurements on past performance as a source selection factor. They are requiring that clients of entities responding to their solicitations be identified and their participation in the evaluation process be requested. Therefore, we are requesting that you provide the following information regarding our performance on the contract identified below. Please complete Sections B-F of this Questionnaire and return it directly to the address shown below no later than ________ a.m./p.m., ______________, 2012.
ATTN: __________________
Office of Contracts Management (OCM)
U.S. DOL – ETA
E-mail__________________________
By my signature below, I authorize you to respond to any additional inquiries by the U. S. Department of Labor regarding our performance on the referenced contract.
(Signature) (Date)
(Title)
A. Past Performance
A. Contract Identifying Information:
Offeror:
Project Title & Contract Number:
Contracting Officer:
Phone No.
Project Manager:
Phone No.
Address:
FAX No.
Work Performance Period: _____________________ to ______________________
Contract Value: $
Brief Summary of Statement of Work:
B. Outcomes vs. Goals:
1. Were there measurable performance goals or outcomes associated with this contract? If yes, describe:
Yes
No
For the following questions, where applicable, check the adjectival rating which most closely represents your assessment of the contractor's performance: Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory
2. How effective was the contractor in achieving those outcomes? (Explain any rating below Satisfactory)
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
C. Cost Control: How well has the contractor:
1. Performed all contracted services within the budget?
Exceptional
Very Good
Satisfactory
2. Submitted complete and accurate financial reports and invoices?
Exceptional
Very Good
Satisfactory
3. Has a draft or final audit report disclosed questioned or disallowed costs? If yes, indicate:
· period covered by audit
· disallowed or recommended for disallowance
· disallowed costs as a % of audited funds
Yes
No
Comments: (Explain any ratings below Satisfactory)
Summary Adjectival Rating of Cost Control
Exceptional
Very Good
Satisfactory
D. Timeliness of Performance: How well has the contractor:
1. Completed contract requirements and submitted reports and schedules according to specified time frames?
Exceptional Marginal
Very Good Unsatisfactory
Satisfactory
2. Responded to technical direction and requests in a timely manner?
Exceptional Marginal
Very Good Unsatisfactory
Comments: (Explain any ratings below Satisfactory)
Summary Adjectival Rating of Timeliness of Performance
Exceptional Marginal
Very Good Unsatisfactory
E. Business Relations: To what extent has the contractor:
1. Been pro-active in contract monitoring and review?
Exceptional Marginal
Very Good Unsatisfactory
2. Demonstrated a responsive and cooperative working relationship with the Contracting Officer and Project staff?
Exceptional Marginal
Very Good
3. Promptly notified the Contracting Officer of potential problems?
Exceptional Marginal
Very Good
4. Used effective approaches and provided technical expertise and resources to solve contract problems?
Exceptional Marginal
Very Good
Comments: (Explain any ratings below Satisfactory)
Summary Adjectival Rating of
Business Relations
Exceptional Marginal
Very Good
F. Customer Satisfaction: To what extent has the contractor:
1. Been effective in tailoring the program to meet the needs of the customers?
Exceptional
Very Good
Satisfactory
2. Shown flexibility in operating the program to meet changing program needs and emphases?
Exceptional
Very Good
Satisfactory
Comments: (Explain any ratings below Satisfactory)
Summary Adjectival Rating of
Customer Satisfaction
Exceptional
Very Good
Satisfactory
Additional Comments:
Name & Title of Individual Completing Information:
Phone No.
(For Department of Labor Use Only)
SUMMARY PAST EXPERIENCE CONFIRMATION
B. Outcomes vs. Goals
C. Cost Control
D. Timeliness of Performance
E. Business Relations
F. Customer Satisfaction
Verified by:___________________________________________Date:____________________ image6.emf
Attachment J-8.docx
Attachment J-8 - Standard Form 1413 – Statement and Acknowledgement image1.gif image7.emf
Woodstock Facility Survey Vol 1 April2015.pdf
WOODSTOCK
Job Corps Center Woodstock, MD
Facility Planning Report Volume I
Planning Strategy
Final April 2015
Department of Labor/ Office of Job Corps
WOODSTOCK
Job Corps Center Woodstock, MD
Facility Planning Report Volume I
Planning Strategy
Final April 2015
Entrance to Main Building 1.
VOLUME I - PLANNING STRATEGY
Acronyms and Abbreviations Defi nition of Terms Executive Summary Existing Site Plan Center Statistics Facility Survey Assement Results and Recommendations
1.0 INTRODUCTION
• Objective and Scope
• Report Contents
2.0 EXISTING CONDITIONS
• Background
• Ownership
• General Site Conditions
• General Building Conditions
• Preventive Maintenance
• Facility Assessment by Function
• Environmental Management
• Resource Use/Conservation
• Sustainability
• Accessibility Standards
• Current Projects
• Health and Life Safety Issues
• Defi ciency Summary
3.0 PLANNING ANALYSIS
• Space Utilization Analysis
• Federal Real Property Asset Management
• Defi ciency Analysis
• Facility Condition Summary
• Building Condition by Function
• Planning Analysis Results and Conclusions
3.0 RECOMMENDATIONS
• Status of Previous Plan
• Proposed Plan
• Funded Not Corrected (FNC) Defi ciencies
• Summary of Proposed Plan
• Proposed Site Plan
Appendix A. Energy and Water Evaluation Report
VOLUME II - SUPPORTING DATA
Executive Summary
1.0 SITE LAYOUT AND PLANS
• Location Map
• Exisiting Site Plan
2.0 DESCRIPTIONS
• Buildings and Structures
• Space Utilization By Function
• NSF by Building
• Environmental Management Report
• Asbestos Report
• Radon Report
• Site Descriptions
• Building Descriptions
3.0 DEFICIENCIES
APPENDICES - CORRESPONDENCE AND REPORTS
Appendix A.
• Center Review Meeting Minutes
• Survey Brief
• Student Questionnaire
Appendix B.
• Life Safety Defi ciencies and List
Appendix C.
• O&M Defi ciencies List
Appendix D.
• Active Warranty List
Appendix E.
• FRPC Performance Measures Matrix
ACRONYMS AND ABBREVIATIONS
A Amperage ABAAS Architectural Barriers Act Accessibility Standard ACM Asbestos-Containing Materials AFUE Annual Fuel Utilization Efficiency AHU Air Handling Unit ANSI American National Standards Institute ARRA American Recovery and Reinvestment Act of 2009 BTU British Thermal Units\ CAA Clean Air Act CCF Hundred Cubic Feet CCTV Closed Circuit Television CDC Child Development Center CDC Centers for Disease Control and Prevention CDP Career Development Period CDSS Career Development Service System CFL Compact Fluorescent Light Bulbs CFM Cubic Feet per Minute CIS Center Information System CMA Certified Medical Assistant CMMS Computerized Maintenance Management System CMU Concrete Masonry Unit CAN Certified Nursing Assistant CO Carbon Monoxide CO Contracting Officer COR Contracting Officer’s Representative CPP Career Preparation Period CRA Construction, Rehabilitation, and Acquisition CTP Career Transition Period CTS Career Transition Services
CTST Career Technical Skills Training (formerly Vocational Skills Training [VST])
CW Cold Water CWA Clean Water Act DDC Direct Digital Controls DFAM Division of Facilities and Asset Management DOL Department of Labor EISA Energy Independence and Security Act of 2007 EMT Emergency Medical Technician
EMT Electrical Metal Tubing (Conduit) EO Executive Order EPA U.S. Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act (1986) EPMD Ethylene Propylene Diene Terpolymer ESC Engineering Support Contractor ESCIS Engineering Support Contractor Information System ESL English as a Second Language oF Degrees Fahrenheit FACP Fire Alarm Control/Annunciator Panel fc Foot Candle FNC Funded Not Corrected FOP Financial Operating Plan FRPC Federal Real Property Council FY Fiscal Year GAO General Accounting Office GED General Educational Development GFCI Ground Fault Circuit Interrupter gph Gallons per Hour GSA General Services Administration GSF Gross Square Feet HID High Intensity Discharge HP Horsepower HSD High School Diploma HTW Hazard and Toxic Waste HVAC Heating, Ventilating, and Air Conditioning HW Hot Water IBC International Building Code IMC International Mechanical Code ION Inventory of Needs IPC International Plumbing code KBTU Thousand British Thermal Unit/Gross Square Foot/Year kV Kilovolt kVA Kilovolt-Amps kw Kilowatt JCC Job Corps Center JCDC Job Corps Data Center JCH Job Corps Handbook kWh Kilowatt Hours LAN Local Area Network LED Light Emitting Diode LF Linear Feet MBH Thousand BTUs per Hour MBTU Thousand British Thermal Unit MWH Megawatt Hour MC Mission Critical MCF Million Cubic Feet MDNC Mission Dependent, Not Critical MDP Main Distribution Panel MLO Main Lug Only m/s Meters/Second MTS Manual Transfer Switch NEC National Electric Code NEMA National Electrical Manufacturers Association NEPA National Environmental Protection Act NFPA National Fire Protection Association NMD Not Mission Dependent NSF Net Square Feet OA Outreach and Admissions OBS On Board Strength OCM Office of Contract Management OIG Office of Inspector General O&M Operations and Maintenance OSHA Occupational Safety and Health Administration PA Public Address pCi Picocurie PV Photovoltaic PVC Polyvinyl Chloride RCRA Resource Conservation and Recovery Act RTU Rooftop Unit SGA Student Government Association SHPO State Historic Preservation Office SF Square Feet SPCC Spill Prevention, Control and Countermeasure SST Social Skills Training T5 Fluorescent Lighting Designation (High Efficiency)
T8 Fluorescent Lighting Designation T12 Fluorescent Lighting Designation (Low Efficiency TSCA Toxic Substances Control Act of 1976 TV Television TVSS Transient Voltage Surge Suppression UEV Unevaluated UFAS Uniform Federal Accessibility Standards UL Underwriters Laboratories USDA U. S. Department of Agriculture V Volt VCR Video Cassette Recorder VST Vocational Skills Training W Watt WAN Wide Area Network WBL Work-Based Learning WIA Workforce Investment Act WIB Workforce Investment Board
DEFINITION OF TERMS
Accessibility: The degree to which a product, device, service, or environment is available to as many people as possible. Accessibility can be viewed as the "ability to access" and benefit from some system or entity. The Federal Government is required to comply with published law (Architectural Barriers Act (ABA) of 1968 , American Disabilities Act of 1990), regulations and related standards. Accessibility laws and standards have evolved over the past 12 years. DOL now follows ABA Accessibility Standards for Federal Facilities (ABAAS) adopted by the General Services Administration.
Annual Operating Cost: This FRPC performance measure reflects the cost to operate each used asset and consists of lease costs as well as costs related to recurring maintenance, utilities, janitorial, and roads and grounds expenses (Source: FRPC 2012).
Building: In accordance with the FRPC 2012 Guidance for Real Property Inventory Reporting, a building includes an enclosure for human occupancy that serves a variety of functions (food service, education, recreation, medical/dental, storage, administration) and is likely to have full utility services (heating, cooling, etc.). A building typically is over 400 square feet.
Building Condition Rating by Function: Each building is assigned a building condition based on the physical condition of the building and the impact on the functional use of the facility. Three ratings are possible:
Good: The facility condition is not impacting the facility function. A facility can have deficiencies and still be considered good.
Fair: The facility condition is impacting the facility function and deficiencies are limited to less than 30% of the replacement value. Correction of the deficiencies would allow the facility to return to a good status.
Poor: The facility condition is significantly impacting the facility function and/or deficiencies are more than 30% of the replacement value. Generally a poor rating indicates a “gut renovation or total replacement/demolition would be required.
Building/Structure Ratings: Each building is rated according to three ratings (good, fair, and poor) based on evaluations of the structure, exterior, interior, mechanical, and electrical elements. Three ratings are possible:
Good: The facility condition is not impacting the facility function. A facility can have deficiencies and still be considered good.
Fair: The facility condition is impacting the facility function and deficiencies are limited to less than 30% of the replacement value. Correction of the deficiencies would allow the facility to return to a good status.
Poor: The facility condition is significantly impacting the facility function and/or deficiencies are more than 30% of the replacement value. Generally a poor rating indicates a “gut renovation or total replacement/demolition would be required
Construction Type: The International Building Code (IBC) construction classifications include the following:
Type I and II. Those types of construction in which building elements are of noncombustible materials, except as permitted in Section 603 and elsewhere in the code.
Type II and III. Any type of construction where the exterior walls are of noncombustible material and the interior building elements are of any material permitted by the code.
Type IV. This type (heavy timber, HT) is where the exterior walls are of noncombustible material and the interior building elements are of solid or laminated wood without concealed spaces.
Type V. That type of construction where structural elements, exterior walls, and interior walls are of any materials permitted by the code.
Contract Strength: The authorized number of students at a Center in accordance with the contract between the Region and Center Operator.
Deficiency: A deficiency at a Center represents the spectrum of conditions related to the Center’s mission and/or its physical, functional, or operational features do not meet related goals, standards, codes, or other measures of acceptability. Each deficiency at a JCC or CCC initially is categorized as one of the following three deficiencies: Program, Site, or Building:
Program: Program deficiencies address issues such as square footage shortages or the omission of amenities required or standard for the proper operation of a particular Job Corps function.
Site: Site deficiencies indicate adverse site and infrastructure conditions which negatively impact operations and environment (e.g., site lighting, sidewalks, roads, etc.)
Building: Building deficiencies indicate adverse conditions at the building level.
This element includes the substructure, shell, interior, services (plumbing, HVAC, fire protection, and electrical), and equipment and furnishings.
Deficiency Classifications (I to IV): Deficiency classifications are defined as follows:
Class IA - Deficiencies which address imminent life safety and health hazards.
Class II - Deficiencies which address code violations, however, do not represent imminent life safety and health hazards.
A - Deficiencies which violate code (Federal, State or Local) and may result in an interruption of center operations if not corrected.
B - Deficiencies which violate code (Federal, State or Local) and have no immediate impact on center operations if not corrected.
C- Deficiencies which are not in compliance for accessibility in accordance with the Architectural Barriers Act (ABA), Americans with Disabilities Act (ADA), Uniform Federal Accessibility Standards (UFAS), or other applicable standards.
Class III - Deficiencies which address facility repair, replacement or maintenance.
A - Deficiencies which if not corrected may result in an interruption of center operations.
B - Deficiencies which if not corrected will have minimal impact on center operations or can be mitigated through temporary measures until the deficiency is corrected.
Class IV – Deficiencies which address programmatic needs.
A - Deficiencies which if corrected produce substantial improvements in the quality of the learning and living environment.
B - Deficiencies which if corrected are desirable enhancements.
Deficiency Funding Status: The status of the deficiency included the following categories:
Funded deficiencies report indicates the funding year for funded Regional projects, which have dollar amounts shown, or deficiencies assigned to funded National and Regional projects without dollar amounts. Major Regional projects are equivalent to National projects but assigned to the Federal agency (e.g., U.S.
Department of Agriculture) that acts as the Center operator. All operations and maintenance (O&M) deficiencies are treated as funded through the Center Operators O&M contract within the Region.
Proposed deficiencies have been assigned to a proposed future National project.
Unfunded deficiencies are Regional projects unless or until they are assigned to a National project.
Deficiency Status: The deficiency status is tracked and updated during the three-year facility survey cycle, or as such deficiencies are corrected and reported. The status includes:
Uncorrected: Once a deficiency is identified, documented, reported, and assigned for correction, the deficiency remains uncorrected until such time that the deficiency is corrected, reported, and verified.
Corrected: A corrected deficiency is one that has been assigned, funded, corrected, reported, and verified. Typically, the ESC verifies completion of the deficiency through the facility survey or site visit. The Center also may report completion and provide verifiable evidence of the correction, subject to review by the ESC.
Funded Not Corrected: A deficiency that has been approved and authorized as a regional project through the CRA budget, emergency or supplemental funding, or the Life Safety Memo. Note: the funding may not have reached the Center yet as the first steps are a FOP allocation by the National Office and a contract modification by the Region.
No Longer Needed: A no longer needed deficiency is one that has been approved and funded as a Regional project, but due to subsequent circumstances, has been reported by the Center as no longer being required to be accomplished. This type of deficiency is verified and confirmed by the ESC and removed from the Funded Not Corrected deficiency category. The Center should take action with its Region to return the funds.
Facility Condition Index: This performance measure reflects the condition of each asset by comparing the current repair needs to the replacement value of the asset. The index is expressed as a percentage, with 100% being a facility with no repair needs.
Gross Square Foot: The sum of all areas on all floors of a building included within the outside faces of its exterior walls, including all vertical penetration areas, for circulation and shaft areas that connect one floor to another. Gross Area is computed by physically measuring or scaling measurements from the outside faces of exterior walls, disregarding cornices, pilasters, buttresses, etc., that extend beyond the wall faces. Exclude areas having less than a 3-foot clear ceiling height unless the criteria of a separate structure are met. Measured in terms of Gross Square Feet (GSF): GSF = Net Usable Area + Structural Space (Source: http://nces.ed.gov/pubs2006/ficm/).
Mission Dependency: The value an asset brings to the performance of the mission as determined by the governing agency. Specific elements of this category include (FRPC 2012):
Mission Critical - – Without constructed asset or parcel of land, mission is compromised.
Mission Dependent, Not critical (MDNC) - Does not fit into Mission Critical or Not Mission Dependent categories.
Not Mission Dependent (NMD) – Mission unaffected
Ownership (Owned vs Leased): If the property is owned, the Federal Government has fee simple interest for the real property asset. If the property is leased, the rights to use the asset are assigned to the Federal Government by a private entity or a non-Federal Government entity for a defined period of time in return for rental payments (FRPC 2012).
National Project: Generally large and complex projects that require professionally prepared drawings and specifications that are time phased (design and construction) and contracted by the DOL National Office.
Net Square Foot: The sum of all areas on all floors of a building assigned to, or available for assignment to, an occupant or specific use. This value is computed by physically measuring or scaling measurements from the inside faces of surfaces that form the boundaries of the designated areas. Exclude areas having less than a 3-foot clear ceiling height unless the criteria of a separate structure are met. Included should be major space use categories for assignable space (e.g., dormitories, education, recreation, etc.) that are used to accomplish the institution’s mission. Net Square foot: NASF = Sum of Areas Designated by the Major Space Use Categories (Source: http://nces.ed.gov/pubs2006/ficm/).
On Board Strength (OBS): The actual number of students on Center on a day to day basis.
Preventive Maintenance: The care and servicing by personnel for the purpose of maintaining equipment and facilities in satisfactory operating condition by providing for systematic inspection, detection, and correction of incipient failures either before they occur or before they develop into major defects (Source: Dictionary of Military and Associated Terms, US DOD 2005).
Property Type: Indicates the asset as one of the following categories of real property:
land, building, structure.
Property Use: Since the elements defined by the FRPC do not match the space use codes employed in ESCIS, a mapping procedure will be created to align the definitions.
In the report, the Federal Real Property Council (FRPC) classifications will be printed for display. The information is available through the property registration field of Engineering Support Contractor Information System (ESCIS), and the current ESCIS designations will be correlated to the FRPC designations as follows:
ESCIS FRPC
Dormitory Dormitories/Barracks Food Service Other Institutional Uses Education School Recreation Other Institutional Uses Medical/Dental Other Institutional Uses Storage Warehouse Administration Office Structure * Storage, Service, Utility
Systems, or Other Land Institutional
* Each structure will be entered manually from the ESCIS database into one of four FRPC categories listed opposite the term “structure”.
Replacement Value: The cost of replacing the existing constructed asset at today’s building standards. It is the amount required to construct an asset of similar size and in the same location at today’s construction standards. The replacement value reported must be greater than zero (FRPC 2012).
Regional Office Project: Generally smaller projects where the funds will be transferred to the region for center execution.
Structure: In accordance with the FRPC 2012 Guidance for Real Property Inventory Reporting, a structure serves to provide storage, service, utility systems and is not likely to have full utilities (heating, cooling, etc.). A structure typically is less than 400 square feet.
Sustainability: Formally known as the World Commission on Environment and Development, the Brundtland Commission's mission in the 1980s was to unite countries to pursue sustainable development. The Commission defined sustainability as the “development which meets the needs of current generations without compromising the ability of future generations to meet their own needs".
Sustainability also is defined as the creation or enhancement of environmental, economic, and social-cultural balance, as realized through business activities, individual actions, and community engagement. Sustainability addresses approaches, methods and practices that optimize the use of energy, water, and materials while reducing greenhouse gas emissions.”
Utilization: This performance measure assesses the degree to which each asset is utilized and is expressed as a percentage. It is calculated on a square footage basis, comparing the square footage used to the “design square footage” based on contract strength (Source: FRPC 2012).
Executive Summary
The old (left) and new water towers dominate the skyline at the center.
The basketball court behind Main Building 1 was renovated in 2011.
A driveway and stairs built through a CTST project provide vehicular and pedestrian access from Gymnasium Building 14 to the vocational buildings on the west side of campus.
Aerial view of the Security Gate House Building 10 at the entrance to the center.
This report documents the results, conclusions and recommendations for the facility survey completed at Woodstock Job Corps Center, Woodstock, Maryland, the week of October 6, 2014.
The U.S. Department of Labor Engineering Support Contractor (ESC) team completed the survey on behalf of the Job Corps facilities program.
The facility assessment is a comprehensive process that provides objective and subjective analysis of existing and projected future condition of facilities. The facility assessment is a key component in understanding the life cycle, condition, and costs of buildings, structures, building systems, and assets within the Center. Specific objectives of this assessment include:
Provide an assessment of all facilities and identify related deficiencies Assess maintenance requirements Define renewal and replacement projects Identify potentially damaging or unsafe conditions Identify sustainability opportunities (e.g., waste recycling and energy and water conservation measures) Inventory accessibility in accordance with Architectural Barriers Act Accessibility Standard Develop cost estimates and schedules for new or replacement projects and correction of deficiencies
The site layout and characteristics of the 64 acre Center are noted in Volume I, Figure ES-1 (Existing Site Plan) and Table ES-1 (Center Statistics), respectively. The survey results indicate the site and buildings generally are in good to fair condition, respectively. Operation and maintenance of the Center and preventive maintenance practices meet the established goals. For the PY14 reporting year, 5 regional life safety deficiencies valued at $5,289.00 were identified. The Center has corrected all life safety deficiencies previously funded. The total number of previously funded but not corrected deficiencies is 6 and totals $566,849.00. The long range plan includes 0 and 4 National and Regional projects, respectively, involving $287,055.00. Table ES-2 (Facility Survey Assessment Results and Recommendations Chart) summarizes the facility assessment and recommendations for projects. Section 4.0 of this report includes the proposed site plan based on these recommendations.
EXECUTIVE SUMMARY
Center Statistics Date: 04/29/2015
Leased 1971Activation Date:
Ownership Status:
Site & Utilities
Water Source:
Sanitary Sewer:
Electrical Service:
Gas Type:
Telephone Service:
Ground Water
On-site Sewage Treatment Plant
Baltimore Gas and Electric
Propane
No. of Vacant Buildings:
Gross Sq. Footage:
Net Sq. Footage:
Net / Gross (%):
Building Age > 50 yrs:
Building Age 20-50yrs:
Building Age 10-20yrs:
Building Age < 10 yrs:
319,903
Bldgs with Asbestos:
Asbestos Survey Date:
Bldgs with Radon:
02/21/1991
Site Access: No
8Buildings with Access:
Regulated:
Non-Regulated:
Above Ground Tanks:
Sewage Treatment:
On-site Sewage Treatment Plant
Air Pollution Sources: None
Tanisha Nixon
(410)461-1100Phone No.:
Center Director:
Adams and Associates, Inc.Operating Contractor:
Lease Expiration:
Contract Strength: Resident Men: Resident Women: Non-residents:
Security Officer 48 Retail Sales 30 Office Administration 30 Business Office Technologies 30 Medical Office Specialist 30 Cert. Nursing Asst. 30 Medical Assistant 30 Electronic Service Tech (EST) 24 Brick Masonry 24 Landscaping 24 Facilities Maint. and Const. 24 Painting 24 Welding 24 Carpentry 24 Electrical 24 ACT (Off-Ctr) 20 Stationary Engineer 20
No. Of Buildings:
505 295 145 65
Real Estate Management
Buildings
Program
JCC# 301 WOODSTOCK 10900 Old Court Road, Woodstock, MD 21163
Accessibility
Environmental Site Area (Acres):
Bldg to Site Coverage: 4%
0Building Age Unknown :
(410)461-5794Fax No.:
Under Ground Tanks: 4
Vacant (NSF):
Energy Actual - BTU/GSF/YR: 16,811
Energy Audit Done: Yes
Status of ECM: Not Implemented
07/31/2011
5,955
50%
158,832
Buildings with Access to Services: 13
3Buildings with Accessible Restrooms:
Buildings with Other Accessible Features: 1
6Buildings in Total Compliance:
295,663
GSF
16,625 5 2,293 1
5,322 2
Average Building Age: 123
Vocations (460):
Radon Surveys Reqd: 5
Age Distribution
Mitigated: 0
Historic Status Buildings on National List:
Eligible Buildings:
Candidate Buildings:
WOODSTOCK JCC
Verizon
64.00
02/01/2015Start / End Dates: 01/31/2017/
00301 Woodstock Job Corps Center PY14 Facility Survey Assessment Results and Recommendations
Background Site Condition
Located on 64 acres of land in Woodstock, Md.
Federally Owned by US Department of Labor (DOL) and operated by Adams & Associates Inc.
Activated as a Job Corps Center (JCC) in 1971.
319,903 GSF within 20 buildings.
158,832 NSF compared to DOL space guideline range of 134,340 to 170,868 NSF.
Provides residential living, academic education, recreation and vocational training for 145 resident female students, 295 resident male students and 65 non-resident students.
Roads and Pavement Good Power Good Natural Gas N/A Central Plant Good Water Supply Good Sewage Good
Student Housing Good Education Good Food Service Good Recreation Good Medical/ Dental Good
Available Deficiency Funding and Execution Long Range Plan Life Safety
Deficiencies Non-Life Safety
Deficiencies Objective: The primary objective of the plan is to provide adequate vocational and administrative spaces, improve site walkways, safety and outdoor recreational spaces, and improve outdated and inefficient building systems.
National Projects:
There are no recommended National projects.
Regional Projects:
Demolish & remove the old water tower:
Deficiency #71531 for a total cost estimate of $22,033.00.
Add wrought iron railing on top of Administration building, Building 2, monumental entry staircase granite side walls. This may need Historical review & approval: Deficiency #105580 for a total cost estimate of $10,000.00.
Replace the gymnasium floor: Deficiency #105581 for a total cost estimate of $150,000.00. A Technical Service Request (TSR) for investigating the floor substructure & foundation should be initiated by the Center, prior to any floor replacement work.
Renovate the first floor rest rooms in the Main building, Building 1: Deficiency #88447 for a total cost estimate of $105,022.00.
Recently Funded 5 $5,289 2 $26,592 Prior Funded 0 $0 6 $593,440 O&M 50 Non CRA
Funded 45 Non CRA
Funded Unfunded 0 $0 71 $926,600
OMB Score Card Metrics Current
Goal Woodstock
JCC
Recommendations
EO13423 FY
2014 GOAL
KBTU/GSF/YR
O&M Costs $/
GSF
4.48
% MC 98.58
% MDNC .36
% NMD 1.06
%Utilization
Office 97 100 Housing 98 93
Warehouse 96 100
FCI 0.919 .94
%FCI < 0.90 15.2 9.1
Green= Meets or Exceeds Goals, Yellow = Within 10% of Goal, Red = Beyond 10% of Goal
Compliance Comments Category Status Energy and Water Environment Sustainability Accessibility
1.0 - Introduction
A team of Engineering Support Contractor (ESC) architects and engineers completed a facility survey for Woodstock Job Corps Center in Woodstock, Maryland, the week of October 6, 2014.
The results, conclusions and recommendations of this survey are documented in two volumes:
Volume I Planning Strategy and Volume II Supporting Data.
Objective and Scope
The objective and scope of the survey were to:
Document existing conditions
– Building and structures
– Barrier-free accessibility
– Operations and maintenance
– Programmatic characteristics (e.g., size of functional areas, operational layout, and functional amenities)
– Energy, water, and waste management plans and actions
– Environmental management plans and practices and associated regulatory compliance
Identify new deficiencies and status previously documented deficiencies
– Documentation and categorization of new deficiencies identified during the survey
– Status of previously identified and funded deficiencies to determine if corrective actions were taken
– Submission of funding requests to DOL for life safety deficiencies that may pose a risk to the Center’s staff and students if not corrected immediately Develop a Long Range Plan
– Plan and implementation strategy based on National, Center, and Regional participation
– Strategy would positively impact Center operations and the overall living and learning environment
– Prioritized facility-specific actions consistent with Center’s mission, educational goals, and National goals and funding
Report Contents
Volume I includes the information and basis for the recommendations for long range planning. The following sections:
Section 2.0 Existing Site Conditions. In this section, the status of the site and building is presented in terms of general conditions, functionality, resource use and intensities (i.e., energy, water, and waste), sustainability, and accessibility. The status of funded projects is noted and current and prior deficiencies are summarized.
Section 3.0 Planning Analysis. The proposed plan is presented in this section and is based on the existing site conditions and functions, Center mission, both near and long term.
National, Regional, and Center engagement is pivotal to the presentation of a plan that can be implemented.
1.0 INTRODUCTION
Section 4.0 Recommendations. The recommendations for proposed projects and revised site plan are presented and are prefaced by summarizing the previous plans for the Center and findings documented during this program year survey.
2.0 - Existing Conditions and findings documented during this program year survey.
The existing conditions of the Center are presented in this section with specific focus on the following:
Background – An overview of the Center is presented on the campus layout and buildings, student population, and vocations.
Ownership – The ownership of the property (leased versus owned) and any related conditions affecting operations and maintenance of the property are highlighted.
General Site Conditions – The site conditions (roadways, stormwater system, and utilities) are summarized based on the findings of this survey.
General Building Conditions – The status of buildings physical conditions is noted with special emphasis on those buildings with repair needs.
Preventive Maintenance – The Center’s practices for systematic inspection, detection, and correction of potential failures either before they occur or develop into major defects are documented.
Facility Assessment by Function – The evaluation of the Center’s functions (e.g., education, housing, recreation, medical/dental, storage/support) is presented and cross referenced to building/structures on the campus.
Resource Use – Energy and water use and intensities are indicated and trends noted as well as waste management practices. The Center’s contributions toward the Executive Order goals for 2015 also are summarized.
Sustainability – This section documents if the Center is proactive and has in place active energy and water use reduction programs; a waste prevention/recycling program; School Dude or CMMS for Preventative Maintenance practices; and green purchasing policies and practices.
Accessibility Standards – The accessibility to buildings and to services and functions within buildings in accordance with the Architectural Barriers Act (ABA) Standard for Federal Facilities is documented.
Completed and Current Projects – The status of National, Regional, Center, and Career Technical Skill Training (CTST) projects by deficiency number is shown in tabular format.
Deficiency Summary – A summary of the number and dollar value (if applicable) of all deficiencies (recently funded, prior funded, operations and maintenance, and unfunded deficiencies) is provided. The deficiency analysis presented in Section 3.0 of this volume, includes additional details on these deficiencies.
f th
2.0 EXISTING CONDITIONS
Background
Woodstock Job Corps Center is located on 64 acres of land near the village of Woodstock in Baltimore County, Maryland, approximately 12 miles west of the City of Baltimore. The land is owned by the State of Maryland and the buildings are owned by the State of Maryland and DOL.
The center is operated by Adams and Associates. The center was activated for Job Corps utilization in 1971. The center has 319,903 gross square feet (GSF) in 20 buildings and 8,438 GSF in 13 structures. Woodstock Job Corps Center provides residential living, academic education, recreation, and vocational training for a population of 505 students, consisting of 295 resident men, 145 resident women, and 65 non-resident students.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.