1630J2-18-R-00005-Section_J_attachments.docx
DOCX document 43 MB Posted
- Attached to
- Glenmont JCC + OA/CTS
- Solicitation number
- 1630J2-18-R-00005
About this file
Glenmont JCC/OA/CTS - Section J attachments Document should be in "Edit Document" mode to open attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Glenmont_Amend_0001.pdf | ||
| 1630J2-18-R-00005_Glenmont_JCC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: 1630J2-18-R-00005
PART III. SECTION J. LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
[NOTE: MUST VIEW IN “EDIT DOCUMENT” MODE TO OPEN ATTACHMENTS]
| NUMBER |
| TITLE |
The following documents are available as electronic attachments and may be downloaded.
| J-1 |
| Cost Detail Template |
| J-2 |
| Statement of Financial Capability (ETA 8554) |
| J-3 |
| Financial Display By Year, ETA 2110 Format – Center (For instructions, see PRH Chapter 5, Appendix 502) |
Financial Display By Year, ETA 2110 Format – OA & CTS (For instructions, see PRH Chapter 5, Appendix 503)
| J-4 |
| Staffing Chart |
| J-5 |
| List of Career Technical Skills Training (CTST) Slots |
| J-6 |
| Subcontracting Plan Summary Sheet |
| J-7 |
| RESERVED |
| J-8 |
| Standard Form 1413 – Statement and Acknowledgement |
J-9 Facility Survey, including:
· Square foot facility utilization table
| J-10 |
| Property Management Listing |
| J-11 |
| Inventory Estimate - Estimate of inventory value to be turned over by the |
incumbent contractor by category
| J-12 |
| Utilities and Fuel Usage for last Contract Year |
| J-13 |
| RESERVED |
| J-14 |
| Collective Bargaining Agreement (if applicable) |
| J-15 |
| Regional Career Pathway Plan (if applicable) |
The following applicable documents are available at the websites listed below:
| NUMBER |
| TITLE |
| J-16 |
| Performance Report Cards available at: https://eprh.jobcorps.gov/Pages/Home.aspx |
· OMS 10 Center Report Card
· OA OMS 10 – Outreach/Admissions Report Card (if applicable)
· POMS 10 – Career Transition Services Report Card (if applicable)
The following reports are available on request:
· MPO 35 – Monthly Center Summary Report
· MSO 20 – Educational Attainment Report
· CTTRC – Career Technical Training Report Card
| J-17 |
| Davis-Bacon Wage Determination |
Applicable wage determinations are available at http://www.wdol.gov found under State of New York, Albany County:
| J-18 |
| Service Contract Act Wage Determinations |
Applicable wage determinations are available on the DOL Wage and Hour website http://www.wdol.gov, and found under the State of New York, Albany County.
Wage Determination No. 2015-4143, Rev No. 08, Dated 4/11/2018
| J-19 |
| State of New York Workforce Investment Goals: |
http://www.doleta.gov/performance//goals/st_neg_perf_level.cfm
Attachment J.2.docx
MODEL CENTER WRITTEN TECHNICAL RFP
ATTACHMENT J-2 – STATEMENT OF FINANCIAL CAPABILITY
U.S. DEPARTMENT OF LABOR * Employment and Training Administration
RFP NO.
STATEMENT OF FINANCIAL CAPABILITY
(Insert the Name and Complete
Mailing Address of Offeror)
A. DATE LAST BALANCE
WAS PREPARED
B. FINANCIAL CONDITION
(As of
Date) _______________ 19____
(1) Cash .........................................................$___________________
(2) Current Assets .........................................$___________________
(3) Current Liabilities .....................................$___________________
(4) Net Worth ................................................$___________________
PERIOD COVERED (Month, Day, Year)
From
To
C. DATE FISCAL YEAR ENDS
(Month, Day, Year)
D. FINANCIAL ARRANGEMENTS TO FACILITATE PERFORMANCE DURING INITIAL PHASE OF CONTRACT ("X" appropriate box(es))
(1) Own Resources
(2) Bank credit
If "YES" complete
a. Name of
Bank(s):
b. Amount
Yes
No
Yes
No
(3) Other (If "YES", specify)
Yes
No
E. IF ADVANCE PAYMENT IS INDICATED UNDER D(3) ABOVE, COMPLETE THE FOLLOWING:-
(1) Estimated Amount of Advance Payment
$_______________________ for ___________ months.
(2) The following advances from the Government are presently being received: (Complete Columns "a" thru "e" below)
AGENCY'S NAME AND ADDRESS
PERIOD
OF
CONTRACT
CONTRACT NO.
AMOUNT
ADVANCE
BANK
AGREEMENT WITH
(a)
(b)
(c)
(d)
(e)
ETA 8554 (Mar. 1981)
F. THE FOLLOWING IS A LIST OF CURRENT CONTRACTS WITH THIS OR ANY OTHER GOVERNMENT AGENCIES.
(If additional space is needed, attach additional sheet(s))
AGENCY'S NAME, ADDRESS, AND TELEPHONE NO.
CONTRACT NO.
AMOUNT
PERIOD OF CONTRACT
(1)
(2)
(3)
(4)
G. IF OVERHEAD/INDIRECT COSTS ARE INCLUDED IN YOUR COST PROPOSAL, THE FOLLOWING DATA WILL BE FURNISHED.
(1) Name and Address(es) of Cognizant Government Audit Agency
(2) Name and Address of Government Auditor
Telephone Area Code
No. ( )
(3) Date Last Rate was Computed (Month, Day, Year) and Negotiated ─────────────────────────────────
(4) If no government audit agency computed and authorized the rate claimed, complete (a), (b), and (c) below.
(a) How it is computed?
(b) Who?
(c) Date (Mo., Day, Yr.)
ATTACH COMPUTATION DATA USED.
COMMENTS
CERTIFICATION:
I CERTIFY that to the best of my knowledge and belief the information contained herein is TRUE and CORRECT.
SIGNATURE
TYPED NAME AND TITLE
DATE (Mo., Day, Yr.)
image3.emf
Attachment J.3.docx
ATTACHMENT J-3 – FINANCIAL DISPLAY BY YEAR (ETA 2110 CENTER FORMAT)
Financial Display by Year (ETA 2110 Center format)
1ST BASE YEAR
2ND BASE YEAR
TOTAL
SY
TOTAL COST
SY
TOTAL COST
SY
TOTAL COST
01 Academic Personnel Exp
02 Other Academic Exp
03 CTT Personnel Exp
04 Other CTT Exp
05 Career Success Personnel Exp
06 Other Career Success Exp
07 Food
08 Clothing
09 Support Ser Personnel Exp
10 Other Support Ser Exp
11 Medical Personnel Exp
12 Other Medical Exp
13 CP/CTR Personnel Exp
14 Other CP/CTR Exp
15 Admin Personnel Exp
16 Other Admin Exp
17 Indirect Admin Exp
18 Facil Maint Personnel Exp
19 Other Facil Maint Exp
20 Security Personnel Exp
21 Other Security Exp
22 Communications
23 Utilities and Fuel
24 Facility Lease Cost
25 Insurance
26 Motor Vehicle Operating Expense
27 Travel and Training
28 Contractor's Technical Performance Incentive Fee
29 Contractor’s Cost Incentive Fee
30 Net Center Operations Expense
Financial Display by Year (ETA 2110 Center format)
1ST OY
2ND OY
3RD OY
TOTAL 5-YR
SY
TOTAL COST
SY
TOTAL COST
SY
TOTAL COST
SY
TOTAL COST
01 Academic Personnel Exp
02 Other Academic Exp
03 CTT Personnel Exp
04 Other CTT Exp
05 Career Success Personnel Exp
06 Other Career Success Exp
07 Food
08 Clothing
09 Support Ser Personnel Exp
10 Other Support Ser Exp
11 Medical Personnel Exp
12 Other Medical Exp
13 CP/CTR Personnel Exp
14 Other CP/CTR Exp
15 Admin Personnel Exp
16 Other Admin Exp
17 Indirect Admin Exp
18 Facil Maint Personnel Exp
19 Other Facil Maint Exp
20 Security Personnel Exp
21 Other Security Exp
22 Communications
23 Utilities and Fuel
24 Facility Lease Cost
25 Insurance
26 Motor Vehicle Operating Expense
27 Travel and Training
28 Contractor's Technical Performance Incentive Fee
29 Contractor’s Cost Incentive Fee
30 Net Center Operations Expense image4.emf
Attachment J.3 - OACTS
ATTACHMENT J-3 – FINANCIAL DISPLAY BY YEAR (ETA 2110 CENTER FORMAT) OA/CTS
Financial Display by Year (2110 OA/CTS format)
1st YEAR
2nd YEAR
TOTAL BASE
1st OPTION
2nd OPTION
3rd OPTION
TOTAL CONTRACT
OUTREACH/ADMISSIONS
01 O/A Personnel Expense
02 Staff Travel/Training Expense
03 Facilities Expense
04 Media/Advertising Expense
05 Indirect Administrative Expense
06 Contractor Fixed/Base Fee
07 Contractor Incentive Fee
08 Other Operating Expense
09 Total O/A Operating Expense (Lines 01-08)
10 Equipment Expense
11 GSA Vehicles Rental
12 TOTAL O/A EXPENSE (Lines 9, 10 & 11)
CAREER TRANSITION SERVICES
01 CTS Personnel Expense
02 Staff Travel/Training Expense
03 Facilities Expense
04 Media/Advertising Expense
05 Indirect Administrative Expense
06 Contractor Fixed/Base Fee
07 Contractor Incentive Fee
08 Other Operating Expense
09 Total CTS Operating Expense (Lines 01-08)
10 Equipment Expense
11 GSA Vehicles Rental
12 TOTAL CTS EXPENSE (Lines 9, 10 & 11)
TOTAL OA/CTS EXPENSE
image5.emf
Attachment J.4.docx
ATTACHMENT J-4 – STAFFING CHART
Instructions for Completing the Staffing Chart:
To ensure that all cost and staffing proposals are evaluated fairly, it is imperative that proposals be presented as clearly and as consistently as possible.
In addition to the presentation of staff resources by cost groups under the ETA 2110 format, it is necessary to display, for the purpose of evaluation, the number of staff by functional groups in accordance with the outline of the Statement of Work, Part I, Section C.
The following Staffing Chart shall be completed. The number of staff in each function shall be shown on this chart. The costs of each staff position shall be shown in the narrative justification for each ETA 2110 line of your cost proposal. Each contractor has its own manner of organizing its staff; however, for the purposes of this proposal, follow the outline of this Staffing Chart. Also, to assure cost proposal consistency, please allocate each staff member cost in your cost proposal in accordance with the ETA 2110 Line Number and Cost Code, as detailed in PRH Chapter 5, for each separate position.
Different contractors have different position titles for similar functions. However, for purposes of evaluation, offerors may not change position titles in column 1. Where offeror’s position titles differ, actual titles should be entered in the “Remarks” column. The Staffing Chart describes functions. In the event that a position is so unique that it does not fit any title on the chart, place the position in the appropriate place on the chart and indicate by Line Number and/or Cost Code where it can be found in your cost proposal.
Definitions.
1. Standard Position Title
2. The number of staff at each position title. If none are proposed, leave the line blank. If one person performs more than one function or one person performs the same function in two or more different functional areas, show the allocation of that person's time as a decimal (e.g., .5) allocation to the proper line.
3. If a position is subcontracted, show the number in the appropriate column.
4. Remarks. The center title, if different from the title shown in the left-hand column, and any comments you wish to make.
Full-Time Equivalent
Line 01 Academic Personnel
Prime Contractor
Subcontractor
Remarks
Career Training Services Director
Academic Manager
Academic Supervisor
Instructors: Please list by Academic Program
Reading Instructor
Math Instructor
Applied Academics Instructor
HSE Instructor
High School Diploma Instructor
English as a Second Language Instructor
Driver’s Education Instructor
Communications Instructor
Wellness/Safety Instructor
Information Technology Instructor
Instructor Substitute
Support:
Testing Coordinator
ACT/OCT Coordinator
Administrative Assistant
Secretary
Clerical
Other Academic Positions (Specify)
Subtotal Academic Personnel
TOTAL Academic Personnel
Full-Time Equivalent
Line 03 Career Technical Training (CTT) Personnel
Prime Contractor
Subcontractor
National Training Contractor
Remarks
Career Training Services Director
CTT Manager
CTT Supervisor
Instructors: Please list by CTT Offering
Trade Instructor A
Trade Instructor B
Trade Instructor C
Trade Instructor D
Trade Instructor E
Trade Instructor F
Career Exploration Instructor
Instructor Substitute
Support:
CTST Coordinator
WBL Coordinator
Testing Coordinator
Administrative Assistant
Secretary
Clerical
Other CTT Positions (Specify)
Subtotal CTT Personnel
TOTAL CTT Personnel
Full-Time Equivalent
Line 05 Career Success Personnel
Prime Contractor
Subcontractor
Remarks
Career Success Director
Residential Living Manager
Residential Living Supervisor
Center Shift Manager
Counseling Manager
Counseling Supervisor
Recreation Manager
Recreation Supervisor
Student Personnel Officer /
Center Standards Officer
Residential Counselor
Senior Residential Counselor
Day RA
Duty Officer
Substitute Residential Advisor
Guidance Counselor
Senior Counselor
ACT/OCT Counselor
Senior Recreation Specialist
Recreation Specialist
Recreation Coordinator
Recreation Aide
Arts & Crafts Instructor
Leadership Coordinator
Diversity Coordinator
Student Government Advisor
Women’s Program Coordinator
Student Safety Advisor/Coordinator
Evening Studies Coordinator
Assistant Student Personnel Officer
Student Personnel Officer Clerk / Center Standards Officer Clerk
Support:
Student Store Specialist
Librarian
Administrative Assistant
Secretary
Clerk
Line 05 Career Success Personnel
(cont’d)
Prime Contractor
Subcontractor
Remarks
Other Career Success Positions (Specify)
Subtotal Career Success Personnel
TOTAL Career Success Personnel
Full-Time Equivalent
Line 09 Support Service Personnel
Prime Contractor
Subcontractor
Remarks
Dining Hall Manager
Food Service Supervisor
Assistant Food Service Manager
Transportation Manager
Transportation Supervisor
Vehicle Fleet Manager
Child Care Manager
Child Care Supervisor
Laundry Manager
Senior/Lead Cook
Cook
Cook Helper/Assistant
Culinary Worker
Transportation Coordinator
Driver
Substitute Driver
Child care Teacher
Child Care Specialist
Child Care Aide
Laundry Operator
Incidental OA/CTS staff
Support:
Student Intern/WBL
Administrative Assistant
Secretary
Clerical
Other Support Positions (Specify)
Subtotal Support Service Personnel
TOTAL Support Service Personnel
Full-Time Equivalent
Line 11 Medical/Dental Personnel
Prime Contractor
Subcontractor
Remarks
Medical Services Director
Health Services Manager
Health Services Administrator
Wellness Supervisor
Physician
Optometrist
Mental Health Consultant
Psychiatrist/Psychologist
TEAP Specialist
TEAP Coordinator
TEAP Assistant
Dentist
Dental Hygienist
Dental Technician
Dental Assistant
Pharmacist
Registered Nurse (RN)
Vocational/Practical Nurse (LVN/LPN)
Physician’s Assistant/Nurse Practitioner (PA/NP)
Medical Assistant
Physician Assistant
Lab Technician
X-Ray Technician
Reproductive Health Specialist
Support:
Administrative Assistant
Secretary
Clerical
Other Medical/Dental Positions (Specify)
Subtotal Medical/Dental Personnel
TOTAL Medical/Dental Personnel
Full-Time Equivalent
Line 13 Career Prep/Career Transition Readiness Personnel
Prime Contractor
Subcontractor
Remarks
CP/CTR Manager
Career Preparation Manager
Career Preparation Supervisor
Career Transition Readiness Manager
Career Transition Readiness Supervisor
Career Preparation Specialist
Career Preparation Instructor /
Career Development Specialist
Career Preparation Coordinator
Career Preparation Advisor/Counselor
Career Planner
Career Transition Readiness Specialist
Career Transition Readiness Instructor
Career Transition Readiness Coordinator
Employability Specialist
Substitute Instructor
Support:
Administrative Assistant
Secretary
Clerical
Other CP/CTR Positions (Specify)
Subtotal CP/CTR Personnel
TOTAL CP/CTR Personnel
Line 15 Administrative Personnel
Full-Time Equivalent
Remarks
Prime Contractor
Subcontractor
Center Director
Deputy Center Director
Training/Program Director
Administration Director
Administration Manager
Finance Manager
Finance Supervisor
Senior Accountant
Accountant
Accounting Clerk
Bookkeeper
Procurement Manager
Procurement Specialist
Procurement Clerk
Purchasing Agent/Buyer
Human Resources (HR) Manager
HR Specialist
Personnel Specialist
Personnel Assistant
EEO Coordinator
Staff Training Coordinator
Business & Community Liaison
Student Records Manager
Student Records Supervisor
Scheduling Clerk
Student Records Specialist
Student Records Clerk
Data Integrity/Quality Assurance Supervisor
Data Integrity Specialist
Data Integrity Clerk
Student Accountability Officer/Duty Officer
Property/Supply Manager
Property/Supply Officer
Property/Supply Specialist
Property/Supply Clerk
Warehouse Worker
Payroll/Clothing Clerk
IT Systems Administrator
Information Technology Specialist
IT Assistant
Postmaster
Mail Clerk
Receptionist
PBX Operator
Student Intern/WBL
Support:
Executive Assistant (CD)
Administrative Assistant
Secretary
Clerical
Other Administrative Positions (Specify)
Subtotal Administrative Personnel
TOTAL Administrative Personnel
Full-time Equivalent
Line 18 Facilities Maintenance
Prime Contractor
Subcontractor
Remarks
Maintenance Manager
Maintenance Supervisor
Maintenance Engineer
Maintenance Technician
Maintenance Mechanic
Maintenance Worker
Maintenance Helper
Maintenance Custodian
Senior Custodian
Utility Worker
Groundskeeper
Janitor
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerical
Other Facility Maintenance Positions (Specify)
Subtotal Facilities Maintenance Personnel
TOTAL Facilities Maintenance Personnel
Full-time Equivalent
Line 20 Security Personnel
Prime Contractor
Subcontractor
Remarks
Security Manager
Security Supervisor
Safety/Security Manager
Safety/Security Supervisor
Senior/Lead Security Officer
Security Officer
Security Guard
Front Gate Officer
Substitute Security Officer
Safety Officer
Fire Chief
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerical
Other Security Positions (Specify)
Subtotal Security Personnel
TOTAL Security Personnel
TOTAL FULL-TIME EQUIVALENT STAFF
Total Contractor Staff
Total Subcontracted Staff
Total National Training Contractor Staff
TOTAL FTE
OUTREACH, ADMISSIONS, and CAREER TRANSITION SERVICES
Full-Time Equivalent
Prime Contractor
Subcontractor
Remarks
OA/CTS Director
Outreach & Admissions Manager
Outreach & Admissions Supervisor
Career Transition Services Manager
Career Transition Services Supervisor
OA Coordinator
Admissions Counselor
Quality Assurance Specialist
Career Transition Services Specialist
Job Developer
Transition Counselor
WBL Specialist/Coordinator
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerk
Other OA/CTS Positions (Specify)
Subtotal OA & CTS Personnel
TOTAL OA & CTS Personnel image6.emf
Attachment J.5.docx
Attachment J-5 – CAREER TECHNICAL SKILLS TRAINING (CTST)
The following Career Technical Training programs qualify for CTST funding.
Training Program
CTST
Training Provider
CTST Slots
Facilities Maintenance
Yes
Center (01)
Total CTST slots image7.emf
Attachment J.6.docx
ATTACHMENT J-6 - SUBCONTRACTING PLAN SUMMARY SHEET
Contract Name:
RFP/Contract No.:
Contractor:
Name of Subcontract Administrator:
Total Dollar Value of Contract (5 Years):
Contract Period Covered By Plan:
1st Year
2nd Year
3rd Year
4th Year
5th Year
Total
A. Total Contract Value
B. Total dollars to be subcontracted:
(% of line A)
C. Subcontracted to:
(% of line B)
(1) Small Business
(2) Small Disadvantaged Business
(3) Women-Owned Small Business
(4) HUB Zone Small Business
(5) Veteran-Owned Small Business (Including Service-Disabled)
(6) Service Disabled Veteran-Owned Small Business
Item A: Enter the total proposed value of the contract for each year.
Item B: Enter the total amount to be subcontracted for each contract year. Calculate the percentage of line A.
Item C: For categories (1) thru (6), enter the dollar amounts to be subcontracted to each category of small business. Small business categories are not mutually exclusive; subcontract dollars may be attributed to as many categories as are applicable. For example, the dollars subcontracted to a self-certified woman-owned and service-disabled veteran –owned small business that is also certified by SBA (on SAM) as a small disadvantaged and HUBZone business should be counted in each of the six categories. Calculate the percentage of line B.
image8.emf
Attachment J.8.docx
Attachment J-8 - Standard Form 1413 – Statement and Acknowledgement image1.gif image9.emf
Glenmont Facility Survey, pt 1
GLENMONT
Job Corps Center Glenmont, NY
Facility Planning Report Volume I
Planning Strategy
Final May 2016
Department of Labor/ Office of Job Corps
GLENMONT
Job Corps Center Glenmont, NY
Facility Planning Report Volume I
Planning Strategy
Final May 2016
Large Chapel Building 12
VOLUME I - PLANNING STRATEGY
1.0 INTRODUCTION and EXECUTIVE SUMMARY
• Introduction
• Executive Summary
• Existing Site Plan
• Center Statistics
• Facility Survey Assessment: Site Conditions, Defi ciencies, and OMB Score Card
2.0 EXISTING CONDITIONS
• Background
• Ownership
• General Site Conditions
• General Building Conditions
• Roofi ng Issues
• Preventive Maintenance
• Facility Assessment by Function
• Environmental Management
• Resource Use/Conservation
• Sustainability
• Accessibility Standards
• Historic Preservation Issues
• Completed and Current Projects Since the Last Survey
• Health and Life Safety Issues
3.0 PLANNING ANALYSIS
• Space Utilization Chart
• Federal Real Property Asset Management Performance Measures
• Funded But Not Corrected (FNC) Defi ciencies by Classifi cation
• Unfunded Defi ciencies by Classifi cation
• Facility Condition Summary Report
• Building Condition by Function
• Planning Analysis Results and Concluusions
4.0 RECOMMENDATIONS
• Status of Previous Plan
• Proposed Plan
• Funded Not Corrected (FNC) Defi ciencies
• Summary of Proposed Projects
• Proposed Site Plan
• Implementation Plan
• Summary of National Projects
• Project Data Sheet
1.0 - Introduction and Executive Summary
A team of Engineering Support Contractor (ESC) architects and engineers completed a facility survey for Glenmont Job Corps Center (Glenmont JCC) the week of October 19, 2015. The team consisted of John Ferri, Architect, Kaleb Shiferaw, Mechanical Engineer, and Margarita Levit, Electrical Engineer.. The results, conclusions and recommendations of this survey are documented in two volumes: Volume I Planning Strategy and Volume II Supporting Data.
Objective and Scope
The objective and scope of the survey were to:
Document existing conditions
– Building and structures
– Barrier-free accessibility
– Operations and maintenance
– Programmatic characteristics (such as, size of functional areas, operational layout, and functional amenities)
– Energy, water, and waste management plans and actions, and
– Environmental management plans and practices and associated regulatory compliance
Identify new deficiencies and status of previously documented deficiencies
– Documentation and categorization of new deficiencies identified during the Survey
– Status of previously identified and funded deficiencies to determine if corrective actions were taken, and
– Submission of funding requests to the United States Department of Labor (DOL) for life safety deficiencies that may pose a risk to the Center’s staff and students if not corrected immediately Develop a Long Range Plan
– Plan and implementation strategy based on National, Center, and Regional participation
– Strategy would positively impact Center operations and the overall living and learning environment, and
– Prioritized facility-specific actions consistent with Center’s mission, educational goals, and
National goals and funding
Report Contents
Volume I includes the information and basis for the recommendations for long range planning. Specific sections of the report are as follows:
Section 2.0 Existing Conditions. In this section, the status of the site and building is presented in terms of general conditions, functionality, resource use and intensities (such as, energy, water, and waste), sustainability, and accessibility. The status of funded projects is noted and current and prior deficiencies are summarized.
Section 3.0 Planning Analysis. The proposed plan is presented in this section and is based on the existing site conditions and functions, Center mission, both near and long term. National, Regional, and Center engagement is pivotal to the presentation of a plan that can be implemented.
Section 4.0 Recommendations. The recommendations for proposed projects and revised site plan are presented and are prefaced by summarizing the previous plans for the Center and findings documented during this program year Survey.
1.0 INTRODUCTION
Large Chapel as dominant campus feature
Entry Pond
Stained Glass and main corridor entry doors
Stained Glass in Large Chapel Building 12
This report documents the results, conclusions and recommendations for the facility survey completed at Glenmont Job Corps Center (Glenmont JCC) the week of October 19, 2015. The United States Department of Labor Engineering Support Contractor (ESC) team completed the Survey on behalf of the Job Corps facilities program.
The facility assessment is a comprehensive process that provides objective and subjective analysis of existing and projected future condition of facilities. The facility assessment is a key component in understanding the life cycle, condition, and costs of buildings, structures, building systems, and assets within the Center. Specific objectives of this assessment include:
Provide an assessment of all facilities and identify related deficiencies Assess maintenance requirements Define renewal and replacement projects Identify potentially damaging or unsafe conditions Identify sustainability opportunities (such as, waste recycling and energy and water conservation measures) Inventory accessibility in accordance with Architectural Barriers Act (ABA) Accessibility Standard, and Develop cost estimates and schedules for new or replacement projects and correction of deficiencies
The site layout and characteristics of the 105-acre Center are noted in Figure ES-1, Existing Site Plan and Table ES-1, Center Statistics, respectively. The survey results indicate the site and buildings generally are in good and fair condition, respectively. Operation and Maintenance (O&M) of the Center and preventive maintenance practices are documented in SchoolDude, a computerized maintenance management system for facility asset management. Maintenance of the facilities is good. For the Program Year 2015 (PY 2015), 16 regional life safety deficiencies valued at $64,817 were identified. An additional 69 life safety O&M deficiencies were identified. The Center has corrected all the life safety deficiencies previously funded. The total number of previously non-life safety funded but not corrected deficiencies is 10 and totals $54,318. The long range plan includes four (4) National projects and four (4) Regional projects, totaling $3,233,105.00. Table ES-2, Facility Survey Assessment Results and Recommendations Chart summarizes the facility assessment and recommendations for projects. Section 4.0 of this report includes the proposed site plan based on these recommendations.
EXECUTIVE SUMMARY
Center Statistics Date: 05/04/2016
Federally Owned (DOL) 1978Activation Date:
Ownership Status:
Site & Utilities
Water Source:
Sanitary Sewer:
Electrical Service:
Gas Type:
Telephone Service:
Public Water Authority
Publicly Owned Treatment Works
Constellation Power
Propane
No. of Vacant Buildings:
Gross Sq. Footage:
Net Sq. Footage:
Net / Gross (%):
Building Age > 50 yrs:
Building Age 20-50yrs:
Building Age 10-20yrs:
Building Age < 10 yrs:
203,845
Bldgs with Asbestos:
Asbestos Survey Date
Bldgs with Radon:
03/21/1990
Site Access: Yes
5Buildings with Access:
Regulated:
Non-Regulated:
Above Ground Tanks:
Sewage Treatment:
Publicly Owned Treatment Works
Air Pollution Sources: Minor Source - Exempt
Deborah Snape
(518)767-9371Phone No.:
Center Director:
Adams and Associates, Inc.Operating Contractor:
Contract Strength: Resident Men: Resident Women: Non-residents:
Nursing Assistant 60 Facilities Maint. and Const. 48 Auto Repair Tech/Helper 48 Security Services 30 Medical Office Support 30 Culinary Arts 30 ACT (Off-Ctr) 4
No. Of Buildings:
266 153 90 23
Real Estate Management
Buildings
Program
JCC# 201 GLENMONT 822 River Road, Glenmont, NY 12077-0993
Accessibility
Environmental Site Area (Acres):
Bldg to Site Coverage: 3%
0Building Age Unknown :
(518)767-2106Fax No.:
Under Ground Tanks: 0
Vacant (NSF):
Energy Actual - BTU/GSF/YR: 123,432
Energy Audit Done: Yes
Status of ECM: Implemented
7,800
68%
138,929
Buildings with Access to Services: 8
4Buildings with Accessible Restrooms:
Buildings with Other Accessible Features: 3
1Buildings in Total Compliance:
118,095
GSF
10,140 5 8,012 4
67,598 33
Average Building Age: 36
Vocations (250):
Radon Surveys Reqd: 5
Age Distribution
Mitigated: 0
Historic Status Buildings on National List:
Eligible Buildings:
Candidate Buildings:
GLENMONT JCC
Verizon/MCI
105.00
07/01/2015Start / End Dates: 12/31/2018/
Historic District:
Contributing:
In/Pending:
201 Glenmont Job Corps Center PY15 Facility Survey Assessment Site Conditions, Deficiencies, and OMB Score Card
Site Condition Roads and Pavement Fair Power Good Natural Gas Good Central Plant Good Water Supply Good Sewage Good
Student Housing Good Education Fair Food Service Poor Recreation Good Medical/ Dental Fair Administration Fair Storage Support Poor
Available Deficiency Funding and Execution Life Safety
Deficiencies Non-Life Safety Deficiencies
Recently Funded 16 $64,817 0 $0
Prior Funded 0 $0 10 $54,318
O&M 69 Non CRA Funded 63 Non CRA Funded
Unfunded 3 $0 89 $5,152,466
OMB Score Card Metrics Current Goal Glenmont JCC Recommendations
EO13693 FY 2015
GOAL
KBTU/GSF/YR
104.415 123.432
O&M Costs $/
GSF/YR
5.10 4.81
% MC 58 82.19
% MDNC 37 17.81
% NMD 5 6.15
%Utilization
Office 97 100 Housing 98 100
Warehouse 96 46.48
FCI 0.919 0.85
%FCI < 0.90 15.2 45.7
Green= Meets or Exceeds Goals, Yellow = Within 10% of Goal, Red = Beyond 10% of Goal
2.0 - Existing Conditions
The existing conditions of the Center are presented in this section with specific focus on the following:
Background – An overview of the Center is presented on the campus layout and buildings, student population, and vocations.
Ownership – The ownership of the property (leased versus owned) and any related conditions affecting operations and maintenance of the property are highlighted.
General Site Conditions – The site conditions (roadways, storm water system, and utilities) are summarized based on the findings of this survey.
General Building Conditions – The status of buildings physical conditions is noted with special emphasis on those buildings with repair needs.
Preventive Maintenance – The Center’s practices for systematic inspection, detection, and correction of potential failures either before they occur or develop into major defects are documented.
Facility Assessment by Function – The evaluation of the Center’s functions (e.g., education, housing, recreation, medical/dental, and storage/support) is presented and cross referenced to building/structures on the campus.
Resource Use – Energy and water use and intensities are indicated and trends noted as well as waste management practices. The Center’s contributions toward the Executive Order goals for 2015 also are summarized.
Sustainability – This section documents if the Center is proactive and has in place active energy and water use reduction programs; a waste prevention/recycling program; School Dude or CMMS for Preventative Maintenance practices; and green purchasing policies and practices.
Accessibility Standards – The accessibility to buildings and to services and functions within buildings in accordance with the Architectural Barriers Act (ABA) Standard for Federal Facilities is documented.
Completed and Current Projects – The status of National, Regional, Center, and Career Technical Skill Training (CTST) projects by deficiency number is shown in tabular format.
Deficiency Summary – A summary of the number and dollar value (if applicable) of all deficiencies (recently funded, prior funded, operations and maintenance, and unfunded deficiencies) is provided.
The deficiency analysis presented in Section 3.0 of this volume, includes additional details on these deficiencies.
2.0 EXISTING CONDITIONS
Background
Glenmont Job Corps Center is located on 105 acres of land near the Hudson River, south of the Albany, New York within the boundary of the town of Bethlehem. The site and building complex, formerly the Congregation of the Mission of Saint Vincent De Paul, is owned by DOL. The majority of the buildings are the part of the original 1962 complex. There is also a historic 1902 barn, Building 9, and several vocational buildings built in the 1980s and 1990s. The Center comprises 203,845 gross square feet (GSF) in 12 reclassified buildings. Building 1 - Wings 1, 2, 3, 5, 11 and 14, as well as Buildings 7 and 12, comprise the original seminary buildings. The barn is a candidate for historic preservation. The campus was activated as a Job Corps Center in 1978 and is currently operated by Adams and Associates.
Glenmont Job Corps Center provides residential living, academic education, recreation, and vocational training for a population of 266 students consisting of 153 resident men, 90 resident women, and 23 non-residents. The total net square foot (NSF) area of the center is 138,929 NSF including 7,800 NSF of vacant space. The DOL suggested space guideline for a Center with this student population is in the range of 77,600 NSF to 116,190 NSF.
Ownership
Glenmont Job Corps Center is federally owned. It was purchased by the Department of Labor from the Congregation of the Mission of Saint Vincent De Paul in Germantown, New York for $2,500,000.00 on April 28, 1978. This purchase conveyed five parcels containing a total of 233.922 acres of land and several original buildings. Three parcels were subsequently sold in 1992 by the General Services Administration, leaving the Center with approximately 105 acres. The Government is responsible for the repair and maintenance of all owned buildings and structures.
General Site Conditions
The Center is located at approximately 45°N latitude and 88°W longitude at 1,400 feet above sea level. The average temperature for January ranges from a low of 1°F to a high of 19°F and the average temperature for July ranges from a low of 54°F to a high of 75°F . The average annual precipitation is 32 inches which includes an average annual snowfall of 46”.
Prior to use as a seminary, this large, elevated property was a privately owned Hudson River Valley estate. Stone wall remnants of the original mansion’s garden remain in the woods southeast of the main campus. Most of the active portion of the site is relatively flat and meadow-like. The site is flat and has reasonably good drainage. The drainage system is by a combination of swales and underground storm water conveyance piping. The campus is very attractive with well-maintained lawns, striking buildings, and surrounded by mature woodlands. Peripheral areas are mostly wooded and slope down to the river and the main entry, River Road-Route 144. Land across the road appears to be undeveloped commercial property. Surrounding the campus to the north and south are residential areas, and the Hudson River forms the eastern boundary of the campus.
Vehicular access is from the northwest corner of the property. The entrance drive from River Road leads to Welcome Center Building 22 and the main gate. The entrance road divides into two branches that form a loop road around the central campus. This paved loop road has been repaved since the previous assessment survey.
Constructed in the early 1960s, the original seminary buildings and wings comprise the campus core and currently house academic and non-academic education, housing, medical/dental, administration and food service functions. Traffic on the one-way loop road was originally directed from an entry road toward the east, which provided a formal sense of arrival at the bell tower and Large Chapel Building 12. However, the direction of the loop road has since been reversed, resulting in a far less optimum arrival at the core campus. Upon arrival at a parking area between the loading dock and dumpster of Food Service Wing (Building) 3, and the rear of Medical/Dental Wing (Building) 1, the direction to proceed is not obvious and access to the buildings is seemingly random.
To the south of Administration Wing 2 (formally Building 2) and Medical/Dental Wing 1 (formally Building 1), and across the loop access road, to the south are paved walkways to the 1902 Storage Barn Building 9, four vocation buildings, and other storage structures. To the west of the main campus, and across the access road are located Gymnasium Building 7 and the outdoor recreation area containing two baseball fields, a large covered pavilion, and a basketball court. Other than the road system described above, the overall campus layout is efficient, and the enclosed corridor system between most of the buildings is a benefit in the northern climate.
The buildings of the original complex are served from a central boiler plant in the basement of Building 7. Domestic water is supplied by the public water authority. There are exterior water hydrants throughout the campus. The water pressure is adequate. Sewage drains to a publicly-owned treatment plant. Both utilities are in good condition and function adequately.
Electrical service is provided by National Grid. The power supply to serve the campus is at maximum capacity. During storms, this service suffers power outages. Telephone service is by Verizon which is adequate and functions well.
The nearest fire department is 4.1 miles from the center with approximately 15 minutes response time.
Site lighting is provided through a combination of pole and building mounted fixtures. Site lighting is controlled by either time clocks or photocell. The site lighting is adequate.
Roofing Issues
The flat single ply roofs on Wings (Buildings) 1, 2, 3, 5 and 14 are failing. These roofs have leaks and are at end of their useful lives. These roofs need replacement, especially roofs on Wings 5 and
14. The roof over the auditorium portion of Wing 5 (formally Education Building 5) was replaced in early 2016 subsequent to the PY 2015 Facility Survey.
Preventive Maintenance
The Center utilizes School Dude, a facility maintenance management software program. A dedicated maintenance staff is responsible for general maintenance of the Center. The students assist through
Figure 1 - Point of Arrival at the Campus, The Welcome and Security Building.
maintenance work-based training assignments. The more technical tasks are handled by the maintenance staff or hired contractors and vendors. There are regulatory inspections of code compliance; health and safety are performed on a regular basis. Center maintenance is good.
Facility Assessment by Function
Buildings 1, 2, 3, 5, 11, 12, 13, and 14 are interconnected and provided with one electrical service connection for Buildings 1, 2, 3, 11, and 12, and another electrical service connection for Buildings 5, and 14. These buildings are actually wings, housed in one (1) building. These buildings will be reclassified as Building 1: Wings 1, 2, 3, 5, 11, 12, 13 and 14.
Student Housing
Housing capacity is for 330 residents, 160 men and 170 women.
There are currently more beds than students, due to the Contract Strength. Male Dormitory Building 28, had been constructed and occupied in August of 2012. Female Dormitory Building 26, had been recently occupied and this is the initial assessment of this building. The buildings are 2 stories and an “I” shaped design.
Education
Academic and some non-academic functions are located in Wing (formally Building 5) 5 which functions well, but has roof leaks, and outdated lighting.
The Culinary Arts vocation is adequately served in three buildings. Food Service Wing (formally Building 3) 3 has a food preparation kitchen. Across the main campus corridor, Wing (formally Building 14) 14 is Culinary Dining Wing (formally Building 13) 13, which is used for serving instruction. Building 16, across the south loop road, houses two culinary arts classrooms. Buildings 13 and 16 are in good condition and function well. A new roof was recently installed on Wing (formally Building 3) 3. However, the overall facility is in poor condition with deteriorated interior finishes. The Wing also lacks student rest room facilities. The Wing also has deteriorated HVAC equipment and an undersized and deteriorated electrical main distribution system.
Most facilities housing vocational instruction are conveniently located just to the west of the main complex across the loop road. Buildings 8, 9D, 16 and 20, and are generally in good condition.
Non-academic, Career Development Service System (CDSS) and student services activities are scattered throughout the campus. Orientation and counseling functions are housed in the north end of Corridor Wing (formally Building 14) 14 and Small Chapel Wing (formally Building 11) 11. CDSS functions are located in Wing (formally Building 5) 5 and Building 9D. These facilities are generally in fair condition but well suited for these functions. A portion of the lower level of Large Chapel Building 12 was converted to a “One Stop” CDSS office area and functions well.
Female Dormitory Building 26
Food Service
Food service is located in Wing (formally Building 3) 3, which is in poor condition. Ample space is provided for food storage, preparation, and dining. The roof of the building was replaced 4 years ago. However much of the water damage caused by the previously leaking roof still exists on the cafeteria and kitchen interior. The kitchen ceiling is also stained and deteriorated. The Wing (Building) distribution equipment has deteriorated. The Culinary Arts electrical panels are undersized and deteriorated.
The facility also has deteriorating HVAC and kitchen equipment.
The Wing also has no toilet rooms for student use during dining hours.
Recreation
Recreation facilities have ample space. An addition to Gymnasium Building 7 was completed 4 years ago. The building provides adequate recreation services for the Center, including a recreation room, weights and aerobics, arts and crafts, and locker areas. The floor of the existing gymnasium is deteriorating.
Just to the south and west of Gymnasium Building 7 are two baseball fields, basketball courts, and a covered picnic area located under Pavilion Structure 17. These facilities are in good condition.
There is a large auditorium in Education Wing (Building) 5. The lighting and HVAC equipment have deteriorated. The space is in fair condition.
Administration
Administration functions are housed almost entirely in Wing (formally Building 2) 2. The Wing functions well but is in fair condition. Security functions are located in two rooms at the north end of Main Corridor Wing (formally Building 14) 14, and in the Welcome Center Building 22, located about 100 yards into the site from the Center’s entrance off Route 144. Wing (formally Building 14) 14, the main corridor is in fair condition due to the failing exterior storefront system. Building 22 is in relatively good condition.
Medical/Dental
Medical/Dental facilities are conveniently located in Wing (formally Building 1) 1 near administration. This Wing is in good condition and functions well.
Kitchen Ceiling
Gymnasium Entry
Storage/Support
Storage and support functions are adequate. The warehouse and property office are located in the lower level of Main Chapel Building 12, which is in fair condition. While the location is convenient, the first floor area is completely utilized while the main second floor area is vacant. Other storage/support facilities include Storage Barn Building 9, which houses a heated shop addition and an unheated equipment and materials storage area. The barn portion of the building is in poor condition due to deteriorated exterior wood siding, gutters and downspouts, some termite damage, and deteriorated electrical load-center. The logistics and facility maintenance office and maintenance shop are in the basement of Administration Wing (Building) 2.
Environmental Management
Energy and Water Conservation
Energy and water use and associated trends are summarized below for the Glenmont JCC. The Glenmont JCC has increased their energy usage in spite of having new dormitories. The Center should review their energy usage practices to find ways to reduce their energy usage.
Background: Table 1, Energy and Water Statistics – FY 2015 has current energy and water usage and cost. Fuel Oil costs are quite high making total utility costs very high.
Table 1: Energy and Water Statistics – FY2015 Energy Usage Cost Unit Cost Average Cost in Job Corps Electricity 2,306,867 kWh $210,720 $0.091/kWh $0.10/kWh Fuel Oil 108,709 gal. $217,491 $2.0/gal. $2.4/gal Propane 23,163 gal. $46,718 $2.0/gal $1.6/gal.
Water 2,968,000 gal. $16,197 $5.5/gal. $6.5/gal.
Total $491,126 This analysis is based on the latest energy information available. FY2015 energy data are the latest entire year available for analysis.
Energy Data Issues: The Glenmont Job Corps Center has consistently posted energy and water data since 2003. The quality of the data appears to be high with few unexpected monthly variations.
Benchmarking: Table 2, Energy and Water Benchmarking is based on the Presidential Executive Order 13423 (EO13423) goals of 3% annual energy reduction and 2% annual water reduction. The baseline year for energy used is Fiscal Year 2003 (FY2003). The water baseline year is FY2007 per EO 13693. Note that EO13693 goals will start in Year 2016 with an energy baseline of FY2015 and a goal of 2.5% reduction.
Historic Storage Barn 9
Table 2: Energy and Water Benchmarking Category Year Current Usage Baseline Usage FY 2015
Target Difference from Target
Energy 2015 123,432 BTU/GSF 149,164 BTU/GSF 104,415
BTU/GSF
18.2%
Water 2015 14.6 gal/GSF 38.1 gal/GSF 32.0 gal/GSF -54% Green – meeting target. Red – not meeting target.
The Center is not meeting energy reduction goals. Water goals have been far surpassed.
Figure 1, Energy Intensity Compared to FY 2003 Baseline and Annual Targets documents the annual energy intensity in BTU/GSF compared to the baseline from 2003 to 2015. Figure 2, Water Intensity versus target for the Glenmont JCC shows the annual water intensity in gal/GSF compared to the FY2007 baseline.
Figure 1: Energy Intensity Compared to FY 2003 Baseline and Annual Targets.
Figure 2: Water Intensity versus target for the Glenmont JCC
Electricity: Figure 3, Monthly Electricity Usage tracks the monthly electricity usage since 2011.
The usage is higher in winter than summer in this cool climate.
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000
B
TU
/G
SF
Energy Intensity Reduction Goal
10.0
20.0
30.0
40.0
50.0
60.0
FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015
G al
./G
SF
Water Intensity Reduction Goal
Figure 3: Monthly Electricity Usage
Figure 4, Average Electricity Usage and 5% and 10% Below the Average shows the average electricity usage per month and potential reductions of 5% and 10% compared to the average of the past 4 years. The 5% and 10% lines can be used as targets for future energy reduction.
Figure 4: Average Electricity Usage And 5% And 10% Below the Average.
Fuel Oil: Monthly fuel oil consumption is shown in Figure 5, Monthly Fuel Oil Usage. Fuel oil usage is mostly for heating as shown by the high usage during winter.
Figure 5: Monthly Fuel Oil Usage
Propane: Monthly propane consumption is shown in Figure 6, Monthly Propane Usage. Propane usage is mostly for heating as shown by the high usage during winter.
50,000
100,000
150,000
200,000
250,000
300,000
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep kW h
FY2011 FY2012 FY2013 FY2014 FY2015
120,000 140,000 160,000 180,000 200,000 220,000 240,000 kW h
Average 5% Below Average 10% Below Average
5,000
10,000 15,000 20,000 25,000 30,000 35,000 lo ns
Figure 6: Monthly Propane Usage
Water: Monthly water consumption is shown in Figure 7, Monthly Water Usage. Water usage has dropped significantly since FY2011.
Figure 7: Monthly Water Usage
Sustainability
United States Department of Labor (DOL) is committed to implementing initiatives in accordance with Presidential Executive Order 13693 (EO 13693) Planning for Federal Sustainability in the Next Decade. As a result, Job Corps Centers have been adopting practices aimed at reducing energy, water, and waste. Centers have also been implementing other measures such as enhancement of indoor environmental quality, storm water management, and reduction of environmental impact of materials, green cleaning practices, environmentally preferred purchasing, integrated pest management and recycling. Furthermore, new construction shall comply with the latest version of the Job Corps Handbook (JCH) 814 which specifies sustainable design criteria.
In response to these goals, Glenmont JCC has implemented the following initiatives:
Recycling program Use of School Dude for Preventive Maintenance, Green Purchasing Practiced, Application of green cleaning practices.
1,000 2,000 3,000 4,000 5,000 6,000 7,000
200,000 400,000 600,000 800,000
1,000,000 1,200,000 1,400,000
A list of nine specific sustainability indicators for the Glenmont JCC is located in the Site Descriptions section of Volume II.
Accessibility Standards
The site and buildings are generally accessible. One (1) building on the Center is in total compliance, five (5) buildings have only access, eight (8) have access to services, four (4) have accessible rest rooms and three (3) have accessible features. The site is accessible.
1. All areas of newly constructed buildings, facilities and altered or leased buildings/facilities as well as the existing buildings and structures, shall comply with the Architectural Barriers Act (ABA) to provide reasonable accommodation as required by federal disability and non-discrimination laws. All future projects at the Center will include provisions for full accessibility. These corrective actions could be accomplished by the Center forces and Centers funding operations and maintenance (O&M) or by qualified contractor and Regional/National/Lessor funding.
2. Funding for immediate and annual accessibility projects will be based on the identification of priorities, funding availability, and DOL policy and directions.
Historic Preservation Issues
The site was part of the former Congregation of the Mission of Saint Vincent De Paul. The Storage Barn, Building 9, is a candidate for Historical status. The former seminary complex, while less than 50 years old, is an expertly executed early work of a nationally recognized architect/planner, Max Urbahn, who went on to design other well-known larger projects.
Current Projects since the Last Survey
The following is a list of projects and their related status since the previous survey:
Completed/Current Projects Deficiencies # Description Responsibility 78286 Repair and repave the Center’s roads
Completed Regional
91230 Reconfigure and upgrade Welcome Center Building 22
91223 Repair interior finishes of Building 3
91278 Provide new roof on Building 5
Health and Life Safety Issues
A summary of deficiencies identified or validated during this Survey can be found in Volume II.
The summary lists identify all Health and Life Safety Deficiencies funded subsequent to, or as a result of the Survey visit, as well as previous deficiencies that were validated during this Survey. Life Safety and Non-Life Safety Deficiencies are summarized in four categories each:
Recently Program Year 2015 (PY 2015) Funded Deficiencies Prior Funded Deficiencies Operations and Maintenance (O&M) deficiencies. These deficiencies are not funded by Construction, Rehabilitation and Acquisition (CRA) funding, and Unfunded Deficiencies
3.0 - Planning Analysis
The purpose of this section is to present objectives, assumptions and specific space, and cost data considered during the planning process. This information is considered with specific existing condition issues in the development of a long range plan. The goal is to provide the Job Corps Program with the best living and learning environment at the best value.
The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.