Grafton_Steel_Replacement_RFP_1630DC-17-R-00033.pdf

PDF 3 MB Posted

Attached to
Design/Build - Roofs and Window Replacement on Buildings 2 and 7 at the Barranquitas Job Corps Center
Solicitation number
1630DC-17-R-00003
Issued by

About this file

RFP Grafton Job Corps Center-Steel Replacement

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJ TITLE: DESIGN BUILD – STRUCTURAL STEEL REPLACEMENT AND ELEVATED WALKWAY

REPAIR AT THE GRAFTON JOB CORPS CENTER, NORTH GRAFTON, MASSACHUSETTS

The work involves design and construction services for the replacement of structural steel at the elevated walkway and landing of Dorm/Admin/Med/Dental Building 17, repair of the elevated walkway surface and landing surface at the Grafton Job Corps Center. The work includes, but is not limited to, replacement of two structural steel beams and one two-story column where the elevated walkway meets Building 17. It also includes resurfacing of the exterior concrete elevated walkway and sandblasting and repainting the elevated walkway supporting steel structure.

Grafton Job Corps Center 100 Pine Street

North Grafton, MA 01536

- This requirement has been set-aside for a competitive Service Disabled Veteran Owned Small Business (SDVOSB)

- The estimated Construction Cost is between $250,000.00 and $500,000.00

- Please Reference Section C for the Statement of Work.

- Contractor shall submit one copy of the proposal via email to 3 7 T Ustephens.david@dol.govU3 7 T by the solicitation due date. Paper copy submittals are not required for this solicitation. Include the solicitation number in the subject line of the email.

- Please see Section L for further offeror instructions.

X

1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 4-85) STANDARD FORM 1442

Prescribed by GSA YFAR (48 CFR) 52.236-1(d)

NSN 7540-01-155-3212

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "of f er" section on the rev erse must be f ully completed by of feror.

9. FOR INFORMATION

CALL: Dav id Stephens, Contract Specialist (202) 693-3267

NOTE: In sealed bid solicitations "of f er" and "of f eror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin perf ormance within ____10______ calendar day s and complete it within ___252___ calendar day s af ter receiv ing award, notice to proceed. This perf ormance period is X mandatory , negotiable. (See _____________________________.)

YES NO

A. Sealed of f ers in original and __One (1)__copies to perf orm the work required are due at the place specif ied in Item 8 by _3:00 PM EST__

(hour) local time _____________________ (date). If this is a sealed bid solicitation, of f ers must be publicly opened at that time. Sealed env elopes containing of f ers shall be marked to show the of f eror's name and address, the solicitation number, the date and time of f ers are due

B. An of f er guarantee is, is not required.

C. All of f ers are subject to the (1) work requirements, and (2) other prov isions and clauses incorporated in the solicitation in f ull text or by ref erence

D. Of f ers prov iding less than ___120 ______ calendar day s f or Gov ernment acceptance af ter the date of f ers are due will not be considered and will be rejected.

NOTICE: SET-ASIDE for SDVOSB Competitive

1630DC-17-R-00033

10-25-2017 1 of 117

U.S. Department of Labor, ETA/OCM SEE SECTION L Division of Job Corps Procurement 200 Constitution Avenue, NW Room N-4643 Washington DC 20210

52.211-10

X Ten (10) Day s

11/27/2017 mailto:stephens.david@dol.gov

DUNS: CAGE:

See Block 7

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO.

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The of f eror agrees to perf orm the work required at the prices specif ied below in strict accordance with the terms of the solicitation, if this of f er is accepted by the Gov ernment in writing within 90 calendar day s af ter the date of f ers are due.

AMOUNTS CLIN 0001 Replacement of structural steel at the elevated walkway and…….….$ _______________

18. The of f eror agrees to f urnish any required perf ormance and pay ment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20B. SIGNATURE 20C. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees of f er on this solicitation, is hereby accepted as to the items listed. This to f urnish and deliv er all items or perf orm all work, requisitions identif ied award consummates the contract. which consists of (a) the Gov ernment on this f orm and any continuation sheets f or the consideration stated in solicitation and y our of f er, and (b) this contract award. No f urther cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary .

shall be gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications incorporated by ref erence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER

TO SIGN

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

OFFER

AWARD

STANDARD FORM 1442(REV. 4-85)BACK

(Include ZIP Code) (Include area code)

(Include only if dif f erent than Item 14)

(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the of f eror accepts the minimum in Item 13D.)

(The of f eror acknowledges receipt of amendments to the solicitation - giv e number and date of each)

(Ty pe or print)

(4 copies unless otherwise specif ied)

(Ty pe or print) MARIA J. PIZARRO, CPCM CFCM Contracting Officer

Division of Job Corps Procurement

(Ty pe or print)

(Contractor is required to sign this X document and return _______ copies to issuing of f ice.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

ETA

U.S. Department of Labor ETA Payment Office 200 Constitution Avenue NW, Suite N-4702 Washington, DC 20210

1630DC-17-R-00033

Table of Contents PART I - THE SCHEDULE .............................................................................................................. A-1

SECTION A - SOLICITATION/CONTRACT FORM ........................................................................ A-1

SF 1442 SOLICITATION, OFFER, AND AWARDNOTICE: Total SET-ASIDE (Construction, Alteration, or Repair) ................................................................................................................. A-1

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS ......................................................... B-1

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ................................... C-1

[For this Solicitation, there are NO clauses in this Section] ....................................................................... C-1

SECTION D - PACKAGING AND MARKING .................................................................................. D-1

SECTION E - INSPECTION AND ACCEPTANCE ........................................................................... E-1 E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE ............................. E-1 E.2 INSPECTION AND ACCEPTANCE ............................................................................................. E-1

SECTION F - DELIVERIES OR PERFORMANCE ........................................................................... F-1

F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE ............................. F-1

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

ALTERNATE I (APR 1984) ...................................................................................................... F-1 F.3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) .......................................... F-1 F.4 PERIOD OF PERFORMANCE .................................................................................................... F-2 F.5 PLACE OF PERFORMANCE ....................................................................................................... F-2

SECTION G - CONTRACT ADMINISTRATION DATA ................................................................... G-1

G.1 PRE-CONSTRUCTION CONFERENCE ....................................................................................... G-1 G.2 PERIODIC PROJECT MEETINGS ............................................................................................... G-1 G.3 SUBCONTRACTS ..................................................................................................................... G-1 G.4 SHOP DRAWINGS .................................................................................................................... G-1 G.5 OPERATIONS, STORAGE AREAS AND SECURITY.................................................................... G-2 G.6 PROJECT SAFETY .................................................................................................................... G-3 G.7 DISPOSAL OF REFUSE ............................................................................................................. G-3 G.8 SCHEDULE OF PROGRESS ....................................................................................................... G-3 G.9 PAYMENTS TO CONTRACTOR ................................................................................................ G-4 G.10 METHOD OF PAYMENT ......................................................................................................... G-4 G.11 FURNISHING INFORMATION AND RECORDS ........................................................................ G-4 G.12 WORKERS’ COMPENSATION LAWS....................................................................................... G-5 G.13 REQUIRED INSURANCE ......................................................................................................... G-5 G.14 EQUITABLE ADJUSTMENTS .................................................................................................. G-6 G.15 WEATHER DELAYS (EXCUSABLE DELAY) ............................................................................ G-8 G.16 TEST RESULTS ....................................................................................................................... G-8 G.17 SUBSTANTIAL COMPLETION ................................................................................................ G-8 G.18 CONTRACT CLOSEOUT.......................................................................................................... G-9 G.19 PRECEDENCE OF PLANS, SPECIFICATIONS, AND CLAUSES ................................................. G-9 G.20 INVOICE PREPARATION AND SUBMISSION ........................................................................ G-10

SECTION H - SPECIAL CONTRACT REQUIREMENTS ................................................................. H-1

H.1 COMMENCEMENT OF WORK .................................................................................................. H-1 H.2 SUBCONTRACTING RESPONSIBILITIES .................................................................................. H-1 H.3 ENVIRONMENTAL COMPLIANCE............................................................................................ H-1 H.4 INSTALLATION RULES AND REGULATIONS........................................................................... H-1 H.5 SPECIAL UTILITY PROVISION ................................................................................................. H-1 H.6 DESIGNATION OF GOVERNMENT INSPECTOR........................................................................ H-1 H.7 ACCOUNTING AND AUDITING SERVICES ............................................................................... H-1 H.8 SUBMISSION OF CORRESPONDENCE ...................................................................................... H-2 H.9 OTHER CONTRACTORS ........................................................................................................... H-3 H.10 DISPOSITION OF MATERIAL .................................................................................................. H-3 H.11 HAZARDOUS OCCUPATION ORDERS .................................................................................... H-3 H.12 DATA COLLECTION FOR THE DEPARTMENT OF LABOR ...................................................... H-3 H.13 RIGHTS AND OBLIGATIONS .................................................................................................. H-3 H.14 INITIATION OF LIQUIDATED DAMAGES ............................................................................... H-3 H.15 MODIFICATIONS AND CHANGE ORDERS .............................................................................. H-3 H.16 PERMITS ................................................................................................................................ H-4 H.17 OVERTIME WORK .................................................................................................................. H-4

PART II - CONTRACT CLAUSES ................................................................................................... I-1

SECTION I - CONTRACT CLAUSES.............................................................................................. I-1

I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE ............................... I-1 I.2 INFORMATION REGARDING RESPONSIBILTY OF MATTERS (FEB 2012) ................................... I-4

I.3 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRCT

AWARDS (JUL 2013) ................................................................................................................ I-5 I.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) ......... I-7

I.5 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (DEC 2010) (DEVIATION) ................................................................................................. I-8 I.6 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013) ............................................ I-9

I.7 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (SEPT 2013) ........................................................................... I-12

I.8 52.223-3 HAZARDOUS MATERIAL IDENTIFICAITON AND MATERIAL

SAFETY DATA (JAN 1997) ...................................................................................................... I-12 I.9 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAY 2014) .......................... I-13

I.10 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT CONSTRUCTION

MATERIALS (MAY 2014) ...................................................................................................... I-16 I.11 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) ALT I (DEC 2007).I-16 I.12 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010) ................ I-17 I.13 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014) .................... I-18 I.14 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ................... I-23 I.15 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) ....................................................... I-24 I.16 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) .......................................... I-25

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS ...............................J-1

SECTION J - LIST OF ATTACHMENTS ..........................................................................................J-1 J.1 WAGE DETERMINATION ........................................................................................................... J-1

J.1 JCH 814....................................................................................................................................... J-1

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF

OFFERORS OR RESPONDENTS ............................................................................................ K-1

K.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE .................. K-1 K.2 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985) ...................... K-1 K.3 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2012) ............................ K-2 K.4 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)...................... K-4 K.5 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (APR 2012) .................................. K-5 K.6 52.219-22 SMALL DISADVANTAGED BUSINESS STATUS (OCT 1999) ....................................... K-8 K.7 SIGNATURE BLOCK .............................................................................................................. K-10

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS ..................................................................................................................... L-1

L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE................... L-1

L.2 52.215-20 REQUIREMENTS FORCERTIFIED COSTOR PRICING DATA AND DATA

OTHER THAN CERTIFIED COST OR PRICING DATA (OCT 2010) .......................................... L-1 L.3 52.216-1 TYPE OF CONTRACT (APR 1984) ................................................................................ L-2

L.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) .......................................... L-2 L.5 52.233-2 SERVICE OF PROTEST (SEP 2006)................................................................................. L-3 L.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE 1 (FEB 1995) .......................... L-4 L.7 52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997) ................................. L-4 L.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE .................................. L-4 L.9 52.252-3 ALTERATIONS IN SOLICITATIONS (APR1984) ............................................................. L-4 L.10 GENERAL PROPOSAL PREPARATION INSTRUCTIONS .......................................................... L-4 SECTION M – EVALUATION FACTORS FOR AWARD ................................................................ M-1

1630DC-17-R-00033 Section B Supplies or Services and Price/Costs

B-1

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

PRICE/COST SCHEDULE

CLIN SUPPLIES/

SERVICES

QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 LS --------- $

Firm Fixed Price

The Contractor shall provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform the Design and Construction Services for the replacement of structural steel at the elevated walkway and landing of Dorm/Admin/Med/Dental Building 17, repair of the elevated walkway surface and landing surface at the Grafton Job Corps Center

TOTAL AMOUNT $ **

**Enter this amount in Block 17, Page 2 of the SF 1442.

B.2 DELIVERABLE - RELEASABLE COPIES - FREEDOM OF INFORMATION ACT

The Freedom of Information Act (FOIA) permits withholding information under several exemptions, including Exemption 4 which protects "trade secrets and commercial or financial information obtained from a person [that is] privileged or confidential," 5 U.S.C. 552(b) (4). Within five business days of contract award, the contractor shall provide a statement that the contract is available for full disclosure under the FOIA or provide a scanned PDF of the redacted copy of the contract identifying the specific potions the contractor believes are covered by the particular exemption requested. Any redactions must be fully supported under the FOIA. In the event the Government notifies the contractor that it does not agree with a proposed redaction, the contractor shall have five business days to submit additional information to support the requested redaction. For subcontracts, within 5 business days of the contractor's award of any subcontract over $500,000 the contractor shall provide the Government a scanned PDF copy of the subcontract with a statement that the copy is either available for full disclosure, or identifying the specific portions believed to be covered by the particular exemption requested.

Redactions should be limited to those protections provided under the FOIA. Following the procedures above, the Government has the right to notify the contractor of any disagreement with proposed redaction or exemption requests.

1630DC-17-R-00033 Section C Description/Specifications

C-1

DESIGN-BUILD SCOPE OF WORK

FOR

BUILDING 1 ROOF AND ACCESSPORIES REPLACEMENT

AT THE

GRADTON JOB CORPS CENTER

NORTH GRAFTON, MA

U.S. DEPARTMENT OF LABOR

PROJECT NO. 3707

DBSOW -

TABLE OF CONTENTS

C-2

I. GENERAL....................................................................................................................C-4 II. SPECIFIC REQUIREMENTS/INSTRUCTIONS ...........................................................C-4

A. LEGALLY MANDATED STANDARDS ..................................................................C-4

1. Code of Federal Regulations ................................................................................C-4

2. National and State Building Codes .......................................................................C-5

3. Permits and Licenses ...........................................................................................C-5

B. JOB CORPS GUIDELINES ......................................................................................C-5

1. JCH-814: Planning, Design, and Construction Administration Guidelines ............C-5

C. OTHER STANDARDS ............................................................................................C-5

1. Life Cycle Costs (LCC) Analyses…………………………………………………...C-5

2. Suistainability Design and Building Requirements................................................C-5

3. Energy Conservation ...........................................................................................C-5

4. Environmentaly Preferable Products.....................................................................C-6

5. Asbetos-Containing Materials ..............................................................................C-6

6. Commissioning ...................................................................................................C-6

7. Existing Facility Investigative Survey……………………………………………….C-7

D. SPECIFIC INSTRUCTIONS .....................................................................................C-7

1. Center Operation .................................................................................................C-7

2. Contractor Responsibilites ...................................................................................C-7

3. Pre-Bid Meeting ..................................................................................................C-7

4. Submittal Requirements .......................................................................................C-8

5. Web Based Project Management System- Not Applicable.....................................C-9

6. Building Design- Not Applicable…………………………………………………..

7. Preconstruction Meeting ......................................................................................C-9

8. Equipment- Not Applicable………………………………………………………C-9

9. Optional Provisions – Not-Applicable ..................................................................C-9

10. Site Visits………………………………………………………………………….C-10

11. As-Builts………………………………………………………………………… C-10

12. Work Scheduling ............................................................................................... C-10

13. Contract Document Reproduction…………………………………………………C-11

14. Availability of Existing Documents……………………………………………….C-11

15. Schedule and Delays……………………………………………………………….C-11

16. Integrated Design Process (IDP) Not Applicable…………………………………..C-11

17. Verification of Construction Sustainability Measures- Not Applicable……………C-11

III. EXTENT OF SITE ...................................................................................................... C-11 A. SITE IMPROVEMENTS AND UTILITIES ............................................................ C-11

1. Design Objectives.............................................................................................. C-11

2. Walkway Surface Improvements………………………………………………….C-11

3. Site Survey…………………………………………………………………………C-11

4. Site Utilities………………………………………………………………………..C-11 B. GENERAL BUILDING DESIGN REQUIREMENTS ............................................. C-11

1. Architectural ..................................................................................................... C-11

2. Structural .......................................................................................................... C-13

3. Mechanical/P lumbing ........................................................................................ C-13

C-3

4. Electrical ........................................................................................................... C-14

5. Radon ............................................................................................................... C-14

6. Warranties......................................................................................................... C-14 IV. CONSTRUCTION REQUIREMENTS/SPECIFIC INSTRUCTIONS ........................... C-15

A. SPECIFIC INSTRUCTIONS ................................................................................... C-15

1. Quality Requirements ........................................................................................ C-15

2. Temporary Facilities and Controls...................................................................... C-16

3. Adherence to Scope of Work ............................................................................. C-17

4. Incidental Cutting and Patching.......................................................................... C-17

5. Coordination of Work ........................................................................................ C-17

6. Demolished Materials ........................................................................................ C-17

V. SKETCHES ................................................................................................................ C-18 A. LOCATION MAP................................................................................................... C-18 B. VICINITY MAP ..................................................................................................... C-19 C. SITE PLAN ............................................................................................................ C-20

VI. PROJECT SCHEDULE ............................................................................................... C-21 ATTACHMENT 1 CONTRACTOR QUICK REFERENCE CHECKLIST .......................... C-22 ATTACHMENT 2 ROOFING SYSTEM WARRANTY EXECUTION ............................... C-24 ATTACHMENT 3 SAMPLE ROOFING SYSTEM WARRANTY ...................................... C-27

C-4

DESIGN-BUILD SCOPE OF WORK

STRUCTURAL STEEL REPLACEMENT AT

NORTH GRAFTON JOB CORPS CENTER

I. GENERAL

The work involves design and construction services for the replacement of structural steel at the elevated walkway and landing of Dorm/Admin/Med/Dental Building 17, repair of the elevated walkway surface and landing surface at the Grafton Job Corps Center. The work includes, but is not limited to, replacement of two structural steel beams and one two-story column where the elevated walkway meets Building 17. It also includes resurfacing of the exterior concrete elevated walkway and sandblasting and repainting the elevated walkway supporting steel structure.

“Contractor Quick Reference Checklist,” Attachment 1, is a required form that identifies a simplified but not all inclusive list of issues that the Contractor needs to address as due diligence items during the design phase. The JCH-814, September 2013 paragraphs shown provide an initial design reference;

however, reference to other sources may be required to fully address the issue.

“Suggested Language for Quality Control, Testing, and Inspection Services”, Attachment 2, provides suggested language for consideration to ensure the Contractor develops and uses effective quality control, testing, and inspection procedures to ensure construction meets contract requirements.

II. DESIGN REQUIREMENTS/ SPECIFIC INSTRUCTIONS

A. LEGALLY MANDATED STANDARDS

The Contractor shall conform to:

Code of Federal Regulations

a) Safety and Health ………………………………………..OSHA CFR Part 1926.62

b) Historic Preservation……………………………………………...36 CFR Part 800

Dorm/Admin/Med/Dental Building 17 which was constructed in 1996 was designed to be consistent with the historic character of the Grafton Job Corps Center. Any modifications to the building need to be done ‘in kind’, and need to be consistent with the Secretary of Interior's Guidelines for Rehabilitation of Historic Properties, to the extent practicable and as deemed reasonable by the U.S. Department of Labor (DOL)

c) The Contractor’s Solicitation Procedure ………………… 48 CFR Part 36

d) Disability/Accessibility……………………………………28 CFR Part 36

C-5

The design must be in strict conformance with the Architectural Barriers Act Accessibility Standard (ABAAS) of 2007 from the General Services Administration.

The Contractor shall conduct a thorough research of these guidelines and, without exception, comply to the fullest extent, including those guidelines pertaining to the visually and hearing impaired.

No deviations from these guidelines are allowed. However, if the Contractor, at any Design Review Submittal, demonstrates that the compliance requirements would be technically infeasible or that compliance will cause an undue burden as defined by the guidelines, the Contractor is obligated to notify the Contracting Officer, in writing, for a final decision on such requirements.

(These standards can be printed from the website at http://www.access.gpo.gov/nara/cfr/cfr-table-search.html).

e) Life Safety Code………………………………………………………NFPA-101

The Contractor’s responsibility for safety related requirements extends to all impacted areas and access ways affected by the work.

National and State Building Codes

The Contractor shall conform to all applicable construction codes, ordinances, and regulations including the national building code used in the local area, laws and local ordinances. Deviations and interpretations will be subject to the approval of the Contracting Officer. Consider whether special requirements should be included because of the geographic location, i.e. hurricane, heavy wind, or storm features for the United States Northeast Region.

Permits and Licenses

The Grafton Job Corps Center is leased from the State of Massachusetts, but Building 17 is owned by the Federal Government. Prior notice of all major projects should be issued to the State before beginning the project.

The Contractor shall research, and be responsible for obtaining, all regulatory, permitting (including State Permitting requirements), and licensing requirements required to perform this work in North Grafton, MA and in accordance with JCH-814, 2013, amended September 2015, Section 1.7. No drawings or specifications will be submitted for building permits unless express notification in writing is received from the Contracting Officer (CO).

B. JOB CORPS GUIDELINES

1. JCH-814, September 2013

C-6

Planning, Design, and Construction Administration Guidelines for Architects and Engineers. Job Corps publication JCH-814, September 2013, "Planning, Design, and Construction Administration Guidelines for Architects and Engineers," is a companion document to this scope of work. The JCH- 814/2013 can be found at Uhttp://www.solicitationattachments.com. UIt presents the Contractor additional design criteria not specifically stated in the scope of work. Where conflicts occur between the contract and JCH-814/2013, the requirements of the scope of work will take precedence.

C. OTHER STANDARDS

1. Life Cycle Cost (LCC) Analyses – Not Applicable

2. Sustainability Design and Building Requirements

The project will use design methodologies, materials, systems and components that will minimize negative environmental impacts, increase energy efficiency and make use of renewable energy technologies. Within budget constraints the project will embody best current sustainable design and building practices. The project team is to propose the highest possible implementation of these strategies for consideration by the Department of Labor, the Regional DOL office, and the Job Corps Center.

To the extent possible, the Contractor shall reference, use, and procure materials, components, equipment and services noted in the attached “Green Sheet” or JOBU CORPS SUSTAINABILITY GUIDELINES FOR PROJECTS OF

LIMITED SCOPE OF WORK V.2.26.2015.

The Contractor shall verify construction phase sustainability measures as detailed in the Green Sheet and provide noted submittals substantiating compliance. Any specifications or proposals will include requirements to provide documentation and comply with the Green Sheet as far as practicable.

3 Energy Conservation-NOT APPLICABLE

4 Environmentally Preferable Products

The Contractor shall evaluate options for the use of environmentally preferable products and environmentally preferable building design and shall include a description of recommended options in the DESIGN NARRATIVE (see JCH-814 for requirements).

5 Asbestos-Containing Materials AND PCB Fluorescent Light Ballasts-NOT APPLICABLE 6 Commissioning- Not Available

7 Existing Facility Investigative Survey http://www.solicitationattachments.com/

C-7

If the work is to be performed on an existing building for which plans are not available, the Contractor shall perform an investigative survey to determine if there are hidden conditions or elements which will impact the proposed design. Demolition may be required to expose suspected unknown elements. The survey’s objectives will include, but not be limited to, the following:

a) Determine if multiple ceilings exist or if there are multiple layers of floor covering.

b) Determine the extent of any hidden structural elements. The design and spacing of hidden structural elements shall be investigated.

c) Locate any hidden mechanical or electrical components, the presence of which would impact the proposed design.

Any openings in the exposed finishes created to perform the investigative survey shall be sealed and restored in all areas where there are occupants. Any opening hidden by the exposed finish ̧ such as a drop-in ceiling, need only be sealed.

Care shall be taken to avoid disruption of suspected or known ACM.

The investigative survey will be submitted for the record 14 calendar days before start of construction and will include appropriate photographic and/or video records to illustrate its findings and existing conditions.

D SPECIFIC INSTRUCTIONS

1. Center Operation

The Center will remain in operation throughout the performance period. The Contractor shall, as part of this contract, coordinate with the US Department of Labor (DOL) Engineering Support Contractor (ESC) to develop a set of construction documents that will minimize disruption of Center operations during construction. The Contractor shall propose a sequencing of the work in coordination with the Center to minimize potential disruption to Center operations. This sequencing schedule is to be provided for approval to the Contracting Officer (CO) at the pre-construction meeting.

2. Contractor Responsibilities

The Contractor shall ensure the security of operations and storage areas to preclude all breaches of security including, but not limited to, vandalism and/or theft that can impact the timely and successful completion of the work. While existing Center operations will be continuing during the course of the project, the Contractor shall not rely on any aspect of Center security to guard aspects of his operations. At no time during this construction duration, up to and including the acceptance of the substantial completion walk-through, will the Contracting Officer (CO) accept requests for additional security measures. DOL shall not be held to have incurred any liability for loss of, and/or damage to, materials, tools, and

C-8 equipment of the Contractor by contract or otherwise. DOL shall not in any way be liable or responsible for damage or loss to work due to trespass or theft.

The Contractor’s design will meet the programmatic requirements as outlined in this scope of work and in the JCH-814, September 2013, amended September 2015.

The specified construction materials must be of quality that is consistent with the intended use of the facility, the Center, and reflect local availability and construction skills. Newly developed materials and methods should be considered and discussed with DOL for inclusion in the project.

Although this scope of work may identify specific elements of construction, it is the Contractor's responsibility to provide any and all elements which are incidental to provide a fully complete and functional facility.

The Contractor is required to provide twenty (20) high quality photographs in digital and paper format to document the completed facility. Submission of the requisite photo record will be following remediation of the Substantial Completion Punch List, and will be included in the project’s Closeout documents.

3. Pre-Bid Meeting

A Pre-Bid Meeting with the interested Contractors will be held at the Grafton Job Corps Center.

Participants may include representatives from the Contracting Officer and/or its ESC and the Center Operator.

This meeting is intended to familiarize the Contractors with the objectives of the project, the programmatic requirements and other inputs and constraints stemming from Center operations. The Contractor's responsibility and lines of communication will also be discussed. Project data, budget, schedule, etc., will be further defined or clarified, if necessary.

The Contractors shall utilize this opportunity to gather as much data as they deem necessary to aid in the preparation of a proposal to the CO. All prospective bidders are strongly encouraged to attend.

4. Submittal Requirements

The required submissions are as follows; percentages are approximate fraction of completed construction documents.

Progress Contract Documents 60% Final Construction and Coordination Drawings 100% Construction-ready Documents Final

All submittals will be in accordance with JCH-814, September 2013 Section 8.4.

This project will require the following submittals:

C-9

The Contractor shall provide a Progress Construction Documents (60%) submission, within four (4) weeks of the Notice to Proceed based on the schedule contained in Section VIII.

The Contractor shall provide a Final Contract Documents and Coordination Drawings (100%) submission, including all corrections and the design review comment responses from the 60% submission, based on the schedule contained in Section VIII.

The Final Construction documents, will include all corrections and design review comment responses from the 100% submission, and be submitted two (2) weeks from receipt of the Final Contract Documents and Coordination Drawings approval by the Contracting Officer.

Three copies of the updated CONTRACTOR QUICK REFERENCE checklist will be provided with each design submission.

Submittals for Review during Design:

One week before the Progress Construction Documents (60%) presentation, the Contractor shall submit five (5) sets of drawings (2 sets full size, 3 sets ½ size) and project documents, as well as three (3) sets of design calculations, and design narrative to the Contracting Officer for evaluation.

For the remaining submissions the Contractor shall submit five (5) sets of drawings (2 sets full size, 3 sets ½ size) and project documents, as well as three (3) sets of design calculations, and design narratives to the CO for review and acceptance. One (1) set of drawings at the 60% stage will be submitted to the Job Corps Data Center. In addition, one (1) set of drawings and specifications will be mailed directly by the Contractor to the Grafton Job Corps Center at each submission stage.

Attn.: Colleen Lanza

North Grafton, MA 01536

Each design submittal will be incorporated into an “AutoCAD (version 14 or later)” and PDF compatible electronic “CD” and be delivered to the Department of Labor by the Contractor in addition to the drawing/specification sets required. Complete project documents will also be furnished on electronic “CD” media that is “Word” (Microsoft Office) compatible.

The levels of detail required for each stage of the submittals are outlined in JCH-814, 2013, amended September 2015, Section 8.4.

The Contractor is required to maintain the design-build schedule per the contract, and must indicate to the CO ways and means to recover lost time due to delays. No additional time will be given to the Contractor unless it is determined by the CO that the delay is legitimate

C-10 and unavoidable and that the Contractor has prudently exercised all options within its authority and ability to avert such delays.

Submittals for Review during Construction:

The Contractor shall, at a minimum, submit the following for approval before commencing construction:

• Schedule, CPM in Microsoft Project or Primavera P6, with electronic files

• Safety Plan

• Quality Plan

• Construction phasing and layout plan

• Installers qualifications

• Required Steel Erection Shop Drawings.

• Product data and shop drawings for Mechanical Equipment and associated accessories including curb modifications as required.

The Contractor shall, at a minimum, submit the following before requesting Substantial Completion:

• As-built record drawings in accordance with requirements of JCH 814, September 2013

• Final punch list with request for certification that the project is substantially complete.

• Warranties

• Record of Waste Disposal

• Appropriate Test results

• O&M manuals

• Consent of Surety

5. Web Based Project Management System – Not Applicable

6. Building Design-Not Applicable

7. Pre-Construction Meeting

The pre-construction meeting will be schedule by the Contracting Officer.

8. Equipment

9. Optional Provisions- Not Applicable

10. Site Visits - Construction Administration/Observation – Construction Progress Meeting

The Contractor shall prepare a monthly construction progress report. The reports will include an updated Critical Path Method (CPM) schedule, a minimum of 10 electronic photos of all aspects of the project and a list of open issues. A representative of the Department of Labor’s ESC may visit the site at least once a month for a monthly status meeting with the Contractor. During this visit, the Contractor’s draft payment application will be quantified against actual progress by the CO’s representative.

C-11

Once construction commences, in coordination with DOL, the Contractor shall organize, prepare agenda, and conduct weekly construction progress meetings, record and prepare meeting minutes, and distribute to team members and attendees within 3 days after the meeting. These weekly progress meetings will include representatives from the Contractor, the ESC, and others as determined by DOL. Meetings may be held at the construction site in conjunction with ESC site visits and/or attended by conference call. The ESC will provide the teleconference platform. The Contractor will also provide verification and reporting of the sustainability (JC HPSB COMPLIANCE TOOL) measures incorporated into the design. See JCH-814, September 2013 Chapter 7 for specific responsibilities.

11. As-Built Drawings

Construction drawings of the buildings involved may be available. The Contractor is required to familiarize himself with the existing conditions affecting the work through site verification. The Contractor will be responsible for verification of all dimensions, layout, and conditions in and around the construction area involved. The Contractor shall inform the ESC immediately of any unforeseen conditions which may affect the work.

12. Work Scheduling

For work scheduling, the Contractor shall provide a sequenced CPM construction schedule to the CO for approval no later than 10 calendar days after he receives a Notice to Proceed (NTP). The CPM schedule will indicate the areas and the periods of time the Contractor requires them vacant in order to perform the work. As the work progresses, the Contractor shall submit an updated CPM schedule on a monthly basis for approval by the CO, as part of the Contractor’s monthly invoices. The CPM schedule will capture the shut down and the sequencing of installation of the new main water line.

13. Contract Document Reproduction

Five (5) sets, in total, of the Final Construction project documents and drawings sealed and dated by the appropriate professionals will be reproduced for the CO use. Three (3) sets full size and two (2) set half size of the project documents will be sent to the ESC, Department of Labor 2101 Wilson Blvd. Suite 200

Arlington, VA 22201

One (1) set full size is to be mailed by the Contractor directly to:

14. Availability of Existing Documents

C-12

Site verification of the existing conditions is required. Existing Construction Documents are available through Uhttp://www.solicitationattachments.com/GraftonB17Steel.U The Contractor shall be responsible for verification of all the dimensions and existing system types and conditions.

Five (5) sets of the specifications and drawings; sealed and dated by the appropriate professionals, will be reproduced by the Contractor for the Contracting Officer’s use. Of these, four (4) sets will be sent to the Department of Labor, and one (1) set will be sent to the Grafton Job Corps Center. Addressing will be as follows:

• Department of Labor, mail to:

U.S. DEPARTMENT OF LABOR

OCM, Division of Job Corps Procurement

A/E & Construction Services c/o Engineering Support Contractor 2101 Wilson Boulevard, Suite 200, Arlington, VA 22201-3062 ATTN: L. White, Documents Control

• Grafton Job Corps Center, mail to:

Attn.: The Center Director

Site verification of the existing conditions is required. Existing “As-Built” Construction Documents are available at the Center and will be available electronically after the pre-bid conference. UThe Contractor shall be responsible for verification of all the dimensions and existing system types and conditions. U

15. Schedule and Delays

The Contractor shall immediately notify the CO of any expected delays in the acquisition of materials which may delay the completion of the project. Should this impact the approved CPM construction schedule the Contractor shall adjust the schedule and resubmit it for the CO’s approval.

No extensions in time will be granted unless the modified schedule is approved by the CO.

16. Integrated Design Process (IDP) – Not Applicable

17. Verification of Construction Sustainability Measures – Not Applicable http://www.solicitationattachments.com/GraftonB17Steel

C-13

III. USE OF SITE

Access to the construction site will be from the secondary entrance off of Pine Street located on the east side of the site. The Contractor shall maintain this road during construction and repair it as necessary at the completion of the project.

Unless otherwise approved by DOL, the lay-down area will be located in the parking lot area adjacent to Building 7 on the northeast side of Building 17, (refer to Section VI – Site Plan). Coordinate the lay-down area’s exact location with the Center personnel prior to the start of construction. Restore the laydown area to its current condition after completion of the project.

IV. EXTENT OF WORK

A. SITE IMPROVEMENTS AND UTILITIES

1. Design Objectives.

The work includes, but is not limited to, replacement of two structural steel beams and one two-story column where the elevated walkway meets Building 17. It also includes the resurfacing of the exterior concrete elevated walkway concrete walking surfaces and sandblasting and repainting of the elevated walkway supporting steel structure.

This walkway and balcony are exposed to the elements and subject to icing during winter, and are treated with ice salts. The joint between the walkway and landing is also stressed by the fact that the concrete walkway’s structural framing below has an expansion joint to accommodate thermal expansion, but the rigid concrete surface above does not have an expansion joint. Over time this lack of continuity in the expansion joint design has cracked the walkway concrete surface, thereby allowing melting salts and water to soak and corrode the supporting steel structure below.

2. Walkway Surface Improvements

a. Exterior access bridge surface concrete spalling

i. Resurface the elevated exterior concrete access bridge walkway as follows:(approximately 6'-0" by 81'-0", field verify exact size prior to submitting proposal).

ii. Patch any damaged concrete areas with new concrete (approximately 10% of the floor deck.

iii. For concrete deck preparation to resurface the pedestrian bridge, remove the top of concrete surface in order to remove the saw cuts, use a scarifier to scarify the concrete deck or roughen the concrete surface with a shot blaster.

iv. Exterior Resinous Flooring System: Abrasion-, impact-, and chemical-resistant, aggregate-filled, and resin-based monolithic floor surfacing. Provide expansion/control joints in the floor material to match those on the existing

C-14

v. Clean and repair the underside of…