This document is a Facility Planning Report for the Cascades Job Corps Center in Sedro-Woolley, Washington. It provides details on the existing site conditions, building assessments, energy and water usage, sustainability initiatives, and proposed projects for the center.
The key details include:
- The center is located on 80 acres and has 23 buildings totaling 234,050 gross square feet. It serves 300 students, including 150 resident males and 150 resident females.
- Several buildings are listed on the National Registry of Historic Places. The facility assessment identified roof issues, HVAC concerns, and accessibility deficiencies that require attention.
- Short-term needs include installing door locks, repairing the walk-in cooler, replacing a deteriorated deck, adding air conditioning to the dining hall, and replacing roofing on several buildings.
- A long-range plan proposes renovating the interior and HVAC of the Vocations Building 31 as an ongoing, partially funded national project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers for Cascades (10-25-2024).xlsx | XLSX spreadsheet | |
| J.9 (Revised Facility Survey Volume 2).pdf | ||
| Lease Agreement.pdf | ||
| Amendment 4.pdf | ||
| J-1 (Further Revised Price Detail Template 10-17-2024).xlsx | XLSX spreadsheet | |
| Amendment 3.pdf | ||
| Amendment 2.pdf | ||
| J-1 (Revised Price Detail Template).xlsx | XLSX spreadsheet | |
| Amendment 1.pdf | ||
| Solicitation for Cascades 09-27-2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CASCADES
Job Corps Center Sedro-Woolley, WA
Facility Planning Report (Public) Planning Strategy
Volume I
Final February 2024
Departmentoflaborl
Office of Job Corps i
CASCADES JOB CORPS CENTER
PY2023 FACILITY SURVEY REPORT
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Objectives and Scope
1.2 Report Contents
1.3 Existing Site Plan
1.4 Center Statistics
1.5 Executive Summary
1.6 Facility Survey Assessment Site Conditions, Available Deficiency Funding, and
Facility Condition Index
2.0 EXISTING CONDITIONS
2.1 Background
2.2 Ownership
2.3 General Site Conditions
2.3.1 Water
2.3.2 Fire Protection
2.3.3 Sewer
2.3.4 Stormwater
2.3.5 Gas
2.3.6 Electrical
2.3.7 Site Lighting
2.3.8 Communications
2.4 General Building Conditions
2.4.1 Roofing Issues
2.5 Preventive Maintenance
2.6 Facility Assessment by Function
2.6.1 Student Housing
2.6.2 Education
2.6.3 Food Service
2.6.4 Recreation
2.6.5 Administration
2.6.6 Medical/Dental
2.6.7 Storage/Support
2.7 Environmental Management
2.8 Resource Use and Conservation: Energy and Water Conservation
2.8.1 Background
2.8.2 Energy Data Issues
2.8.3 Benchmarking
ii
2.8.4 Electricity
2.8.5 Natural Gas
2.8.6 Water
2.9 Sustainability
2.9.1 Climate Resilience
2.9.2 Climate and Natural Vulnerabilities and Solutions
2.10 Drone Survey
2.11 Accessibility Standards
2.12 Historic Preservation Issues
2.13 Campus Security Inventory
2.14 Health and Life Safety Issues
2.15 Completed and Current Projects Since the Last Survey
3.0 CENTER ISSUES
3.1 Introduction
3.2 Significant Issues Being Addressed
3.3 Significant Issues to be Addressed
3.3.1 Short-Term Needs
3.3.2 Watch Items
4.0 LONG RANGE PLAN
4.1 Introduction
4.2 Proposed Plan for Program Year 2023
4.3 Summary of Proposed Projects
4.3.1 Proposed National Projects
4.4 Proposed Site Plan
APPENDICES
Space Utilization Chart ................................................................................................... A-1 Federal Real Property Asset Management Performance Measures ................................ A-2 Funded but Not Corrected Deficiencies by Classification .............................................. A-3 Unfunded Deficiencies by Classification ........................................................................ A-4 Energy Conservation Deficiencies .................................................................................. A-5 Accessibility Deficiencies by Building ........................................................................... A-6 Facility Condition Summary Report ............................................................................... A-7 Building Condition by Function ..................................................................................... A-8 Acronyms and Abbreviations ......................................................................................... A-9
1.0 INTRODUCTION
A team of Engineering Support Contractor (ESC) architects and engineers completed a facility survey and assessment of Cascades Job Corps Center (JCC) in Sedro-Woolley, Washington during the week of October 16, 2023. The results, conclusions, and recommendations of the Survey are documented in two volumes: Volume I - Planning Strategy and Volume II - Supporting Data.
The United States Department of Labor (DOL) ESC team completed the Survey on behalf of the Job Corps Division of Facilities and Asset Management. The following team members conducted the completed facility survey and assessment for Cascades JCC:
Architect: Muhamed Ridanovic Mechanical Engineer: Christopher Allen Electrical Engineer: Constantin Kotzev Project Manager: Rodney Turnbough
The facility survey relies on the assistance and cooperation of the Job Corps Center Operator without whose help this could not have been completed. Appreciation to the team that directly assisted the facility survey including:
Center Team Center Director: Kendra Watson F&A Director: David Czuba Safety Manager: Eva Swain Maintenance Manager: Jonathan DeYoung Security Manager: Jimmy Ross
1.1 Objectives and Scope
The purpose of the Facility Survey is to accomplish the following objectives:
A. Document existing conditions of Cascades JCC B. Identify new deficiencies and status of previously documented deficiencies.
C. Recommend funding for health and life safety deficiencies.
D. Identify short-term (less than 3 year) needs and watch items for the Campus.
E. Consolidate functions, improve operations, enhance security, reduce footprint by demolishing buildings where feasible.
F. Develop a Long-Range Plan to optimize Campus operations.
1.2 Report Contents
Volume I includes the information and basis for the recommendations for long-range planning.
Volume I consists of the sections identified below.
Section 2.0 – Existing Conditions
In this section, the status of the site and buildings in Cascades JCC is presented in terms of conditions, functionality, energy and water usage, sustainability, and accessibility.
The status of funded projects is noted and current and prior deficiencies are summarized.
Section 3.0 – Center Issues
Each Center issue will be ranked as a Short-Term need or a watch item. The issues will be presented in order based providing a quality environment for Job Corps staff and students. Ranking is subjective based on the facility survey teams experience with Job Corps operations.
Section 4.0 – Recommendations
The recommendations for proposed projects and revised site plan are presented for Cascades JCC.
Cascades Job Corps Center Sedro-Woolley, Washington
BUILDINGS
10 - RECREATION/GYMNASIUM
10A - SECURITY SHACK
12 - MOUNT RAINIER DORMITORY
13 - DINING HALL
15 - ACADEMICS/EVERGREEN DORMITORY
16 - CHALLENGER DORMITORY
17 - WHITEWATER DORMITORY
24 - REGISTRARS OFFICE
25 - VOCATIONAL
26 - MAINTENANCE STORAGE
27E - WAREHOUSE/RECEIVING
27W - MEDICAL ASSISTANCE/MEDICAL
OFFICE SPECIALIST
28 - CENTER MAINTENANCE SHOP
29 - MAINTENANCE EQUIPMENT STORAGE
30 - CULTURAL CENTER
31 - VOCATIONS BUILDING
32 - ADMINISTRATION/EDUCATION/
MEDICAL-DENTAL
33A - FORMER STORAGE (VACANT)
33B - TEAP MEETING ROOM
34 - SECURITY/SAFETY
48 - LEARNING RESOURCE CENTER/LIBRARY
50 - WAREHOUSE STORAGE A
57 - ADMISSION AND PLACEMENT
63 - TRACTOR SHED
STRUCTURES
51 -WAREHOUSE STORAGE B
53 -STORAGE
54 -STORAGE
56 -ELECTRICAL MOCK-UP
57A-GAZEBO
57B-GAZEBO
57C-GAZEBO
570-GAZEBO
57E -PAVILION
57F -PAVILION
58 -CARPORT
59 -CEMENT MASONRY MOCK-UP
61 -STORAGE
62 -STORAGE
64 -GREENHOUSE
67 -ELECTRICAL MOCK-UP
68 -CARPORT
69 -GAS FILLING STATION
70 -SHED
8 November 2023
33B
Existing Site Plan 150 300 600 Feet fl gQ
FUNCTION LEGEND
ADMINISTRATION
CAFETERIA
DORMITORY
EDUCATION
MEDICAUDENTAL
RECREATION
STORAGE/SUPPORT
SECURITY
VACANT
1.3 Existing Site Plan
Page Intentionally Left Blank
1.4 Center Statistics
Date: 02/15/2024
Leased Activation Date: 1982
Site & Utilities
Water Source:
Sanitary Sewer:
Electrical Service:
Water Utility:
Gas Type:
Telephone Service:
234,130
Regulated:
Non-Regulated:
Above Ground Tanks:
Sewage Treatment:
Bldgs with Asbestos:
Asbestos Survey Date:
Bldgs with Radon:
No
Operating Contractor: Lifeskills Connections
Start / End Dates: 09/01/2023 / 08/31/2024
Phone No.: (360)854-3400
Center Director: Kendra Watson
Ownership Status:
Lease Expiration:
Resident Men: Resident Women: Non-residents:
Medical Office Specialist 50 ACT (Off-Ctr) 30
Medical Assistant 50 Computer Tech. Network + 30
IT Pathway 150 Cert. Nursing Asst. 50 Advanced A + Administrator 15
300 150 150 0
Real Estate Management
Buildings
Program
JCC# 1003 CASCADES 7782 Northern State Road, Sedro-Woolley, WA 98284
Accessibility
EnvironmentalSite Area (Acres):
CASCADES JCC
Bldg to Site Coverage: 10%
Age Distribution
Building Age > 50 yrs:
Building Age 20-50yrs:
Building Age 10-20yrs:
Building Age < 10 yrs:
Building Age Unknown :
Under Ground Tanks: 0
06/30/2029
5,594
69%
162,227
Site Access:
Buildings with Access:
Buildings with Access to Services:
Buildings with Accessible Restrooms:
Buildings with Other Accessible Features: 10
Buildings in Total Compliance: 6#
220,120
GSF
13,930 6
No. Of Buildings:
Gross Sq. Footage:
Net Sq. Footage:
No. of Vacant Buildings:
Vacant (NSF):
Net / Gross (%):
Average Building Age: 81
Contract Strength:
Vocations (375):
Radon Surveys Reqd: 3
Publicly Owned Treatment Works
01/17/1991
0 Mitigated: 0
Historic Status
Public Water Authority Publicly Owned Treatment Works Puget Sound Energy (PSE)
Skagit County Public Utility District N
Natural
Frontier Communication
37.56
Buildings on National List:
Eligible Buildings:
Candidate Buildings:
Historic District:
Contributing:
In/Pending:
Whitewater Dormitory Building 17
Administration/ Education/ Medical-
Dental Building 32
Cultural Center Building 30
Recreation/ Gymnasium Building 10
1.5 Executive Summary
Short-Term Needs
1. Doors are missing door locks in Academics/ Evergreen Dormitory Building 15. Procure and install door locks (estimated cost: $.......).
2. Kitchen walk-in cooler refrigerant line-set is covered with ice in Dining Hall Building
13. Procure services of a licensed HVAC contractor to troubleshoot and reinsulate the refrigerant suction piping inside the walk-in cooler (estimated cost: $.......).
3. The wood deck is falling apart on Admission and Placement Building 57. Repair any structural issues and replace the entire decking (estimated cost: $.......).
4. The dining area lacks air conditioning. The dining area is provided with heating and ventilation units only. During the summer months, the temperature in the dining area gets unbearably warm and uncomfortable. Furnish and install a 10-ton variable refrigerant flow split heat pump system with six 1.5-ton ductless wall mounted indoor evaporator units (estimated cost: $.......).
5. The asphalt shingle roof is in poor condition in Maintenance Storage Building 26, Warehouse Storage A Building 50, Warehouse Storage B 51 and Storage 53. Remove the existing asphalt shingled roof and replace it with light-colored, asphalt fiberglass architectural grade shingle roofing containing recycled materials, including new drip, gutters, and downspouts (estimated cost: $.......).
6. The gymnasium floor is slippery in Recreation /Gymnasium Building 10. Refinishing or resurfacing the gym floor (estimated cost: $.......).
7. The Center has no vehicular security gate. Procure a complete installation of electric gate operators with surge protection battery backup standby power (estimated cost:
Proposed Projects This project is ongoing and partially funded.
Project Name Estimated Cost National Project 4151:
Renovate Building 31 interior finishes and HVAC The work involves design and construction services for installing ceiling, floor finishes, painting walls and HVAC equipment.
The existing building was previously used as the laundry facility and later as a vocational training area for hard trades.
HVAC upgrades are needed to use the building for classroom instruction and to cool server rooms. The fans are too noisy for the classroom environment. There is no air conditioning in the building.
Building Condition
The Survey results indicate that the 80-acre site is in good condition and buildings are in good condition with the exception of the following buildings.
Building Condition Backlog Justification Recreation/Gymnasium Building 10 $....... Roof and flashing are at the end of their life expectancy; the plaster is chipped, and the Gym floor is slippery.
Maintenance Storage Building 26 $....... Roof is at the end of its life expectancy.
Maintenance Equipment Storage Building 29
$....... Roof is at the end of its life expectancy.
Former Storage (Vacant) Building 33A $....... Roof is at the end of its life expectancy.
Teap Meeting Room Building 33B $....... Roof is at the end of its life expectancy.
Warehouse Storage A Building 50 $....... Roof is at the end of its life expectancy.
Tractor Shed Building 63 $....... Roof is at the end of its life expectancy.
👍 = Good Condition ✓ = Fair Condition 👎 = Poor Condition
Maintenance
Maintenance of the Campus is shared between the Center and the Lessor (State of Washington).
The Center’s Maintenance staff uses Brightly to process work orders and periodic maintenance (PMs) of government owned equipment. The Lessor maintenance staff uses Bench Mate facility software to process work orders received from the Center for Lessor owned equipment. The total number of Center’s maintenance staff is 4: one supervisor, one custodian, and two maintenance support staff. Random checks of air handler filters indicate proper filter replacements are occurring. The Operations and Maintenance (O&M) staff is sufficiently maintaining these aged facilities.
Energy and Water Goals
Category FY2022 Intensity Baseline
Year Baseline Intensity FY2022 Target
Difference from
Target Energy 71,962 BTU/GSF FY2021 62,395 BTU/GSF 61,459 BTU/GSF ++15.0% Water 3,637.77 kgal FY2021 2,944.33 kgalal 2,900.1 kgalalal +20.0%
Green – meeting target, Yellow- within 10% of target. Red – not meeting target.
The Center is NOT meeting its energy goal (Actual +15.0%) The Center is NOT meeting its water goal (Actual +20.0%)
With closures and decreased student population and then the return of students and staff due to Covid safety protocols, FY2022 was an anomalous year. These conditions would likely be the cause of the disparity of the 2021 to 2022 energy and water intensities.
1.6 Facility Survey Assessment Site Conditions, Available Deficiency Funding, and Facility Condition Index
KEY
FCI: Facility Condition Index ((1-repair cost)/value)
GSF: Gross Square Feet O&M: Operations and Maintenance OBS: On Board Strength (current number of students)
Site Condition Roads and Pavement Fair Parking areas and roads have deteriorated, site lighting is inadequate, and all buildings have poor grading.
Power Good Natural Gas Good Central Plant N/A Water Supply Good Sewage Good
Building Conditions Student Housing Good Education Good Food Service Good Recreation Fair Roof is at the end of its life expectancy.
Medical/ Dental Good Administration Good Storage Support Fair Roof is at the end of its life expectancy.
Deficiency Cost Life Safety Deficiencies Non-Life Safety Deficiencies
Number Cost, $ Number Cost, $ Recently Funded 1 $6,696 0 $0.00 Prior Funded 0 $0 0 $0 O&M 29 Non-CRA Funded 28 Non CRA Funded Unfunded 9 $48,433 37 $908,703
Available Beds Contract Strength OBS during Survey
Maximum Bed Capacity
Bed Capacity above Contract
Strength Resident Students Non-
Resident Students
Resident Students
Non-Resident Students
300 0 150 0 304 4
Facility Condition Index Metrics Current
Goal Cascades JCC Comments
FCI 0.919 .96
%FCI < 0.90 15.2 12 Roofs are at the end of their life expectancy.
2.0 EXISTING CONDITIONS
2.1 Background
The Cascades JCC is located on 80 acres of land in Sedro-Woolley, Washington. The land and buildings are leased and operated by the Lifeskill Connections LCC. The facility was originally built in 1909. It was activated as a JCC in 1982. The Campus has 234,050 gross square feet (GSF) in 23 buildings.
The original construction was 1909 on 225 acres for the Northern State Hospital. The hospital project started in 1909 when the State of Washington purchased land to build a mental institution and retained Olmsted Brothers architects to design the master plan for the site. The landscape design was completed in 1911, and the Northern State Hospital opened in 1913. The hospital closed in 1973, and the buildings and site were remodeled to house the Young Adult Conservation Corps (YACC). YACC provided job experience for young adults who, in turn, helped with conservation work on public land. 1977 YACC became Camp Cascade, administered by the United States of America Forest Service and National Park Service. Since Camp Cascade also offered job training, the DOL became the third administrator of the YACC program. Camp Cascade was re-named State Multi-Service Center after the Skagit Valley College started offering students educational programs.
In December 2010, the entire site was categorized as a ‘Historic District, and most of its buildings were awarded a ‘Historic Contributing building designation. Cascade's land and nine of its buildings are listed on the National Registry of Historic Places.
The Cascades JCC provides residential living, academic education, recreation, and vocational training for a population of 300 students as in the Table 1. Dormitory beds per each wing are in Table 2.
Table 1: Number of Students Resident
Men Resident Women
Non- Residents
On-Board Strength (at the date of the survey) 94 56 0 Contract Strength 150 150 0
Table 2: Number of Beds per Dormitory Wing Building Gender Floor Wing Number of
Beds Mount Rainier Dormitory Building 12 Male 1 East Wing 13 Mount Rainier Dormitory Building 12 Male 1 Main Hollway 15 Mount Rainier Dormitory Building 12 Male 1 West Wing 13 Mount Rainier Dormitory Building 12 Male 2 East Wing 10 Mount Rainier Dormitory Building 12 Male 2 Main Hollway 20 Mount Rainier Dormitory Building 12 Male 2 West Wing 13 Academics/Evergreen Dormitory 15 Neutral 2 East Wing 18 Academics/Evergreen Dormitory 15 Neutral 2 Main Hollway 15 Academics/Evergreen Dormitory 15 Neutral 2 West Wing 10
Challenger Dormitory 16 Male 1 East Wing 13 Challenger Dormitory 16 Male 1 Main Hollway 16 Challenger Dormitory 16 Male 1 West Wing 12 Challenger Dormitory 16 Female 2 East Wing 13 Challenger Dormitory 16 Female 2 Main Hollway 12 Challenger Dormitory 16 Female 2 West Wing 25 Whitewater Dormitory 17 Male 1 East Wing 12 Whitewater Dormitory 17 Male 1 West Wing 11 Whitewater Dormitory 17 Neutral 2 East Wing 14 Whitewater Dormitory 17 Neutral 2 Main Hollway 17 Whitewater Dormitory 17 Neutral 2 West Wing 12 Whitewater Dormitory 17 Female 3 East Wing 5 Whitewater Dormitory 17 Female 3 Main Hollway 10 Whitewater Dormitory 17 Female 3 West Wing 5
Total 304
The total building area at the Campus is 162,227 net square feet (NSF), which compares to the recommended NSF of between 84,770 and 107,400 for this student population.
2.2 Ownership
Cascades JCC is leased by DOL (Government) from the Port of Skagit (Lessor). The original lease commenced on January 1, 1992, and the current lease will expire on June 30, 2029, if all options are exercised. The current monthly rent for this lease is $74,323.46.
View of the Center
This Center's facilities consist of leased and federally owned buildings and structures. The Government owns any buildings or structures built by the Government during the lease term and are subject to removal by the Government upon the expiration of the lease. The Lessor’s written approval is required before any alterations, improvements, or renovations are made to the Leased Premises.
The Government is responsible for the maintenance and repair of buildings it has constructed.
The Lessor is responsible for the maintenance and repair of buildings that the Government has not constructed.
Lessor’s responsibilities include but are not limited to foundations and underground tunnels;
buildings’ structural systems; buildings’ exterior (facades and roofing); building systems (HVAC, plumbing, electrical, and sewer); snow removal from public roads and parking areas;
public roads maintenance; light posts; traffic and public information signs; pest control management at the exterior of all buildings to include the underground tunnels; fire alarm systems.
The Government must maintain, repair, or replace all interior walls, wall surfaces, ceilings, light bulbs, door hardware, flooring, windows, and window coverings;
provide all interior painting and application of other protective coating as needed; maintain and/or repair interior wood/metal trim around doors and windows; provide weekday grounds maintenance and services such as litter pickup, removal of safety hazards, etc., included within the Leased Premises;
provide mowing, weeding, planting and fertilizing within the Leased Premises.
The Government is responsible for the installation, maintenance, and replacement of all interior and exterior signs within the Leased Premises. The Government must provide pest control management within the interior of buildings of the Leased Premises. The Government is responsible for all on-premises equipment and inside wiring and its associated costs. The Government is responsible for the installation, repair, or replacement of heating, plumbing, or electrical systems related to tenant improvements to the building within the Leased Premises.
2.3 General Site Conditions
The Center is located at 48.31° N, 122.12° W at an average elevation of 128 feet above sea level.
The Center is within the ASHRAE 4C Marine Climate Zone. The average temperatures range from an average high of 47 and an average low of 35 degrees in January to an average high of 74 and an average low of 53 degrees in July. Cascades receives 46.46 inches of annual rainfall and an average annual snowfall of 7 inches.
View of the rural surrounding around the Center
The site is located in a rural setting approximately 72 miles north of Seattle.
The campus perimeter is not fenced. The property is surrounded by a wooded area on the north and west and by farmland on the east and south. Main vehicular access is from the west side. The access road terminates into Hub Drive, a loop road along which most campus buildings are disposed of linearly. The north segment of Hub Drive separates the day from the night campus. The day campus, which includes education, vocations, medical/dental, administration, and storage/support, is located on the north side of this segment. The night campus, which includes housing, food services, and recreation, is on the south side of this road.
The main entrance to the Center is Hub Drive at the northwest corner of the Center and loops around. It leads to the visitor parking and Security/Safety Building 34. The visitor parking is covered with compacted gravel. This parking area is not adequate. Asphalt-covered parking areas for staff and Center vehicles are between Administration Education Medical Dental Building 32, and parking surfaces have deteriorated. The asphalt surfaces of Hub Drive Road and the secondary loop road south of Storage 62 and Vocation Building 31 have also deteriorated. The total number of parking spaces is 3 for visitors, 142 for staff, 13 for GSA, and 2 for ADA (Americans with Disabilities Act).
Pedestrian circulation is directed toward the interior, and sidewalks connect the buildings. The sidewalks are concrete, with curb cuts. Some sidewalks along the main loop road and main parking area are deteriorated. Decorative concrete pavers and concrete sidewalks facilitate pedestrian access to buildings.
The topography is flat; grass, trees, and plantings are abundant between and along the buildings. The landscaped areas are well maintained. A large, green commons between the day and night campus affords breathtaking views of the surrounding mountains. For informal gatherings and outdoor recreation, the Center has four gazebos, three pavilions, and outdoor courts (basketball, football, soccer, and volleyball).
Stormwater flows by gravity to an underground system. The State built two bio-swales, a detention pond, and stormwater pumps to control stormwater better and prevent soil erosion. However, water ponding occurs east and west of Dormitory Academic Evergreen Dormitory Building 15 and southwest of Whitewater Dormitory Building 17. Soil erosion was noted south of Dining Hall Building 13.
View of the day Campus
View of the West side of Campus
2.3.1 Water
The domestic water supply and sanitary system services are provided by the Skagit County Public Utility District No. 1. Water usage is measured by water meters at individual buildings while others are zoned. Buildings 10, 12, 13, and 57 are individually metered, and all other buildings are zoned metered. The water meters are in good working condition.
Water pressure and flow are adequate for both domestic use and fire protection. The Lessor owns and maintains the domestic water distribution system, which is in good condition and functions adequately.
2.3.2 Fire Protection
Fire protection for the Center is provided by several fire hydrants strategically located within the Campus. The wet sprinkler system provides coverage in dormitory Buildings 12, 15, 16, and 17. The local municipality provides adequate water pressure for both the fire hydrants and the building’s wet sprinkler systems. The fire hydrants and sprinkler systems are owned and maintained by the Lessor, and the sprinkler systems are inspected per NFPA requirements, which is yearly. The Center is supported by the Sedro Woolley Fire Department, located at 325 Metcalf Street, Sedro Woolley, which is approximately 3 miles away and has an estimated response time of four minutes.
2.3.3 Sewer
The underground sewer from the Center flows into the publicly owned wastewater treatment plant by means of gravity and a lift station west of Administration Building 32.
The systems are in good condition and function adequately. The Lessor maintains the underground sewer within the Center.
2.3.4 Stormwater
Stormwater at the Center is managed by surface run-off and underground drains that direct surface run-off to an underground storm drain system. The Center has a combination of hilly and flat areas, resulting in minor ponding in some areas, but otherwise, the stormwater system operates adequately. Soil erosion problems have been identified near the south side of Dining Hall Building 13. The Lessor maintains the stormwater system.
2.3.5 Gas
The underground natural gas is supplied by Cascade Natural Gas Corporation. Gas usage is measured at the master meter located north of Dining Hall Building 13. A 500-gallon above-ground propane tank located in the northwest corner of Admission and Placement Building 57 provides propane gas to the building for heating. The Lessor owns and maintains the gas distribution lines within its site. The natural gas pressure and flow to the Center are adequate, in good condition, and functioning well.
2.3.6 Electrical
Electric service is provided by Puget Sound Energy (PSE). The 12.47/4.16 kV primary lines are brought to the main switchgear located in the Lessor's powerhouse. This switchgear serves the entire complex, including Cascades JCC buildings and Lessor's buildings. The primary 4.16 kV feeders from the switchgear emanate to the buildings through a loop of transformer vaults via a tunnel network. The 120/208V secondary distribution system is distributed to DOL leased buildings via their respective service disconnect and/or main distribution panel. Most major buildings have their own meter, while others are zone metered. The dormitories and cafeteria have backup power derived from the Lessor's 400 kW diesel engine generator. The utility company owns and maintains the electrical system, and it is adequate.
2.3.7 Site Lighting
Site lighting consists of pole-mounted and building-mounted lights controlled by photocells and time clocks. Site lighting is adequate for the Campus, owned and maintained by the Lessor.
2.3.8 Communications
2.4 General Building Conditions
The twenty-three buildings on site were built at various times between 1922 and 1995. Eighteen buildings were part of the original hospital complex; the other five were built after the conversion to JCC.
Building structural systems vary from load-bearing concrete or masonry to wood framing. The storage buildings are wood-framed. The original buildings were designed in the Spanish colonial revival style, with red clay tile roofs and stucco walls. Over the years, as roofs were replaced, fiberglass shingles were installed on the new roofs, matching the texture and color of the original clay tiles. Most of the buildings have stucco finishes on the facades. A few others have finishes varying from corrugated plastic, concrete, exterior insulation finishing system (EIFS), wood siding, and plaster. Various buildings throughout the Center have exterior plaster walls that are chipped, cracked, and water stained. However, these conditions are limited to small to medium size areas and, in most instances, are cosmetic. Nevertheless, this matter should be addressed before the conditions worsen and allow water to infiltrate, further deteriorating the plaster and potentially damaging interior finishes.
Building 15 Academic Evergreen Dormitory
Mount Rainier Dormitory Building 12, Dining Hall Building 13, Academic Evergreen Dormitory Building 15, Challenger Dormitory Building 16, Whitewater Dormitory Building 17, Registrar’s Office Building 24, Warehouse Receiving Building 27E, Cultural Center Building 30 and Vocation Building 31 are listed on the National Registry of Historic Places.
All buildings on Campus are in fair to good condition. The State is responsible for maintaining all building systems, including the building envelopes. Most roofs are approaching the end of their life expectancy. Though roof deterioration is present in most buildings, no active leaks exist. The State has proactively identified and monitored significant problems with building conditions and secured funding to correct roof and building skin deficiencies.
Over the past few years, energy-inefficient single-glazed windows in 14 buildings were replaced with double-glazed windows in 14 buildings were replaced with double-glazed insulated windows.
Eighteen structures built between 1933 and 2018 serve recreational, storage, and utility needs.
Carport 58, Storage 61, and Greenhouse 64 structures are in fair condition. Shed 70 and Storage 53 structures are in poor condition. All other structures are in good condition and function well.
2.4.1 Roofing Issues
The single-ply roof on Recreation/Gymnasium Building 10, and the EPDM Roof on Center Maintenance Shop Building 28 is old and deteriorated, past life expectancy.
Building 17 Whitewater Dormitory
Roof past life expectancy Recreation/Gymnasium Building 10
Roof past life expectancy Center Maintenance Shop Building 28
The asphalt shingle roofs on the Maintenance Storage Building 26, Maintenance Equipment Storage Building 29, Administration/Education/Medical-Dental Building 32, Vacant (Former Safety/ Storage) Building 33A, TEAP Meeting Room Building 33B, Warehouse Storage Building 50, and Tractor Shed Building 63 are also old and at the end of their live expectancy.
Roofs leak at Warehouse Storage A Building 50 and Storage B Storage 51.
See the Roof Report Site plan.
Roofs leak at Warehouse Storage A Building 50 Roofs leak at Warehouse Storage 51
2.5 Preventive Maintenance
Overall, the maintenance of the Center is fair. The Lessor (Port of Skagit) is responsible for maintaining the buildings, building systems, and utility systems and for periodically inspecting regulated equipment/systems such as fire sprinklers, fire hydrants, boilers, and kitchen hood fire suppression. All inspections were complete and up to date during the Facility Survey. The Lessor is utilizing the Bench Mate facility maintenance management software. The underground utility tunnel connects and serves the heating and ventilation for Dormitory Buildings 12, 15, 16, and
17. Access to the steam plant is limited to Lessor maintenance staff only. The Center utilizes Brightly, a facility Computerized Maintenance Management System (CMMS), for its maintenance tasks. Corrective work orders are transmitted, scheduled, and closed using this program. Most of the O&M deficiencies have been completed. The Center has a written Preventive Maintenance Plan (PMP) and provided a completed Center PMP Checklist within the facility survey confirmation package.
2.6 Facility Assessment by Function
2.6.1 Student Housing
The Center accommodates 150 resident women and 150 resident men in four buildings. All four dormitory buildings are laid out in a ‘T’ type configuration. Mount Rainier Dormitory Building 12, Dining Hall Building 13, Academic Evergreen Dormitory Building 15, Challenger Dormitory Building 16, and Whitewater Dormitory Building 17 were constructed in 1922, 1927, 1927, and 1933, respectively. The sleeping rooms have two or as many as four beds (some bunk beds), and bathrooms are shared. Currently, the Center has a capacity of 304 beds.
The dormitory rooms were originally designed as open bays and later converted into individual rooms. The number of sleeping rooms per floor varies. Also, the sleeping rooms vary in shape, size, and number of beds. Mount Rainier Dormitory Building 12, Academic Evergreen Dormitory Building 15, and Challenger Dormitory Building 16 are very similar. The main entry, vestibule, and vertical circulation (a ramp, in the case of Building
15) are located on the north side of the building. Classrooms and associated offices occupy the first floor of Academic Evergreen Dormitory Building 15. The second floor of Building 15 is student housing, which is vacant due to the decrease in the student population and ongoing renovations. A large student lounge is located in the middle of the second-floor south wing. Other shared areas are located at the intersection of the ‘T’ wings, and they contain an interior stair connecting all floors, including the basement and the attic, toilet rooms, showers, staff toilets, luggage storage, laundry, and janitor closets.
Interior of dormitory room Challenger Dormitory Building 16
All three dormitory buildings have metal fire escape stairs at both ends of the south wing. Whitewater Dormitory Building 17 is similar; however, this building has three stories and a mansard roof. On the third floor, the honor dormitory has a small study room and a pantry east and west of a large lounge. The former large meeting room, located on the east side in the north wing, was converted into a dormitory sleeping room to accommodate new students for their first day on campus. However, the room does not have a dedicated toilet/shower. All other sleeping rooms on this floor have dedicated shower rooms with storage closets. Also, the shared toilet room, located at the intersection of the ‘T’ wings, was converted to a laundry room. The laundry rooms in Dormitory Buildings 12, 15, 16, and 17 lack sufficient make-up air.
The heating and ventilation systems in the dormitories are old, function poorly, and are inadequate, resulting in areas not effectively zoned for heating and temperature control.
Also, contributing to the heating and ventilation problem, furniture is placed in front of the return air grilles in many sleeping rooms.
2.6.2 Education
All the academic and non-academic functions are housed in four buildings, which are located on the day campus, except for some classrooms in one of the Academic/Evergreen Dormitory Building
15. The combined area of academic/non-academic educational space amounts to 12,941 NSF; the combined area of vocational space amounts to 18,284 NSF.
The main academic functions and support spaces are located in the east wing of the Administration/Education/ Medical-Dental Building 32. Non-academic functions are located in the Learning Resource Center /Library Building 48.
The existing vocations are Information Technology Pathway (IT Pathway) with a vocational slot count of 150, Certified Nursing Assistant with a vocational slot count of 50, Medical Assistant with a vocational slot count of 50, and Medical Office Specialist with a vocational slot count of 50. At present, the vocational slots allocated to the three health occupation vocations are 50, with a combined total of 150 vocational slots. The new
Interior of dormitory room Whitewater Dormitory Building 17
Interior of classroom Medical Assistance Medical Office Specialist
Building 27W vocations are Advance A+ administrator training with a vocational slot count of 15 and ACT (off-Ctr) with a vocational slot count of 30.
Soft vocation functions are housed in Medical Assistant/Medical Office Specialist at Medical Assistance Medical Office Specialist Building 27W. The former Culinary Arts vocational area, located in the north section of Dining Hall Building 13, is currently vacant. IT Pathway vocational classrooms are located in the Vocations Building 31.
The academic rooms on the first floor of the Academics/Evergreen Dormitory Building 15 are vacant and under renovation. Only four offices are in use at the back of the building.
Vocational Building 25 is currently vacant. The future use of this building has not been determined.
Despite the age of some buildings (six buildings were built between 1922 and 1947), the educational and vocational facilities function well, are adequate, and are in general good condition.
2.6.3 Food Service
Food Service, located in the Dining Hall Building 13, contains a dining area, kitchen/food preparation, food storage, serving, dishwashing functions, a small clubhouse, and a vacant Culinary Arts vocation area located in the northern section of the building. The Culinary Arts vocation was discontinued from the curriculum.
However, all the Culinary Arts kitchen equipment is still in place. The building is located at the center of the night campus, between Dormitory Buildings 12 and 15.
The main entry to the kitchen and dining hall are located on the east side. A painted steel portico’ and two gabled canopies above the entries protect against the elements along the east façade. Also, ramps are provided at the two east entrances for accessibility, one to the dining hall and one to the kitchen. There is a ramp on the northwest side of the building to access the former Culinary Arts area and the loading dock. The kitchen functions occupy the central part of the building. A service corridor connects to storage, freezer, and locker areas, a loading dock, and the former Culinary Arts vocation at the far north end of the building.
Interior of classroom Vocations Building 31
Dining Area Dining Hall Building 13
The former Culinary Arts vocation suite has direct access to the loading dock. In addition, a staging area for trash collection and removal is located far south of the loading dock with direct access from the pot wash area. The clubhouse is located west of the kitchen/food preparation and can be accessed directly from the outside. The dining area is divided into two separate areas by a partition wall with two openings, and dedicated public restrooms are located at the south end of the building.
The freezer and cooler unit door gaskets are old and deteriorated, and the walk-in freezer is not operational due to a failed compressor unit. Otherwise, the overall facility is adequate in size, well-maintained, and generally in good condition.
2.6.4 Recreation
Indoor recreation functions are located in Recreation/Gymnasium Building ten and Cultural Center Building 30. Recreation /Gymnasium Building 10 is on the east side of the night campus. These buildings, constructed in 1963 and 1936 respectively, are in good condition and function well. The gymnasium is located in the southern half of Building 10. It is well-lit by tall, saw-toothed windows placed along the east and west walls. Male and female toilet and locker rooms, an exercise room, storage, and laundry rooms are located on the east side of the gymnasium and can also be accessed directly from the outside. Bleachers are located along the entire west gymnasium wall opposite the above-mentioned rooms. The main entry is from the east side. It leads to a spacious lobby. A wide loop corridor provides access to offices, a mechanical room, restrooms, and a small Arts and Crafts room clustered within the mentioned rooms. A large weight room and Arts and Crafts room are located at the north end of the building, together with a small kiln room, storage room, and janitor’s room. The indoor recreational facilities in Recreation/Gymnasium Building 10 are in good condition and function very well except that the Gym floor in slippery and needs to be refinished.
Cultural Center Building 30 is located within the day campus on the north side of Hub Drive, west of Vocations Building 31. The building entrance located on the south side is marked by a beautiful gable wall in the Spanish Revival style. The interior has several generous spaces comprising a large pool room, a student government meeting room, which
Kitchen Area Dining Hall Building 13
Gymnasium Recreation/Gymnasium Building 10 opens to a coffee bar, and a student government office. There is also a T.V.
room with theater-style seating, two game rooms, an office, and restrooms. The attic space of this building is accessed through an exterior stair located on the north side. The single-ply roof on Recreation/Gymnasium Building 10 is at the end of its useful life expectancy. This facility is in fair condition, adequate, and functions well.
Outdoor recreation facilities consist of soccer, football, baseball fields, volleyball, and basketball courts. The baseball field is located northwest of the day campus. The other activities are located within the night campus in close proximity to Recreation/Gymnasium Building ten and Mount Rainier Dormitory Building 12. Several pavilions dispersed within the campus provide a nice setting for informal gatherings.
Additionally, a fireplace is located in the campus commons across Administration/Education/Medical-Dental Building 32 and Mount Rainer Dormitory 12.
Also, there are several gardens located throughout the Center. The outdoor recreation facilities are plentiful, well maintained, and function well.
2.6.5 Administration
Administration functions are in four buildings: Registrar’s Office Building 24, Administration/Education/ Medical-Dental Building 32, Security/Safety Building 34, and Admissions and Placement Building 57.
Most administrative functions are in Administration/ Education/Medical-Dental Building 32. Building 32 is laid out in an ‘H’ type configuration and has two large east and west wings and a central core with a landscaped courtyard in the middle. On the east and west sides, two corridors provide access to all suites or spaces within the building. These corridors border the patio:
the math and CPP 2 classes on the north and the executive administrative suite on the south. The interior courtyard is paved with decorative concrete pavers and is furnished with concrete and wood benches and tables.
Concrete planters with native flowers and trees are scattered throughout the courtyard.
Other administrative functions are in Registrar’s Office Building 24 and Admissions and Placement Building 57. These two buildings are small, linear-shaped, and single-story.
Building 57 is a metal trailer with an attached wood deck the full length of the building.
Pool Room Cultural Center Building 30
Secretary room Admin./Education/ Medical-Dental Building 32
2.6.6 Medical/Dental
Medical and dental functions are primarily located in Administration/Education/Medical- Dental Building 32. The TEAP Meeting Room Building 33B, which is a single-room building, is used for student meetings by the mental health team.
The medical-dental suite is located in the northern section of the west wing of Administration/ Education/Medical-Dental Building 32. A common reception area separates the medical director suite on the south from the medical-dental suite on the north. The medical-dental suite can be accessed directly from the covered porch at the northeast side of the building’s west wing. It has a large waiting room, examination rooms, male and female wards, a unisex restroom, medical and dental offices, two separate laboratories, supplies, Dental exam room and medication storage. The executive suite Admin./Education/ Medical-Dental Building 32 contains a large conference room, the medical director's office, records, and medical offices. The asphalt shingle roof on TAEP Meeting Room Building 33B is in poor condition and at the end of its life expectancy. The medical facilities are maintained well, in good condition, adequate, and function well.
2.6.7 Storage/Support
The Center’s storage/support functions are located in six buildings clustered on the northeast side of the day campus.
Maintenance Storage Building 26, Warehouse/Receiving Building 27E, Center Maintenance Shop Building 28, Maintenance Equipment Storage A Building 50, Tractor Shed Building 63, and Warehouse Storage B Structure 51. The buildings/structures were constructed in 1933, 1953, 1984, 1985, and 1995, respectively. Most storage functions are Second-floor storage room located in the basement, first and second Warehouse/Receiving Building 27E floors of Warehouse/Receiving Building 27E. The Center uses this building for general and excess storage, clothing storage, warehouse supplies, and receiving. The building is served by a loading dock on the south side and ramps on the west side. The ramps provide a direct link and transition to the warehouse in the southeast section of Medical Assistant/ Medical Office Specialist Building 27W.
2.7 Environmental Management
The Cascades JCC has asbestos-containing materials on-site, primarily asbestos floor tile and mastic. All asbestos-containing materials must be kept in good condition in an O&M program that includes condition observation and recordkeeping every six months. The Center must have an asbestos coordinator with current training to oversee its asbestos program. The above-ground gasoline tank needs spill-prevention containment. The containment should be cinder block containment high enough to contain 110% of the tank's volume with a valve for stormwater drainage. The State of Washington and the Port of Skagit County are investigating the potential contamination of under-slab areas at Vocations Building 31 for the presence of dry-cleaning chemicals. During the period of operation as a hospital campus, Building 31 was used as a laundry facility. An environmental report on the investigation findings will be provided to the ESC Project Manager.
The Center observed or reported no other environmental issues during the October 2023 facility survey. Please see the Environmental Management Report section for the asbestos-containing materials (ACM) inventory report for more details on the locations of asbestos at the Center.
Warehouse/Receiving Building 27E, although 81 years old, is in good overall condition and serves the needs of the Center well. The warehouse in Building 27W also opens to the loading dock, shared by Buildings 27E and 27W. Center maintenance functions are located in Center Maintenance Shop Building 28, which houses the large maintenance shop with mezzanine storage, supply storage, maintenance supervisor’s office, laundry room, and rest room. The warehouse space
Loading dock area Warehouse/ Receiving Building 27E is adequate and functions well. Yard equipment, paint storage, and flammable storage are located in Maintenance Equipment Storage Building 29. Acetylene and oxygen containers are located outside the north wall and enclosed within fenced storage bins. Lawn and gardening equipment is located in Tractor Shed Building 63. Additional storage is in Warehouse Storage A Building 50 and Warehouse Storage B Structure 51. The asphalt shingle roofs on Maintenance Storage Building 26, Warehouse Storage A Building 50, and Tractor Shed Building 63 are in poor condition and are at the end of their life expectancy.
All storage/support buildings are generally in fair condition and function well.
2.8 Resource Use and Conservation: Energy and Water Conservation Energy and water usage and associated trends are summarized below for Cascades JCC. This data includes the fiscal year that ended in September of 2022, and most of the staff and student populations have increased to the normal levels.
2.8.1 Background
Table 3, Electricity and Water Statistics – FY2022, has current electricity, natural gas, and water usage and cost. (Energy Watchdog 2022) Electric, natural gas and water unit costs are lower than the Average Cost in Job Corps.
Table 3: Energy and Water Statistics – FY2022 Energy Usage Cost Unit Cost Average Cost in Job Corps Electricity 1,425,322 kWh $139,421.34 $0.098/kWh $0.142/kWh Natural Gas 1,980.69 CCF $2,485.19 $1.255/CCF $1.287/CCF Water 3,637.78 kgal $44,437.39 $12.000/kgal $3.000/kgal Total $186,343.92
Notes: 1. This analysis is based on the latest energy information available.
2. Financial Year 2022 (FY2022) energy data are the latest entire year available for analysis.
With closures and the return student population due to Covid, FY2022 was an anomalous year
3. kgal = thousand gallons; kWh = kilowatt-hours; CCF= Centum cubic feet (100 cubic feet)
2.8.2 Energy Data Issues
The Cascades JCC began posting electricity and natural gas data in FY1985 until FY2000 when no records for electricity exist until the first and fourth quarters of FY2003 and then were consistent going forward. Natural Gas records stopped in FY2000, then resumed for the third and fourth quarters of FY2001, the third quarter only of FY2002 and the first and fourth quarters of FY2003 then it became consistent going forward. Water records began in FY2004 and have been consistent with each year’s information going forward.
2.8.3 Benchmarking
The DOL has set the following goals in the Sustainability Report and Implementation Plan for energy intensity and water intensity reduction. These goals will be used to benchmark each JCC. (Table 4)
Table 4: DOL Energy and Water Intensity Reduction Goals Energy Intensity Reduction Water Intensity Reduction
From FY2021 to FY2022 1.5% 1.5% From FY2022 to FY2023 1.5% 1.5%
Table 5: Energy and Water Benchmarking
Category FY2022 Intensity Baseline Year
Baseline Intensity FY2022 Target
Difference from
Target Energy 71,962 BTU/GSF FY2021 62,395 BTU/GSF 61,459 BTU/GSF +15.0% Water 3,637.77 kgal FY2021 2,944.33 kgal 2,900.17 kgal +20.0%
Green – meeting target, Yellow- within 10% of target. Red – not meeting target.
The Center is NOT meeting its energy goal (Actual +15.0%) The Center is NOT meeting its water goal (Actual +20.0%)
With closures and decreased student population and then the return of students and staff due to Covid safety protocols, FY2022 was an anomalous year. These conditions would likely be the cause of the disparity of the 2021 to 2022 energy and water intensities.
Figure 1 shows the Energy Intensity in BTU/GSF FY2013-FY2022. Energy intensity reached to its highest point in FY2014, then trended downward to its lowest point in FY2017. Figure 2 shows the Energy Usage in MMBTU for FY2013-FY2022.