About this file
These are detailed HVAC system floor plans, control diagrams, and equipment schedules for the Little Rock Air Traffic Control Tower (ATCT) and Environmental Support Unit (ESU) building, prepared by Parsons for the Federal Aviation Administration. The 26-page technical drawing set includes comprehensive schematics for multiple building levels, focusing on HVAC equipment replacement, including air handling units, condensing units, fan coil units, boilers, and associated control systems. The drawings specify equipment locations, airflow configurations, temperature control diagrams, and technical specifications for various mechanical systems across different building zones, with specific attention to computer room cooling, ventilation, and environmental control infrastructure.
The drawings are part of a solicitation (6973GH-25-R-00125) for replacing three 15-ton split computer room HVAC systems in the ATCT, two 5-ton split HVACs in the Environmental Support Unit, and the facility's boiler. The project requires comprehensive system replacement, including field components, sensors, control wiring, a new computer interface/control workstation with Enterprise Server software, network cabling, and leak detection system replacement. The small business set-aside contract mandates maintaining continuous cooling during construction, with strict requirements for coordinating work through the FAA Contracting Officer's Representative and submitting a detailed construction sequencing plan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16 6973GH-25-R-00125-002.pdf | ||
| 16 Att 03 230900 SF REV 01 - INSTRUMENTATION AND CONTROL FOR LIT TOWB HVAC.pdf | ||
| 16 6973GH-25-R-00125-001.pdf | ||
| 17 Questions and Answers.docx | DOCX document | |
| 16 Att 10 Payment Bond.pdf | ||
| 16 Att 07 FAA-C-1217H.pdf | ||
| 16 6973GH-25-R-00125.pdf | ||
| 16 Att 09 Contractors Release Form DOT F4220.4.doc | DOC document | |
| 16 Att 08 FAA-STD-019f Chg 3 20200401.pdf | ||
| 16 Att 03 230900 SF - INSTRUMENTATION AND CONTROL FOR LIT TOWB HVAC.pdf | ||
| 16 Att 01 Statement of Work.pdf | ||
| 16 Att 11 Performance Bond.pdf | ||
| 16 Att 04 230800 SF - COMMISSIONING OF LIT TOWB HVAC.pdf | ||
| 16 Att 06 Contractor As Built Dwgs For Controls.pdf | ||
| 16 Att 13 Offeror Organizational Experience.pdf | ||
| 16 Att 12 Wage Determination.pdf | ||
| 16 Att 05 230593 SF - TESTING ADJUSTING AND BALANCING FOR LIT TOWB HVAC.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A16
A
A16
A
A15
A14
A14
A15
A55
A41
A41
6 A35
A41
A36
A30
A41
A55
A41
A40
A44
A37
E-2
E-3
A37
E-1
A39
E-4
A39
A41
A41
A41
A41
A40
E-4
A
A39
A39
A41
OPP
HAND
A43
A44
A41
A41
A16
B
A16
B
A55
A55
A55
A36
A41
A41
1 OPP
HAND
A44
A55
A44
A43
A41
B
C
D
E
6 1 2 3 4 5 4.4
A
B
C
D
E
08’ 8’ 16’
SCALE: 1/8" = 1’-0"
SCALE: 1/8" = 1’-0"
FLOOR PLAN
8’-11 1/4"
10’-6 3/8" 1/4"6’-0 22’-3"
1’-6 7/8"
6’-0" 6’-0" 6’-0"
26’-3" 9’-3" 38’-2"
145’-2"
12’-0" 9"
12’-0"
3’-41/2"
1’-0"
2"
1’-0" TYP
30’-7 1/4"
9’-6"5’-95/8"
4’-5 5/8"
24’-9 3/8"
11’-3" 9’-7 3/8"5’-3 5/8" 11’-4"
11 3/8"
2’-0"
TYP
3’-0" TYP
6’-5 3/4"
1’-7 1/8"
FEC
D R
D R
1’
1’-
"E J
D R
E J
1’-10 3/4"
12" DIA CONC
COL (TYP)
6’-10"
17’-0"
3’-0" CENTER
OF TOWER
23’-2"
FD
2’-3 7/8" 2’-3 7/8"
FS
FS
3’-4"
FS
3’-7"
1’-10" 1’-10"
MB MBEQ EQ
DR OPNG
4’-3"
3’-4 1/2"
31’-9 1/4"
16’-5 3/8"
OPP
HAND
D
RDR
D R3’-6" 15’-7 3/8"
30’-5"
2’-3 7/8"
15’-0 5/8"1’-10 3/4"
T
Y P
N E
L
T Y
T
E N
D
OPP
HAND
2’-11 3/4"
26’-3"
12’-0" 3’-0" 6’-0"
3’-0" 3’-0"
3’-0" 6’-0"
6’-0" 8’-8"
3’-4 1/2"
STAINED CONC
FLATWORK
(TYP)
29’-5 1/4"
3’-4"
13’-7 3/8"
13’-9" 8’-7 5/8" 15’-1 3/4" 2’-8"
2’-7 1/8"
3’-11 3/8"
8’-5 1/8"
3’-6 5/8"
4’-10 1/2"
11 3/8"
1’-5 3/8"10’-3 5/8" 6’-57/8"
8’-4 3/4"
T Y
P
TYP
FEC
FD
FS
WH 1
1’-4 1/2"
6’-10 3/8"
9’-7 7/8"
FS
10"
TYP
SIM
8’ -8 3/8"
8’ -0 3/8"
26’-3"
5’-9"
3’-7"6’-0"
8’-5 7/8"
30’-2 1/2"
1’-0"
TYP
17’-2 3/4"
12’-3 5/8"
12’-3 1/2"
1’-6 1/4"
5’-4 1/4"
T
Y P
T
Y P
CONC COL
T
Y P
STAINED CONC
FLATWORK
(TYP)
12" DIA CONC
COL (TYP)
REF DETAIL
PANEL
TYP AT
END PNL
139 138
145146
111108
AL COL (TYP)
3’-7"6’-0" TYP
Q010
5’-0 5/8"
5’-1 1/4"
6’-6 1/2"
TROPHY CASE
FEC-SEE
FOR CONTINUATION OF WALKWAYS
TO ESU SEE DRAWING LIT-ATCT-A08
6’-4 1/2" 3’-10"6’-4 1/2"
7’-6 1/2"
1.
2.
GENERAL NOTES:ROOM SCHEDULE
NO. NAME
LOBBY
PPS
CORRIDOR
WOMEN’S
MEN’S
JANITOR’S CLOSET
CORRIDOR
LOCKER ROOM
KITCHEN/BREAK ROOM
LINK
CORRIDOR
VESTIBULE
REPAIR ROOM
VESTIBULE
AF TECHNICIANS
MATERIAL STORAGE
PUMP ROOM
TRACON ROOM
VESTIBULE
FILE ROOM
SUPERVISOR’S OFFICE
TELCO ROOM
CORRIDOR
TRAINING
CONFERENCE
AF RECEPTION
AF MGR
CABLE ACCESS ROOM 152
FOR DOORS, WINDOWS AND
PARTITION TYPES REFERENCE
SYMBOLS, AND ADDITIONAL
NOTES, REFERENCE DRAWING
LIT-ATCT-A06.
FOR ABBREVIATIONS.
LIT-ATCT-G03
REFERENCE DRAWING
ADMIN
A.T. RECEPTION
UNASSIGNED
ADMIN
A.T. OFFICE
A.T. MANAGER
A.T. TRAINING
A.T. OFFICE
STORAGE
NATCA
NATCA
A.T. TRAINING
ETG
STARS SECURITY OFFICE
LAN ROOM
P.A.S.S.
CBI
ADMIN
STORAGE
STORAGE
UNASSIGNED
UNASSIGNED
AF OFFICE
BASE
BUILDING
ATCT
ESU
KEY PLAN
NOT TO SCALE
ELECTRONIC EQUIPMENT ROOM
ELECTRICAL/MECHANICAL ROOM
E D
M
IS
S
U E
D
F O
R
AR
GW 07/07/1997
09/06/2011A
01/12/20001
ATCT
FLOOR PLAN
LITTLE ROCK
JOHN K. MARUTJACK ZICKL
REVISED PER SITE SURVEY.
AS BUILT PER CONTRACTOR MARK-UP
L
IT
A T
C T
A .D
G
LIT-ATCT-A05-01
BASE BUILDING
ED
SUPERVISOR OF SECTION, ASW-451
EMH
AR
THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
LITTLE ROCK NATIONAL AIRPORT/ADAMS FIELD
AIRWAY FACILITIES
DIVISION
PROGRAM IMPLEMENTATION ENGINEER
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:3
:0
A
M j o h n p o s t o n
APPROVED
DATE
L
IT
A T
C T
A .D
G
| LIT-ATCT-A05-01-A |
| LIT-ATCT-A09-01 |
| LIT-ATCT-A12-01 |
| LIT-ATCT-E21-01 |
| LIT-ATCT-M02-D |
| LIT-ATCT-M03-01 |
| LIT-ATCT-M04 |
| LIT-ATCT-M04-B |
| LIT-ATCT-M05-D |
| LIT-ATCT-M06 |
| LIT-ATCT-M06-B |
| LIT-ATCT-M07-B |
| LIT-ATCT-M08 |
| LIT-ATCT-M08-B |
| LIT-ATCT-M09 |
| LIT-ATCT-M10 |
| LIT-ATCT-M11 |
| LIT-ATCT-M12-01 |
| LIT-ATCT-M14 |
| LIT-ATCT-M15 |
| LIT-ATCT-M16-B |
| LIT-ATCT-M19 |
| LIT-D-ATCT-M001-BL |
| LIT-D-ATCT-M002-BL |
| LIT-D-ATCT-Q001-BL |
| LIT-D-ATCT-Q011 |
File details come from the government source that posted it. Updated .