16-4- SCOPE OF WORK ROADWAY IMPROVEMENTS.pdf

PDF 19 KB Posted

Attached to
IFB - ROADWAY IMPROVEMENTS - VARIOUS LOCATIONS
Solicitation number
26-286
Issued by
Washington County, Utah

About this file

This Scope of Work document outlines roadway improvement construction requirements for the City of St. George Public Works Department in Utah. The project encompasses two locations: 3430 East from 1800 South to 2000 South, and Ezra Drive (2700 South) from 3330 East to 3430 South. At the first location, the City will reconstruct and widen approximately 1,300 linear feet of existing roadway to enhance traffic operations, drainage, and safety through rotomilling of existing pavement and construction of a new widened roadway section including curb, gutter, sidewalk, asphalt trail, and drainage upgrades. At the second location, approximately 500 linear feet of Ezra Drive will be widened with pavement section, curb and gutter, and base construction to complete the right-of-way width. All work must comply with St. George City Standards and Specifications for Construction and the contract documents, with measurement and payment conducted according to the bid schedule.

The City of St. George is soliciting construction bids through an Invitation for Bid process and requires all bids to be accompanied by a bid bond in the amount of 5% of the total bid value, issued by a surety company licensed in Utah on a bond form acceptable to the City. One hundred percent payment and performance bonds will be required upon contract award. The City reserves the right to reject any or all proposals or waive any formality or technicality in the interest of the municipality. No specific response date, award date, or contract term is identified in the provided documentation.

View the file

Other files

File Type Posted
15-5- MEASURE PAYMENT ROADWAY IMPROVEMENTS.pdf PDF
13-sample - CERTIFICATE OF INSURANCE.pdf PDF
14-sample - CONSTRUCTION AGREEMENT.pdf PDF
17-6- ROADWAY IMPROVEMENTS VARIOUS LOCATIONS - 5.29.26.pdf PDF
7-NOTICE OF AWARD.docx DOCX document
6-CONDITIONAL WAIVER RELEASE UPON FINAL PAYMENT.docx DOCX document
8-GENERAL CONDITIONS rev 09.pdf PDF
5-PERFORMANCE BOND.docx DOCX document
12-MAJOR SUBCONTRACTOR LISTING.pdf PDF
1-3- BID BOND.pdf PDF
9-1- INFORMATION FOR BIDDERS.pdf PDF
10-2- BID TERMS.pdf PDF
3-NOTICE TO PROCEED.docx DOCX document
4-PAYMENT BOND.docx DOCX document
2-CONDITIONAL WAIVER RELEASE UPON PROGRESS PAYMENT.docx DOCX document
11-E-Verify Form.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Inquiry # 26-286 Roadway Improvements Various Locations

Owner: City of St George Public Works Department

Locations:

1. 3430 East, from 1800 South to 2000 South

2. Ezra Drive (2700 South), from 3330 East to 3430 South

Date: May 29, 2026

Scope of Project:

Location 1, 3430 East: Reconstruct and widen the existing roadway to improve tra9ic operations, drainage and safety. Work includes rotomilling the existing pavement, construction of new, widened roadway section, including curb, gutter, sidewalk and asphalt trail and drainage upgrades. Project length is approximately

1300 linear feet

Location 2, Ezra Drive: Widen pavement section, construct curb and gutter, and base to complete right of way width. Project length is approximately 500 linear feet.

All work shall be performed in accordance with the St. George City Standards and

Specifications for Construction and the contract documents. All work shall be measured and paid for in accordance with the bid schedule.

File details come from the government source that posted it. Updated .