16-4- SCOPE OF WORK ROADWAY IMPROVEMENTS.pdf
PDF 19 KB Posted
- Attached to
- IFB - ROADWAY IMPROVEMENTS - VARIOUS LOCATIONS
- Solicitation number
- 26-286
- Issued by
- Washington County, Utah
About this file
This Scope of Work document outlines roadway improvement construction requirements for the City of St. George Public Works Department in Utah. The project encompasses two locations: 3430 East from 1800 South to 2000 South, and Ezra Drive (2700 South) from 3330 East to 3430 South. At the first location, the City will reconstruct and widen approximately 1,300 linear feet of existing roadway to enhance traffic operations, drainage, and safety through rotomilling of existing pavement and construction of a new widened roadway section including curb, gutter, sidewalk, asphalt trail, and drainage upgrades. At the second location, approximately 500 linear feet of Ezra Drive will be widened with pavement section, curb and gutter, and base construction to complete the right-of-way width. All work must comply with St. George City Standards and Specifications for Construction and the contract documents, with measurement and payment conducted according to the bid schedule.
The City of St. George is soliciting construction bids through an Invitation for Bid process and requires all bids to be accompanied by a bid bond in the amount of 5% of the total bid value, issued by a surety company licensed in Utah on a bond form acceptable to the City. One hundred percent payment and performance bonds will be required upon contract award. The City reserves the right to reject any or all proposals or waive any formality or technicality in the interest of the municipality. No specific response date, award date, or contract term is identified in the provided documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15-5- MEASURE PAYMENT ROADWAY IMPROVEMENTS.pdf | ||
| 13-sample - CERTIFICATE OF INSURANCE.pdf | ||
| 14-sample - CONSTRUCTION AGREEMENT.pdf | ||
| 17-6- ROADWAY IMPROVEMENTS VARIOUS LOCATIONS - 5.29.26.pdf | ||
| 7-NOTICE OF AWARD.docx | DOCX document | |
| 6-CONDITIONAL WAIVER RELEASE UPON FINAL PAYMENT.docx | DOCX document | |
| 8-GENERAL CONDITIONS rev 09.pdf | ||
| 5-PERFORMANCE BOND.docx | DOCX document | |
| 12-MAJOR SUBCONTRACTOR LISTING.pdf | ||
| 1-3- BID BOND.pdf | ||
| 9-1- INFORMATION FOR BIDDERS.pdf | ||
| 10-2- BID TERMS.pdf | ||
| 3-NOTICE TO PROCEED.docx | DOCX document | |
| 4-PAYMENT BOND.docx | DOCX document | |
| 2-CONDITIONAL WAIVER RELEASE UPON PROGRESS PAYMENT.docx | DOCX document | |
| 11-E-Verify Form.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Inquiry # 26-286 Roadway Improvements Various Locations
Owner: City of St George Public Works Department
Locations:
1. 3430 East, from 1800 South to 2000 South
2. Ezra Drive (2700 South), from 3330 East to 3430 South
Date: May 29, 2026
Scope of Project:
Location 1, 3430 East: Reconstruct and widen the existing roadway to improve tra9ic operations, drainage and safety. Work includes rotomilling the existing pavement, construction of new, widened roadway section, including curb, gutter, sidewalk and asphalt trail and drainage upgrades. Project length is approximately
1300 linear feet
Location 2, Ezra Drive: Widen pavement section, construct curb and gutter, and base to complete right of way width. Project length is approximately 500 linear feet.
All work shall be performed in accordance with the St. George City Standards and
Specifications for Construction and the contract documents. All work shall be measured and paid for in accordance with the bid schedule.
File details come from the government source that posted it. Updated .