10-2- BID TERMS.pdf
PDF 68 KB Posted
- Attached to
- IFB - ROADWAY IMPROVEMENTS - VARIOUS LOCATIONS
- Solicitation number
- 26-286
- Issued by
- Washington County, Utah
About this file
This is a Bid Terms document for the City of St. George, Utah, regarding the Roadway Improvements Various Locations project (Reference No: 26-286). The document outlines the bidding requirements and contractual obligations for construction work on various roadway locations within the city. Bidders must submit proposals in strict accordance with the Contract Documents, Instructions, Drawings, and Specifications, and must certify that their bids have been prepared independently without consultation with competitors. All work is subject to the City's approval, with the City maintaining authority over quality assessment, material suitability, and specification interpretation. The contract requires completion within a specified contract time period, with the City reserving the right to reject any or all proposals or waive any formality or technicality.
Liquidated damages are assessed at $1,000 per calendar day for failure to complete work within the contract time or any City-granted extension. An additional $1,000 per day penalty applies for failure to repair deficiencies within ten days of notification, with these rates being cumulative. Every bid must be accompanied by a bid bond in the amount of five percent of the total bid amount, issued by a surety company licensed in Utah and on a form acceptable to the City. One hundred percent payment and performance bonds are required for project completion. Bidders must familiarize themselves with existing site conditions and are responsible for furnishing all labor, materials, equipment, incidental items, permits, fees, and services necessary to perform the specified work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15-5- MEASURE PAYMENT ROADWAY IMPROVEMENTS.pdf | ||
| 13-sample - CERTIFICATE OF INSURANCE.pdf | ||
| 14-sample - CONSTRUCTION AGREEMENT.pdf | ||
| 17-6- ROADWAY IMPROVEMENTS VARIOUS LOCATIONS - 5.29.26.pdf | ||
| 7-NOTICE OF AWARD.docx | DOCX document | |
| 6-CONDITIONAL WAIVER RELEASE UPON FINAL PAYMENT.docx | DOCX document | |
| 8-GENERAL CONDITIONS rev 09.pdf | ||
| 5-PERFORMANCE BOND.docx | DOCX document | |
| 12-MAJOR SUBCONTRACTOR LISTING.pdf | ||
| 1-3- BID BOND.pdf | ||
| 9-1- INFORMATION FOR BIDDERS.pdf | ||
| 3-NOTICE TO PROCEED.docx | DOCX document | |
| 4-PAYMENT BOND.docx | DOCX document | |
| 2-CONDITIONAL WAIVER RELEASE UPON PROGRESS PAYMENT.docx | DOCX document | |
| 11-E-Verify Form.pdf | ||
| 16-4- SCOPE OF WORK ROADWAY IMPROVEMENTS.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TERMS
Project Name: Roadway Improvements Various Locations
Reference No: 26-286
Proposal of (“BIDDER"), organized and existing under the laws of the State of doing business as a corporation, partnership, or an individual (circle applicable status), to the City of St. George ("CITY"). Pursuant to and in compliance with the Public Notice, BIDDER hereby proposes to perform all Work for the above named Project in strict accordance with the Contract Documents, BIDDER'S Instructions, Drawings, Specifications, and other documents related thereto, the undersigned, having familiarized themselves with the existing conditions on the site and the conditions under which the work on the Drawings and in the Specifications is to be done, hereby proposes to furnish all labor, materials, equipment, incidental items, permits, fees, and services to perform all specified work on the above named project.
By submission of this BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies as to his own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.
All Work shall be in strict accordance with the Contract Documents and documents issued thereto and shall be installed at the price/prices set forth in the Contract Documents.
Bidder acknowledges that all Work shall be done subject to CITY’S approval. Decisions and questions as to the quality, suitability, and acceptability of the materials, interpretation of drawings and specifications, and acceptable fulfillment of the Contract by the BIDDER shall be made by CITY.
Of particular importance to be considered in the BID are the following:
CONTRACT TIME AND LIQUIDATED DAMAGES
The WORK is to be performed within the specified CONTRACT TIME. If the CONTRACTOR shall fail to complete the WORK within the CONTRACT TIME, or extension of time granted by the CITY, then the CONTRACTOR will pay the CITY LIQUIDATED DAMAGES assessed at the rates established as follows:
a. $1000.00 (dollars) per day for each calendar day that the CONTRACTOR shall be in default after the CONTRACT TIME.
b. $1000.00 (dollars) per day for failure to make repairs to deficiencies in the work within 10 days of notification to repair.
The rates specified in ‘b.’ above are cumulative and are in addition to LIQUIDATED DAMAGES assessed in association with the overall Contract Time as listed in ‘a.’ above.
Additional information on LIQUIDATED DAMAGES is provided in the GENERAL
CONDITIONS.