15F06721R0000156 SECTION B - SUPPLIES OR SERVICE.pdf

PDF 220 KB Posted

Attached to
Redstone Arsenal Job Order Contract Solicitation Notice
Solicitation number
15F06721R0000156
Issued by

About this file

This document outlines the requirements for a Job Order Contract solicitation notice. The Federal Bureau of Investigation is seeking continued Job Order Contract services to support construction, alteration, and repair projects at various FBI facilities located on Redstone Arsenal in Alabama. Services will include project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design, and other associated construction tasks. The contract will have a one year base period and up to four option periods for a total period of up to sixty months. The solicitation will be a Request for Proposal with a 100% small business set-aside. The North American Industry Classification code is 236220. Interested small businesses should contact the point of contact by the specified date to be added to the interested parties list and receive notice when the solicitation is issued. An industry day will be held on specified dates with limited attendance.

View the file

Other files

File Type Posted
15F06721R0000156 P00002 REDSTON ARSENAL JOC.pdf PDF
15F06721R0000156 P00001 REDSTON ARSENAL JOC.pdf PDF
QUESTIONS 15F06721R0000156 Redstone Arsenal JOC (Updated 19 Aug 21).pdf PDF
Attachment P - DAVIS BACON WAGE DETERMINATION (MADISON COUNTY AL).pdf PDF
15F06721R0000156 SECTION L Instructions Conditions and Notices to Offerors.pdf PDF
15F06721R0000156_REDSTONE ARSENAL JOC.pdf PDF
15F06721R0000156 - SECTION C - STATEMENT OF WORK.pd.pdf PDF
QUESTIONS 15F06721R0000156 Redstone Arsenal JOC.pdf PDF
Attachment H - Questions Template.xlsx XLSX spreadsheet
Attachment I Ethics Fact Sheet.pdf PDF
Attachment N FD-816 Access of Non-FBI Personnel to FBI Facilities Background Data Information Form.pdf PDF
SECTION E - INSPECTION AND ACCEPTANCE 15F06721R0000156.pdf PDF
SECTION F - DELIVERIES OR PERFORMANCE 15F06721R0000156.pdf PDF
Attachment D - Past Performance Information (PPI) Contract Reference Sheet.pdf PDF
Attachment G - Financial Questionnaire.pdf PDF
15F06721R0000156_REDSTONE ARSENAL JOC.pdf PDF
Attachment E - Acquisition Risk Questions.pdf PDF
Attachment K - LAR_SF_85_Completion_Guide.pdf PDF
Attachment Q Non_Pre-Priced_Item_Bid_Sheet.pdf PDF
SECTION H - SPECIAL CONTRACT REQUIREMENTS 15F06721R0000156.pdf PDF
SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS 15F06721R0000156.pdf PDF
Attachment M - SF-85 FBI LAR Form.pdf PDF
Attachment O Joint Venture Partner Form.pdf PDF
SECTION B - SUPPLIES OR SERVICE 15F06721R0000156.pdf PDF
SECTION M - EVALUATION CRITERIA 15F06721R0000156.pdf PDF
Attachment A Construction Task Catalog - FBI Redstone.pdf PDF
Attachment L - RSA Badge Request Form.pdf PDF
Attachment F - Surety Form.pdf PDF
Attachment J - FD-857a NDA.pdf PDF
Attachment C-Past Performance Questionaire.pdf PDF
SECTION C - STATEMENT OF WORK 15F06721R0000156.pd.pdf PDF
Attachment P Key Management Personnel Listing.pdf PDF
SECTION G - CONTRACT ADMINISTRATION DATA 15F06721R0000156.pdf PDF
Attachment B Job Order Contract Specifications - FBI Redstone.pdf PDF
Seed Project Photo (Counter).jpg JPG image
Seed Project Photo (Replacement Sink) (2).jpg JPG image
Seed_Project_Site_Visit_sign_in_roster.pdf PDF
Seed Project Photo (Back Wall).jpg JPG image
Seed Project Photo (Plumbing).jpg JPG image
Seed Project Photo (Replacement Sink).jpg JPG image
Seed Project Photo.jpg JPG image
SECTION F - DELIVERIES OR PERFORMANCE 15F06721R0000156.pdf PDF
SECTION M - EVALUATION CRITERIA 15F06721R0000156.pdf PDF
Attachment B Job Order Contract Specifications - FBI Redstone.pdf PDF
Attachment K - LAR_SF_85_Completion_Guide.pdf PDF
Attachment G - Financial Questionnaire.pdf PDF
Attachment F - Surety Form.pdf PDF
SECTION H - SPECIAL CONTRACT REQUIREMENTS 15F06721R0000156.pdf PDF
Attachment H - Questions Template.xlsx XLSX spreadsheet
Attachment E - Acquisition Risk Questions.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B – SUPPLIES OR SERVICE AND PRICE/COST

B.1 ITEM/DESCRIPTION

The purpose of this Job Order Contract (JOC) solicitation is to obtain construction, alteration or repair of buildings, structures, or other real property at various FBI facilities on Red Stone

Arsenal, AL. Types of facilities include, but are not limited to, administrative, industrial, maintenance, warehouses, hangars, communications, personnel support, recreation, lodging, dormitory, training, ranges, and roads. Projects may include, but are not limited to new work, additions, alterations, maintenance, and repairs of real property and will be accomplished by awarding an Indefinite Delivery/Indefinite Quantity (IDIQ) contract at pre-determined unit prices and bid price coefficients, for a base period of one (1) year with four (4) one-year options, contingent upon the availability of funding.

The Government will issue one (1) individual IDIQ contract award. Jobs ordered under this award will be awarded as Task Order(s) (TO). Each TO Request for Proposal shall include appropriate attachments such as, but not limited to, Statement of Need (SON), Statement of

Work (SOW), drawing(s) for the Contractor to develop their proposal(s).

B.2 SERVICES AND PRICES

The Contractor shall perform any and/or all functions specified in this contract in accordance with the scope of work provided within individual task orders issued. Pricing for this contract is based on the eGordian Construction Task Catalog© (“Unit Price Book” or “UPB”) which is accessed through Gordian’s eGordian JOC Management SaaS application system. This UPB shall be the only method used for pre-priced costs.

B.2.1 PRICING

Pricing of each Pre-Priced Item in the Task Order is determined by applying the Construction

Task Catalog (CTC®) unit pricing and the Contractor’s Pre-Priced Item Coefficient factor (and

Multipliers if applicable), along with applying a set coefficient factor rate of 1.95% to support the CTC that the Government has negotiated with eGordian to pay for the services. Non-pre-priced tasks will be negotiated using the method described herein and multiplied by the

Contractor’s Non-Pre-Priced Items Coefficient factor (and Multipliers if applicable). No additional coefficient factor, multiplier, burden or any other factor will be allowed under this contract. Note that any non-pre-priced item, if used more than three (3) times, will become pre-priced. The Contractor and the CO will agree on a price to be used moving forward.

The Economic Price Adjustment will be accomplished through annual updates to the UPB provided by eGordian. All coefficient factor rates will remain the same through the life of the contract. No other economic price adjustments will be granted.

B.2.2 SERVICES AND PRICES TABLES

Offerors shall submit a proposal for the coefficients and multipliers for the base year, four (4) option years, and a six (6) month extension. The coefficients shall be offered as a numeric expression. Do not describe the coefficient as a percentage. Note that a coefficient of 1.000 means no adjustment to the CTC prices; a coefficient of 0.950 means a downward adjustment to

CTC prices; and 1.150 means an upward adjustment to the CTC prices.

Each work item where a unit price can be found in the CTC is referred to as “pre-priced item”.

B.3 OFFERS

B.3.1 Each offeror submitting a proposal must submit two (2) coefficients to include one (1) multiplier to represent the individual Service Area for the Contract Line-Item Number (CLIN) site listed in Attachment B Microsoft Excel Spreadsheet entitled “Pricing Schedule”, one (1) coefficient for standard work, one (1) coefficient for non-standard work. Coefficients are offeror provided numeric factors that adjust unit prices see Section B.3.3 for detailed information.

B.3.1.1 eGordian’s JOC Management SaaS application system is incorporated by reference. The contractor, at no cost to the Government, shall provide the government with access to the eGordian JOC Management SaaS application system. The Contractor is responsible for obtaining access and licenses and responsible for payment to eGordian by applying the pre-negotiated set rate of 1.95% for each Task Order awarded at the CTC negotiated price only within 45 days after issuance of Task Order. The eGordian JOC Management SaaS application system contains CTC pricing information for the description of work to be accomplished and for the unit of measure specified. The CTC is updated annually by eGordian. The contractor, at no cost to the Government, shall update the eGordian Construction Task Catalog® database yearly as soon as the annual update becomes available within the given year. The new pricing will go into effect at the beginning of the exercised option period incorporated into the contract by the modification exercising the Government's right to purchase additional contract periods under the contract. This update shall provide the only annual economic price adjustment under the contract.

B.3.2 Any changes in the applicable prevailing Davis-Bacon minimum hourly rates of wages and fringe benefits during the entire term of the contract including any option years shall not affect the co-efficient to be paid by the Government for work performed under the contract. See

Section J for the Davis-Bacon Wages (www.dol.gov) applicable at the time of the solicitation.

Offerors must maintain conformance with prevailing Davis-Bacon wages for the duration of the contract without notice from the FBI.

B.3.3 COEFFICIENTS

The Contractor’s coefficient is a numerical factor that represents all indirect costs of construction. The CTC shall be used by the Contractor to break down the work into individual work items. Details about the coefficient’s can be found in the FBI JOC CTC, (Attachment A) which is also accessible through the eGordian JOC Management application system.

The coefficient shall be offered as a numeric expression. Do not describe the coefficient as a percentage. Note that a coefficient of 1.000 means no adjustment to the CTC prices; a coefficient of 0.950 means a downward adjustment to the CTC prices; and 1.150 means an upward adjustment to the CTC prices.

Each work item where a unit price can be found in the CTC is referred to as “pre-priced item”.

The Coefficient must include all costs incurred in the performance of work—that cannot be charged to any specific work elements and which are not already included in the unit pricing.

All components of price shall be included in the offeror's coefficient and shall be fully supported as no allowance for omitted cost will be made later. The offeror's coefficients shall be all inclusive to include, but not be limited to, the following costs:

• Home office overhead

• Office space

• Office equipment

• Office and management personnel

• Office supplies

• Employee transportation

• Insurance

• Bonds

• Profit

• Subcontractor's overhead and profit

• Cost of financing the work

• Business risks

• Job order development services (meetings and administrative services required per contract)

• Project trailer

• Project equipment and supplies

• Portable toilets for Contractor's use

• Services required to obtain filings and permits

• Preparation and modification of sketches, drawings, submittals, as-built drawings, and other project records

• Incidental engineering and architectural services

• Gang boxes and storage containers for Contractor's tools, equipment and materials

• Personnel safety equipment

• Basic safety and warning signage, minor barricades, tape, etc.

• Meeting Owner security requirements

• All taxes

• Removing and returning Owner's furniture and furnishings

• Sealing windows, doors, and openings with plastic to contain construction dust and protect existing surfaces

• Working in extreme temperatures (below or above normal) or adverse conditions such as excessive rain, wind, sleet or snow

• Daily clean-up

• Final professional project clean-up

B.3.3.1 Coefficient for Non-Pre-priced Items of Work:

There shall be no Task Order Request for Proposals or award of Task Orders under the JOC

Contract for work which contain only Non-Pre-Priced Items of Work. Non-Pre-Priced Items of work are exceptional and few, not exceeding three items of work in any given Task Order.

B.3.3.2 All work on Non-Priced Tasks shall not proceed without prior written approval of the

Contracting Officer. The Government may require the provision of non-pre-priced item(s) for projected task orders. Non-pre-priced items are defined as construction materials, services, and work not listed by the CTC. The Government will not consider an item as non-pre-priced if the materials or services are listed in the CTC or the non-pre-priced item has been established as a pre-priced item by prior modification. The Contracting Officer’s determination as to whether an item is a pre-priced task or a non-pre-priced item shall be final, binding and conclusive. The cost breakdown proposed shall follow the CTC Model for pre-priced items, as determined by the

Contracting Officer or his/her representative and shall be all inclusive.

For non-pre-priced items, the contractor shall provide verifiable documentation, at a minimum, the following for each component or task required:

• Item Description

• Direct Labor Hours

• Davis-Bacon wage rate for trade performing task

• Hourly fringe benefit rate for trade performing task

• Description of proposed material

• Number of units of material

• Cost per unit of material (direct bare costs only – submit quotation from three (3) suppliers)

• Description of proposed equipment

• Time for which equipment will be required

• Rental rate for equipment (direct/bare costs only)

• Profit and overhead for the installing subcontractor, if applicable

B.3.4. Minimal Design

The government will require a conventional design developed up to 35% stage for renovation and repair projects (project dependent). If the design requires the services of a registered architect or engineer and if the SOW does not specifically require design services, it is outside the parameters of minimum design. The contractor is then responsible for submitting documentation that substantiates the proposed approach.

The Government shall only provide basic concept design, sketches, and/or drawing(s) information for a specific work requirement. The Contractor must demonstrate design capabilities of providing quality, cost effective minimal design for multiple TOs simultaneously, which shall comply with Government requirements and all applicable building codes and governing authorities. The Contractor will be provided with the Government’s initial concept design and SOW for each TO. The Contractor shall then be responsible for further development of the Government’s concept design to a point where the Contractor’s designs/drawings clearly indicate the proposed method of accomplishing the work, as well as the description, size, and location of all proposed elements of the work. The Contractor’s design must fully comply with the Government’s concept design requirements as well as all governing codes and UFGS. The Contractor is expected to use recognized industry standard practice in determining proposed design materials and methods unless the Government specifies otherwise.

B.3.4.1 Minimal Design Ranges/Fees

The minimal design ranges are broken out into the following two (2) categories of magnitude.

The offeror shall provide a FFP design fee amount for each minimum design range category for the base and all option year periods.

Category 1 (Low), minimum design range: $2,000.01 - $50,000.00

Category 2 (Medium), minimum design range: $50,000.01 - $300,000.00

B.4 Modifications

Modifications to a Task Order shall utilize the coefficients and the eGordian JOC CTC data that the Task Order was issued under. Since the JOC Task Orders are anticipated to be of short duration, once a Task Order is issued there shall be no modifications issued for changes due to a new edition of the CTC becoming effective. No modification work shall proceed without the prior written approval of the Contracting Officer or his/her representative.

B.5 Minimum/Maximum Contract Value

The guaranteed minimum quantity of work which will be $20,000.00. The anticipated aggregate capacity for each year of this contract is 7M. The government does not guarantee that it will place any orders under each contract in excess of the guaranteed minimum award amount.

B.6 Minimum/Maximum Task Order Value

The minimum order value for each Task Order issued shall not be less than the minimum order value of $2,000. The estimated maximum order value for each Task Order issued shall not exceed the maximum order value of $750,000.00.

If a potential Task Order is identified that exceeds the maximum order value of $750,000.00, and following the written approval of the Contracting Officer, the Contractor has the right to accept or reject the Task Order. If accepted by the Contractor, the Task Order shall follow all terms and conditions establish in the contract.

Item Supplies/Service Quantity Unit Unit

Price

Amount

0001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to

6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

1 LT

0002 NON-STANDARD working hours.

The coefficient will be multiplied by the total price of labor and material for each project as computed using

Defined as the period outside of

Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

0003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

0004 NON-PRE-PRICED

NON-STANDARD working hours.

The coefficient will be multiplied by the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the

0005 Low Minimal Design Fee, minimum design range: $2,000.01 - $50,000.00

1 LT

0006 Medium Minimal Design Fee, minimum design range: $50,000.01 -

$300,000.00

1001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

1002 NON-STANDARD working hours.

The coefficient will be multiplied by the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, 1003 NON-PRE-PRICED total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

1004 NON-PRE-PRICED

the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, 1005 Low Minimal Design Fee, minimum design range: $2,000.01 - $50,000.00

1 LT

1006 Medium Minimal Design Fee, 2001 STANDARD work hours. The total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

2002 NON-STANDARD working hours.

The coefficient will be multiplied by the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, 2003 NON-PRE-PRICED total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

2004 NON-PRE-PRICED

the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, 2005 Low Minimal Design Fee, minimum design range: $2,000.01 - $50,000.00

1 LT

2006 Medium Minimal Design Fee, 3001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

3002 NON-STANDARD working hours.

the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, 3003 NON-PRE-PRICED total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

3004 NON-PRE-PRICED

the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, 3005 Low Minimal Design Fee, minimum design range: $2,000.01 - $50,000.00

1 LT

3006 Medium Minimal Design Fee, 4001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

4002 NON-STANDARD working hours.

the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, 4003 NON-PRE-PRICED total price of labor and material for excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the

CO (access to work sites may be restricted to this period due to mission requirements) and approved

4004 NON-PRE-PRICED 1 LT

the total price of labor and material coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours

AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, 4005 Low Minimal Design Fee, minimum design range: $2,000.01 - $50,000.00

1 LT

4006 Medium Minimal Design Fee,