This is a memorandum from the U.S. Department of Justice, Federal Bureau of Prisons, Facilities Management division, regarding the period of performance for a contract project at FCI Elkton.

The memorandum, dated April 14, 2026, is addressed to Zachary Bowers, Contract Specialist at FCI Elkton, from George Holisky, Facility Manager. The subject is B&F Project 26Z2BC3 for the replacement of rooftop HVAC units. The contract is structured as a single obligation contract with a total performance period of 90 calendar days from the issuance of the notice to proceed. The anticipated timeline breaks down as follows: Unit and Material Procurement (30 calendar days), Mobilization (30 calendar days), and Replacement of Existing Equipment if required (30 calendar days). Questions or requests for additional information should be directed to George Holisky at (330) 420-6426.

View the file

Other files

File Type Posted
26Z2BC3_SOW UPDATE.pdf PDF
Liquidated Damages.pdf PDF
Evaluation Factors.pdf PDF
SOW.pdf PDF
BRQ FY26 BF Project 26Z2BC3 HVAC Units 15B21626Q00000012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .