This is Addendum #4 from the Virginia Department of Transportation (VDOT) for IFB #159297 regarding the Stanardsville Area Headquarters Combo Building project (Project Code: 501-18130-047). The addendum changes the bid submission deadline to 1:30 PM EST on January 3, 2025, with a public bid opening scheduled for 1:30 PM EST on January 6, 2025. The project is located in Ruckersville, Virginia and includes construction of a headquarters facility. A prebid conference was held on December 9, 2024.

Addendum #3, which is also included, provides technical clarifications regarding helical piles (70-Kip exterior and 20-Kip interior load capacities), confirms epoxy coated rebar requirements for the Chemical Storage Building, addresses storm sewer and waterline specifications, and clarifies that the WQU and UST shown on prototype drawings are not applicable to this project. The addendum also confirms that no fire-rated walls are required for the Prototype Combination Office and Maintenance Building and rejects the Hormann Steel Ranger 9500 LS overhead door as an approved equal.

View the file

Other files

File Type Posted
159297 Addendum Stanardsville AHQ Addendum 1 12.11 V2.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION Drawings 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume I 2024-11-01 11.26 JS.pdf PDF
159297_Addendum_Stanardsville_AHQ_Addendum_4_12.23.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume I 2024-11-01 11.26 JS.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION Drawings 2024-11-01.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 2.pdf PDF
Notice of intent to Award —
159297 Addendum Stanardsville AHQ Addendum 2.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 3 12.20.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION Drawings 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume II 2024-11-01.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 2.pdf PDF
159297_Addendum_Stanardsville_AHQ_Addendum_4_12.23.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume I 2024-11-01 11.26 JS.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 3 12.20.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume II 2024-11-01.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 1 12.11 V2.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 3 12.20.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume II 2024-11-01.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 1 12.11 V2.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 3 12.20.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume II 2024-11-01.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 1 12.11 V2.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 2.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION Drawings 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume I 2024-11-01 11.26 JS.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume I 2024-11-01 11.26 JS.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION Drawings 2024-11-01.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 1 12.11 V2.pdf PDF
159297 Addendum Stanardsville AHQ Addendum 2.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume II 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume II 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION Drawings 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume I 2024-11-01 11.26 JS.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION Drawings 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume I 2024-11-01 11.26 JS.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume II 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION Drawings 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume II 2024-11-01.pdf PDF
PC 501-18130-047 FOR CONSTRUCTION PROJECT MANUAL Volume I 2024-11-01 JS.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF TRANSPORTATION

Stephen C. Brich, P.E. (804) 786-2701 Commissioner Fax: (804) 786-2940

1401 East Broad Street Richmond, Virginia

23219 December 23, 2024

ADDENDUM No. 4 TO ALL BIDDERS:

Reference-IFB: 159297 Commodity Stanardsville Area Headquarters Combo Building

Project Code: 501-18130-047 Dated: November 26, 2024

For Delivery To: Virginia Department of Transportation (VDOT) Attention: Joshua Saunders

Bids Due: December 26, 2024 Prebid Conference December 9, 2024

The above is hereby changed to read:

Note:

Acknowledgement of this addendum or any subsequent addenda must be prior to the bid due date and time or signed and uploaded as an attachment with the electronic bid submission. Failure to acknowledge or submit the addendum may be grounds for declaring the bid non-responsive.

Sincerely, Joshua Saunders Joshua Saunders, VCCO, VCO, Senior Procurement Officer

Name of Firm

Signature Title Date

1. Reference Bid Due Date: Change to read “The deadline for submitting bids is 1:30 PM EST, as determined by the bid officer, on January 3, 2025.

2. Reference Bid Opening Date: Changed to read “The bids will be opened publicly and read aloud beginning at 1:30 PM EST on January 6, 2025.

Addendum No. 3 VDOT Stanardsville Area Headquarters IFB No. 159297 Project Code No. 501-18130-047 VAE Project No. 23021

5. Question: Helical piles: Will a load test be required? On the Bid form it says 70 KIPS but, it reads Ninety

KIPS.

Response: No load test is required. Exterior helical piles are 70-Kip ultimate load capacity, minimum.

Interior helical piles are 20-Kip ultimate load capacity, minimum. Change “ninety” to “seventy” under Bid Form, Part F.

6. Question: Specifications Section number 316613, page 1.7B: It says no square bar shall be used. Does this include the lead Section? Most all leads are square shaft and then transition to the round shaft. The theory is that the square shaft is in laterally supported soil. This one is important because round shaft leads are specially made. Cost are expensive.

Response: Square helical pile lead anchors are permitted. All pile extensions above the lead anchor shall be round shaft.

7. Question: Does Chemical Storage Building require epoxy coated rebar?

Response: Yes, refer to Concrete Note 5 on Drawing 4S3.

8. Question: Storm Sewer Details on Drawing C10: SWM-DR detail shows Concrete Cradle schedule. Is encasement required as pipe is existing?

Response: A concrete cradle is not required on the existing pipe.

9. Question: OFF-SITE WATERLINE PLAN Drawing C9: Casing indicated of 45 LF 4inch DR-11 pipe. 4 inch DR-11 comes in 40 ft sticks. Would reducing the casing to 40 ft be allowed?

Response: A minimum of 45 feet must be provided to allow for sufficient offset from the edge of pavement.

10. Question: Chemical Storage Building Drawing A4.2: SALT STORAGE TANK schematic for the WQU and UST, indicates an overflow line, which presumably goes to Str 26. Does this overflow line replace the run shown between Str 27 and Str 26? Implying Str 27 is moved to other side of pad? (to be close to UST) or does 27 - 26 stay as shown, and a 2nd catch basin (+130 LF pipe) be assumed to make the UST system functional?

Response: The WQU and UST shown on Prototype Chemical Storage Building Drawing A4.2 are not located or identified on the Stanardsville AHQ Site Drawings and therefore not applicable to this project, as a new salt pond will control runoff from pads.

11. Question: Chemical Storage Building Drawing A4.2: Please provide sizing on ADS Water Quality Unit.

Civil Set Cover Sheet page G, Note 3. states VDOT will provide and install any calcium chloride or brine pumps and associated power on this project. Please confirm the site contractor will furnish and install 20,000 gallon tank only.

Response: The 20,000 gallon underground storage tank and associated water quality unit shown on Prototype Chemical Storage Building Drawing A4.2 are not located or identified on the Stanardsville AHQ Site Drawings and therefore not applicable to this project.

12. Question: Refer to Office & Maintenance Building Drawing FP1: Please provide wall fire rating types.

Response: None of the walls associated with the Prototype Combination Office and Maintenance Building are required to be fire rated.

13. Question: Refer to Specification Section 033000, page 1, paragraph 1: Concrete specification makes no mention of the requirement for using epoxy coated rebar at all cast-in-place concrete applications. Please confirm epoxy coated rebar is required.

Addendum No. 3 VDOT Stanardsville Area Headquarters IFB No. 159297 Project Code No. 501-18130-047 VAE Project No. 23021

Response: Referenced Specification Section is for Protype Combo Building which does not require epoxy coated rebar. Per Specifications Outline Item 2 on Page 6 of the Project Manual - Volume 1 Table of Contents, the same specification is applicable to the Sitework Equipment Storage Building, and Fuel Station; all of which do not require epoxy coated rebar. Per Concrete Note 5 on Drawing 4S3, epoxy coated rebar is required for the Chemical Storage Building.

14. Question: Refer to Specification Section 083323, page 1, paragraph 1: Specification 083323 lists approved overhead coiling door manufacturers, please advise if Horman Steel Ranger LS door would be considered as an approved equal.

Response: Hormann Steel Ranger 9500 LS overhead door is NOT an approved equal due to available motor voltages/phasing, no indication of compliance with UL 235, no indication of compliance with NFPA 70, slat material thickness, and springless construction.

15. Question: Refer to Prototype Chemical Storage Building Drawing A4.2 - Salt Storage Tank: During the pre-bid it was mentioned that either build the salt pond or salt storage tank. Both are shown on the plans and if it is either/or, please advise which one is preferred.

Response: Refer to Questions 10 and 11 above.

IFB 159297 Addendum No. 3 2024-12-18 (003).pdf