About this file
This addendum from the Virginia Department of Transportation (VDOT) modifies IFB #159297 for the Stanardsville Area Headquarters Combo Building project (Project Code: 501-18130-047). The bid due date has been extended to December 26, 2024 at 2:00 PM, with a public bid opening via teleconference scheduled for December 27, 2024 at 2:00 PM. The addendum includes multiple technical modifications to the project specifications including changes to floor plans, workstation layouts, plumbing fixtures, electrical systems, and building hardware requirements. Key changes include revisions to the prototype combo building drawings for floor plans, reflected ceiling plans, and the addition of access control rough-ins for multiple doors.
The document contains detailed technical specifications including revised sequences of operations for maintenance bay ventilation and vehicle exhaust extraction systems, modifications to electrical panel configurations, and updates to hardware specifications for various doors. Two sketches (SK1 and SK2 dated 2024-12-06) are attached showing partial floor plans with modified workstation layouts and electrical configurations. The addendum requires acknowledgment by bidders prior to the bid due date, with failure to acknowledge potentially resulting in bid rejection.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street (804) 786-2701 Commissioner Richmond, Virginia 23219 Fax: (804) 786-2940 December 11, 2024
ADDENDUM No. 1 TO ALL BIDDERS:
Reference-IFB: 159297 Commodity Stanardsville Area Headquarters Combo Building
Project Code: 501-18130-047 Dated: November 26, 2024
For Delivery To: Virginia Department of Transportation (VDOT) Attention: Joshua Saunders
Bids Due: December 17, 2024 @ 11:30AM Prebid Conference December 9, 2024
The above is hereby changed to read:
1. In Reference to Addendum #1 (one) sealed by Bill Allen of Virginia A&E. (5pages) to include changes to specifications and changes to drawings.
2. In reference to Bid Due Date: Change to read “The deadline for submitting bids is 2:00 P.M. sharp, as determined by the Bid Officer, on December 26, 2024”
3. In reference Page 8, Bid Opening Date: Change to read “A public bid opening via teleconference will be hosted by a VDOT representative. The bids will be opened publicly and read aloud beginning 2:00 PM on December 27, 2024.”
Note:
Acknowledgement of this addendum or any subsequent addenda must be prior to the bid due date and time or signed and uploaded as an attachment with the electronic bid submission. Failure to acknowledge or submit the addendum may be grounds for declaring the bid non-responsive.
Sincerely, Joshua Saunders Joshua Saunders, VCCO, VCO, Senior Procurement Officer
Name of Firm
Signature Title Date
December 6, 2024, Addendum No. 1 VDOT Stanardsville Area Headquarters IFB No. 159297 Project Code No. 501-18130-047 VAE Project No. 23021 below setpoint, the damper shall close which shall disable the fan. Thermostat shall not be tied into the central controller.”
9. Prototype Combo Building Drawing M6, Sequence of Operations for vehicle exhaust extraction system is revised to read as follows: “Vehicle exhaust extraction fan (F-3) shall operate and the maintenance bay intake louver damper (L-4) shall open whenever either of the hose reels is uncoiled. When the damper opens, the damper end switch shall activate the fan. Once the damper closes, the fan will be disabled.
Vehicle exhaust system shall not be tied into the central controller.”
10. Prototype Combo Building Drawing E3, Floor Plan: Refer to attached Sketch SK2 dated 2024-12-06 for additional and/or modified power and data in Open Office 104 and Staff Work Room 107. Provide 3#12 in 3/4" conduit for circuit LVB-26.
11. Prototype Chemical Storage Building Drawing A2, Elevation A: Remove fabric and associated support framing along the front of the building. Fabric shall terminate along the bottom of the steel truss spanning across the building front.
12. Project Manual Appendix A - Prototype Combo Building Specification Section 087100 Parts 3.8.B:
Replace Note with the following:
NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit device. Omit weatherstrip, threshold, and sweep from Door 104A.
13. Project Manual Appendix A - Prototype Combo Building Specification Section 087100 Parts 3.8.C:
Replace Note with the following:
NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit device.
14. Project Manual Appendix A - Prototype Combo Building Specification Section 087100 Part 3.8.F Hardware Set F: Add the following
Note: For Door 112B, see electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit device.
15. Project Manual Appendix A - Prototype Combo Building Specification Section 087100 Parts 3.8.G:
Replace with the following:
G. Hardware Set G – Doors 103, 104B, and 106 (Door 113 if Option 1 is selected) Hardware Qty BHMA Finish Code Hinges 3 652 Passage Latch (F75) 1 626 Closer with Stop 1 689 Kick Plate 1 630
NOTE: Provide two (2) kick plates on Doors 104B and 106. Provide 180-degree hinges, 180-degree closer without a stop, and a wall stop on Door 106.
16. Project Manual Appendix A - Prototype Combo Building Specification Section 221319.13: Delete 1.2.A.2 “Heavy Duty Floor Drains.”
December 6, 2024, Addendum No. 1 VDOT Stanardsville Area Headquarters IFB No. 159297 Project Code No. 501-18130-047 VAE Project No. 23021
17. Project Manual Appendix A - Prototype Combo Building Specification Section 221513: 2.1.A is revised to read as follows: “Aluminum Pipe: ASTM B241, seamless extruded, 6060 or 6063.”
18. Project Manual Appendix A - Prototype Combo Building Specification Section 221513: Add the following items 1.5: “Special Warranty: compressed air piping system warranty shall be 10 years.”
19. Project Manual Appendix A - Prototype Combo Building Specification Section 231126: Delete 2.1.B.3.e “Tracer wire connection.”
20. Project Manual Appendix A - Prototype Combo Building Specification Section 262726 Part 2.2.C: Add the following:
2. WR Marking: All receptacles that have a weather-resistant or weatherproof-while-in-use cover shall have a “WR” or “weather-resistant” marking that remains visible when the receptacle is installed.
21. Project Manual Appendix A - Prototype Combo Building Specification Section 262726 Part 2.2.D: Add the following:
2. WR Marking: All GFCI receptacles that have a weather-resistant or weatherproof-while-in-use cover shall have a “WR” or “weather-resistant” marking that remains visible when the receptacle is installed.
Attachments: Sketch SK1 dated 2024-12-06 Sketch SK2 dated 2024-12-06
SCALE:
0 1' 5' 10'
1/4"=1'-0"
PARTIAL FLOOR PLAN
OR
'-1
3/
8"
7'-0"
J
A1
A
A
ELEC
PANEL
1' -2
/4
BUILT-IN WORK
STATIONS,
SEE 2/A10
A2 A10
FI
EL
D V
ER
IF
Y
EQ
EQ
EQ
EQ
23021
Drawing No.:
VIRGINIA A&E, PLLC
1115 VISTA PARK DRIVE
FOREST, VA 24551
PHONE: (434) 316-6001 1"
Full Scale Verification
0"
DATE:
PROJECT NO:
REV:
DRAWING REFERENCE:
VIRGINIA DEPARTMENT OF TRANSPORTATION
STANARDSVILLE AREA HEADQUARTERS
COMBO BUILDING
PROJECT CODE: 501-18130-047
GREENE COUNTY, VIRGINIA
PARTIAL FLOOR PLAN
SK11
PC 501-B1501-034 A2
2024-12-06
PANEL "LVA"
A E4 E8
STORAGE
+70"
LVB-13
LVB-25, AC
LVB-25, AC
LVB-20, AC
LVB-18, AC
U
TYP
AC
AC
AC
ACU
LVB-26
AC
AC
SCALE:
0 1' 5' 10'
1/4"=1'-0"
PARTIAL FLOOR PLAN
PARTIAL FLOOR PLAN
SK21
PC 501-B1501-034 E4
23021
Drawing No.:
VIRGINIA A&E, PLLC
1115 VISTA PARK DRIVE
FOREST, VA 24551
PHONE: (434) 316-6001 1"
Full Scale Verification
0"
DATE:
PROJECT NO:
REV:
DRAWING REFERENCE:
VIRGINIA DEPARTMENT OF TRANSPORTATION
STANARDSVILLE AREA HEADQUARTERS
COMBO BUILDING
PROJECT CODE: 501-18130-047
GREENE COUNTY, VIRGINIA
2024-12-06
AutoCAD SHX Text
TV
| IFB 159297 Addendum No. 1 2024-12-06.pdf |
| Signature |
| IFB 159297 Addendum No. 1 2024-12-06 |
| NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exi... |
| NOTES: See electrical for rough-in for future access control. Future access control equipment shall be fail secure and exit devices must continue to operate to release door lock for egress during a power failure. Lever trim with key exterior on exit ... |
| G. Hardware Set G – Doors 103, 104B, and 106 (Door 113 if Option 1 is selected) |
| PC 501-18130-050 CB REVISION SK1 SK2 2024-12-06.pdf |
| Sheets and Views |
| CB 23021SK01-A PORTRAIT |
| CB 23021SK02-A PORTRAIT |
File details come from the government source that posted it. Updated .