BRIDGE INSPECTION REPORT
SQUAW CREEK BRIDGE (CAMPGROUND)
CAMPGROUND ENTRANCE OVER SQUAW CREEK
THEODORE ROOSEVELT NATIONAL PARK
LOOKING SOUTH
STRUCTURE NO. 1540-006P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 8/20/2019
EAST (DOWNSTREAM) SIDE
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 1540-006P
SQUAW CREEK BRIDGE (CAMPGROUND) INSPECTION DATE: 08/20/2019
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: .
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUDNATION(S):
ABUTMENT / PIER MAT'L: ..
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
5 - PRESTRESSED CONCRETE NO. OF MAIN SPANS:
05 - BOX BEAM OR GIRDERS - NO. OF APPR. SPANS:
9 STRUCT. TOTAL LENGTH: . 42.0 FT (12.8 M)
2 - CONCRETE PRECAST PANELS MAX. SPAN LENGTH: ......... 40.7 FT (12.4 M)
6 - BITUMINOUS DECK WIDTH: ..................... 27.0 FT (8.2 M)
4 - PILE BENT CURB TO CURB WIDTH: .... 26.5 FT (8.1 M)
6 - N/A YEAR BUILT:
1 - CONCRETE YEAR RECONSTRUCTED: .
UNKNOWN SKEW ANGLE: .................... 0 °
3- SPECIAL PURPOSE FRACTURE CRITICAL: ....... N
2001 - GABION BASKETS INSTALLED IN FRONT OF ABUTMENTS. 2010 - REPAIRS TO
GABIONS.
LOCATION
THEODORE ROOSEVELT NATIONAL PARK MILE POINT: .. .07 (KM PT 0.02)
STATE: .............................. 388 - NORTH DAKOTA LOCATION: .... JUNIPER CAMPGROUND ENTRANCE
ROADFACILITY CARRIED: ......... CAMPGROUND ENTRANCE
FEATURE INTERSECTED: SQUAW CREEK
INSPECTION TEAM: Z. Bailey, M. Miller
CONDITION ASSESSMENT:
Marcus Miller
REPORT REVIEW:
Marcus Miller
REPORT APPROVAL: Date: 02/27/2020
Jorgomai Ceesay
STRUCTURE EVALUATION SUMMARY
This prestressed concrete box beam bridge is in good structural condition, and has only minor problems at this time. There are areas of paint failure with minor rusting on the bridge railing, mainly at the post-to-rail welds and the bottom of the posts. In addition, the double yellow centerline striping over the bridge and approaches has faded. Corrective action should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
Other issues include evidence of water leakage between Beams"A" and "B" and between Beams "H" and "I". Water leakage is also present at the bearing area on the east side of the south abutment. The gabion baskets in front of both abutments have settled, but appear to be functioning as designed. These conditions will continue to be monitored during future inspection cycles.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 1540-006P
SQUAW CREEK BRIDGE (CAMPGROUND) INSPECTION DATE : 08/20/2019
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazzard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D
Item No.
Maintenance Recomendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.6
CLEAN AND SPOT PAINT RAILING AS NECESSARY.
1 LS 5000 5000
58.3,222.
RESTRIPE CENTERLINE OVER BRIDGE AND
APPROACHES. 1 LS 2000 2000
PRELIM. MAINTENANCE TOTAL : 7000
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : .. 0
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 1540-006P
ITEM REFERENCE AND REMARKS
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
58.1
58.3
59.2
PRECAST CONCRETE BOX BEAM SUPERSTRUCTURE. TOP SURFACE OF BOX BEAMS FUNCTION AS DECK, WITH ASPHALT
WEARING SURFACE PRESENT.
MINOR HONEYCOMBING ON BOTTOM OF BEAMS "C" AND "D" NEAR NORTH ABUTMENT, AND ON FACE OF BEAM "I".
MINOR SPALL (10" LONG X 6" WIDE X 1/4" DEEP) ON EXTERIOR FACE OF BEAM "A". MINOR POPOUTS ON EXTERIOR FACES OF
BEAMS "A" AND "I".
MODERATE LEAKAGE AND EFFLORESCENCE FROM JOINTS BETWEEN BEAMS "A" AND "B" AND BETWEEN BEAMS "H" AND "I".
MINOR MAP CRACKING WITH EFFLORESCENCE ON BEAM "I" AT SOUTH ABUTMENT.
METAL DRAIN FOR BEAM "H" AT MIDSPAN EXHIBITS CORROSION.
58.2 EXPANSION JOINTS HAVE BEEN PAVED OVER. CRACKS OVER JOINTS HAVE BEEN SEALED, BUT ARE NOW PROPAGATING
THROUGH SEALANT.
58.3
222.4
ROUGH FINISH ON ASPHALT PAVEMENT AT APPROACHES AND ON DECK. PAVEMENT DOES NOT EXTEND TO DECK EDGES (2" GAP). 2" DROP OFFS BETWEEN WEARING SURFACE AND ADJACENT BARE DECK ON BOTH SIDES OF BRIDGE.
MINOR TRANSVERSE/DIAGONAL CRACKS IN WEARING SURFACE AND APPROACH PAVEMENT; CRACKS REOPENING THROUGH
SEALANT IN SEVERAL LOCATIONS. MINOR RUTTING OF WEARING SURFACE.
DOUBLE YELLOW CENTERLINE OVER BRIDGE AND APPROACHES NEARLY FADED AWAY.
58.6 MINOR PAINT FAILURE WITH RUST STAINING ON BOTH RAILS, MAINLY AT RAIL-TO-POST WELDS AND LOWER PORTIONS OF
POSTS. MINOR COLLISION SCRAPES WITH RUST ON WEST RAILING. SEE ALSO 222.9.
58.8 UTILITY LINE ATTACHED TO BEAM "A".
58.10 TREES GROWING AT BOTH SOUTH CORNERS OF BRIDGE.
59.9 SLIGHT CAMBER DIFFERENCE IN BEAM "A" AND BEAM "B".
60.1 1' X 1' CONCRETE PATCH AT WEST SIDE OF SOUTH ABUTMENT
60.3 MINOR DEBRIS AND VEGETATION GROWTH AT ENDS OF ABUTMENTS. LEAKAGE ON BOTH CAPS BENEATH JOINTS OF BEAMS "A"
AND "B" AND BEAMS "H" AND "I".
60.9
60.11
ABUTMENT CAPS WERE NOTED AS BEING UNDERMINED WITH EXPOSED STEEL IN PAST REPORTS. HOWEVER, GABION BASKETS
CONSTRUCTED IN 2001 APPEAR TO HAVE STABILIZED THIS CONDITION.
PILES ARE NO LONGER VISIBLE DUE TO ADDITION OF CONCRETE TOPPING ON GABIONS; TOPPING EXTENDS FULL WIDTH OF ABUTMENT. MINOR SETTLEMENT OF GABIONS AT BOTH ABUTMENTS; SOUTH GABIONS APPEAR TO HAVE COLLAPSED AND/OR
SHIFTED. MODERATE TO HEAVY MUD BUILDUP ON TOP AND ALONG TOE OF GABIONS.
60.10 SOUTH ABUTMENT PILE CAP APPEARS TO HAVE ROTATED SLIGHTLY (APPROXIMATELY 1/8") TOWARD NORTH
61.2
61.4
MINOR SLOUGHING OF UPSTREAM CHANNEL BANKS. SEVERAL SMALL, DEAD TREES ON UPSTREAM CHANNEL BANKS.
61.6 PARK SERVICE HAS INDICATED THAT BRIDGE OVERTOPPED DURING FLOOD/ICE JAM OF MARCH 1997.
222.4
222.6
BITUMINOUS OVERLAY ON APPROACHES AND BRIDGE. OVERLAY FINISH IS ROUGH. APPROACH PAVEMENT HAS SETTLED APPROXIMATELY 1" AT ENDS OF BRIDGE. PATCH POTHOLES IN PAVEMENT AT NORTH APPROACH.
222.7 UNDERSIZED AND DETERIORATED REFLECTORS AT RAILING ENDS. TYPE 3 OBJECT MARKER PANELS IN PLACE AT BRIDGE
CORNERS
222.9 EMBANKMENT BEARS AGAINST RAILING END POSTS AT ALL FOUR CORNERS OF BRIDGE
STRUCTURE LOAD RATING STRUCTURE NO. 1540-006P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 38 34 64 58
HS 54 49 90 82
TYPE 3 48 44 80 73
TYPE 3S2 74 67 123 112
TYPE 3-3 93 84 156 142
DESIGN LOADING: 2 - H 15
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
X ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 07/01/2016
LOAD RATING CONTROLLED BY: MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-006P
STRUCTURE IDENTIFICATION
(201) PARK: THEODORE ROOSEVELT NATIONAL PARK
(202) STRUCTURE NAME:..............SQUAW CREEK BRIDGE
(CAMPGROUND)
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........1540-006 P
5 - MIDWEST(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:
(208) NPS ROAD CLASS:............... 3- SPECIAL PURPOSE
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................NORTH
(211) PROJECT NO(S):................... UNKNOWN
(212) DRAWING NUMBERS:
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:............................................ 388 - NORTH DAKOTA
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
38053
00000
1 6 8 00000 0
SQUAW CREEK
CAMPGROUND ENTRANCE
1540006P0000000
JUNIPER CAMPGROUND ENTRANCE
ROAD
99.99 FT ( 99.99 M)
.07 (KM PT: 0.02 )
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........5 - PRESTRESSED CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 05 - BOX BEAM OR GIRDERS - MULTI (44B) APPR. STR. TYPE:.................... 00 - OTHER
(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............40.7 FT ( 12.4 M)
(49) STRUCTURE LENGTH:........... 42.0 FT ( 12.8 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 4 - PILE BENT A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS
(216B) ABUTMENT #2 FDN:........... 4 - PILE BENT B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 2 - CONCRETE PRECAST PANELS
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............54 METRIC TONS) (70) BRIDGE POSTING:......................TONS ( 49
(64) OPERATING RATING:..............90 TONS ( 81.6 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 08/09/2017 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 5 - SCOUR INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: 09/01/1998 (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-006P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 47° 35'43.10" (51) CURB TO CURB WIDTH:............ 26.5 FT ( 8.1 M)
(17) LONGITUDE:............................103°19 '59 00" (52) DECK WIDTH:.......................... 27.0 FT ( 8.2 M)
(19) DETOUR LENGTH:.................. 199 MI ( 199 KM) (32) APPR. ROADWAY WIDTH:...... 22.0 FT ( 6.7 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 0 0 FT ( 0 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 0 0 FT ( 0 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............200 (34) SKEW ANGLE:......................... 0 °
(30) YEAR OF ADT:......................... 2007 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................500 (47) TOTAL HORIZ. CLEARANCE:.. 26.5 FT ( 8.1 M)
(115) YEAR OF FUTURE ADT:........2027 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON W RIGHT:.................................. 0 0 FT ( 0 M)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 4 - STEEL
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 3 00 FT ( 0 91 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:
(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:................ N
(61) CHANNEL:................................7 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 6 (113) SCOUR CRITICAL:.................... 7 - COUNTERMEASURES INSTALLED
(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 1 - MAINTENANCE
(36) TRAFFIC SAFETY FEAT: 1 0 0 0 (226) PRIORITY OF IMPROVEMENT: D - MINOR
(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION (227) MAINTENANCE COST:.............$ 7000
(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT (228) REHAB / RECNSTR COST:..... $ 0
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $ 0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2001 - GABION BASKETS INSTALLED IN FRONT OF ABUTMENTS. 2010 - REPAIRS TO GABIONS.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Marcus Miller Structure Number: 1540006P0000000
Inspection Date: 08/20/2019 Facility Carried: CAMPGROUND ENTRA
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING NORTH TOWARD SCENIC DRIVE
PHOTO 4
Description WEST (UPSTREAM) SIDE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOP SIDE VIEW LOOKING NORTH
PHOTO 6
Description GENERAL UNDERSIDE VIEW LOOKING NORTH
Bridge Inspection Report
Pictures
PHOTO 7
Description PREVIOUSLY SEALED CRACKS ON NORTH END OF WEARING SURFACE HAS REOPENED;
NOTE ALSO FADED DOUBLE YELLOW CENTERLINE STRIPING
PHOTO 8
Description TYPICAL REOPENED CRACKS
Bridge Inspection Report
Pictures
PHOTO 9
Description ASPHALT PATCH AT NORTH APPROACH IN SOUTHBOUND LANE; NOTE VEGETATION
GROWTH.
PHOTO 10
Description COLLISION SCRAPES WITH RUSTING ON WEST RAILING NEAR NORTH END
Bridge Inspection Report
Pictures
PHOTO 11
Description CRACKING WITH EFFLORESCENCE AT EXTERIOR BEAM, SOUTHWEST CORNER
PHOTO 12
Description GENERAL VIEW OF NORTH ABUTMENT; NOTE COLLAPSED AND SHIFTED GABION
BASKETS
Bridge Inspection Report
Pictures
PHOTO 13
Description EVIDENCE OF LEAKAGE BETWEEN BEAM "H" AND BEAM "I" NEAR NORTH ABUTMENT
SHOWN
PHOTO 14
Description GRADE DIFFERENTIAL BETWEEN BEAMS "A" AND BEAMS "B" NEAR SOUTH ABUTMENT;
NOTE LEAKAGE FROM BETWEEN BEAMS
Bridge Inspection Report
Pictures
PHOTO 16
Description REPAIRED SCALING ON BEAM "G" NEAR NORTH ABUTMENT
PHOTO 17
Description VIEW FROM BRIDGE LOOKING UPSTREAM
Bridge Inspection Report
Pictures
PHOTO 18
Description VIEW FROM BRIDGE LOOKING DOWNSTREAM