BRIDGE INSPECTION REPORT

PADDOCK CREEK BRIDGE

SCENIC LOOP DRIVE OVER PADDOCK CREEK

THEODORE ROOSEVELT NATIONAL PARK

LOOKING EAST

STRUCTURE NO. 1540-001P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 8/20/2019

NORTH (DOWNSTREAM) SIDE

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 1540-001P

PADDOCK CREEK BRIDGE INSPECTION DATE: 08/20/2019

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ..... 5 - PRESTRESSED CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: .............. 06 - BOX BEAM OR GIRDERS - NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: . 4 STRUCT. TOTAL LENGTH: . 67.0 FT (20.4 M)

DECK TYPE: ........................ 1 - CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: ......... 64 FT (19.5 M)

WEARING SURFACE: ......... 6 - BITUMINOUS DECK WIDTH: ..................... 32.3 FT (9.8 M)

ABUT. FOUNDATIONS: ....... 4 - PILE BENT CURB TO CURB WIDTH: .... 30.0 FT (9.1 M)

PIER FOUDNATION(S): ...... 6 - N/A YEAR BUILT:

ABUTMENT / PIER MAT'L: .. 1 - CONCRETE YEAR RECONSTRUCTED: .

PROJ./PLAN REF. NO: ....... SKEW ANGLE: .................... 0 °

NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ....... N

STRUCTURE HISTORY: ..... 2013-ROADWAY RESURFACED, APPROACH GUARDRAIL ENDS REPLACED.

LOCATION

THEODORE ROOSEVELT NATIONAL PARK

STATE: .............................. 388 - NORTH DAKOTA

FACILITY CARRIED: ......... SCENIC LOOP DRIVE

FEATURE INTERSECTED: PADDOCK CREEK

MILE POINT: .. 28.60 (KM PT 8.72)

LOCATION: .... SCENIC LOOP DRIVE, MILEPOST 28.6

INSPECTION TEAM: Z. Bailey, M. Miller

CONDITION ASSESSMENT:

Marcus Miller

REPORT REVIEW:

Marcus Miller

REPORT APPROVAL: Date: 02/10/2020

Jorgomai Ceesay

STRUCTURE EVALUATION SUMMARY

This prestressed concrete box beam bridge is in good structural condition and has only minor problems at this time. These include cracking and delamination of the abutment backwalls, and hairline cracking on the sides of several box beams. No repairs to the cracks are needed at this time, but these conditions will continue to be monitored during future inspection cycles.

Problems requiring attention include minor to moderate decay of several approach guardrail posts; an accumulation of debris on the bearing seats and along the deck edges; cracking of the asphalt pavement at the west approach; re-opening of the previously sealed pavement crack at the east abutment; and several loose utility line connections.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 1540-001P

PADDOCK CREEK BRIDGE INSPECTION DATE : 08/20/2019

PRIORITY OF IMPROVEMENT226

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazzard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D

Item No.

Maintenance Recomendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.7,60.3

REMOVE GRAVEL FROM DECK EDGES. REMOVE DEBRIS

ACCUMULATION FROM WEST ABUTMENT BEARING SEAT. 1 LS 1000 1000

PRELIM. MAINTENANCE TOTAL : 1000

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

222.3 REPLACE DECAYED POSTS AT SOUTHWEST

GUARDRAIL AS NECESSARY. 1 LS 2000 2000

58.8 RE-ATTACH LOOSE UTILITY CONNECTIONS AS

NECESSARY. 1 LS 1000 1000

58.2,222.

SEAL CRACKS IN ASPHALT AT WEST

APPROACH. RESEAL CRACK IN PAVEMENT

OVER EAST ABUTMENT.

1 LS 1000 1000

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, DESIGN, AND

CONSTRUCTION ENGINEERING.

1 LS 5000 5000

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : 9000

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : .. 0

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 1540-001P

ITEM REFERENCE AND REMARKS

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

58.1

58.7

MINOR TO MODERATE ACCUMULATION OF GRAVEL SURFACING MATERIAL AND ASPHALT TACK COAT ON EDGES OF DECK;

ACCUMULATION IMPEDES DRAINAGE AND MAY RETAIN MOISTURE. WATER STAINS ON SIDES OF DECK.

58.3

222.4

3.5" ASPHALT WEARING SURFACE OVER BRIDGE. DECK JOINTS HAVE BEEN PAVED OVER. PATCH OF BROKEN PAVEMENT ON NORTH SIDE OF BRIDGE NEAR WEST ABUTMENT. DROP OFF ALONG EDGES OF PAVEMENT ON BOTH SIDES OF BRIDGE

MINOR TRANSVERSE CRACKING OF WEST APPROACH PAVEMENT. PREVIOUSLY SEALED CRACK OVER EAST ABUTMENT HAS

REOPENED IN WESTBOUND LANE.

MODERATE DETERIORATION OF CENTERLINE STRIPING, HOWEVER STRIPING REMAINS FUNCTIONAL.

58.6 STEEL BACKED W-BEAM GUARDRAILS. SEVERAL RAIL POST ANCHOR BOLTS NOT FULLY SEATED AND SEVERAL LACK WASHERS.

58.8 ELECTRIC CONDUIT ALONG OUTSIDE OF BEAM "A". SEVERAL ATTACHMENT CONNECTIONS ARE LOOSE. BROKEN CONDUIT

SLEEVE AND CONNECTION NEAR NORTH END OF WEST ABUTMENT.

59.2

59.6

PRESTRESSED CONCRETE SPREAD BOX BEAMS ARE IN GOOD CONDITION. NUMEROUS BIRD NESTS ON SOUTH FACE OF BEAM

"D" AND ON ISOLATED AREAS OF REMAINING BEAMS AND DIAPHRAGMS.

HAIRLINE SHRINKAGE CRACKING OF BOX BEAMS RANDOMLY LOCATED, MAINLY AT TIE ROD HOLES. HAIRLINE HORIZONTAL CRACKING OF GIRDER "D" AT WEST ABUTMENT; CRACKS ARE LIKELY RESULT OF HANDLING DURING CONSTRUCTION.

MINOR HONEYCOMBING PATCHES ALONG BOTTOM CHAMFER IN SOME AREAS. MINOR SPALLING ALONG UPSTREAM EXTERIOR

BEAM CHAMFER; LIKELY DUE TO HANDLING DURING CONSTRUCTION.

60.3 MODERATE SOIL AND DEBRIS ACCUMULATION ON BEARING SEAT ENDS; MINOR ACCUMULATION ON WEST ABUTMENT BEARING

SEAT BETWEEN BEAMS "A" AND "B".

60.4 MINOR DIAGONAL CRACKING OF EAST BACKWALL BETWEEN BEAMS "A" AND "B". MINOR AREA OF CRACKING AND

DELAMINATION ON EAST BACKWALL BETWEEN BEAMS "C" AND "D".

MINOR CRACKING ON WEST BACKWALL BETWEEN BEAMS "A" AND "B" AND BETWEEN "B" AND "C".

MINOR AREA OF CRACKING AND DELAMINATION ON WEST BACKWALL ON BOTH SIDES OF BEAMS "C" AND "D". MINOR SPALL

WITH EXPOSED REBAR ON WEST BACKWALL ON OUTSIDE FACE OF BEAM "D".

61.3 GABION BASKETS IN FRONT OF BOTH ABUTMENTS ARE IN GOOD CONDITION.

222.3 MODERATE DECAY OF RAIL POST AT SOUTHWEST CORNER; MINOR DECAY IN SEVERAL OTHER POSTS. WIDESPREAD

CHECKING OF RAIL POSTS.

NORTHWEST APPROACH GUARDRAIL HAS BEEN BENT NEAR END TO ACCOMMODATE CURVING ALIGNMENT.

ROTATED SPACER BLOCK ON NORTHEAST GUARDRAIL.

222.7 TYPE 3 OBJECT MARKERS PRESENT ON GUARDRAIL ENDS. REFLECTORS AT INTERVALS ALONG GUARDRAILS.

SURVEY MARKER ON TOP OF SOUTHEAST WINGWALL.

EQUESTRIAN TRAIL CROSSING SIGN BY EAST END OF NORTH GUARDRAIL.

STRUCTURE LOAD RATING STRUCTURE NO. 1540-001P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 20 18 44 40

HS 26 24 62 56

TYPE 3 24 22 58 53

TYPE 3S2 33 30 77 70

TYPE 3-3 40 36 83 75

DESIGN LOADING: 5 - HS 20

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

X ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 06/01/2015

LOAD RATING CONTROLLED BY: INTERIOR BOX GIRDER

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-001P

STRUCTURE IDENTIFICATION

(201) PARK: THEODORE ROOSEVELT NATIONAL PARK (1) STATE:............................................ 388 - NORTH DAKOTA

(202) STRUCTURE NAME:..............PADDOCK CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND:............... 1 - BRIDGE (3) COUNTY CODE:....................... 01007 BIBB

(204) STRUCTURE NUMBER:.........1540-001 P (4) CITY / PLACE CODE:

5 - MIDWEST (5) INVENTORY ROUTE:................(205) NPS REGION:........................ 1 6 8 00000 0

(206) ROUTE CODE NUMBER:.......11 (6) FEATURES INTERSECTED:.......... PADDOCK CREEK

(207) ROAD SECTION NO:............. (7) FACILITY CARRIED:...................... SCENIC LOOP DRIVE

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO:.............. 1540001P0000000

(209) WITHIN NPS BNDRY?:.......... Yes (9) LOCATION:..................................... SCENIC LOOP DRIVE, MILEPOST 28.6

(210) OPERATING UNIT:.................SOUTH (10) INV. RTE. - MIN. VERT. CLR:..... 99.99 FT ( 99.99 M)

(211) PROJECT NO(S):................... (11) MILE POINT:................................. 28.60 (KM PT: 8.72 )

(212) DRAWING NUMBERS:...........RG2358 (27) YEAR BUILT:

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE (20) TOLL:............................................ 3 - ON FREE ROAD

(37) HISTORIC DESIGNATION:.......... 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........5 - PRESTRESSED CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 06 - BOX BEAM OR GIRDERS - SINGL (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............1 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............64 FT ( 19.5 M)

(49) STRUCTURE LENGTH:........... 67.0 FT ( 20.4 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 4 - PILE BENT A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 4 - PILE BENT B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................5 - HS 20 (41) LOAD RESTRICTION:.................. A - OPEN

(66) INVENTORY RATING:..............26 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL LOATONS ( 23.6

(64) OPERATING RATING:..............62 TONS ( 56.2 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 08/20/2019 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 5 - SCOUR INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: 09/01/1998 (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-001P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 46° 57'25 06 " (51) CURB TO CURB WIDTH:............ 30.0 FT ( 9.1 M)

(17) LONGITUDE:............................103 30° '03 02 " (52) DECK WIDTH:.......................... 32.3 FT ( 9.8 M)

(19) DETOUR LENGTH:.................. 25 MI ( 40 KM) (32) APPR. ROADWAY WIDTH:...... 26.0 FT ( 7.9 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 2 0 FT ( 0.6 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 2 0 FT ( 0.6 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............200 (34) SKEW ANGLE:......................... 0 °

(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................500 (47) TOTAL HORIZ. CLEARANCE:.. 26 FT ( 7.9 M)

(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON W RIGHT:.................................. 0 0 FT ( 0 M)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)

(111) ABUT OR PIER PROT:...........1 - NAVIGATION PROTECTION NOT REQUIR MATERIAL:........................... 4 - STEEL

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2.42 FT ( 0.74 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................8 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 7 - COUNTERMEASURES INSTALLED

(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 1 1 1 (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION (227) MAINTENANCE COST:.............$ 1000

(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT (228) REHAB / RECNSTR COST:..... $ 9000

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $ 0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2013-ROADWAY RESURFACED, APPROACH GUARDRAIL ENDS REPLACED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Marcus Miller Structure Number: 1540001P0000000

Inspection Date: 08/20/2019 Facility Carried: SCENIC LOOP DRIVE

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING WEST AWAY FROM BEEF CORRAL PULLOUT

PHOTO 4

Description SOUTH (UPSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOP SIDE VIEW LOOKING WEST

PHOTO 6

Description GENERAL UNDERSIDE VIEW LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 7

Description TYPICAL DEBRIS ACCUMULATION ON BRIDGE ENDS, NORTH END SHOWN

PHOTO 8

Description VEGETATION GROWTH ALONG CRACK AT WEST ABUTMENT, SOUTH SIDE SHOULDER

Bridge Inspection Report

Pictures

PHOTO 9

Description SEALANT OVER EAST ABUTMENT

PHOTO 10

Description DETERIORATION OF CENTERLINE STRIPING, LOOKING WEST

Bridge Inspection Report

Pictures

PHOTO 11

Description BROKEN UTILITY CONDUIT AT WEST ABUTMENT, DOWNSTREAM END

PHOTO 12

Description UTILITY BRACKETS MISSING ON DOWNSTREAM SIDE NEAR WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 13

Description UPSTREAM BOX BEAM; NOTE BIRD NESTS

PHOTO 14

Description DOWNSTREAM SIDE OF BEAM "D", NOTE CRACK IDENTIFIED IN 2011 HAS NOT CHANGED

Bridge Inspection Report

Pictures

PHOTO 15

Description DELAMINATION AND SHALLOW SPALLING BETWEEN BEAMS "C" AND "D" AT WEST

ABUTMENT

PHOTO 16

Description SPALL WITH EXPOSED REBAR ON WEST BACKWALL NEAR BEAM "D"

Bridge Inspection Report

Pictures

PHOTO 17

Description HONEYCOMBING ON BEAM "C" NEAR WEST ABUTMENT

PHOTO 18

Description DEBRIS ACCUMULATION ON EAST ABUTMENT BEARING SEAT

Bridge Inspection Report

Pictures

PHOTO 19

Description GENERAL VIEW OF EAST ABUTMENT AND STEPPED GABION BASKETS

PHOTO 20

Description GENERAL VIEW OF WEST ABUTMENT; NOTE STEPPED GABION BASKETS

Bridge Inspection Report

Pictures

PHOTO 21

Description ROTATED SPACER BLOCK ON NORTH GUARDRAIL, EAST END

PHOTO 22

Description DECAYED TIMBER POST AT WEST APPROACH, POST # 2

Bridge Inspection Report

Pictures

PHOTO 23

Description UPSTREAM CHANNEL

PHOTO 24

Description DOWNSTREAM CHANNEL

Bridge Inspection Report

Pictures

PHOTO 25

Description SIGN NEAR EAST END OF NORTH GUARDRAIL

File details come from the government source that posted it. Updated .