BRIDGE INSPECTION REPORT
JULES CREEK BRIDGE
SCENIC LOOP DRIVE OVER JULES CREEK
THEODORE ROOSEVELT NATIONAL PARK
LOOKING SOUTH
STRUCTURE NO. 1540-003P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 8/20/2019
EAST (UPSTREAM) SIDE
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 1540-003P
JULES CREEK BRIDGE INSPECTION DATE: 08/20/2019
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: .
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUDNATION(S):
ABUTMENT / PIER MAT'L: ..
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
2 - CONCRETE CONTINUOUS NO. OF MAIN SPANS:
01 - SLAB NO. OF APPR. SPANS:
1 STRUCT. TOTAL LENGTH: . 22.8 FT (6.9 M)
1 - CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: ......... 10 FT (3 M)
6 - BITUMINOUS DECK WIDTH: ..................... 27.0 FT (8.2 M)
2 - SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: .... 26.0 FT (7.9 M)
2 - SPREAD FTG ON BEARING MAT'L YEAR BUILT:
1 - CONCRETE YEAR RECONSTRUCTED: . 1984
UNKNOWN SKEW ANGLE: .................... 0 °
1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ....... N
2013-ROADWAY RESURFACED, RAIL SYSTEM INSTALLED, DRAINAGE
IMPROVEMENTS, DECK REPAIRS.
LOCATION
THEODORE ROOSEVELT NATIONAL PARK
STATE: .............................. 388 - NORTH DAKOTA
FACILITY CARRIED: ......... SCENIC LOOP DRIVE
FEATURE INTERSECTED: JULES CREEK
MILE POINT: .. 25.40 (KM PT 7.74)
LOCATION: .... SCENIC LOOP DRIVE MILEPOST 25.40
INSPECTION TEAM: Z. Bailey, M. Miller
CONDITION ASSESSMENT:
Marcus Miller
REPORT REVIEW:
Marcus Miller
REPORT APPROVAL: Date: 02/10/2020
Jorgomai Ceesay
STRUCTURE EVALUATION SUMMARY
This concrete slab bridge is in fair condition overall. Moderate scaling with efflorescence is present along both edges of the bridge. There is a full length longitudinal crack in the bottom of the slab at the south span near the center pier. Minor vertical cracks exist in both abutment walls and the pier wall. No repairs to the structural concrete are required at this time, but these conditions will continue to be monitored during future inspection cycles.
It should be noted that there are no posts attaching the railing to the bridge. The end treatments for the railing meets current standards, but the transitions from the approach railing to the bridge railing are not gradually stiffened. Improvements should be made to the railing system as outlined in this report.
Some sloughing of the channel bank is present at the southwest corner of the structure, and debris has accumulated on the pier wall and at the end of the southwest wingwall. Corrective measures should be taken as
STRUCTURE SUMMARY STRUCTURE NO. 1540-003P
outlined in this report.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 1540-003P
JULES CREEK BRIDGE INSPECTION DATE : 08/20/2019
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazzard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C
Item No.
Maintenance Recomendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
PRELIM. MAINTENANCE TOTAL :
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
58.6,36.
A,36.B
INSTALL POSTS AND BLOCKING FOR W-BEAM
RAILING OVER BRIDGE. ADD POSTS AT
TRANSITIONS AS NECESSARY TO GRADUALLY
STIFFEN APPROACH RAILING.
1 LS 20000 20000
61.3 INSTALL ENGINEERED RIPRAP TO PROTECT
SLOUGHING OF CHANNEL BANK AT
SOUTHWEST CORNER OF BRIDGE.
1 LS 15000 15000
61.4 REMOVE DEBRIS FROM PIER WALL AND END
OF SOUTHWEST WINGWALL. 1 LS 2000 2000
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, DESIGN, AND
CONSTRUCTION ENGINEERING.
1 LS 25000 25000
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : 62000
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : .. 0
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates are based on historical data, including costs for similar projects when available.
FIELD INSPECTION REPORT STRUCTURE NO. 1540-003P
ITEM REFERENCE AND REMARKS
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
58.1
59.3
MINOR CRACKING WITH EFFLORESCENCE AND DELAMINATED CONCRETE ON DECK SIDES (BETWEEN REPAIRED AREAS) EXTENDING UP TO 1' INTO DECK UNDERSIDE. MINOR SCALING AND HONEYCOMBING OF DECK UNDERSIDE NEAR OUTSIDE EDGES. MINOR TO MODERATE CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE, ESPECIALLY ON EAST SIDE. MINOR LONGITUDINAL CRACKS ELSEWHERE ON UNDERSIDE ALSO VISIBLE. SMALL HOLE (3" X 4") IN DECK UNDERSIDE IN NORTH SPAN
NEAR EAST SIDE. SEVERAL MINOR POPOUTS ON SLAB UNDERSIDE WITH EXPOSED REBAR.
MINOR EFFLORESCENCE LEACHING FROM ENDS OF CONSTRUCTION JOINTS BETWEEN DECK SLAB AND BREASTWALLS; MINOR CRACKING ALONG JOINTS. MINOR TRANSVERSE CRACKING ON DECK UNDERSIDE AT CHANGE IN SECTION.
58.5
58.7
WIDESPREAD MINOR CRACKING OF CURBS. UP TO 2.5" OF REVEAL ON CURBS.
EVIDENCE OF PONDING ALONG CURBS, MINOR DEBRIS ACCUMULATION.
58.6
222.3
36.A
36.B
W-TYPE GUARDRAIL OVER BRIDGE AND AT APPROACHES. NO POSTS ATTACHING RAILING TO BRIDGE. RAILING TRANSITIONS
FROM APPROACHES TO BRIDGE ARE NOT GRADUALLY STIFFENED.
59.3
60.13
MINOR VERTICAL AND DIAGONAL CRACKING OF PIER WALL. VERTICAL CRACK IN CENTER OF PIER EXTENDS APPROXIMATELY 3'
INTO SLAB.
60.1 MINOR DIAGONAL CRACK IN UPSTREAM END OF SOUTH ABUTMENT BREASTWALL. MINOR HORIZONTAL CRACKS AT BOTH ENDS
OF SOUTH ABUTMENT BREASTWALL; LIGHT EFFLORESCENCE FROM CRACKS.
MINOR VERTICAL/DIAGONAL CRACK WITH EFFLORESCENCE IN NORTH ABUTMENT AT EAST END. MINOR VERTICAL CRACKS IN
NORTH ABUTMENT BREASTWALL.
60.6 DEBRIS CAUGHT ON BRANCHES OVERHANGING SOUTHWEST WINGWALL.
MINOR SPALLS ON TOP OF WINGWALL AT SOUTHEAST CORNER. MINOR SPALL AT END OF SOUTHEAST WINGWALL.
HORIZONTAL/DIAGONAL CRACK IN FACE OF SOUTHEAST WINGWALL.
60.6
60.9
WATER LEVEL GAGE NO LONGER ATTACHED TO SOUTHWEST WINGWALL; ONLY POST REMAINS. SUBSTANTIAL FLOOD DEBRIS
BUILDUP ON POST AND MINOR SCOUR HOLE DOWNSTREAM OF POST ALONG WINGWALL.
TREE GROWTH BEHIND SOUTHWEST WINGWALL.
60.9 PREVIOUSLY NOTED MODERATE EROSION BEHIND SOUTHEAST WINGWALL HAS BEEN REPAIRED WITH RIPRAP, SOME MINOR EROSION REMAINS. DRAINAGE IMPROVEMENTS ALONG EAST SIDE OF SOUTH APPROACH TO HELP DIVERT ROADWAY
DRAINAGE TO CHANNEL.
61.1
61.2
61.4
MODERATE TO MODERATE SLOUGHING OF CHANNEL BANKS BOTH UPSTREAM AND DOWNSTREAM FROM BRIDGE. APPEARS
SEDIMENT FROM BARRELS HAS BEEN USED TO ALIGN CHANNEL.
2' - 3' OF SEDIMENT ACCUMULATION IN NORTH SPAN AND DOWNSTREAM FROM STRUCTURE. NORMAL FLOW IS ENTIRELY
THROUGH SOUTH SPAN.
61.3 DRY STACKED STONE AND CONCRETE BLOCK (CHANNEL PROTECTION) AT SOUTH BANK, EAST SIDE.
MINOR MOVEMENT OF WALL WITH HEAVY VEGETATION GROWTH.
61.4 MODERATE ACCUMULATION OF FLOOD DEBRIS HUNG UP ON UPSTREAM END OF PIER WALL.
222.7 TYPE 3 OBJECT MARKERS ON GUARDRAIL ENDS AND ON RAILING POSTS AT ALL CORNERS OF BRIDGE; MARKERS ON BRIDGE ARE EFFECTIVELY OFFSET SLIGHTLY FROM RAILING. 35 MPH SPEED LIMIT SIGN ON SOUTH SIDE OF STRUCTURE.
STRUCTURE LOAD RATING STRUCTURE NO. 1540-003P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 27 24 45 41
TYPE 3 27 24 46 42
TYPE 3S2 38 34 63 57
TYPE 3-3 53 48 89 81
DESIGN LOADING: 0 - UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: INSUFFICIENT INFORMATION AVAILABLE FOR LOAD RATING CALCULATION. LOAD RATING IS BASED ON ENGINEERING JUDGEMENT, IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE EVALUATION (MBE). SEE BRIDGE FILE FOR MORE INFORMATION.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-003P
JULES CREEK BR DGE INSPECTION DATE: 08/20/2019
STRUCTURE IDENTIFICATION
(201) PARK: THEODORE ROOSEVELT NATIONAL PARK
(202) STRUCTURE NAME:..............JULES CREEK BRIDGE
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........1540-003 P
5 - MIDWEST(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:
(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................SOUTH
(211) PROJECT NO(S):................... UNKNOWN
(212) DRAWING NUMBERS:
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:............................................ 388 - NORTH DAKOTA
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:....................... 01007 BIBB
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:................ 1 6 8 00000 0
(6) FEATURES INTERSECTED:.......... JULES CREEK
(7) FACILITY CARRIED:...................... SCENIC LOOP DRIVE
(8) STATE STRUCTURE NO:.............. 1540003P0000000
(9) LOCATION:..................................... SCENIC LOOP DRIVE MILEPOST
25.40
(10) INV. RTE. - MIN. VERT. CLR:..... 99.99 FT ( 99.99 M)
(11) MILE POINT:................................. 25.40 (KM PT: 7.74 )
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:............................................ 3 - ON FREE ROAD
(37) HISTORIC DESIGNATION:.......... 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 01 - SLAB (44B) APPR. STR. TYPE:.................... 00 - OTHER
(45) NO. OF MAIN SPANS:..............2 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............10 FT ( 3 M)
(49) STRUCTURE LENGTH:........... 22.8 FT ( 6.9 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS
(216B) ABUTMENT #2 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 2 - SPREAD FTG ON BEARING MAT'L C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................0 - UNKNOWN (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............27 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL LOATONS ( 24.5
(64) OPERATING RATING:..............45.1 TONS ( 40.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 08/20/2019 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: Y - 3 - LOAD RATING CALCULATION (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-003P
JULES CREEK BR DGE INSPECTION DATE: 08/20/2019
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 46° 59'32 82" (51) CURB TO CURB WIDTH:............ 26.0 FT ( 7.9 M)
(17) LONGITUDE:............................103°29 '15.40" (52) DECK WIDTH:.......................... 27.0 FT ( 8.2 M)
(19) DETOUR LENGTH:.................. 25 MI ( 40 KM) (32) APPR. ROADWAY WIDTH:...... 25.0 FT ( 7.6 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 25.0 FT ( 7.6 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 0 0 FT ( 0 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 0 0 FT ( 0 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............200 (34) SKEW ANGLE:......................... 0 °
(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................500 (47) TOTAL HORIZ. CLEARANCE:.. 26 FT ( 7.9 M)
(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON W RIGHT:.................................. 0 0 FT ( 0 M)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 4 - STEEL
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 33 FT ( 0.71 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:
(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N
(61) CHANNEL:................................5 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 5 - SCOUR WITHIN LIMITS OF FOOTIN
(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: 0 1 1 1 (226) PRIORITY OF IMPROVEMENT: C - MODERATE
(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION (227) MAINTENANCE COST:.............$ 0
(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT (228) REHAB / RECNSTR COST:..... $ 62000
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $ 0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2013-ROADWAY RESURFACED, RAIL SYSTEM INSTALLED, DRAINAGE MPROVEMENTS, DECK REPAIRS.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Marcus Miller Structure Number: 1540003P0000000
Inspection Date: 08/20/2019 Facility Carried: SCENIC LOOP DRIVE
Bridge Inspection Report
Pictures
PHOTO 1
Description LOOKING SOUTH
PHOTO 4
Description WEST (DOWNSTREAM) SIDE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOP SIDE LOOKING SOUTH; NOTE DEBRIS ACCUMULATION ALONG CURBS
PHOTO 6
Description GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING DOWNSTREAM
Bridge Inspection Report
Pictures
PHOTO 7
Description SOUTH APPROACH PAVEMENT; NOTE CRACKING
PHOTO 8
Description LACK OF POSTS ATTACHING GUARDRAIL TO BRIDGE
Bridge Inspection Report
Pictures
PHOTO 9
Description TERMINAL SECTION FOR NORTHEAST APPROACH GUARDRAIL
PHOTO 10
Description GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING WEST
Bridge Inspection Report
Pictures
PHOTO 11
Description EAST END OF NORTH SPAN WITH HONEYCOMBING AND EFFLORESCENCE
PHOTO 12
Description WEST EDGE OF SOUTH SPAN; NOTE CRACKING, EFFLORESCENCE, AND DELAMINATION
Bridge Inspection Report
Pictures
PHOTO 13
Description EAST UNDERSIDE EDGE OF DECK; NOTE SPALLING, CRACKING, AND EFFLORESENCE
PHOTO 14
Description DOWNSTREAM END OF NORTH ABUTMENT; NOTE NUMEROUS DIAGONAL AND VERTICAL
CRACKS
Bridge Inspection Report
Pictures
PHOTO 15
Description NORTH FACE OF PIER; NOTE VERTICAL CRACK EXTENDS INTO DECK UNDERSIDE
PHOTO 16
Description POPOUTS IN SOUTH SPAN WITH AREAS OF HONEYCOMBING
Bridge Inspection Report
Pictures
PHOTO 17
Description POPOUT WITH EXPOSED REBAR IN NORTH SPAN NEAR DOWNSTREAM EDGE
PHOTO 18
Description PATCH EFFLORESCENCE AND HONEYCOMBING ON UNDERSIDE ON NORTH SPAN
Bridge Inspection Report
Pictures
PHOTO 19
Description STEEL POST AT SOUTHWEST CORNER; NOTE SCOUR ALONG WINGWALL ALSO VISIBLE
PHOTO 20
Description EROSION AND TREE GROWTH AT SOUTHEAST WINGWALL
Bridge Inspection Report
Pictures
PHOTO 21
Description SEDIMENT ACCUMULATION IN NORTH SPAN
PHOTO 22
Description DEBRIS BUILDUP ON UPSTREAM SIDE OF PIER WALL
Bridge Inspection Report
Pictures
PHOTO 23
Description SLOUGHING OF BANK NEXT TO SOUTHWEST WINGWALL
PHOTO 24
Description UPSTREAM CHANNEL
Bridge Inspection Report
Pictures
PHOTO 25
Description DOWNSTREAM CHANNEL
File details come from the government source that posted it. Updated .