BRIDGE INSPECTION REPORT
SQUAW CREEK BRIDGE
SCENIC DRIVE OVER SQUAW CREEK
THEODORE ROOSEVELT NATIONAL PARK
LOOKING EAST
STRUCTURE NO. 1540-005P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 8/20/2019
NORTH (UPSTREAM) SIDE
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 1540-005P
SQUAW CREEK BRIDGE INSPECTION DATE: 08/20/2019
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: .
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUDNATION(S):
ABUTMENT / PIER MAT'L: ..
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
5 - PRESTRESSED CONCRETE NO. OF MAIN SPANS:
05 - BOX BEAM OR GIRDERS - NO. OF APPR. SPANS:
9 STRUCT. TOTAL LENGTH: . 67.0 FT (20.4 M)
2 - CONCRETE PRECAST PANELS MAX. SPAN LENGTH: ......... 62.3 FT (19 M)
6 - BITUMINOUS DECK WIDTH: ..................... 27.0 FT (8.2 M)
4 - PILE BENT CURB TO CURB WIDTH: .... 26.5 FT (8.1 M)
6 - N/A YEAR BUILT:
1 - CONCRETE YEAR RECONSTRUCTED: .
SKEW ANGLE: .................... 45 °
1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ....... N
2009 - WEARING SURFACE REPLACED, NEW GUARDRAIL TERMINAL SECTIONS,
GABION BASKET BANK PROTECTION INSTALLED. 2010 - REPAIRS TO GABIONS
LOCATION
THEODORE ROOSEVELT NATIONAL PARK MILE POINT: .. 4.70 (KM PT 1.43)
STATE: .............................. 388 - NORTH DAKOTA LOCATION: .... SCENIC DRIVE IN NORTH UNIT, JUST
PAST JUNIPER CAMPGROUNDFACILITY CARRIED: ......... SCENIC DRIVE
FEATURE INTERSECTED: SQUAW CREEK
INSPECTION TEAM: Z. Bailey, M. Miller
CONDITION ASSESSMENT:
Marcus Miller
REPORT REVIEW:
Marcus Miller
REPORT APPROVAL: Date: 02/10/2020
Jorgomai Ceesay
STRUCTURE EVALUATION SUMMARY
This prestressed concrete box beam bridge is in fair to good structural condition, but has several issues that require attention. Problems with the box beams include spalling with exposed steel on the underside of Beam "B", and longitudinal cracking along the bottom chamfer of Beam "E".
Other problems noted include lack of attachment of the southeast approach guardrail at one post; rotated railing spacer blocks; a broken utility connection hanger at the east abutment; and separation of the gabion basket splice at the northeast corner of the bridge.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future. It should also be noted that the superstructure exhibits water leakage between several box beams. To address this, consideration should be given to installing a waterproof membrane over the structure as part of a future pavement replacement project.
STRUCTURE SUMMARY STRUCTURE NO. 1540-005P
There is an area of settlement and pavement failure at the west side of the north approach. Cracks in the pavement have been sealed, but this condition will continue to be monitored until it also can be addressed as part of a pavement project.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 1540-005P
SQUAW CREEK BRIDGE INSPECTION DATE : 08/20/2019
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazzard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D
Item No.
Maintenance Recomendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
PRELIM. MAINTENANCE TOTAL :
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
59.2 EPOXY-INJECT CRACK IN BEAM "E" NEAR WEST
ABUTMENT. PATCH SPALL IN BEAM "B" ON
SOUTH SIDE NEAR EAST ABUTMENT.
1 LS 2000 2000
222.3 ADD TIMBER SPACER SHIM TO SOUTHEAST
APPROACH GUARDRAIL POST AND SECURE
GUARDRAIL. RESET ROTATED SPACER
BLOCKS AS NECESSARY.
1 LS 1000 1000
61.3,58.8 REPAIR SEPARATION OF GABION BASKET
SPLICE AT NORTHEAST CORNER. REATTACH
UTILITY CONDUIT TO EAST ABUTMENT.
1 LS 2000 2000
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, DESIGN, AND
CONSTRUCTION ENGINEERING.
1 LS 5000 5000
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : 10000
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : .. 0
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
Consideration should be given to installation of a membrane over the structure as part of a future pavement replacement project.
FIELD INSPECTION REPORT STRUCTURE NO. 1540-005P
ITEM REFERENCE AND REMARKS
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
58.1
58.3
59.2
TOP SURFACE OF PRECAST CONCRETE BOX BEAMS FUNCTION AS DECK WITH ASPHALT WEARING SURFACE. HAIRLINE TRANSVERSE TRANSVERSE CRACKING ON TOP OF BEAM "I" (NORTH EXTERIOR BEAM) AT NORTHWEST CORNER OF BRIDGE
VEGETATION GROWTH THROUGH SEALANT ALONG SOUTH EDGE OF WEARING SURFACE.
58.2
58.3
EXPANSION JOINTS HAVE BEEN PAVED OVER. TRANSVERSE CRACKING PROPAGATING THROUGH SEALANT OVER BOTH
ABUTMENTS. TWO SHORT DIAGONAL CRACKS IN PAVEMENT AT EAST END IN WESTBOUND LANE.
58.6 MINOR TEAR IN RAILING SPLICE LOCATION AT NORTHWEST CORNER OF BRIDGE.
58.8 UTILITY CONDUIT ALONG BEAM "A"; CONDUIT IS DISCONNECTED AND COVERED WITH A PLASTIC SLEEVE AT SOUTHWEST CORNER OF STRUCTURE. SEVERAL ELECTRICAL UNITS AT SOUTHWEST CORNER OF APPROACH. CONNECTION HANGER
BROKEN AT EAST ABUTMENT.
59.2 PRECAST CONCRETE BOX BEAM SUPERSTRUCTURE.
MINOR CRACKING OF BEAM "A" AT EAST ABUTMENT; EFFLORESCENCE AND MOISTURE PENETRATION PRESENT. LONGITUDINAL CRACKING (UP TO 1/16" WIDE AND 42" LONG) OF CHAMFER EDGE ON BOTTOM OF BEAM "E" APPROXIMATELY 11' FROM WEST ABUTMENT. MINOR SPALL ON EXTERIOR FACE OF BEAM "A" (10" LONG X 4" WIDE) AND BEAM "I" (4" LONG X 3" WIDE) LIKELY FROM
HANDLING OR DEBRIS COLLISION; NO REBAR EXPOSED.
MINOR GRADE DIFFERENCE (UP TO 1") BETWEEN BEAMS "A" AND "B"; DIFFERENCE IS WITHIN MANUFACTURER'S TOLERANCE.
MINOR LONGITUDINAL CRACKING AT LATERAL TIE ROD HOLE IN BEAMS "A" AND "I".
4' LONG X 1' WIDE X 3" DEEP DELAMINATION/SPALL ON UNDERSIDE OF BEAM "B" APPROXIMATELY NEAR EAST ABUTMENT;
SMALL PORTION (4.5" LONG) OF EXPOSED STEEL APPROXIMATELY 15' FROM ABUTMENT; LEAKAGE AROUND SPALL. LEAKAGE FROM JOINTS BETWEEN BEAMS "A" AND "B" (FULL LENGTH) AND BEAMS "H" AND "I" (NEAR EAST ABUTMENT).
60.1
60.3
FULL HEIGHT (3') MINOR VERTICAL HAIRLINE CRACK IN PILE CAP AT WEST ABUTMENT UNDER GIRDERS "E" AND "F". SEVERAL
OTHER VERTICAL CRACKS IN BOTH ABUTMENT PILE CAPS.
MINOR LEAKAGE EVIDENT AT SEVERAL BEARING AREAS.
60.6 SURVEY MARKER ON SOUTHWEST WINGWALL.
60.12 MINOR TO MODERATE VEGETATION GROWTH AT ALL CORNERS OF STRUCTURE AND ALONG ALL WINGWALLS.
61.1
61.2
61.3
CHANNEL ALIGNMENT SKEWED TOWARD EAST ABUTMENT. GABION BASKET BANK PROTECTION ON BOTH BANKS AND UNDER BRIDGE. CONCRETE CAST IN GAP BETWEEN GABIONS AND ABUTMENTS. 4' LONG GAP IN EAST GABION WALL, EXPOSING BOTTOM OF ABUTMENT UNDER EASTBOUND LANE. MINOR EROSION BEHIND EAST UPSTREAM GABIONS; RIPRAP ADDED AT END
AND BEHIND TO ARREST AND PREVENT FURTHER EROSION.
61.6 PARK SERVICE RELATED THAT BRIDGE OVERTOPPED DURING FLOOD/ICE JAM OF MARCH 1997.
222.3
222.7
TWO ROTATED SPACER BLOCKS: ONE IN NORTHWEST RAIL AND ONE IN SOUTHEAST RAIL. MINOR SPLITTING AND CHECKING OF
GUARDRAIL POSTS. RAILING POST NOT ATTACHED TO GUARDRAIL AT SOUTHEAST APPROACH.
TYPE 3 OBJECT MARKERS ON ENDS OF APPROACH RAILING AND AT BRIDGE CORNERS. OBJECT MARKERS AT CORNERS ARE
SLIGHTLY OFFSET FROM EDGE OF RAILING.
222.4 MINOR CRACKING WITH VEGETATION GROWTH THROUGH SEALANT ALONG SOUTH CURBLINES OF BOTH APPROACHES.
VEGETATION GROWTH AT NORTHEAST APPROACH.
222.4
222.6
AREA OF SETTLEMENT (12' LONG X 3.5' WIDE X UP TO 3" DEEP) ALONG NORTH SIDE OF WEST APPROACH; PAVEMENT IS
BREAKING UP, BUT CRACKS HAVE BEEN SEALED.
STRUCTURE LOAD RATING STRUCTURE NO. 1540-005P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 38 34 72 65
HS 47 43 88 80
TYPE 3 43 39 82 74
TYPE 3S2 61 55 115 104
TYPE 3-3 72 65 136 123
DESIGN LOADING: 5 - HS 20
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
X ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 06/01/2016
LOAD RATING CONTROLLED BY: MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-005P
STRUCTURE IDENTIFICATION
(201) PARK: THEODORE ROOSEVELT NATIONAL PARK (1) STATE:............................................ 388 - NORTH DAKOTA
(202) STRUCTURE NAME:..............SQUAW CREEK BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND:............... 1 - BRIDGE (3) COUNTY CODE:
(204) STRUCTURE NUMBER:.........1540-005 P (4) CITY / PLACE CODE:
5 - MIDWEST (5) INVENTORY ROUTE:................(205) NPS REGION:........................ 1 6 8 00000 0
(206) ROUTE CODE NUMBER:.......10 (6) FEATURES INTERSECTED:.......... SQUAW CREEK
(207) ROAD SECTION NO:............. (7) FACILITY CARRIED:...................... SCENIC DRIVE
(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO:.............. 1540005P0000000
(209) WITHIN NPS BNDRY?:.......... Yes (9) LOCATION:..................................... SCENIC DRIVE IN NORTH UNIT, JUST
PAST JUNIPER CAMPGROUND
(210) OPERATING UNIT:.................NORTH (10) INV. RTE. - MIN. VERT. CLR:..... 99.99 FT ( 99.99 M)
(211) PROJECT NO(S):................... (11) MILE POINT:................................. 4.70 (KM PT: 1.43 )
(212) DRAWING NUMBERS:...........RG2391 (27) YEAR BUILT:
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE (20) TOLL:............................................ 3 - ON FREE ROAD
(37) HISTORIC DESIGNATION:.......... 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........5 - PRESTRESSED CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 05 - BOX BEAM OR GIRDERS - MULTI (44B) APPR. STR. TYPE:.................... 00 - OTHER
(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............62.3 FT ( 19 M)
(49) STRUCTURE LENGTH:........... 67.0 FT ( 20.4 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 4 - PILE BENT A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS
(216B) ABUTMENT #2 FDN:........... 4 - PILE BENT B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 2 - CONCRETE PRECAST PANELS
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................5 - HS 20 (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............47 METRIC TONS) (70) BRIDGE POSTING:......................TONS ( 42.6
(64) OPERATING RATING:..............88 TONS ( 79.8 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 08/20/2019 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 5 - SCOUR INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: 09/01/1998 (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-005P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 47° 35'46.61" (51) CURB TO CURB WIDTH:............ 26.5 FT ( 8.1 M)
(17) LONGITUDE:............................103°20 '08 34" (52) DECK WIDTH:.......................... 27.0 FT ( 8.2 M)
(19) DETOUR LENGTH:.................. 199 MI ( 199 KM) (32) APPR. ROADWAY WIDTH:...... 26.0 FT ( 7.9 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 2 0 FT ( 0.6 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 2 0 FT ( 0.6 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............200 (34) SKEW ANGLE:......................... 45 °
(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................500 (47) TOTAL HORIZ. CLEARANCE:.. 26.4 FT ( 8 M)
(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON W RIGHT:.................................. 0 0 FT ( 0 M)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 4 - STEEL
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2.42 FT ( 0.74 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:
(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N
(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 5 (113) SCOUR CRITICAL:.................... 7 - COUNTERMEASURES INSTALLED
(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: 1 1 1 1 (226) PRIORITY OF IMPROVEMENT: D - MINOR
(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION (227) MAINTENANCE COST:.............$ 0
(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT (228) REHAB / RECNSTR COST:..... $ 10000
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $ 0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2009 - WEARING SURFACE REPLACED, NEW GUARDRAIL TERMINAL SECTIONS, GABION BASKET BANK PROTECTION INSTALLED. 2010 - REPAIRS TO
GABIONS
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Marcus Miller Structure Number: 1540005P0000000
Inspection Date: 08/20/2019 Facility Carried: SCENIC DRIVE
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING WEST TOWARD LONG X PULLOUT
PHOTO 4
Description SOUTH (DOWNSTREAM0 SIDE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOP SIDE VIEW LOOKING EAST
PHOTO 6
Description GENERAL UNDERSIDE VIEW LOOKING WEST
Bridge Inspection Report
Pictures
PHOTO 7
Description TRANSVERSE CRACKING OVER EAST ABUTMENT
PHOTO 8
Description GENERAL VIEW OF SETTLEMENT AND PAVEMENT FAILURE ALONG NORTH SIDE OF WEST
APPROACH; NOTE ROTATED SPACER BLOCK
Bridge Inspection Report
Pictures
PHOTO 9
Description VEGETATION GROWTH THROUGH SEALANT ALONG SOUTH EDGE OF WEARING SURFACE
PHOTO 10
Description BROKEN UTILITY BRACKET AT EAST ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 12
Description HORIZONTAL CRACKING AT TIE ROD HOLE IN BEAM "I" NEAR CENTERLINE
PHOTO 13
Description LEAKAGE BETWEEN BEAMS "A" AND "B" NEAR WEST ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 14
Description GRADE DIFFERENTIAL BETWEEN BEAM "A" AND "B"
PHOTO 15
Description SPALLING WITH EXPOSED STEEL ON UNDERSIDE OF BEAM "B" NEAR EAST ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 16
Description LONGITUDINAL CRACKING ALONG BOTTOM CHAMFER OF BEAM "E" NEAR WEST
ABUTMENT
PHOTO 17
Description GENERAL VIEW OF WEST ABUTMENT; NOTE STEPPED GABION BASKETS
Bridge Inspection Report
Pictures
PHOTO 18
Description GENERAL VIEW OF EAST ABUTMENT; NOTE STEPPED GABION BASKETS
PHOTO 19
Description ROTATED SPACER BLOCK, SOUTH RAIL BLOCK #2 FROM EAST END
Bridge Inspection Report
Pictures
PHOTO 20
Description LEAKAGE ON UPSTREAM SIDE OF WEST ABUTMENT BEARING SEAT
PHOTO 21
Description VIEW FROM BRIDGE LOOKING DOWNSTREAM
Bridge Inspection Report
Pictures
PHOTO 22
Description VIEW FROM BRIDGE LOOKING UPSTREAM