BRIDGE INSPECTION REPORT

SQUAW CREEK BRIDGE

SCENIC DRIVE OVER SQUAW CREEK

THEODORE ROOSEVELT NATIONAL PARK

LOOKING EAST

STRUCTURE NO. 1540-005P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 8/20/2019

NORTH (UPSTREAM) SIDE

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 1540-005P

SQUAW CREEK BRIDGE INSPECTION DATE: 08/20/2019

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

MAIN SPAN TYPE:

# OF BEAMS, MAIN SPAN: .

DECK TYPE:

WEARING SURFACE:

ABUT. FOUNDATIONS:

PIER FOUDNATION(S):

ABUTMENT / PIER MAT'L: ..

PROJ./PLAN REF. NO:

NPS ROAD CLASS:

STRUCTURE HISTORY:

5 - PRESTRESSED CONCRETE NO. OF MAIN SPANS:

05 - BOX BEAM OR GIRDERS - NO. OF APPR. SPANS:

9 STRUCT. TOTAL LENGTH: . 67.0 FT (20.4 M)

2 - CONCRETE PRECAST PANELS MAX. SPAN LENGTH: ......... 62.3 FT (19 M)

6 - BITUMINOUS DECK WIDTH: ..................... 27.0 FT (8.2 M)

4 - PILE BENT CURB TO CURB WIDTH: .... 26.5 FT (8.1 M)

6 - N/A YEAR BUILT:

1 - CONCRETE YEAR RECONSTRUCTED: .

SKEW ANGLE: .................... 45 °

1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ....... N

2009 - WEARING SURFACE REPLACED, NEW GUARDRAIL TERMINAL SECTIONS,

GABION BASKET BANK PROTECTION INSTALLED. 2010 - REPAIRS TO GABIONS

LOCATION

THEODORE ROOSEVELT NATIONAL PARK MILE POINT: .. 4.70 (KM PT 1.43)

STATE: .............................. 388 - NORTH DAKOTA LOCATION: .... SCENIC DRIVE IN NORTH UNIT, JUST

PAST JUNIPER CAMPGROUNDFACILITY CARRIED: ......... SCENIC DRIVE

FEATURE INTERSECTED: SQUAW CREEK

INSPECTION TEAM: Z. Bailey, M. Miller

CONDITION ASSESSMENT:

Marcus Miller

REPORT REVIEW:

Marcus Miller

REPORT APPROVAL: Date: 02/10/2020

Jorgomai Ceesay

STRUCTURE EVALUATION SUMMARY

This prestressed concrete box beam bridge is in fair to good structural condition, but has several issues that require attention. Problems with the box beams include spalling with exposed steel on the underside of Beam "B", and longitudinal cracking along the bottom chamfer of Beam "E".

Other problems noted include lack of attachment of the southeast approach guardrail at one post; rotated railing spacer blocks; a broken utility connection hanger at the east abutment; and separation of the gabion basket splice at the northeast corner of the bridge.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future. It should also be noted that the superstructure exhibits water leakage between several box beams. To address this, consideration should be given to installing a waterproof membrane over the structure as part of a future pavement replacement project.

STRUCTURE SUMMARY STRUCTURE NO. 1540-005P

There is an area of settlement and pavement failure at the west side of the north approach. Cracks in the pavement have been sealed, but this condition will continue to be monitored until it also can be addressed as part of a pavement project.

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 1540-005P

SQUAW CREEK BRIDGE INSPECTION DATE : 08/20/2019

PRIORITY OF IMPROVEMENT226

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazzard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D

Item No.

Maintenance Recomendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

PRELIM. MAINTENANCE TOTAL :

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

59.2 EPOXY-INJECT CRACK IN BEAM "E" NEAR WEST

ABUTMENT. PATCH SPALL IN BEAM "B" ON

SOUTH SIDE NEAR EAST ABUTMENT.

1 LS 2000 2000

222.3 ADD TIMBER SPACER SHIM TO SOUTHEAST

APPROACH GUARDRAIL POST AND SECURE

GUARDRAIL. RESET ROTATED SPACER

BLOCKS AS NECESSARY.

1 LS 1000 1000

61.3,58.8 REPAIR SEPARATION OF GABION BASKET

SPLICE AT NORTHEAST CORNER. REATTACH

UTILITY CONDUIT TO EAST ABUTMENT.

1 LS 2000 2000

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, DESIGN, AND

CONSTRUCTION ENGINEERING.

1 LS 5000 5000

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : 10000

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : .. 0

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

Consideration should be given to installation of a membrane over the structure as part of a future pavement replacement project.

FIELD INSPECTION REPORT STRUCTURE NO. 1540-005P

ITEM REFERENCE AND REMARKS

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

58.1

58.3

59.2

TOP SURFACE OF PRECAST CONCRETE BOX BEAMS FUNCTION AS DECK WITH ASPHALT WEARING SURFACE. HAIRLINE TRANSVERSE TRANSVERSE CRACKING ON TOP OF BEAM "I" (NORTH EXTERIOR BEAM) AT NORTHWEST CORNER OF BRIDGE

VEGETATION GROWTH THROUGH SEALANT ALONG SOUTH EDGE OF WEARING SURFACE.

58.2

58.3

EXPANSION JOINTS HAVE BEEN PAVED OVER. TRANSVERSE CRACKING PROPAGATING THROUGH SEALANT OVER BOTH

ABUTMENTS. TWO SHORT DIAGONAL CRACKS IN PAVEMENT AT EAST END IN WESTBOUND LANE.

58.6 MINOR TEAR IN RAILING SPLICE LOCATION AT NORTHWEST CORNER OF BRIDGE.

58.8 UTILITY CONDUIT ALONG BEAM "A"; CONDUIT IS DISCONNECTED AND COVERED WITH A PLASTIC SLEEVE AT SOUTHWEST CORNER OF STRUCTURE. SEVERAL ELECTRICAL UNITS AT SOUTHWEST CORNER OF APPROACH. CONNECTION HANGER

BROKEN AT EAST ABUTMENT.

59.2 PRECAST CONCRETE BOX BEAM SUPERSTRUCTURE.

MINOR CRACKING OF BEAM "A" AT EAST ABUTMENT; EFFLORESCENCE AND MOISTURE PENETRATION PRESENT. LONGITUDINAL CRACKING (UP TO 1/16" WIDE AND 42" LONG) OF CHAMFER EDGE ON BOTTOM OF BEAM "E" APPROXIMATELY 11' FROM WEST ABUTMENT. MINOR SPALL ON EXTERIOR FACE OF BEAM "A" (10" LONG X 4" WIDE) AND BEAM "I" (4" LONG X 3" WIDE) LIKELY FROM

HANDLING OR DEBRIS COLLISION; NO REBAR EXPOSED.

MINOR GRADE DIFFERENCE (UP TO 1") BETWEEN BEAMS "A" AND "B"; DIFFERENCE IS WITHIN MANUFACTURER'S TOLERANCE.

MINOR LONGITUDINAL CRACKING AT LATERAL TIE ROD HOLE IN BEAMS "A" AND "I".

4' LONG X 1' WIDE X 3" DEEP DELAMINATION/SPALL ON UNDERSIDE OF BEAM "B" APPROXIMATELY NEAR EAST ABUTMENT;

SMALL PORTION (4.5" LONG) OF EXPOSED STEEL APPROXIMATELY 15' FROM ABUTMENT; LEAKAGE AROUND SPALL. LEAKAGE FROM JOINTS BETWEEN BEAMS "A" AND "B" (FULL LENGTH) AND BEAMS "H" AND "I" (NEAR EAST ABUTMENT).

60.1

60.3

FULL HEIGHT (3') MINOR VERTICAL HAIRLINE CRACK IN PILE CAP AT WEST ABUTMENT UNDER GIRDERS "E" AND "F". SEVERAL

OTHER VERTICAL CRACKS IN BOTH ABUTMENT PILE CAPS.

MINOR LEAKAGE EVIDENT AT SEVERAL BEARING AREAS.

60.6 SURVEY MARKER ON SOUTHWEST WINGWALL.

60.12 MINOR TO MODERATE VEGETATION GROWTH AT ALL CORNERS OF STRUCTURE AND ALONG ALL WINGWALLS.

61.1

61.2

61.3

CHANNEL ALIGNMENT SKEWED TOWARD EAST ABUTMENT. GABION BASKET BANK PROTECTION ON BOTH BANKS AND UNDER BRIDGE. CONCRETE CAST IN GAP BETWEEN GABIONS AND ABUTMENTS. 4' LONG GAP IN EAST GABION WALL, EXPOSING BOTTOM OF ABUTMENT UNDER EASTBOUND LANE. MINOR EROSION BEHIND EAST UPSTREAM GABIONS; RIPRAP ADDED AT END

AND BEHIND TO ARREST AND PREVENT FURTHER EROSION.

61.6 PARK SERVICE RELATED THAT BRIDGE OVERTOPPED DURING FLOOD/ICE JAM OF MARCH 1997.

222.3

222.7

TWO ROTATED SPACER BLOCKS: ONE IN NORTHWEST RAIL AND ONE IN SOUTHEAST RAIL. MINOR SPLITTING AND CHECKING OF

GUARDRAIL POSTS. RAILING POST NOT ATTACHED TO GUARDRAIL AT SOUTHEAST APPROACH.

TYPE 3 OBJECT MARKERS ON ENDS OF APPROACH RAILING AND AT BRIDGE CORNERS. OBJECT MARKERS AT CORNERS ARE

SLIGHTLY OFFSET FROM EDGE OF RAILING.

222.4 MINOR CRACKING WITH VEGETATION GROWTH THROUGH SEALANT ALONG SOUTH CURBLINES OF BOTH APPROACHES.

VEGETATION GROWTH AT NORTHEAST APPROACH.

222.4

222.6

AREA OF SETTLEMENT (12' LONG X 3.5' WIDE X UP TO 3" DEEP) ALONG NORTH SIDE OF WEST APPROACH; PAVEMENT IS

BREAKING UP, BUT CRACKS HAVE BEEN SEALED.

STRUCTURE LOAD RATING STRUCTURE NO. 1540-005P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 38 34 72 65

HS 47 43 88 80

TYPE 3 43 39 82 74

TYPE 3S2 61 55 115 104

TYPE 3-3 72 65 136 123

DESIGN LOADING: 5 - HS 20

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

X ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 06/01/2016

LOAD RATING CONTROLLED BY: MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-005P

STRUCTURE IDENTIFICATION

(201) PARK: THEODORE ROOSEVELT NATIONAL PARK (1) STATE:............................................ 388 - NORTH DAKOTA

(202) STRUCTURE NAME:..............SQUAW CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND:............... 1 - BRIDGE (3) COUNTY CODE:

(204) STRUCTURE NUMBER:.........1540-005 P (4) CITY / PLACE CODE:

5 - MIDWEST (5) INVENTORY ROUTE:................(205) NPS REGION:........................ 1 6 8 00000 0

(206) ROUTE CODE NUMBER:.......10 (6) FEATURES INTERSECTED:.......... SQUAW CREEK

(207) ROAD SECTION NO:............. (7) FACILITY CARRIED:...................... SCENIC DRIVE

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO:.............. 1540005P0000000

(209) WITHIN NPS BNDRY?:.......... Yes (9) LOCATION:..................................... SCENIC DRIVE IN NORTH UNIT, JUST

PAST JUNIPER CAMPGROUND

(210) OPERATING UNIT:.................NORTH (10) INV. RTE. - MIN. VERT. CLR:..... 99.99 FT ( 99.99 M)

(211) PROJECT NO(S):................... (11) MILE POINT:................................. 4.70 (KM PT: 1.43 )

(212) DRAWING NUMBERS:...........RG2391 (27) YEAR BUILT:

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE (20) TOLL:............................................ 3 - ON FREE ROAD

(37) HISTORIC DESIGNATION:.......... 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........5 - PRESTRESSED CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 05 - BOX BEAM OR GIRDERS - MULTI (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............62.3 FT ( 19 M)

(49) STRUCTURE LENGTH:........... 67.0 FT ( 20.4 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 4 - PILE BENT A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 4 - PILE BENT B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 2 - CONCRETE PRECAST PANELS

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................5 - HS 20 (41) LOAD RESTRICTION:.................. A - OPEN

(66) INVENTORY RATING:..............47 METRIC TONS) (70) BRIDGE POSTING:......................TONS ( 42.6

(64) OPERATING RATING:..............88 TONS ( 79.8 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 08/20/2019 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 5 - SCOUR INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: 09/01/1998 (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1540-005P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 47° 35'46.61" (51) CURB TO CURB WIDTH:............ 26.5 FT ( 8.1 M)

(17) LONGITUDE:............................103°20 '08 34" (52) DECK WIDTH:.......................... 27.0 FT ( 8.2 M)

(19) DETOUR LENGTH:.................. 199 MI ( 199 KM) (32) APPR. ROADWAY WIDTH:...... 26.0 FT ( 7.9 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 2 0 FT ( 0.6 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 2 0 FT ( 0.6 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............200 (34) SKEW ANGLE:......................... 45 °

(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................500 (47) TOTAL HORIZ. CLEARANCE:.. 26.4 FT ( 8 M)

(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON W RIGHT:.................................. 0 0 FT ( 0 M)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 4 - STEEL

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2.42 FT ( 0.74 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 5 (113) SCOUR CRITICAL:.................... 7 - COUNTERMEASURES INSTALLED

(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 1 1 1 (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION (227) MAINTENANCE COST:.............$ 0

(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT (228) REHAB / RECNSTR COST:..... $ 10000

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $ 0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2009 - WEARING SURFACE REPLACED, NEW GUARDRAIL TERMINAL SECTIONS, GABION BASKET BANK PROTECTION INSTALLED. 2010 - REPAIRS TO

GABIONS

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Marcus Miller Structure Number: 1540005P0000000

Inspection Date: 08/20/2019 Facility Carried: SCENIC DRIVE

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING WEST TOWARD LONG X PULLOUT

PHOTO 4

Description SOUTH (DOWNSTREAM0 SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOP SIDE VIEW LOOKING EAST

PHOTO 6

Description GENERAL UNDERSIDE VIEW LOOKING WEST

Bridge Inspection Report

Pictures

PHOTO 7

Description TRANSVERSE CRACKING OVER EAST ABUTMENT

PHOTO 8

Description GENERAL VIEW OF SETTLEMENT AND PAVEMENT FAILURE ALONG NORTH SIDE OF WEST

APPROACH; NOTE ROTATED SPACER BLOCK

Bridge Inspection Report

Pictures

PHOTO 9

Description VEGETATION GROWTH THROUGH SEALANT ALONG SOUTH EDGE OF WEARING SURFACE

PHOTO 10

Description BROKEN UTILITY BRACKET AT EAST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 12

Description HORIZONTAL CRACKING AT TIE ROD HOLE IN BEAM "I" NEAR CENTERLINE

PHOTO 13

Description LEAKAGE BETWEEN BEAMS "A" AND "B" NEAR WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 14

Description GRADE DIFFERENTIAL BETWEEN BEAM "A" AND "B"

PHOTO 15

Description SPALLING WITH EXPOSED STEEL ON UNDERSIDE OF BEAM "B" NEAR EAST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 16

Description LONGITUDINAL CRACKING ALONG BOTTOM CHAMFER OF BEAM "E" NEAR WEST

ABUTMENT

PHOTO 17

Description GENERAL VIEW OF WEST ABUTMENT; NOTE STEPPED GABION BASKETS

Bridge Inspection Report

Pictures

PHOTO 18

Description GENERAL VIEW OF EAST ABUTMENT; NOTE STEPPED GABION BASKETS

PHOTO 19

Description ROTATED SPACER BLOCK, SOUTH RAIL BLOCK #2 FROM EAST END

Bridge Inspection Report

Pictures

PHOTO 20

Description LEAKAGE ON UPSTREAM SIDE OF WEST ABUTMENT BEARING SEAT

PHOTO 21

Description VIEW FROM BRIDGE LOOKING DOWNSTREAM

Bridge Inspection Report

Pictures

PHOTO 22

Description VIEW FROM BRIDGE LOOKING UPSTREAM

File details come from the government source that posted it. Updated .