Attachment_J-8_Clarification_Support_Documentation.pdf

PDF 1 MB Posted

Attached to
Renovation of Animal Rooms, Jefferson Laboratories, Building 5A
Solicitation number
15-223-SOL-0056
Issued by

About this file

Attachment J-8 Clarification Support Documentation (4) pages

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

tbaioni Polygon tbaioni Polygon

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text Attachment J-8 Clarification Support Documentation Page 1 of 4

SBlair Typewritten Text

SBlair Typewritten Text tbaioni Polygon

SBlair Typewritten Text

SBlair

Attachment J-8 Clarification Support Documentation Page 2 of 4

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text Attachment J-8 Clarification Support Documentation Page 3 of 4

SBlair

BLDG 5A - PARTIAL WEST ELEVATION

Design Intent - (blue dashed line) was for new sloped roof using the Retrofit Roof Panel System (RRPS) to continue the slope and line of the existing Standing Seam Metal Roof Panels (SSMRP).

Not to Scale

Roof extension is along south wall & is roof above the added Procedure Rooms between Grid Lines G & H, on east side of O.H. Door @ Processing Dirty Dock.

Proposed Re-Design - (red line) Lower the Retrofit Roof Panel System (RRPS) approx. 8" at connection point to existing exterior vertical (South) wall w/ RRPS to match existing slope of SSMRP. Flash watertight at connection to wall

Design Remains As-Is - (green line) All indicated & related building components on Sheet A-7 in Key Notes, Roof Plan, Section, and Elevation to remain as-is only shifted (lowered) the approx. 8" with the RRPS Re-Design direction.

7-19-2015

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair Typewritten Text

SBlair

Attachment J-8 Clarification Support Documentation Page 4 of 4

Existing AHU equip for additional demo (question 11)
Existing Ductwork for Additional Demo (Questions 5791115)
Existing Piping for Additional Demo(Question 11)
Bldg 5A - West Elev_exist. conditions - Grid G - H_with Proposed info (Question from NOACON)

File details come from the government source that posted it. Updated .