Attachment_J-2_Drawings_S.1_and_S.2.pdf

PDF 545 KB Posted

Attached to
Renovation of Animal Rooms, Jefferson Laboratories, Building 5A
Solicitation number
15-223-SOL-0056
Issued by

About this file

Attachment J-2 Drawings S.1. Building 5A Renovation of Animal Rooms Equipment Platform Existing Framing Demo Plan dated July 6 2012 (1) page. S.2 Equipment Platform New Framing Plan dated July 6 2012 (1) page.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES

DRAWING NO. SHEET:

CHECKED BY: REG

DRAWN BY: DDMDATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

NCTRAs Indicated

100% Submittal

July 6, 2012

Building 5A - Renovation of Animal Rooms

2-3741-11

S

T

Phone: 501.224.7070 Fax: 501.228.2215

EQUIPMENT PLATFORM

EXISTING FRAMING DEMO PLAN

S.1

J:\GGAE Projects\212034-NCTR 5A Animal Rooms\Drawings\212034-S1-DEMO-E18.dwg, 7/27/2012 4:54:03 PM

SBlair Typewritten Text Attachment S.1. Building 5A – Renovation of Animal Rooms, Equipment Platform Existing Framing Demo Plan dated July 6, 2012

SBlair Typewritten Text

JEFFERSON, ARKANSAS 72079

SUBMITTED:

STUCK ASSOCIATES

DRAWING NO. SHEET:

CHECKED BY: REG

DRAWN BY: DDMDATE:SCALE:

DESCRIPTION BY CHECK

A

B

C

D

E

F

G

H

I

J

K

1 2 3 4 5 6 7 8 9

JEFFERSON LABORATORIES OF THE FDA

NCTRAs Indicated

100% Submittal

July 6, 2012

Building 5A - Renovation of Animal Rooms

2-3741-11

S

T

Phone: 501.224.7070 Fax: 501.228.2215

EQUIPMENT PLATFORM

NEW FRAMING PLAN

S.2

CONNECTION TO EXIST. BEAM

MODIFY EXIST. CONNECTION

EXIST. BEAM TO EXIST. COL. CONN.

BRACE ANGLE TO BEAM CONN.

COVER PLATE OF EXIST COL.

J:\GGAE Projects\212034-NCTR 5A Animal Rooms\Drawings\212034-S2-NEW-E18.dwg, 7/27/2012 4:54:29 PM

SBlair Typewritten Text

SBlair Typewritten Text S.2 Equipment Platform New Framing Plan, dated July 6, 2012 Page 1 of 1

Sheet S.1.R. Structural Details Platform Framing
Sheet S.2 -New Framing Plan_13 of 51_Bldg 5A Animal Rms...

File details come from the government source that posted it. Updated .