Attachment 9 Payment Plan (Draft)
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 9: Payment Plan for
Solicitation No. FA8811-xx-x-000x
Contract No. FA8811-xx-x-000x
11 May 2015
Revision Date Affected Pages Comments 1 15 Oct 2014 All Original
11 May 2015 Cover 5, 6, 8, 10-13 GPS III Update
Section I.B.;
Milestones 1, 6 and 9
I. Basis of Payment The basis of payment for this effort shall be the successful accomplishment of event milestones scheduled for each Space Launch Service (SLS) mission throughout the period of performance of any order issued under the contract. The milestones represent meaningful efforts or actions that are an integral and necessary part of order performance. The basis for an event should be either specifically described events or a measurable criterion of performance. Included within this Payment Plan is a description of what constitutes successful performance of each event. For purposes of establishing and calculating payment amounts, a percentage of the total contract price for all applicable firm fixed price (FFP) Contract Line Item Numbers (CLINs) pertaining to the mission (CLINs 1000 – 3000) will be assigned to each milestone. The dollar amount associated with each milestone will be calculated based on the percentages assigned to each milestone. This contract is for the procurement of a GPS III mission only; therefore, requirements with specific NRO-only references are not applicable. NRO-only references appear in grey text.
A. Milestone Success Criteria and Completion Evidence Each event milestone has associated measurable success criteria that serve to validate milestone accomplishment. All milestone success criteria must be met before the milestone payment will be authorized. When the Launch Vehicle Contractor (LVC) has successfully completed all applicable milestone success criteria, the LVC shall provide a written Request for Interim Payment (RIP) to the Procurement Contracting Officer (PCO). This RIP shall include supporting documentation to substantiate meeting the milestone success criteria as provided in the completion evidence defined herein.
To support milestone tracking and verification, launch vehicle manifest and production management (schedule alerts) shall be prepared in accordance with (IAW) the LVC’s command media, and include reference to applicable SLS CLINs. Delivery of RIP supporting documentation to the Government shall be in electronic format on the My Mission Link (MML) web-based collaborative environment, followed by prompt email notification of the directory location of the documents to the PCO and Government Mission Integration Manager (GMIM) (for Air Force missions) or Office of Space Launch (OSL) Mission Manager (OMM) and OSL Launch Service Contracting Officer’s Technical Representative (COTR) (for National Reconnaissance Office [NRO] missions).
B. Event Milestone Payments and Event Timing The RIP may not be submitted more often than once monthly, regardless of how many milestones have been completed in that month. Therefore, the RIP may include a payment request for multiple milestones. Completion of milestones and subsequent RIPs may be submitted non-successively (e.g., if milestone two is completed before milestone one, then the LVC may submit a RIP for milestone two before a RIP for milestone one). In the event the LVC completes a milestone ahead of the milestone completion date, the LVC may submit a proper invoice and the Government will consider on a case-by-case basis, the early payment of the milestone.
The PCO will determine whether or not the LVC has successfully met each of the milestone success criteria based on inputs provided by the United States Government (USG) Team (for Air Force missions) and the Mission Team (for NRO missions).
For Air Force missions, the USG Team consists of the Air Force Space and Missile Systems Center, Launch Systems Directorate (SMC/LR) and Air Force Program Executive Officer for Space (AFPEO/SP) office personnel, but also includes The Aerospace Corporation, LR’s Systems Engineering and Integration (SE&I) Contractor, LR’s Systems Engineering and Technical Assistance (SETA) support Contractors, the NRO/OSL (as applicable), the SMC Independent Readiness Review Team (IRRT), Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), 30th Space Wing (30 SW), 45th Space Wing (45 SW), and other organizations as designated by the SMC/LR PCO.
For NRO missions, in addition to the USG Team listed above for Air Force missions, the Mission Team consists of the OMM, the OSL COTR, and their support personnel (to include Government, Aerospace Corporation, and SETA personnel). At their discretion, the OMM and COTR may solicit inputs from SMC/LR to assist in their determination of the LVC’s satisfactory completion of the milestone success criteria. Written concurrence from both the OMM and COTR that the LVC has successfully met the milestone success criteria is required before the PCO will authorize payment of the milestone.
To the maximum extent possible within fifteen (15) business days after receipt of the LVC’s RIP, the PCO will provide written notification to the LVC specifying which milestones contained in the RIP are determined to be “met” (complete) and, if necessary, which are considered “not met” (incomplete). For milestones identified as incomplete, the PCO will: (1) specify in the notification the issue(s) that led to the determination based upon the milestone success criteria and completion evidence provided herein, and
(2) the corrective action(s) required to complete the milestone. The Government and LVC will ensure agreement and understanding of the corrective actions, and the LVC will make a good faith effort to quickly reconcile any incomplete milestones. When the LVC accomplishes the corrective actions, the LVC will submit an RIP addendum to the PCO for Government review. To the maximum extent possible within fifteen (15) business days after receipt of the LVC’s RIP addendum, the PCO will provide a written notification to the LVC specifying whether the Government concurs that all corrective actions have been accomplished and the milestone has been “met” (completed).
For each milestone, the Estimated Completion Date is the estimated date that the LVC will complete the payment event and submit the associated RIP for payment of each milestone under this Plan. For each milestone, the value in the percentage “%” column of Table 1 indicates the percentage of the contract value of all applicable FFP CLINs (CLINs 1000 – 3000) that will be used to calculate the dollar amount to be paid to the LVC upon successful completion of the milestone. The Government reserves the right to withhold up to fifty percent (50%) of the total payment value for any milestone(s) in the event of a Government-approved Class 1 change required for the launch service that is not implemented/completed to the Government’s satisfaction by the implementation deadlines specified in and IAW Performance Work Statement (PWS) section 3.2.4, Table 1.
C. Event Milestone Schedule Criteria for payment of each event milestones appear in Table 1. In no event shall the LVC receive payments in excess of 80% of the total contract price until after contract completion [Space Vehicle (SV) delivery on orbit IAW contract clause Federal Acquisition Regulation (FAR) 52.212-04, Addendum to Contract Terms and Conditions—Commercial Items (Sep 2013)]. Given that defects in service for the last milestone 10, Acceptance of Launch Service, are not suitable for correction by re-performance, the Contracting Officer has determined that pursuant to FAR 52.246-4(e) the appropriate relief for the Government in the event of milestone 10 defect, e.g. mission failure, is to reduce the contract price by the amount of the full milestone 10 payment, which appropriately reflects the reduced value of the services performed.
Table 1: Payment Event Schedule
Milestone
Payment Event Accomplishment Criteria
Est.
Comp.
Date
Total Payment (Dollar Value)*
% of FFP CLINs
1000-3000
Long lead hardware procurement initiated; Initial
Hazardous Materials Management Program (HMMP) Plan; Initial Contractor Standard
Operating Procedures, Initial Vertical Integration and Operations Plan; Initial
Flight Critical Hardware List First Submissions; and
Baseline Schedule and Plan for Launch Service Provider
Space Flight Worthiness (SFW) Non-Recurring
Engineering (NRE) Work Closure Submission
Long lead hardware procurement or build initiated as required.
First submission and Government acceptance/approval of HMMP Plan IAW Contract Data Requirements List (CDRL) A013;
the initial Contractor Standard Operating Procedures IAW CDRL A014; the initial Vertical Integration and Operations Plan IAW CDRL A027; the initial Flight Critical Hardware List
IAW CDRL A029.
Submission and Government approval of the baseline schedule and plan for launch service provider SFW NRE work closure
IAW CDRL A032.
ATP +
Month
To Be Filled In By Offeror
10%
Contractor Work Breakdown Structure (CWBS) and
CWBS Dictionary;
Integrated Master Schedule
(IMS); Launch Vehicle Familiarization Training
Materials; and As-proposed Launch Vehicle
Configuration First Submissions
First submission and Government acceptance of the CWBS and CWBS Dictionary IAW CDRL A006; the IMS IAW CDRL A007; the Launch Vehicle Familiarization Training Materials IAW CDRL A011; and the as-proposed launch vehicle configuration IAW CDRL A015.
ATP +
Months
To Be Filled In By Offeror
5%
First Draft Systems Safety Program Plan (SSPP) and
First Draft Baseline Mission Interface Control Document
(ICD) Submitted
First draft SSPP and Preliminary/baseline ICD submitted and accepted by the Government IAW CDRLs A009 and A019 respectively.
ATP +
Months
To Be Filled In By Offeror
5%
First draft Mission Integration Verification Planning Matrix (VPM)
Submitted
CDRL A021 first draft submitted and accepted by the Government.
ATP +
Months
To Be Filled In By Offeror
5%
Preliminary Coupled Loads Analysis (CLA), and Preliminary Mission
Integration Design Review (MIDR-1) Completed
Preliminary CLA complete and results delivered and accepted by the Government (CDRL A020).
Preliminary MIDR-1 complete.
ATP +
Months
To Be Filled In By Offeror
5%
Flight and Ground Hardware Interface Checks Completed, Second Draft Baseline Mission ICD and Second
Draft Verification Planning Matrix (VPM) Approved, and Launch Service Provider SFW NRE Work Complete
Flight and ground hardware interface checks complete.
Second Draft Baseline ICD, Second Draft VPM, and Final Launch Service Provider SFW NRE work complete and approved by the Government (CDRLs A019, A021, and A032).
L-12 Months
To Be Filled In By Offeror
20%
Critical Mission Integration Design Review (MIDR-2)
Completed
MIDR-2 complete.
L – 8
Months
To Be Filled In By Offeror 10%
Launch countdown parameters and operational redline limits baseline, and
Mission Assurance Independent Assessment and
Design Data Submitted
Launch countdown parameters and operational redline limits baseline submitted and accepted/approved by the Government IAW PWS Section 3.2.6.
CDRL A020 data submitted and accepted by the Government:
- Intermediate unguided three
Degrees of Freedom (3DOF)
- Collision and Contamination
Avoidance Maneuver (CCAM) memo
- Acoustics, shock, and vibration environments
- Vibroacoustic modeling and analysis
- Engineering drawings
- Transportation environments
L – 6 Months
To Be Filled In By Offeror
10%
Additional Mission Assurance Independent
Assessment and Design Data and Calculations Submitted and Hardware Pre-Ship Review(s) and Independent
Hardware Review(s) Completed
CDRL A020 data submitted and accepted by the Government:
- Controls tools input data
- Controls analysis outputs
(except pad/launch drift analysis)
- Acoustics, shock, and vibration testing
- Interface environments
Major launch vehicle hardware pre-ship reviews and Government independent hardware review(s) complete IAW PWS 3.6.7 and
3.6.6 respectively.
L – 2 Months
To Be Filled In By Offeror
10%
Acceptance of Launch
Service
Final post-flight assessment report (CDRL A016) has been delivered and accepted by the Government, and the launch has been accepted and not deemed a “mission failure” IAW contract clause FAR 52.212-04 and the Launch Service Acceptance Criteria (LSAC) outlined in contract Attachment 4.
L + 2 Months
To Be Filled In By Offeror
20%
*The dollar amount for each milestone is to be filled in by the Offeror, and is equal to the percentage listed in the last column multiplied by the value of the contract (CLINs 1000 – 3000) prior to award of each milestone. No adjustment to the payment will occur after milestone award.
MILESTONE 1: Long Lead Hardware Procurement or Production Initiated; Initial Hazardous
Materials Management Program Plan; Initial Contractor Standard Operating Procedures; Initial Vertical Integration and Operations Plan; Initial Flight Critical Hardware List First Submissions; and Launch Service Provider SFW NRE Work Closure Plan and Schedule Baseline Approved
Description:
1. Long Lead Hardware Procurement or Production Initiated. LVC has initiated procurement orders for or production of long lead hardware required for the mission.
2. Initial Hazardous Materials Management Program (HMMP) Plan. LVC’s initial HMMP plan delivered and accepted by the Government IAW PWS paragraph 3.1.15 and CDRL A013.
3. Initial Contractor Standard Operating Procedures. All LVC’s initial standard operating procedures delivered and accepted by the Government IAW PWS sections 3.1 and 3.2 and CDRL A014.
4. Initial Vertical Integration and Operations Plan. LVC’s initial vertical integration and operations plan delivered and accepted by the Government IAW PWS paragraph 3.5.1.9.1 and CDRL A027.
5. Initial Flight Critical Hardware List. LVC’s initial flight critical hardware list delivered and accepted by the Government IAW PWS paragraph 3.6.6 and CDRL A029.
6. Launch Service Provider SFW NRE Work Closure Schedule and Plan. LVC’s baseline launch service provider SFW NRE work closure schedule and plan delivered and approved by the Government IAW PWS paragraph 3.6 and CDRL A032.
Success Criteria:
1. The LVC has initiated procurement orders for or production of long lead hardware required for the mission.
2. The LVC has delivered and the Government has accepted the initial, first draft HMMP plan IAW
CDRL A013.
3. The LVC has delivered and the Government has accepted all initial Contractor Standard Operating Procedures listed in and IAW CDRL A014.
4. The LVC has delivered and the Government has accepted the initial vertical integration and operations plan IAW CDRL A027.
5. The LVC has delivered and the Government has accepted the initial flight critical hardware list
IAW CDRL A029.
6. The LVC has delivered and the Government has approved the baseline launch service provider SFW NRE work closure plan and schedule IAW CDRL A032.
Completion Evidence:
1. Copies of signed, written procurement or build orders for all long lead hardware required for the mission received and accepted by the PCO, appropriate Contracting Officer Representative (COR) or appropriate Contracting Officer Technical Representative (COTR).
2. CDRL A013 initial draft HMMP plan acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
3. CDRL A014 acceptance sheets signed by the PCO, appropriate COR or appropriate COTR for all initial Contractor Standard Operating Procedures listed in CDRL A013.
4. CDRL A027 initial draft vertical integration and operations plan acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
5. CDRL A029 initial flight critical hardware list acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
6. CDRL A032 baseline launch service provider SFW NRE work closure plan and schedule acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
MILESTONE 2: First Submission of the Contractor Work Breakdown Structure and Dictionary;
Integrated Master Schedule; Launch Vehicle Familiarization Training Materials;
and As-proposed Launch Vehicle Configuration
Description:
1. Contractor Work Breakdown Structure (CWBS) and CWBS Dictionary. LVC’s CWBS and
CWBS dictionary delivered and accepted by the Government IAW PWS paragraph 3.1.4 and
CDRL A006.
2. Integrated Master Schedule (IMS). LVC’s IMS delivered and accepted by the Government IAW PWS paragraph 3.1.4 and CDRL A007.
3. Launch Vehicle Familiarization Training Materials. LVC’s initial LV familiarization training materials required by CDRL A009 delivered and accepted by the Government IAW PWS paragraph 3.1.10 and CDRL A011.
4. As-proposed Launch Vehicle Configuration. LVC’s initial as-proposed launch vehicle configuration and critical ground support equipment delivered and approved by the Government IAW PWS paragraph 3.2.4 and CDRL A015.
1. The LVC has delivered and the Government has accepted the initial CWBS and CWBS Dictionary IAW CDRL A006.
2. The LVC has delivered and the Government has accepted the initial IMS IAW CDRL A007.
3. The LVC has delivered and the Government has accepted the initial submission of all LV familiarization training materials required by and IAW CDRL A011.
4. The LVC has delivered and the Government has approved the initial submission of the as-proposed launch vehicle configuration and critical ground support equipment specific to the launch service required by and IAW CDRL A015.
1. CDRL A006 initial CWBS and CWBS Dictionary acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
2. CDRL A007 initial IMS acceptance sheet signed by the PCO, appropriate COR or appropriate
COTR.
3. CDRL A011 initial submission of LV familiarization training materials acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
4. CDLR A015 initial submission of the as-proposed launch vehicle configuration and critical ground support equipment acceptance sheet signed by the PCO, appropriate COR or appropriate
COTR.
MILESTONE 3: First Draft Systems Safety Program Plan and Baseline Mission Interface Control
Document Submitted Description:
1. Systems Safety Program Plan (SSPP). LVC’s first draft SSPP delivered and accepted by the Government IAW PWS 3.1.7 and CDRL A009.
2. Interface Control Document (ICD). LVC’s initial baseline mission ICD delivered and accepted by the Government IAW PWS paragraph 3.4.4 and CDRL A019.
1. The LVC has delivered and the Government has accepted the initial, first draft SSPP IAW CDRL A009.
2. The LVC has delivered and the Government has accepted the initial, first draft baseline mission
ICD IAW CDRL A019.
1. CDRL A009 initial draft SSPP acceptance sheet signed by the PCO, appropriate Contracting Officer Representative (COR) or appropriate Contracting Officer Technical Representative
(COTR).
2. CDRL A019 initial draft mission ICD acceptance sheet signed by the PCO, appropriate Contracting Officer Representative (COR) or appropriate Contracting Officer Technical Representative (COTR).
MILESTONE 4: First draft Mission Integration Verification Planning Matrix Submitted
Description:
1. Verification Planning Matrix (VPM). LVC’s first draft VPM delivered and accepted by the Government IAW CDRL A021.
1. The LVC has delivered and the Government has accepted the first draft VPM IAW CDRL A021.
Completion Evidence:
1. CDRL A021 first draft VPM acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
MILESTONE 5: Preliminary Coupled Loads Analysis and Preliminary Mission Integration
Design Review (MIDR-1) Completed Description:
1. Preliminary Coupled Loads Analysis (CLA). LVC has completed preliminary CLA, submitted the preliminary CLA data, and the Government has accepted the CLA data IAW CDRL A020.
2. Preliminary Mission Integration Design Review (MIDR-1): The LVC shall conduct MIDR-1.
1. LVC has completed preliminary CLA, submitted the preliminary CLA data, and the Government has accepted the CLA data IAW CDRL A020.
2. The LVC has conducted the MIDR-1 with actions and action closure plans identified and accepted by the Government.
Completion Evidence:
1. CDRL A020 preliminary CLA data acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
2. MIDR-1 meeting minutes documenting meeting completion, action items, and action item closure plans.
MILESTONE 6: Flight and Ground Hardware Interface Checks Completed, Second Draft
Baseline Mission ICD and Verification Planning Matrix (VPM) Approved, and Launch Service Provider SFW NRE Work Complete
1. Flight and Ground Hardware Interface Tests. The LVC shall perform tests to verify the compatibility of the physical and electrical interfaces and clearances between the LV and SV IAW PWS sections 3.4.11 and 3.4.12 and CDRL A023. The LVC shall perform mechanical fit-checks of the adapter harness to the standard electrical interface panel for each SV. The testing shall verify that all physical interfaces meet mission ICD requirements. These tests shall be performed, with Space Vehicle Contractor (SVC)/Launch System Integration Contractor (LSIC) support, to satisfy all applicable requirements in the ICD, contract PWS, and CDRL A023.
2. Second Draft Baseline Mission ICD: LVC’s second submission of the baseline mission ICD IAW CDRL A019 has been approved by the Government.
3. Second Draft Verification Planning Matrix (VPM): LVC has submitted and the Government has approved the second draft VPM IAW CDRL A021.
4. Launch Service Provider SFW NRE Work Complete. LVC’s launch service provider SFW NRE work is complete and all action items have been closed IAW the LVC’s Government-approved baseline SFW NRE work closure plan and schedule, PWS paragraph 3.6 and CDRL A032.
1a. Flight and ground hardware interface checks have been performed IAW PWS sections 3.4.11 and
3.4.12 and CDRL A023.
1b. CDRL A023 second submission of as-run interface check procedures received and accepted by the Government.
2. CDRL A019 second submission received and approved by the Government.
3. CDRL A021 second submission received and approved by the Government.
4. CDRL A032 final submission received and approved by the Government.
1. CDRL A023 second submission acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
2. CDRL A019 second submission acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
3. CDRL A021 second submission acceptance sheet signed by the PCO, appropriate COR or appropriate COTR.
4. CDRL A032 final submission acceptance sheet signed by the PCO, appropriate COR or
MILESTONE 7: Critical Mission Integration Design Review (MIDR-2) Completed
1. The LVC shall perform the critical Mission Integration Design Review (MIDR-2) IAW the
LVC’s Mission Integration Management Plan (MIMP) (CDRL A018) and PWS paragraph 3.4.2.
1. The LVC has conducted the MIDR-2 with either no liens or an action closure plan accepted by the Government.
1. Meeting minutes documenting successful MIDR-2 completion, including action items, and assessment of mission design effort to Critical Design Review (CDR) level.
MILESTONE 8: Launch Countdown Parameters and Operational Redline Limits Baseline, and
Mission Assurance Independent Assessment and Design Data Submitted Description:
1. The LVC shall provide the launch countdown parameters and operational redline limits baseline
IAW PWS Section 3.2.6.
2. The LVC shall submit the following Mission Assurance Independent Assessment and Design data
IAW CDRL A020:
a. Intermediate unguided 3DOF
b. CCAM memo
c. Acoustics, shock, and vibration environments
d. Vibroacoustic modeling and analysis
e. Engineering drawings
f. Transportation environments
1. The LVC has provided and the Government has accepted the launch countdown parameters and operational redline limits baseline IAW PWS Section 3.2.6.
2a. The LVC has submitted and the Government has accepted the intermediate unguided 3DOF IAW
CDRL A020.
2b. The LVC has submitted and the Government has accepted the CCAM memo IAW CDRL A020.
2c. The LVC has submitted and the Government has accepted the acoustics, shock, and vibration environments IAW CDRL A020.
2d. The LVC has submitted and the Government has accepted the vibroacoustic modeling and analysis IAW CDRL A020.
2e. The LVC has submitted and the Government has accepted the engineering drawings IAW CDRL
A020.
2f. The LVC has submitted and the Government has accepted the transportation environments IAW
CDRL A020.
1. Written acknowledgement of receipt by the Government of launch countdown parameters and operational redline limits baseline.
2. All CDRL A020 submission acceptance sheets signed by the PCO, appropriate COR or
MILESTONE 9: Additional Mission Assurance Independent Assessment and Design Data and Calculations Submitted and Hardware Pre-Ship Review(s) and Independent Hardware Review(s) Completed
1. The LVC shall submit the following Mission Assurance Independent Assessment and Design data and calculations IAW CDRL A020:
a. Controls tools input data
b. Controls analysis outputs (except pad/launch drift analysis)
c. Acoustics, shock, and vibration testing
d. Interface environments
2. The LVC shall conduct and complete pre-ship reviews for the major launch vehicle elements prior to shipment to the launch site IAW PWS paragraph 3.6.7. These major launch vehicle elements shall include:
a. Core booster(s)
b. Upper stage
c. Payload fairing
d. Payload adapter, and
e. Solid rocket motors (as applicable)
3. The LVC shall verify that all data is available for the Government’s independent hardware reviews and that all nonconformances and Out of Position (OOP) items and their closure plans have been identified IAW PWS section 3.6.6.
1a. The LVC has submitted and the Government has accepted the controls tools input data (CDRL
A020).
1b. The LVC has submitted and the Government has accepted the controls analysis outputs (except pad/launch drift analysis) (CDRL A020).
1c. The LVC has submitted and the Government has accepted the acoustics, shock, and vibration testing results (CDRL A020).
1d. The LVC has submitted and the Government has accepted the interface environments (CDRL
A020).
2a. The LVC has conducted, completed, and the Government has acknowledged completion in writing of a pre-ship review for the core booster(s) IAW PWS paragraph 3.6.7.
2b. The LVC has conducted, completed, and the Government has acknowledged completion in writing of a pre-ship review for the upper stage IAW PWS paragraph 3.6.7.
2c. The LVC has conducted, completed, and the Government has acknowledged completion in writing of a pre-ship review for the payload fairing IAW PWS paragraph 3.6.7.
2d. The LVC has conducted, completed, and the Government has acknowledged completion in writing of a pre-ship review for the payload adapter IAW PWS paragraph 3.6.7.
2e. The LVC has conducted, completed, and the Government has acknowledged completion in writing of a pre-ship review for the solid rocket boosters (as applicable) IAW PWS paragraph 3.6.7.
3a. The LVC has made all required data (e.g., build paper) available for the Government’s independent hardware reviews IAW PWS section 3.6.6.
3b. The LVC has identified closure plans acceptable to the Government for all nonconformances identified during the Government’s independent hardware review(s) for all hardware associated with the mission, flight or ground.
3c. The LVC has identified all OOP items and has identified closure plans acceptable to the Government for all such items.
1. All CDRL A020 submission acceptance sheets signed by the PCO, appropriate COR or appropriate COTR.
2a. - e. Written acknowledgment by the Government that pre-ship reviews have been completed for the core booster(s), upper stage, payload fairing, payload adapter, and (as applicable) solid rocket booster(s) IAW PWS paragraph 3.6.7.
3a. – c. Written acceptance by the Government of closure plans for all hardware nonconformances and OOP items identified during the Government’s independent hardware review(s) IAW PWS section 3.6.6.
MILESTONE 10: Acceptance of Launch Service
1. Final Post Flight Assessment Report completed and delivered IAW CDRL A016.
2. The Launch Service Order has been accepted by the Government IAW contract clause FAR
52.212-04 and contract Attachment 4, Launch Service Acceptance Criteria (LSAC).
Success Criteria:
1. Final Post Flight Assessment Report has been completed, delivered to, and accepted by the Government IAW CDRL A016.
2. The mission has not been deemed a “Mission Failure” IAW contract clause FAR 52.212-04 and Attachment 4, LSAC.
3. The Launch Service Order has been accepted by the PCO IAW contract clause FAR 52.212-04 and contract Attachment 4, LSAC.
1. CDRL A016 final submission acceptance sheet signed by the PCO, appropriate COR or appropriate
COTR.
2. No written determination by the Director, Space and Missile Systems Center, Launch Systems Directorate (SMC/LR) deeming the Launch Service Order a “Mission Failure” IAW contract clause FAR 52.212-04 and Attachment 4, LSAC.
3. PCO’s written notification to the LVC that the mission launched has been accepted by the Government IAW contract clause FAR 52.212-04 and contract Attachment 4, LSAC.
File details come from the government source that posted it. Updated .