06_Acceptance_Criteria_30_Sep_2015.pdf

PDF 275 KB Posted

Attached to
EELV Phase 1A GPS III Launch Services Federal contract opportunity
Solicitation number
15-102
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

06 Acceptance Criteria

View the file

Other files for this federal contract opportunity

Other files attached to EELV Phase 1A GPS III Launch Services, newest first.
File Type Posted
02b_Exhibit_B_CDRL_30_Sep_2015.pdf PDF
07_Instructions_to_Offerors_30_Sep_2015.pdf PDF
05_Small_Business_Plan_30_Sep_2015.pdf PDF
11_Payment_Plan_GPS_III_30_Sep_2015.pdf PDF
04_DD254_30_Sep_2015.pdf PDF
01_Model_Contract_30_Sep_2015.pdf PDF
03_PWS_30_Sep_2015.pdf PDF
02c_Exhibit_C_CDRL_30_Sep_2015.pdf PDF
10_Government_Property_30_Sep_2015.pdf PDF
09_Mission_Requirements_Annex_(See_Bidder's_Library).pdf PDF
08_Evaluation_Criteria_30_Sep_2015.pdf PDF
02a_Exhibit_A_CDRL_30_Sep_2015.pdf PDF
07_Attachment_5_Draft_Instructions_to_Offerors_(updated_15_Jul_15).pdf PDF
10_Attachment_8_Government_Property_(updated_15_Jul_15).pdf PDF
08_Attachment_6_Draft_Evaluation_Criteria_(updated_15_Jul_15).pdf PDF
03_Attachment_1_Draft_PWS_(updated_15_Jul_15).pdf PDF
02_Draft_CDRLs_Exhibit_A.pdf PDF
09_Attachment_7_Mission_Requirements_Annex_(See_Bidder's_Library).pdf PDF
01_Draft_Model_Contract.pdf PDF
02_Draft_CDRLs_Exhibit_B_(updated_15_Jul_15).pdf PDF
11_Attachment_9_Draft_Payment_Plan_(updated_15_Jul_15).pdf PDF
06_Attachment_4_Draft_Acceptance_Criteria_(updated_15_Jul_15).pdf PDF
02_Draft_CDRLs_Exhibit_C_(updated_15_Jul_15).pdf PDF
04_Attachment_2_Draft_DD_254_(updated_15_Jul_15).pdf PDF
05_Attachment_3_Draft_Small_Business_Plan.pdf PDF
09_DRAFT_GPS_III_MRA_Version_2015-04-30.pdf PDF
DRAFT_GPS_III_RFP_CRM.XLSX XLSX spreadsheet
07_Draft_Attach_5_Instr_to_Offerors_11_May_(GPSIII).pdf PDF
06_attachmnt_4_acceptance_criteria_150511_(GPS_III).pdf PDF
04_draft_attachmnt_2_dd_254_150511_(GPS_III).pdf PDF
03_draft_attachmnt_1_pws_11_may_(GPS_III).pdf PDF
05_draft_attachmnt_3_small_business_plan.pdf PDF
02_Draft_CDRLs_20150511_(GPS_III).pdf PDF
01_Draft_1449_Model_Contract_110515.pdf PDF
NDA_Bidders_Library_Access.pdf PDF
11_draft_payment_plan_atch_9_150511_GPS_III.pdf PDF
08_Draft_Attach_6_Eval_Criteria_11_May_GPS_III.pdf PDF
10_government_property_attachmnt_8_(GPS_III).pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4: Launch Service Acceptance Criteria for

FA8811-15-R-0001

30 September 2015

1. INTRODUCTION

This Launch Service Acceptance Criteria (LSAC) attachment defines the acceptance criteria for all National Security Space (NSS) Launch Services under this contract.

2.0 ORGANIZATIONAL RESPONSIBILITIES

2.1 The Director, Launch Systems Directorate (SMC/LR): The SMC/LR Director will consider the Contractor’s reports and other pertinent data, and determine whether the Contractor has met the acceptance criteria as outlined in this LSAC.

2.3 Procuring Contracting Officer (PCO): The PCO is the liaison between Contractor and Government personnel and executes the LSAC. The PCO reviews and implements the SMC/LR Director’s acceptance criteria determination.

3. EVALUATION

3.1 SMC/LR Director Determination

Within 30 days of the Government Post Flight Review, the SMC/LR Director will use the data specified in Section 3.2 and the criteria in Section 3.3 to provide the PCO with a Launch Service mission acceptance determination, and the PCO will notify the Contractor in writing whether a mission launched has been either accepted with full payment or accepted with partial payment by the Government. For missions with secondary and/or auxiliary payload(s), the Government’s acceptance will be based on successful delivery of the primary mission, regardless of the success or failure of the secondary and/or auxiliary payload(s). Any missions/requirements added to this Contract involving multiple primary payloads (dual or multiple manifest) or secondary payloads shall be the subject of a separate contractual action. In the event the Contractor does not concur with the PCO’s written decision, it shall be considered a dispute within the meaning of the clause FAR 52.233-1, “Disputes – Alternate 1” as included by reference in clause FAR 52.212-4(d).

3.2 Data Reliance. Launch Service acceptance will be determined using but not limited to the following data:

a. Orbit elements determined from launch vehicle guidance data provided by the Contractor.

b. Launch vehicle data indicating payload separation provided by the Contractor.

c. Available launch vehicle environmental data, including shock, acceleration, and thermal data, including data at the launch vehicle/payload interface.

d. Launch vehicle sequencing and attitude data provided by the Contractor.

e. Payload orbit elements determined from tracking and telemetry data provided by the observing networks with adjustments for the applicable orbit determination uncertainties (provided by the Government).

f. Payload telemetry data provided by the observing networks with adjustments for the applicable orbit determination uncertainties (provided by the Government).

3.3. Launch Service Acceptance Criteria: A Launch Service shall be determined by the SMC/LR Director to be acceptable with full payment if any of the conditions below are met.

a. The primary spacecraft is placed into an orbit within the allowable dispersions, as defined in the appropriate Interface Control Document (ICD), from the target values as defined in the mission definition letter and/or Target Specification and the Satellite has 100% operational utility. Verification of insertion will be the responsibility of the Government.

b. The primary spacecraft is placed into orbit, as defined in paragraph 3.3.a above and independent of the operational utility of the spacecraft, the launch vehicle induced environments are not in excess of those specified in the ICD. Verification of launch vehicle environments to which the spacecraft is exposed is the responsibility of the Contractor with confirmation by the Government. For the purposes of ICD compliance, the booster-induced flight environments shall be considered satisfied where they are:

1) not in excess of the magnitude of the ICD level where the ICD level is defined as P99/90 (probability of 99%, with 90% confidence level), or;

2) not in excess of the magnitude of the ICD level +6dB where the ICD level is defined as P95/50 (probability of 95%, with 50% confidence). ICD violations unrelated to the SV functional failure shall not be considered herein as a material factor in mission success or failure.

c. The spacecraft is placed into the orbit, as defined in paragraph 3.3.a above, and has zero operational utility and at no fault of the Contractor the environmental data portion of the launch vehicle telemetry has not been obtained or has been obtained but is unreliable or unusable.

d. A mission failure is due to the improper issuance of destruct command by a Government Agency. Improper issuance is defined as the Government Flight Termination System activation in error.

e. A mission failure is due to any Spacecraft, Associate Contractor [Federally Funded Research & Development Contractor (FFRDC), Systems Engineering & Technical Assistance (SETA), or Systems Engineering & Integration (SE&I)] or Government agency related error.

f. A mission failure is due to inaccurate Government Furnished Data (inclusive of spacecraft Contractor data) leading to an erroneous decision to launch or the mission failure is determined to be a result of the inaccurate Government Furnished Data.

g. A mission failure is due to the failure of the spacecraft to successfully issue a separation command (for those missions dependent upon the spacecraft to initiate the separation event).