EXHIBIT A
TO
FA8811-15-R-0001
EVOLVED EXPENDABLE LAUNCH VEHICLE (EELV)
PHASE 1A
CONTRACT DATA REQUIREMENTS LIST (CDRLs)
14 July 2015
Department of the Air Force
Space and Missile Systems Center
Launch and Range Systems Directorate
Los Angeles Air Force Base, California
CDRL General Instructions CDRL Address List CDRL Distribution List CDRLs
CDRL GENERAL INSTRUCTIONS
CONTRACT DATA REQUIREMENTS LIST (CDRL)
A list of data requirements authorized for this specific procurement and made a part of this contract. The contractual method is the use of DD Form 1423s, Contract Data Requirement List (CDRL), which specifies the data which is required to be delivered to the government. For the purpose of this agreement, the “contract” applies for each Launch Vehicle Service order.
DATA ITEM NUMBER
If the Contract is awarded multiple Launch Vehicle Service orders, the Contractor shall use a sequential alphanumeric number scheme. For example, Order 1 will have CDRLs A001-A027 and Order 2 will have CDRLs B001-B027.
DATA ITEM DESCRIPTIONS (DIDs) The DID is a specification for the preparation of data. The DIDs listed on the CDRLs were selected from DOD 5010.12-L, Acquisition Management Systems and Data Requirement Control List (AMSDL).
DID TAILORING
DID tailoring is made to either relax format requirements or to tailor the DID to be in consonance with the source document tailoring contained in the Performance Work Statement (PWS). Since contract data requirements are normally a by-product of some contract task, if the requirements of the DID are in conflict with the tailored application of the source document as reflected in the PWS, the latter takes precedence.
DATA DELIVERY DATES
For Soft Copies, delivery of data is to be construed as the date data is available in the contractors’ data management system and electronic notification is sent to addressees.
For Hard Copies, delivery of data is to be construed as “On Dock” dates at destination. Provision of a three-day postage handling period from postmark at contractor's facility to "On-Dock" delivery at destination meets this requirement, unless otherwise stated in CDRL. The date of government signature at destination, if courier service is used, is to be construed as the “On Dock” date. It shall be the contractor's responsibility to ensure data delivery prior to end of business on the due date if a courier service is used in lieu of the U.S. Postal Service.
If due date falls on weekend or government holiday, data shall be due on the next scheduled government workday.
DD FORM 250 REQUIREMENTS
Block 7 of the CDRL will indicate whether inspection and acceptance of the data by DD Form 250 is required. "Draft" copies submitted for advance approval and "Preliminary" copies submitted are exempt from the DD Form 250 requirements.
ADDITIONS TO DISTRIBUTION
If an addressee is added to distribution, or distribution quantities have been increased to an existing addressee, initial submittal to new addressee shall include the basic document and revisions as appropriate.
COMMUNICATIONS
Any correspondence related to requests for data delivery deviations, amendments, additions or deletions shall be addressed to the PCO with an information copy to the government Data Management Officer
(DMO).
For those data items where "LT" (Letter of Transmittal) is indicated in Block 7 of the CDRL, the Contractor shall utilize a Letter of Transmittal (LOT). Each copy submitted shall have a LOT attached. In addition, the contractor shall furnish one copy of each LOT (without data) to the government DMO. Change pages shall indicate updates by a bar in the margin adjacent to the change and encompassing all changed portions.
CDRL ADDRESS LIST AND DATA DISTRIBUTION LIST
The Address List provides the complete mailing address for each addressee and a mailing code.
The Data Distribution List provides information regarding quantities for shipment (normally in Blocks 14 & 15 of the CDRL) to each mailing code. Quantity of Hard deliverables and Soft deliverables will be indicated to the left and right of the “/”, respectively. See CDRL for possible additional format or delivery instructions.
DATA APPROVALS
While all data are subject to government approval, selected data will require advanced approval. The letter "A" appearing in Block 8 of the CDRL designates such data. Approval will be required on every submittal (i.e., the Preliminary, Draft, Finals that incorporate government comments, and revisions and/or change pages, if applicable). The approving authority shall be the Procuring Contracting Office (PCO). Delivery of the Final data shall be submitted within 30 CD after receipt of government approval of Draft unless otherwise stated on CDRL.
CODES USED ON THE CDRL
The following codes may be used as described below. a. Block 7: DD
Form 250 requirements
CODE WHEN USED
LT Letter of Transmittal only b. Block 8:
Approval code
CODE WHEN USED
A Approval is required by government on all submittals. N/A Approval is not required.
c. Block 10: Frequency
CODE (Limit to five characters)
DAILY Daily WEKLY Weekly BI-WE Each two weeks MTHLY Monthly BI-MO Each two months QRTLY Quarterly ANNLY Annually SEMIA Each six months OTIME One time ONE/R One time, & revisions R/ASR Revisions as required *ASREQ As required DFDEL Deferred delivery DFORD Deferred ordering ONE/P 1-time preliminary draft 2TIME Two separate submittals
*When ASREQ is used in items 10, 11, 12 or 13, an explanation of the requirement must be entered in item 16.
d. Blocks 12 & 13: Date of 1st and Subsequent Submissions
SDA = Government APPROVAL CDR = Critical Design Review CA = Contract Award IPR = In Process Review CO = Change Order FCA = Functional Configuration Audit SA =Supplemental Agreement PCA = Physical Configuration Audit
SRR = System Requirements Review FLT = Flight Test Review SDR = System Design Review CD = Calendar Days PDR = Preliminary Design Review WD = Working Days EOC = End of Contract ATP = Authority to Proceed ILC = Initial Launch DACA = Days After Contract Award*
* For this agreement, Contract Award is the same as Launch Vehicle Services Order
ELECTRONIC DISTRIBUTION
CDRL’s shall be delivered on the contractors’ data management system(s). The contractor shall enable remote access to these systems by all SPO personnel; AF, Aerospace and SETA, subject to applicable terms on this contract. An index of addressees to be allowed access to and/or to be notified of CDRL availability will be provided by government DMO via email notification for contractor’s implementation.
Access Lists will be updated, as required, without modification to the contract. The contractor shall use an acceptable electronic format which is compatible with existing government systems, unless a precise format is specified in the CDRL.
CDRL ADDRESS LIST
1. HQ Space & Missile Systems Center (AFSPC) LRx
Launch Systems Directorate 483 North Aviation Blvd.
Los Angeles AFB El Segundo, CA 90245-2808 smc.lrdm@us.af.mil
a. LRE, Bldg. 271 B3-405 (Data Management Office, DMO)
b. LRE
c. LRP
d. LRK
e. LRG
f. LRS
NOTE: Submit Hard Copies to 1.a. for distribution, if applicable
2. HQ Space & Missile Systems Center (AFSPC) SAF/SL
Attn: SAF/SL, Bldg. A5 483 North Aviation Blvd.
Los Angeles AFB El Segundo, CA 90245-2808
3. 30th Launch Group 30 LCG
4th Space Launch Squadron Directorate of Engineering Attn: Data Desk 1515 Iceland Ave., Suite 222 Bldg. 8500 Vandenberg AFB, CA 93437-5321
4. 45 LCG / 45 LCSS 45 LCG
Attn: Data Library 15270 Samuel C. Phillips Parkway (CCAFS) Building 1645 Patrick AFB, FL 32925-2009
5. Defense Cost and Resource Center (DCARC) DCARC
201 12th Street South Suite 220 Arlington, VA 22202
(703) 601-4850
6. DCMA, TBD DCMA
7. NRO Operations Squadron NOPS
401 Discoverer Ave. Ste 32 Schriever AFB, CO 80912 NOPS_Launch@us.af.mil
CDRL DISTRIBUTION LIST
CDRL TITLE OFFICE
SYMBOL
QTY
Hard/Soft
A001 Data Accession List (DAL) LRE 0/1 A002 “Cost Data Summary Report”
(DD Form 1921)
LRP
DCARC
0/1 0/1
A003 “Functional Cost-Hour Report” (DD Form 1921-1)
LRP
DCARC
0/1 0/1
A004 Contractor Business Data Report (DD Form 1921-3)
LRP
DCARC
0/1 0/1
A005 Contract Work Breakdown Structure (CWBS) LRP
DCARC
DCMA
0/1 0/1 0/1
A006 Integrated Program Management Report (IPMR) - Integrated Master Schedule (IMS)
DCARC
LRP
0/1 0/1
A007 Training Materials - Launch Vehicle Familiarization Training
LRG
SAF/SL
30 LCG
45 LCG
0/1
A008 Program Protection Implementation Plan (PPIP) LRE 0/1
A009 As Built Configuration List (ABCL) - Launch Vehicle Configuration
LRE
LRG
0/1 0/1
A010 Test Plan - Launch Vehicle Test and Verification Plan
(LVTVP)
LRG
LRE
0/1
A011 Test Procedure - Flight Hardware Interface Checks LRG
SAF/SL**
0/1 0/1
** For NRO Missions ^ For Launches from Vandenberg Air Force Base (VAFB) ^^ For Launches from Cape Canaveral Air Force Station (CCAFS) or Kennedy Space Center (KSC)
NOTE: The contractor shall provide electronic access of CDRLs, and notification via Email to select addressees, when requested, in accordance with government provided Access List index. Addressees (for notification purposes only) not listed above may include, for example, Aerospace, DCMA, Patrick AFB, Vandenberg AFB, and SETA contractors. It is not the responsibility of the Contractor to make actual distribution of either electronic or hard copy CDRLs to these unnamed addressees. Draft documents delivered electronically must be marked “draft.” Notifications for Revisions to required CDRL deliveries shall be provided to all POCs
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 Data Accession List (DAL)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-MGMT-81453A/T Performance Work Statement, Para 3.1.3 SMC/LRE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT MTHLY 30 DACA b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
FINAL
N/A N/A MTHLY Draft Reg Repro
16. REMARKS See Distribution List
1. (BLK 4):
a. Data Accession List (DAL) will be cumulative.
b. List is not to include data generated by other CDRLs on contract.
c. The DAL shall contain pointers (links) to the contractor’s electronic data systems file names or document location in the online database.
2. (BLK 13): Technical data shall be added to the online dataset within 10WD after release
15. TOTAL 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Electronically Generated PAGE 1 OF 1 PAGES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Cost Data Summary Report (DD Form 1921)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-FNCL-81565C/T Performance Work Statement, Para 3.1.4 SMC/LRP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT BLK 16 BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
N/A BLK 16 BLK 16 Draft Reg Repro
16. REMARKS See Distribution List
1. (BLK 4):
a. Prepare in accordance with the CAIG Chair approved Cost and Software Reporting (CSDR) Plan provision, the WBS Data Dictionary, and the Contract Cost Data Reporting (CCDR) Manual (DoD 5000.4 M-1). Use the latest revisions of the CSDR Plan and the WBS Dictionary. The CCDR Manual is available from the Defense Cost and resource Center (DCARC) website at http://dcarc.pae.osd.mil
b. The responsible DoD office for receiving and storing all CCDR related formats is:
Defense Cost and Resource Center (DCARC)
201 12th Street South
Suite 220
Arlington, CA 22202
c. Prepare CCDR data in electronic format in accordance with the detailed instructions contained in Data Item Description DI-FNCL-81565C. The required file format is Microsoft Excel compatible spreadsheet. PDF format is not acceptable. These reports must be submitted by report upload to the DCARC’s secure website. The DCARC website contains information about deliver methods and submission instructions.
d. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to DCARC and SMC/LRP. If the subcontractor agrees, a copy of the report may be provided concurrently to the prime or higher tier contractor.
e. Contractor shall identify major subcontractor names, values, and corresponding WBS elements in the remarks sections of the DD Form 1921.
2. (BLK 10, 11, 12 & 13): Please reference the latest approved CSDR Plan provided by DCARC for current submission events and due dates.
15. TOTAL
Electronically Generated PAGE 1 OF 1 PAGES
a. NAME:
Pre-A B X C-FRP X
A C-LRIP O&S
PROGRAM X
X
X
a. CWBS
DICTIONARY
d. DD 1921-2
(PCR)
f. SRDR
FORMATS
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X
X X X X X
X
X
X
DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE
1.3 1.3 Supplier Readiness X
X
X
X
b. DD 1921
(CDSR)
XLaunch Vehicle System (MISSION NAME)
Core Vehicle X
Mission Unique Hardware X
1.01.0
1.8.3 1.8.3
1.8.2.3 1.8.2.3
9b. CONTRACT NUMBER
PHASE 1A
b. CONTRACT/
SUBCONTRACT
12.
WBS REPORTING ELEMENTS
11. WBS ELEMENT CODE
13. REPORTS REQUIRED
(X if applicable)
a. PROGRAM/
CONTRACT/
SUBCONTRACT
8. PREPARING
ORGANIZATION
AF SMC/LR Program Control
AF-05-C-C14
10. APPROVED PLAN NUMBER
c. DD 1921-1
(FCHR)
e. DD 1921-4
(CSR)
DD 1921-3 (CBDR):
6d. E-MAIL ADDRESS roy.bryson@us.af.mil
TBD
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) SMC/LRP Cost Chief 483 N. Aviation Blvd Los Angeles AFB El Segundo, CA 90245
RDT&E
PROCUREMENT
O&M
9c. APPROPRIATION
6b. TELEPHONE NUMBER (Include Area Code)
7. PLAN TYPE
CONTRACT (PRIME)
CONTRACT (SUB)
ii. DIVISION
9a. CONTRACTOR NAME/ADDRESS
i. PERFORMING ORGANIZATION
COST AND SOFTWARE DATA REPORTING PLAN
Form Approved
OMB No. 0704-0188
b. PHASE/MILESTONE c. PRIME MISSION PRODUCT
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
2. WBS SYSTEM TYPE
1. MAJOR PROGRAM EELV – Evolved Expendable Launch Vehicle
3. SUBMISSION TYPE4. CURRENT SUBMISSION
DATE (YYYYMMDD)
310-653-4715
6c. FAX NUMBER (Include Area Code)
310-653-3151
Launch Vehicle SystemLaunch Vehicle
5. LAST APPROVED PLAN DATE
(YYYYMMDD)
20140502
INITIAL
CHANGE
1.8.2.2 1.8.2.2 Payload Attach Fitting (Adapter) X X
1.8.2.1 1.8.2.1 Payload Fairing X X
1.8.2 1.8.2 Payload Accommodations X
1.8.1.3 1.8.1.3 Solid Rocket Motors X X
1.8.1.2 1.8.1.2 Upper Stage Engine X X
1.8.1.1 1.8.1.1 Booster Engine X X
1.8.1 1.8.1 Propulsion X X
1.8 1.8 Launch Vehicle X X
1.7.6 1.7.6 Propellants (Vehicle) X
1.7.5 1.7.5 Range Operations Services X
1.7.4 1.7.4 Base Support X X
1.7.3.2 1.7.3.2 Other Maintenance X
1.7.3.1 1.7.3.1 Sustainment Propellants X
1.7.3 1.7.3 Site Maintenance X X
1.7.2.2 1.7.2.2 Launch Operations System Engineering X X
1.7.2.1 1.7.2.1 Launch Operations Program Management X X
1.7.2 1.7.2 Launch Operations SEPM X X
1.7.1.2 1.7.1.2 P/L Encapsulation X
1.7.1.1 1.7.1.1 Launch Crew (mate, checkout, launch) X
1.7.1 1.7.1 Launch Support X
1.7 1.7 Launch Operations X
1.6 1.6 Transportation X
1.5.4 1.5.4 Special Studies (by Study) X X
1.5.3 1.5.3 Factory Support X X
1.5.2 1.5.2 System Engineering X X
1.5.1 1.5.1 Program Management X X
1.5 1.5 System Engineering, Integration, Test, Program Management X X
1.4 1.4 Mission Unique Development/Design X
1.2 1.2 Mission Assurance X
1.1.2 1.1.2 Mission Unique Integration X
1.1.1 1.1.1 Mission Standard Integration X
1.1 1.1 Mission Integration X
1.8.3.1 1.8.3.1 Booster Structure X X
1.8.3.2 1.8.3.2 Intertank Adapter & Skirts X X
X
a. CWBS
DICTIONARY
d. DD 1921-2
(PCR)
f. SRDR
FORMATS
X X
X X X
X
X
X
X X X
X
DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE
12.
WBS REPORTING ELEMENTS
13. REPORTS REQUIRED
(X if applicable)
DD 1921-3 (CBDR):
a. PROGRAM/
CONTRACT/
SUBCONTRACT
b. CONTRACT/
SUBCONTRACT
b. DD 1921
(CDSR)
c. DD 1921-1
(FCHR)
e. DD 1921-4
(CSR)
1.8.3.3 1.8.3.3 Aft Transition Structure X X
X
X
X
X
Subtotal Cost X
1.9 1.9 Training X
1.8.7 1.8.7 Integration, Assembly, Test & Checkout (IAT&C) X X
1.8.6 1.8.6 Guidance and Control (Avionics) X X
1.8.5 1.8.5 Mission Assurance Instrumentation X X
1.8.4.1 Upper Stage Structure X X
1.8.4.2 1.8.4.2 Interstage Adapters, Stub Adapters, Forward Adapters X X
X
1.8.4 1.8.4 Upper Stage X X
X
1.8.3.4 1.8.3.4 Heat Shield X
1.8.4.1
Reporting Contractor FCCM
Total Cost
X
Reporting Contractor Profit/Loss or Fee
Total Price X
Reporting Contractor G&A
Reporting Contractor Undistributed Budget
Reporting Contractor Management Reserve
1.10 1.10 Other X
d. AS OF DATE e. DUE DATE
(YYYYMMDD) (YYYYMMDD)
1 CWBS Dictionary 20150601 20150901
2 1921, 1921-1 20150610 20150902
3 1921, 1921-1
Initial CWBS Submission Initial Cost Report (GPS III) Final Cost Report (GPS III) 20170601 20180831
DD FORM 2794 (PAGE 2), MAY 2011 PREVIOUS EDITION IS OBSOLETE
Special Instructions:
(1) Develop a mapping approach to assign production, test, and check out costs / hours to those identified in the CSDR plan's section 1.7 (Launch Vehicle) elements.
(2) Develop a mapping approach to assign engineering costs / hours to those identified in the CSDR plan's section 1.4 (System Engineering, Program Management) elements.
(3) Either build a mapping plan to assign mission integration and launch operations costs / hours to those identified in the CSDR plan's section 1.1 (Mission Integration), section 1.5 (Transportation), and 1.6 (Launch Operations) elements or identify these as costs captured in the overhead costs. Discrete easily identifiable launch costs (specifically telemetry data) you would intend to break out.
(4) Use the notes section in the form(s) to document your assumptions, allocations, mappings, etc.
(5) For WBS 1.10 "Other" category, specifically define what these costs are in Remarks' section
COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES:
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
1921-3 CONTRACTOR BUSINESS DATA REPORT:
a. The Contractor Business Data Report is prepared by and for the business entity (e,g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government, if applicable.
b. Reports are submitted annually at the end of the contractor's fiscal year.
c. Blocks 1 through 11, on Page 1, must be completed. Sections A - F are not required. REMARKS section must include "Headcount by Department" on a monthly basis.
NON-RECURRING/RECURRING DEFINITIONS:
There are no refinements or expansions to these definitions warranted.
14. CSDR SUBMISSION DATES
15. REMARKS
c.
EVENT
a.
SUBMISSION
b.
FORM(S)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 Functional Cost-Hour Report (DD Form 1921-1)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-FNCL-81566C/T Performance Work Statement, Para 3.1.4 SMC/LRP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT BLK 16 BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
16. REMARKS See Distribution List
1. (BLK 4):
a. Prepare in accordance with the CAIG Chair approved Cost and Software Reporting (CSDR) Plan provision, the WBS Data Dictionary, and the Contract Cost Data Reporting (CCDR) Manual (DoD 5000.4 M-1). Use the latest revisions of the CSDR Plan and the WBS Dictionary. The CCDR Manual is available from the Defense Cost and resource Center (DCARC) website at http://dcarc.pae.osd.mil
b. The responsible DoD office for receiving and storing all CCDR related formats is:
Defense Cost and Resource Center (DCARC)
201 12th Street South
Suite 220
Arlington, CA 22202
c. Prepare CCDR data in electronic format in accordance with the detailed instructions contained in Data Item Description DI-FNCL-81566C. The required file format is Microsoft Excel compatible spreadsheet. PDF format is not acceptable. These reports must be submitted by report upload to the DCARC’s secure website. The DCARC website contains information about deliver methods and submission instructions.
d. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to DCARC and SMC/LRP. If the subcontractor agrees, a copy of the report may be provided concurrently to the prime or higher tier contractor.
e. Contractor shall identify major subcontractor names, values, and corresponding WBS elements in the remarks sections of the DD Form 1921.
2. (BLK 10, 11, 12 & 13): Please reference the latest approved CSDR Plan provided by
15. TOTAL 1
Electronically Generated PAGE 1 OF 1 PAGES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 Contractor Business Data Report (DD Form 1921-3)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-FNCL-81765B/T Performance Work Statement, Para 3.1.4 SMC/LRP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT BLK 16 BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
16. REMARKS See Distribution List
1. (BLK 4):
a. Prepare in accordance with the CAIG Chair approved Cost and Software Reporting (CSDR) Plan provision, the WBS Data Dictionary, and the Contract Cost Data Reporting (CCDR) Manual (DoD 5000.4 M-1). Use the latest revisions of the CSDR Plan and the WBS Dictionary. The CCDR Manual is available from the Defense Cost and resource Center (DCARC) website at http://dcarc.pae.osd.mil
b. The responsible DoD office for receiving and storing all CCDR related formats is:
Defense Cost and Resource Center (DCARC)
201 12th Street South
Suite 220
Arlington, CA 22202
c. Prepare Contractor Business Data Report (CBDR) data in electronic format in accordance with the detailed instructions contained in Data Item Description DI-FNCL- 81565B. The required file format is Microsoft Excel compatible spreadsheet. PDF format is not acceptable. These reports must be submitted by report upload to the DCARC’s secure website. The DCARC website contains information about deliver methods and submission instructions.
d. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to DCARC and SMC/LRP. If the subcontractor agrees, a copy of the report may be provided concurrently to the prime or higher tier contractor.
e. Contractor shall identify major subcontractor names, values, and corresponding WBS elements in the remarks sections of the DD Form 1921.
2. (BLK 10, 11, 13 & 13): Please reference the latest approved CSDR Plan provided by
Electronically Generated PAGE 1 OF 1 PAGES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 Contractor Work Breakdown Structure (CWBS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-MGMT-81334D/T Performance Work Statement, Para 3.1.4 SMC/LRP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT BLK 16 BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
A BLK 16 BLK 16 Draft Reg Repro
16. REMARKS See Distribution List
1. (BLK 4):
a. Prepare in accordance with the Contract Cost Data Reporting (CCDR) Manual (DoD 5000.4-M-1) and the guidance in Military Standard 881C,”Work Breakdown Structures for Defense Material Items’, Appendix J (T), “Launch Vehicle Systems work Breakdown Structure and Definitions. The CCDR Manual is available at the DCARC website http://dcarc.pae.osd.mil
b. The responsible DoD office for receiving and storing all CCDR related formats is:
Defense Cost and Resource Center (DCARC)
201 12th Street South
Suite 220
Arlington, CA 22202
c. Prepare CCDR data in electronic format in accordance with the detailed instructions contained in Data Item Description DI-MGMT-81334D. The required file format is Microsoft Excel compatible spreadsheet. PDF format is not acceptable. Microsoft Word is an acceptable format for submission of the CWBS Dictionary. These reports must be submitted by report upload to the DCARC’s secure website. The DCARC website contains information about deliver methods and submission instructions.
d. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to DCARC and
SMC/LRP.
e. The CWBS shall include up to Level 4 of indenture. Contractor shall provide reporting for Levels 1 through 4 of the Program WBS. Any differences between the CWBS and Program WBS shall be identified.
2. (BLK 10, 11, 12 & 13):
a. CWBS and CWBS Dictionary date of first submission is 60 CD after Contract Award.
b. Subsequent submissions 30 CD after Fiscal Year end (Sep 30).
c. Please reference the latest approved CSDR plan provided by DCARC for current submission events and due dates.
d. Any redlines to the CWBS dictionary after first submittal shall be provided to SMC/LRP monthly for Government review and DCARC coordination.
Electronically Generated PAGE 1 OF 1 PAGES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 Integrated Program Management Report (IPMR) Integrated Master Schedule
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-MGMT-81861/T Performance Work Statement, Para 3.1.4 SMC/LRP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT MTHLY BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
16. REMARKS See Distribution List
1. (BLK 4):
a. Only the following DID sections and their sub-sections (omitting references to Formats 1- 5 or 7) are applicable: 1.3, 1.5, 2.1.1, 2.1.1.2, 2.2.5, 2.3, 2.5.1, 2.6.1, 2.7, 3.6.7 and 3.7 as tailored below.
b. 2.1.1 Electronic Submission of Data Add the following: The IMS shall be submitted electronically using the contractor’s schedule tool and only in a pdf file format when specifically requested by the Government.
c. 2.2.5 Native Schedule Format Add the following: The IMS shall be created using a network capable scheduling software application of the contractor’s choice. The IMS shall be configured to allow sorting a filtering by key events and to allow filtering for various views; for example, top level summary view, mid-level summary view, critical path for each mission and a complete detail view.
d. 2.6.1 Submission Requirements. Replace with: Format 6 shall be submitted to the procuring activity no later than 14 federal working days after contractor’s month end close.
e. 3.7.1 IMS Requirements Delete all references to the Integrated Master Plan (IMP). An IMP is not required.
f. 3.7.1.1.1 Production Contract IMS Add the following: Production key events/milestones shall be incorporated at the summary level and networked to their associated activities within the IMS. The interrelationships/interdependencies shall be identified with sufficient detailed activities through the use of network logic that provide a clear picture of the mission's progress from ATP through contract completion.
g. 3.7.1.3 IMS Content Elements 2nd bullet – Replace with: The IMS shall have traceability to WBS and Performance Work Statement.
h. 3.7.1.3.4.3 Scope Planning Add the following: Planning packages shall be detailed planned into discrete work packages, or apportioned tasks (as appropriate) no later than one accounting period prior to the schedule start of the planning package. Planning package plans shall reflect the manner in which the work is to be performed.
i. 3.7.1.3.5.3 Duration Add the following: Discrete/measureable activities shall be baselined in accordance with the contractor’s System Description Document. Where durations are longer than 44 working days, rationale shall be provided within the IMS.
Electronically Generated PAGE 1 OF 2 PAGES
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP X TM OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
16. REMARKS
j. 3.7.1.3.5.8 Driving Path – Delete
k. 3.7.1.3.5.9 Critical Path Add the following: Each mission’s critical path shall show clear network logic through the launch operation schedule of activities. The launch operations data shall be provided to the Government using existing contractor schedule and format on a monthly basis. At the mission level, the critical path follows the standard definition (a critical path being the longest contiguous path through the network) flow from mission ATP through launch providing a clear network of logic of all tasks along the critical path. As a mission progresses, the critical path shall also include activities that have negative float. Where critical path is not calculated based on the longest path, but based on risk, development of known delivery problems, the critical path shall explain the deviation from the standard derived critical path.
l. 3.7.1.3.5.10 Current Schedule Add the following: Reporting thresholds shall be consistent with the most recent DCMA 14 Point Assessment metrics.
m. 3.7.1.3.5.15 External Dependencies Add the following: A network schedule for each mission shall clearly identify activities, product hand-offs and deliverables from external interfaces, from the lowest level of contract tasks/activities up to the summary level schedule activities and milestones.
The determination of external significant and critical interfaces to be identified within the IMS requires agreement among the contractor(s) and Government and is documented accordingly.
n. Delete 3.7.1.3.6 Schedule Risk Assessment (SRA)
o. Delete 3.7.1.3.6.1 – 3.7.1.3.6.5
p. 3.7.1.3.7.2 Required traceability Replace with: The WBS must be traceable for all discrete work in the IMS. Traceability may be met with a field in the IMS or via other means as long as discrete work reconciles.
q. Delete 3.7.1.3.7.3. Item 4) Earned Value Technique (EVT)
2. (BLK 11) Last day of the contractor’s monthly accounting period
3. (BLK 12) No later than 60 DACA
4. (BLK 13) Electronic copy shall be submitted NLT 14 federal working days after contractor’s month end close
5. (BLK 14) All IMS related forms must be electronically submitted to the central repository at the DCARC website at https://service.dcarc.cape.osd.mil/DCARCPortal/site/login.asox
Electronically Generated PAGE 2 OF 2 PAGES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A X TDP TM OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 Training Materials Launch Vehicle Familiarization
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ILSS-80872/T Performance Work Statement, Para 3.1.10 SMC/LRG
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ 60 DACA b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
A N/A BLK 16 Draft Reg Repro
16. REMARKS See Distribution List
1. (BLK 4):
a. Replace 10.1 with “10.1 Format. The material provided shall be in the contractor’s own format. The material shall be printable on standard size paper, e.g. 8 ½ x 11 or A4;
foldouts are allowed”
b. Delete 10.1.1
c. Replace 10.2 with “10.2 Contents. The Launch Vehicle Familiarization training materials shall consist of text, supplemental written and audio-visual material used to support the Launch Vehicle Familiarization class.”
d. Replace 10.2.1 with
“10.2.1 The Launch Vehicle hardware, software and ground interface sections shall include the following elements:
A. Overall review of hardware or software element function and construction
B. Basic performance requirements and interfaces
C. Qualification approach
D. Fault tolerance
E. Test questions for the student”
e. Delete 10.2.1.1 – 10.2.1.7
f. Replace 10.2.2 with
“10.2.2 Required Material. The Launch Vehicle Familiarization training materials shall address the following elements (as appropriate for the Launch Service provided):
1. Launch Vehicle Hardware and Software
a. Booster
i. Structure
1. Propellant Tanks
2. Primary Transition Structure
3. Heat Shields
Electronically Generated PAGE 1 OF 3 PAGES
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A X TDP TM OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
16. REMARKS
4. Propellant Feed Subsystems
5. Avionics Structure
6. Fairings
ii. Booster Systems
1. Booster Tank Pressurization
2. Propellant Level Control Systems
3. Propellant Utilization System
4. Propellant Depletion System
5. Retro-Rockets
6. Separation and Ordnance Systems
iii. Booster Propulsion
1. Main engine
2. Main engine hydraulics
iv. SRB Propulsion
1. Solid Rocket Booster
2. Strap-On Attach Hardware
3. CCB/SRB Umbilicals
b. Upper Stage
i. Structure
1. Tanks
2. Avionics Panels
ii. Upper Stage System
1. Propellant Level System
2. Propellant Utilization System
3. Pressurization and Venting System
4. Helium System
5. Reaction Control Thrusters
iii. Upper Stage Engine
c. Payload Fairings and Payload Adapters
d. Avionics and Electrical Systems
i. Electrical Power Subsystem (EPS)
ii. Guidance, Navigation, and Control (GNC) Subsystem
1. Navigation Unit
2. Flight Software
3. Remote Command and Control Units
iii. Ordnance Control Units
iv. Batteries
v. Data Acquisition System (DAS) Telemetry Data Transmission System (TDTS)
vi. Tracking System
vii. Flight Termination System (FTS)
Electronically Generated PAGE 2 OF 3 PAGES
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A X TDP TM OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
16. REMARKS
2. Ground Systems
a. Ground Command, Control Communications
b. Launch Mount and Umbilical System
c. Range Interface
d. Facility systems and capabilities
e. Launch site critical ground mechanical, structural and fluid/has systems
f. Ground electrical systems
3. Launch Vehicle Processing
a. Manufacturing Facility
b. Factory Checkout and Test
c. Transportation
d. Receive and Inspection, Checkout and Test
e. Integrated Systems Test
f. Payload processing and Integration
g. Launch Vehicle and Facility Walkdown process
h. Launch Countdown and Launch
4. Launch Vehicle System and Systems Engineering
a. Mission Profiles and Vehicle Capability
b. Requirements and Verification
c. Standard analyses performed by all disciplines during each mission integration cycle
i. Analysis Scope
ii. Tools Utilized
d. Risk Identification, Tracking, and Resolution criteria/process
e. Types of Contractor Work Authorization Documents
5. Contractor organizational structure, roles and responsibilities”
2. (BLKs 13): Updates to the training shall be submitted to reflect the latest United States Government certified/approved launch system configuration.
Electronically Generated PAGE 3 OF 3 PAGES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP X TM OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008 Program Protection Implementation Plan (PPIP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-ADMN-81306 Performance Work Statement, Para 3.1.11 SMC/LRE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
A N/A BLK 16 Draft Reg Repro
16. REMARKS See Distribution List
1. (BLK 4):10.1 Content Requirements
a. 10.1.a Replace with “Description detailing how the PPIP aligns with the Government PPP methodology and the defined Program Protection schedule activities/events.
Description shall also addresses implementation of Government Program Protection contractual direction (PWS)“
b. Add “10.1.d Definitions of contractor Criticality Analysis methods to further define Government PPP Critical Components (CC) detail. CC detail must be provided down to the point where the contractor loses configuration management control of the CC internal components (e.g. COTS hardware). Criticality Analysis results should be provided as modifications/additions to Government PPP content.”
c. Add “10.1.e Definition of contractor identified vulnerabilities and Program Protection incidents and how/when they are reported to the Government.”
d. Add “10.1.f Definition of contractor identified vulnerabilities and Program Protection incidents and how/when they are reported to the Government. Also, describe methods to ensure accountability of all Critical Program Information (CPI) handled by the contractor”
e. Add 10.1.g For Supply Chain Risk Management countermeasures aspects; provide a detailed set of supplier information for all CCs and components that handle CPI. A supplier can either be a Manufacturer (e.g. Original Equipment Manufacturer) or a Vendor (sells Manufacturer components). If CCs are purchased from a Vendor, the Manufacturer information must also be provided. Required supplier details include:
CC supplied, company name, address, website, type (Manufacturer or Vendor), and CAGE code. These details should be specific to where the component being acquired/manufactured.”
2. (BLK 8): Approval shall be by Contracts letter.
3. (BLK 10, 12 & 13):
a. Draft PPIP shall be submitted 30 CD after receipt of the EELV Program Protection Plan (PPP) with the contractor-specific annex.
b. Final PPIP shall be submitted 30 CD after receipt of Government comments to the Draft
PPIP.
c. Updates shall be submitted as significant revision to the PPP are made or by PCO direction.
Electronically Generated PAGE 1 OF 1 PAGES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 As Built Configuration List (ABCL) Launch Vehicle Configuration
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-CMAN-81516/T Performance Work Statement, Para 3.2.4. SMC/LRE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ONE/R 45 DACA b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
A N/A ASREQ Draft Reg Repro
16. REMARKS See Distribution List
1. (BLK 4):
a. Replace 3.1 with the following:
“3.1 The list shows the launch vehicle configuration and critical ground support equipment specific to the launch service delivered under the contract.”
b. Replace 10.2.1 with the following:
“10.2.1 Part name, part number and revision, next higher assembly part number, software part number and revision as applicable for each serial-number-controlled, assembly, subassembly, part or component installed in the end item at time of launch”
2. (BLK 13): Revisions shall be ASREQ when a change occurs
Electronically Generated PAGE 1 OF 1 PAGES
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
9001 A X TDP TM OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
EELV FA8811-15-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010 Test Plan Launch Vehicle Test and Verification Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80566A Performance Work Statement, Para 3.2.5 SMC/LRG
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ 90 DACA b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE FINAL
A N/A BLK 16 Draft Reg Repro
16. REMARKS See Distribution List
1. (BLK 4):
a. Replace 2 with “2. General. The test plan shall document in detail the contractor’s plan for conducting tests and analyzing the test results to show how the system, when fielded, will satisfy the requirements of the applicable design specification and compliance documents.
Component, Subsystem and System…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .