About this file
Fred Poppe Regional Park Bridge and New Roadway - Civil Plans Bid Set
This is a civil construction plan document prepared by Kimley-Horn and Associates, Inc. for the City of Palm Bay Public Works Department in Brevard County, Florida. The project involves the design and construction of approximately 1,300 linear feet of new access roadway connecting the Regional Park Trail NW to St. Johns Heritage Parkway, including a canal crossing bridge with pedestrian walks. The project encompasses 8.30 acres and is located in Section 33, Township 20 South, Range 36 East, with the ultimate receiving waters being the Melbourne-Tillman Canal C7. The comprehensive bid set includes 27 sheets covering general notes, stormwater pollution prevention plans, existing conditions and demolition plans, site plans, plan and profile drawings, grading and drainage plans, typical sections, and general construction details. The project requires compliance with Florida erosion and sediment control standards, storm water management design for a 10-year, 24-hour event, and coordination with the Melbourne-Tillman Water Control District for canal crossing permits and dewatering approvals.
The project specifications detail extensive earthwork, grading, and drainage requirements with stabilization practices for temporary and permanent conditions. Construction activities include site clearing and grubbing, installation of sediment and erosion control measures, utilities installation, roadway and parking construction, and bridge installation. Critical environmental requirements mandate contractor compliance with stormwater pollution prevention procedures, daily sediment and erosion control inspections, maintenance reporting, and spill prevention protocols. The contractor must anticipate groundwater presence on site and provide adequate dewatering and drainage management during wet weather operations. All disturbed areas must be stabilized within seven days of construction activity cessation, with permanent seeding and sodding required for slopes steeper than 4:1 and all retention/detention basins. The project also includes turn lane improvements at St. Johns Heritage Parkway with specific paving sections and landscape requirements, as well as ADA-compliant sidewalk and pathway construction throughout the site.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARCEL #: 28-36-33-00-251
PREPARED BY
BREVARD COUNTY, FLORIDA
CONSTRUCTION PLANS
AERIAL PHOTOGRAPH
N.T.S.
LOCATION MAP
N.T.S.
PROJECT TEAM
OWNER:
CITY OF PALM BAY PUBLIC WORKS DEPARTMENT
1050 MALABAR ROAD SOUTHWEST
PALM BAY, FL 32907
CONTACT: CHRISTEEN SULLIVAN
ASST PUBLIC WORKS DIRECTOR
PHONE: (321)-726-5665
EMAIL: CHRISTEEN.SULLIVAN@PALMBAYFLORIDA.ORG
KIMLEY-HORN AND ASSOCIATES, INC.
200 S. ORANGE AVE., SUITE 1000
ORLANDO, FL 32801
CONTACT: MATTHEW S. GILLESPIE, P.E.
PHONE: (407) 409-7007
EMAIL: MATTHEW.GILLESPIE@KIMLEY-HORN.COM
SITE
SITE
SECTION 33, TOWNSHIP 20 SOUTH, RANGE 36 EAST
NORTH
NORTH
SURVEYOR:
THE CITY OF PALM BAY PUBLIC WORKS
1050 MALABAR ROAD SOUTHWEST
PALM BAY, FLORIDA 32907
CONTACT: JOE HALE, P.S.M.
PHONE: (321) 952-3400 EXT. 6438
EMAIL: JOE.HALE@PALMBAYFLORIDA.ORG
CIVIL ENGINEER - LAND DEVLOPMENT
FRED POPPE REGIONAL PARK - NEW
ACCESS ROADWAY
FOR
C0.0
1951 MALABAR RD NW PALM BAY, FLORIDA 32907
PROJECT LOCATION
BREVARD COUNTY, FL
DATE: 6/8/2026
ST
J
O H
N S
H
ER
IT
AG
E
PK
W Y
CH
AM
PI
O
NS
HI
P
CI
R
NW
A PARCEL OF LAND LYING IN SECTION 33, TOWNSHIP 20 SOUTH, RANGE 36 EAST, BREVARD
COUNTY, FLORIDA, BEING THE NORTHWEST ONE-QUARTER OF SAID SECTION 33 AND THE NORTH
1174.40 FEET (MEASURED AT RIGHT ANGLES) OF THE SOUTHWEST ONE-QUARTER OF SAID SECTION
33, LESS AND EXCEPT THE EAST ONE-QUARTER OF THE NORTHEAST ONE-QUARTER OF THE
NORTHWEST ONE-QUARTER OF SAID SECTION 33 AND LESS CANAL AND ROAD RIGHT-OF-WAY.
CONTAINING 200.000 ACRES MORE OR LESS AND BEING MORE PARTICULARLY DESCRIBED AS
FOLLOWS: COMMENCE AT THE SOUTHWEST CORNER OF SAID SECTION 33; THENCE RUN N0°38'04" E ALONG THE WEST LINE OF SAID SECTION 33, A DISTANCE OF 1464.93 FEET; THENCE RUN N89°43'06" E A DISTANCE OF 69.01 FEET TO THE EAST LINE OF A CANAL RIGHT-OF-WAY (130' WIDTH) AND THE POINT OF BEGINNING: THENCE RUN N0°38'04"E ALONG SAID CANAL RIGHT-OF-WAY A DISTANCE OF
3701.54 TO THE SOUTH LINE OF A CANAL RIGHT-OF-WAY (225' WIDTH); THENCE RUN N89°42'17"E A DISTANCE OF 2239.39 FEET; THENCE RUN S0°31'05"W A DISTANCE OF 1207.49 FEET; THENCE RUN N89°42'41"E A DISTANCE OF 254.95 FEET TO THE WEST LINE OF A CANAL RIGHT-OF-WAY (150' WIDTH); THENCE RUN S0°36'34"W ALONG SAID CANAL RIGHT-OF-WAY LINE A DISTANCE OF 225.72
FEET TO THE NORTHERN TERMINUS OF A ROAD RIGHT-OF-WAY (100' WIDTH); THENCE RUN
S89°42'17"W ALONG SAID ROAD RIGHT-OF-WAY A DISTANCE OF 100.01 FEET; THENCE RUN
S0°36'34"W ALONG THE WEST LINE OF SAID ROAD RIGHT-OF-WAY A DISTANCE OF 1094.30 FEET;
THENCE RUN N89°43'06"E A DISTANCE OF 10.00 FEET TO THE WEST LINE OF SAID ROAD
RIGHT-OF-WAY; THENCE RUN S0°36'34"W ALONG SAID ROAD RIGHT-OF-WAY, A DISTANCE OF 1174.55 FEET; THENCE RUN S89°43'06"W A DISTANCE OF 2405.00 FEET TO THE POINT OF BEGINNING.
LEGAL DESCRIPTION
Know what'sbelow.
Callbefore you dig.
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
KIMLEY-HORN AND ASSOCIATES, INC.
200 S. ORANGE AVE., SUITE 1000
ORLANDO, FL 32801
CONTACT: HAO CHAU, P.E.
PHONE: (407) 797-3745
EMAIL: HAO.CHAU@KIMLEY-HORN.COM
CIVIL ENGINEER - ROADWAY
ARDAMAN AND ASSOCIATES, INC.
8008 S. ORANGE AVE.
ORLANDO, FL 32809
CONTACT: ZAN C. BATES, P.E.
PHONE: (407) 926-3486
EMAIL: ZBATES@ARDAMAN.COM
GEOTECHNICAL
MELBOURNE-TILLMAN WATER CONTROL DISTRICT
5990 MINTON ROAD
PALM BAY, FL 32907
CONTACT: MIKE MCCABE
PHONE: (321) 723-7233
EMAIL: MIKE@MELBOURNETILLMAN.ORG
WATER CONTROL DISTRICT
Sheet List Table Sheet Number Sheet Title
C0.0 COVER SHEET
C1.0 GENERAL NOTES
C1.1 GENERAL NOTES
C2.0 STORMWATER POLLUTION PREVENTION PLAN
C2.1 EROSION CONTROL DETAILS
C2.2 EROSION CONTROL DETAILS
C3.0 OVERALL EXISTING CONDITIONS AND DEMOLITION PLAN
C3.1 EXISTING CONDITIONS AND DEMOLITION PLAN
C3.2 EXISTING CONDITIONS AND DEMOLITION PLAN
C3.3 EXISTING CONDITIONS AND DEMOLITION PLAN
C3.4 EXISTING CONDITIONS AND DEMOLITION PLAN
C4.0 OVERALL SITE PLAN
C4.1 SITE PLAN
C4.2 SITE PLAN
C4.3 SITE PLAN
C4.4 SITE PLAN
C4.5 TEMPORARY STRIPING PLAN
C5.0 PLAN & PROFILE
C5.1 PLAN & PROFILE
C5.2 ROADWAY SECTIONS
C5.3 ROADWAY-SECTION
C5.4 ROADWAY-SECTION
C5.5 ROADWAY-SECTION
C5.6 ROADWAY-SECTION
C6.0 GRADING AND DRAINAGE PLAN
C6.1 GRADING AND DRAINAGE PLAN
C6.2 GRADING AND DRAINAGE PLAN
C6.3 GRADING AND DRAINAGE PLAN
C6.4 GRADING AND DRAINAGE PLAN
C6.5 TURN LANE- GRADING AND DRAINAGE PLAN
C7.0 TYPICAL SECTIONS
C8.0 GENERAL CONSTRUCTION DETAILS
C8.1 GENERAL CONSTRUCTION DETAILS
C8.2 GENERAL CONSTRUCTION DETAILS
PERMIT SET
BID SET
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
O M
R
EG
IS
TR
Y
N o.
DATUM:
NAVD88
C1.0
FR
ED
P O
PP
E
PA
R
K G
EN
ER
AL
N
O
TE
S
FL
O
R
ID
A C
IT
Y
O F
PA
LM
B
AY
GENERAL PAVEMENT MARKING AND SIGNAGE
STORM DRAINAGE SYSTEM
TREES AND VEGETATION
DEMOLITION
SAFETY
EARTHWORK / GRADING / DEMUCKING PROCEDURES
TEST, INSPECTION AND CLOSEOUT REQUIREMENTS
PAVING/GRADING TESTING AND INSPECTION
is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C1.1
FR
ED
P O
PP
E
PA
R
K G
EN
ER
AL
N
O
TE
S
FL
O
R
ID
A C
IT
Y
O F
PA
LM
B
AY
PAVING, GRADING AND DRAINAGE
DRAINAGE SYSTEM TESTING AND INSPECTION
SANITARY SYSTEM
SANITARY TESTING AND INSPECTION
POTABLE WATER SYSTEM
is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C2.0
FR
ED
P O
PP
E
PA
R
K
ST
O R
M W
AT
ER
PO
LL
U
TI
O N
PR
EV
EN
TI
O N
P
LA
N
FL
O R
ID
A
C
IT
Y O
F
PA
LM
B
AY
-CLEANING SUPPLIES
-DETERGENTS
-MASONARY BLOCK/BRICKS
-PAINT
-WOOD
ITEMS REQUIRING POLLUTION PREVENTION
THE FOLLOWING ITEMS ARE EXPECTED TO BE PRESENT ON THE PROJECT SITE:
-ASPHALT
-CONCRETE
-FERTILIZERS
-METAL PIECES
-PETROLEUM BASED PRODUCTS
-TAR
THE FOLLOWING ARE NON-STORM WATER SOURCES THAT WILL BE
ENCOUNTERED AT THE SITE AND SHOULD BE DIRECTED TO THE SEDIMENT BASIN
PRIOR TO DISCHARGE:
-UNCONTAMINATED GROUNDWATER EXPOSED DURING EXCAVATION
-WATER FROM WATER LINE FLUSHING
-PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR
HAZARDOUS MATERIALS HAVE OCCURRED).
SPILL PREVENTION AND CONTROL
THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE
USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF
MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF.
GOOD HOUSEKEEPING
-SUPERINTENDENT SHALL INSPECT PROJECT AREA DAILY FOR PROPER STORAGE,
USE, AND DISPOSAL OF CONSTRUCTION MATERIALS.
-STORE ONLY ENOUGH MATERIAL ON SITE FOR PROJECT COMPLETION.
-ALL SUBSTANCES SHOULD BE USED BEFORE DISPOSAL OF CONTAINER.
-ALL CONSTRUCTION MATERIALS STORED SHALL BE ORGANIZED AND IN THE
PROPER CONTAINER AND IF POSSIBLE, STORED UNDER A ROOF OR PROTECTIVE
COVER.
-PRODUCTS SHALL NOT BE MIXED UNLESS DIRECTED BY THE MANUFACTURER.
-ALL PRODUCTS SHALL BE USED AND DISPOSED OF ACCORDING TO THE
MANUFACTURER'S RECOMMENDATIONS.
HAZARDOUS PRODUCTS
-MATERIALS SHOULD BE KEPT IN ORIGINAL CONTAINER WITH LABELS UNLESS THE
ORIGINAL CONTAINERS CANNOT BE RESEALED. IF ORIGINAL CONTAINERS
CANNOT BE USED, LABELS AND PRODUCT INFORMATION SHALL BE SAVED.
-PROPER DISPOSAL PRACTICES SHALL ALWAYS BE FOLLOWED IN ACCORDANCE
WITH MANUFACTURER AND LOCAL/STATE REGULATIONS.
PRODUCT SPECIFIC PRACTICES
-PETROLEUM PRODUCTS MUST BE STORED IN PROPER CONTAINERS AND
CLEARLY LABELED. VEHICLES CONTAINING PETROLEUM PRODUCTS SHALL BE
PERIODICALLY INSPECTED FOR LEAKS. PRECAUTIONS SHALL BE TAKEN TO AVOID
LEAKAGE OF PETROLEUM PRODUCTS ON SITE.
-THE MINIMUM AMOUNT OF FERTILIZER SHALL BE USED AND MIXED INTO THE SOIL
IN ORDER TO LIMIT EXPOSURE TO STORM WATER. FERTILIZERS SHALL BE
STORED IN A COVERED SHED. THE CONTENTS OF ANY PARTIALLY USED BAGS OF
FERTILIZER SHALL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID
SPILLS.
-PAINT CONTAINERS SHALL BE SEALED AND STORED WHEN NOT IN USE. EXCESS
PAINT MUST BE DISPOSED OF IN AN APPROVED MANNER.
-CONCRETE TRUCKS SHALL NOT BE ALLOWED TO WASH OUT OR DISCHARGE
SURPLUS CONCRETE OR DRUM WASH WATER ON THE SITE.
SPILL CONTROL PRACTICES
IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT
PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN, THE
FOLLOWING PRACTICES SHALL BE FOLLOWED FOR SPILL PREVENTION AND
CLEANUP:
-SPILL CLEANUP INFORMATION SHALL BE POSTED ON SITE TO INFORM
EMPLOYEES ABOUT CLEANUP PROCEDURES AND RESOURCES.
-THE FOLLOWING CLEAN-UP EQUIPMENT MUST BE KEPT ON-SITE NEAR THE
MATERIAL STORAGE AREA: GLOVES, MOPS, RAGS, BROOMS, DUST PANS, SAND,
SAWDUST, LIQUID ABSORBER, GOGGLES, AND TRASH CONTAINERS.
-ALL SPILLS SHALL BE CLEANED UP AS SOON AS POSSIBLE.
-WHEN CLEANING A SPILL, THE AREA SHOULD BE WELL VENTILATED AND THE
EMPLOYEE SHALL WEAR PROPER PROTECTIVE COVERING TO PREVENT INJURY.
-TOXIC SPILLS MUST BE REPORTED TO THE PROPER AUTHORITY REGARDLESS OF
THE SIZE OF THE SPILL.
-AFTER A SPILL, THE PREVENTION PLAN SHALL BE REVIEWED AND CHANGED TO
PREVENT FURTHER SIMILAR SPILLS FROM OCCURRING. THE CAUSE OF THE
SPILL, MEASURES TO PREVENT IT, AND HOW TO CLEAN THE SPILL UP SHALL BE
RECORDED.
-THE SUPERINTENDENT SHALL BE THE SPILL PREVENTION AND CLEANUP
COORDINATOR AND IS RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS.
THE SUPERINTENDENT ALSO OVERSEES THE SPILL PREVENTION PLAN AND SHALL
BE RESPONSIBLE FOR EDUCATING THE EMPLOYEES ABOUT SPILL PREVENTION
AND CLEANUP PROCEDURES.
STORMWATER POLLUTION PREVENTION PLAN
MAINTENANCE AND INSPECTION PRACTICES
THE FOLLOWING ARE MAINTENANCE AND INSPECTION PRACTICES THAT SHALL BE
COMPLETED BY THE CONTRACTOR:
-ALL SEDIMENT AND EROSION CONTROL METHODS SHALL BE CHECKED AT A
MINIMUM OF EVERY 7 DAYS AND WITHIN 24 HOURS OF EACH 0.5 INCH OR
GREATER RAINFALL BY THE SUPERINTENDENT OR SOMEONE UNDER HIS/HER
DIRECT SUPERVISION.
-ALL SEDIMENT AND EROSION CONTROL METHODS SHALL BE KEPT IN GOOD
CONDITION. REPAIRS MUST BE MADE WITHIN 24 HOURS OF REPORT.
-THE SILT FENCE SHALL BE INSPECTED AT A MINIMUM OF EVERY 7 DAYS AND
WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT FOR HEIGHT OF SEDIMENT
AND CONDITION OF FENCE.
-THE SILT FENCE SHALL BE CLEARED OF SEDIMENT WHEN SEDIMENT MEASURES
ONE-THIRD THE HEIGHT OF THE FENCE.
-THE SEDIMENT BASINS/DITCHES SHALL BE CHECKED AT A MINIMUM OF EVERY 7
DAYS AND WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT FOR DEPTH OF
SEDIMENT. THEY SHALL BE CLEANED WHEN SEDIMENT REACHES 10% OF TOTAL
CAPACITY AND AFTER CONSTRUCTION IS COMPLETE.
-DIVERSION DIKES SHALL BE INSPECTED AT A MINIMUM OF EVERY 7 DAYS AND
WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT. ANY BREACHES SHALL BE
PROMPTLY REPAIRED.
-ALL SEEDING SHALL BE CHECKED FOR PROPER GROWTH AND UNIFORMITY.
UNSTABALIZED AREAS SHALL BE RE-SODDED.
-A MAINTENANCE REPORT SHALL BE COMPLETED DAILY AFTER EACH INSPECTION
OF THE SEDIMENT AND EROSION CONTROL METHODS. THE REPORTS SHALL BE
FILED IN AN ORGANIZED MANNER AND RETAINED ON-SITE DURING
CONSTRUCTION. AFTER CONSTRUCTION IS COMPLETED, THE REPORTS SHALL BE
SAVED FOR AT LEAST THREE YEARS. THE REPORTS SHALL BE AVAILABLE FOR
ANY AGENCY THAT HAS JURISDICTION OVER EROSION CONTROL.
-THE SUPERINTENDENT SHALL ORGANIZE THE TRAINING FOR INSPECTION
PROCEDURES AND PROPER EROSION CONTROL METHODS FOR EMPLOYEES
THAT COMPLETE INSPECTIONS AND REPORTS.
POLLUTION PREVENTION PLAN CERTIFICATION
I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL
ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN
ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED
PERSONNEL PROPERLY GATHERED AND EVALUATED THE INFORMATION
SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE
THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE
INFORMATION, THE INFORMATION SUBMITTED IS, TO THE BEST OF MY
KNOWLEDGE AND BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT
THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION,
INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING
VIOLATIONS.
SIGNED: _____________________________________ DATE:__________________
MATTHEW S. GILLESPIE
FLORIDA REGISTRATION NUMBER: 76950
PROFESSIONAL ENGINEER
CONTRACTOR'S CERTIFICATION
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, SHALL COMPLY WITH,
THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC PERMIT FOR
STORMWATER DISCHARGE FORM LARGE AND SMALL CONSTRUCTION ACTIVITIES
AND THIS STORMWATER POLLUTION PREVENTION PLAN PREPARED
THEREUNDER.
SIGNATURE AND DATE
NAME AND TITLE,
COMPANY / ADDRESS AND
TELEPHONE NUMBER
RESPONSIBILITY
-CLEANING SUPPLIES
-DETERGENTS
-MASONARY BLOCK/BRICKS
-PAINT
-WOOD
ITEMS REQUIRING POLLUTION PREVENTION
THE FOLLOWING ITEMS ARE EXPECTED TO BE PRESENT ON THE PROJECT SITE:
-ASPHALT
-CONCRETE
-FERTILIZERS
-METAL PIECES
-PETROLEUM BASED PRODUCTS
-TAR
THE FOLLOWING ARE NON-STORM WATER SOURCES THAT WILL BE
ENCOUNTERED AT THE SITE AND SHOULD BE DIRECTED TO THE SEDIMENT BASIN
PRIOR TO DISCHARGE:
-UNCONTAMINATED GROUNDWATER EXPOSED DURING EXCAVATION
-WATER FROM WATER LINE FLUSHING
-PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR
HAZARDOUS MATERIALS HAVE OCCURRED).
SPILL PREVENTION AND CONTROL
THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE
USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF
MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF.
GOOD HOUSEKEEPING
-SUPERINTENDENT SHALL INSPECT PROJECT AREA DAILY FOR PROPER STORAGE,
USE, AND DISPOSAL OF CONSTRUCTION MATERIALS.
-STORE ONLY ENOUGH MATERIAL ON SITE FOR PROJECT COMPLETION.
-ALL SUBSTANCES SHOULD BE USED BEFORE DISPOSAL OF CONTAINER.
-ALL CONSTRUCTION MATERIALS STORED SHALL BE ORGANIZED AND IN THE
PROPER CONTAINER AND IF POSSIBLE, STORED UNDER A ROOF OR PROTECTIVE
COVER.
-PRODUCTS SHALL NOT BE MIXED UNLESS DIRECTED BY THE MANUFACTURER.
-ALL PRODUCTS SHALL BE USED AND DISPOSED OF ACCORDING TO THE
MANUFACTURER'S RECOMMENDATIONS.
HAZARDOUS PRODUCTS
-MATERIALS SHOULD BE KEPT IN ORIGINAL CONTAINER WITH LABELS UNLESS THE
ORIGINAL CONTAINERS CANNOT BE RESEALED. IF ORIGINAL CONTAINERS
CANNOT BE USED, LABELS AND PRODUCT INFORMATION SHALL BE SAVED.
-PROPER DISPOSAL PRACTICES SHALL ALWAYS BE FOLLOWED IN ACCORDANCE
WITH MANUFACTURER AND LOCAL/STATE REGULATIONS.
PRODUCT SPECIFIC PRACTICES
-PETROLEUM PRODUCTS MUST BE STORED IN PROPER CONTAINERS AND
CLEARLY LABELED. VEHICLES CONTAINING PETROLEUM PRODUCTS SHALL BE
PERIODICALLY INSPECTED FOR LEAKS. PRECAUTIONS SHALL BE TAKEN TO AVOID
LEAKAGE OF PETROLEUM PRODUCTS ON SITE.
-THE MINIMUM AMOUNT OF FERTILIZER SHALL BE USED AND MIXED INTO THE SOIL
IN ORDER TO LIMIT EXPOSURE TO STORM WATER. FERTILIZERS SHALL BE
STORED IN A COVERED SHED. THE CONTENTS OF ANY PARTIALLY USED BAGS OF
FERTILIZER SHALL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID
SPILLS.
-PAINT CONTAINERS SHALL BE SEALED AND STORED WHEN NOT IN USE. EXCESS
PAINT MUST BE DISPOSED OF IN AN APPROVED MANNER.
-CONCRETE TRUCKS SHALL NOT BE ALLOWED TO WASH OUT OR DISCHARGE
SURPLUS CONCRETE OR DRUM WASH WATER ON THE SITE.
SPILL CONTROL PRACTICES
IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT
PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN, THE
FOLLOWING PRACTICES SHALL BE FOLLOWED FOR SPILL PREVENTION AND
CLEANUP:
-SPILL CLEANUP INFORMATION SHALL BE POSTED ON SITE TO INFORM
EMPLOYEES ABOUT CLEANUP PROCEDURES AND RESOURCES.
-THE FOLLOWING CLEAN-UP EQUIPMENT MUST BE KEPT ON-SITE NEAR THE
MATERIAL STORAGE AREA: GLOVES, MOPS, RAGS, BROOMS, DUST PANS, SAND,
SAWDUST, LIQUID ABSORBER, GOGGLES, AND TRASH CONTAINERS.
-ALL SPILLS SHALL BE CLEANED UP AS SOON AS POSSIBLE.
-WHEN CLEANING A SPILL, THE AREA SHOULD BE WELL VENTILATED AND THE
EMPLOYEE SHALL WEAR PROPER PROTECTIVE COVERING TO PREVENT INJURY.
-TOXIC SPILLS MUST BE REPORTED TO THE PROPER AUTHORITY REGARDLESS OF
THE SIZE OF THE SPILL.
-AFTER A SPILL, THE PREVENTION PLAN SHALL BE REVIEWED AND CHANGED TO
PREVENT FURTHER SIMILAR SPILLS FROM OCCURRING. THE CAUSE OF THE
SPILL, MEASURES TO PREVENT IT, AND HOW TO CLEAN THE SPILL UP SHALL BE
RECORDED.
-THE SUPERINTENDENT SHALL BE THE SPILL PREVENTION AND CLEANUP
COORDINATOR AND IS RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS.
THE SUPERINTENDENT ALSO OVERSEES THE SPILL PREVENTION PLAN AND SHALL
BE RESPONSIBLE FOR EDUCATING THE EMPLOYEES ABOUT SPILL PREVENTION
AND CLEANUP PROCEDURES.
STORMWATER POLLUTION PREVENTION PLAN
MAINTENANCE AND INSPECTION PRACTICES
THE FOLLOWING ARE MAINTENANCE AND INSPECTION PRACTICES THAT SHALL BE
COMPLETED BY THE CONTRACTOR:
-ALL SEDIMENT AND EROSION CONTROL METHODS SHALL BE CHECKED AT A
MINIMUM OF EVERY 7 DAYS AND WITHIN 24 HOURS OF EACH 0.5 INCH OR
GREATER RAINFALL BY THE SUPERINTENDENT OR SOMEONE UNDER HIS/HER
DIRECT SUPERVISION.
-ALL SEDIMENT AND EROSION CONTROL METHODS SHALL BE KEPT IN GOOD
CONDITION. REPAIRS MUST BE MADE WITHIN 24 HOURS OF REPORT.
-THE SILT FENCE SHALL BE INSPECTED AT A MINIMUM OF EVERY 7 DAYS AND
WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT FOR HEIGHT OF SEDIMENT
AND CONDITION OF FENCE.
-THE SILT FENCE SHALL BE CLEARED OF SEDIMENT WHEN SEDIMENT MEASURES
ONE-THIRD THE HEIGHT OF THE FENCE.
-THE SEDIMENT BASINS/DITCHES SHALL BE CHECKED AT A MINIMUM OF EVERY 7
DAYS AND WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT FOR DEPTH OF
SEDIMENT. THEY SHALL BE CLEANED WHEN SEDIMENT REACHES 10% OF TOTAL
CAPACITY AND AFTER CONSTRUCTION IS COMPLETE.
-DIVERSION DIKES SHALL BE INSPECTED AT A MINIMUM OF EVERY 7 DAYS AND
WITHIN 24 HOURS OF A 0.5" OR GREATER RAIN EVENT. ANY BREACHES SHALL BE
PROMPTLY REPAIRED.
-ALL SEEDING SHALL BE CHECKED FOR PROPER GROWTH AND UNIFORMITY.
UNSTABALIZED AREAS SHALL BE RE-SODDED.
-A MAINTENANCE REPORT SHALL BE COMPLETED DAILY AFTER EACH INSPECTION
OF THE SEDIMENT AND EROSION CONTROL METHODS. THE REPORTS SHALL BE
FILED IN AN ORGANIZED MANNER AND RETAINED ON-SITE DURING
CONSTRUCTION. AFTER CONSTRUCTION IS COMPLETED, THE REPORTS SHALL BE
SAVED FOR AT LEAST THREE YEARS. THE REPORTS SHALL BE AVAILABLE FOR
ANY AGENCY THAT HAS JURISDICTION OVER EROSION CONTROL.
-THE SUPERINTENDENT SHALL ORGANIZE THE TRAINING FOR INSPECTION
PROCEDURES AND PROPER EROSION CONTROL METHODS FOR EMPLOYEES
THAT COMPLETE INSPECTIONS AND REPORTS.
POLLUTION PREVENTION PLAN CERTIFICATION
I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL
ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN
ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED
PERSONNEL PROPERLY GATHERED AND EVALUATED THE INFORMATION
SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE
THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE
INFORMATION, THE INFORMATION SUBMITTED IS, TO THE BEST OF MY
KNOWLEDGE AND BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT
THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION,
INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING
VIOLATIONS.
SIGNED: _____________________________________ DATE:__________________
MATTHEW S. GILLESPIE
FLORIDA REGISTRATION NUMBER: 76950
PROFESSIONAL ENGINEER
CONTRACTOR'S CERTIFICATION
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, SHALL COMPLY WITH,
THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC PERMIT FOR
STORMWATER DISCHARGE FORM LARGE AND SMALL CONSTRUCTION ACTIVITIES
AND THIS STORMWATER POLLUTION PREVENTION PLAN PREPARED
THEREUNDER.
EROSION AND SEDIMENT CONTROLS
BEST MANAGEMENT PRACTICES SHALL BE USED FOR THIS PROJECT TO CONTROL
EROSION AND TURBIDITY CAUSED BY STORM WATER RUN-OFF. THE LOCATION AND
DETAILS OF EROSION CONTROL METHODS ARE SHOWN ON THE PLANS. THE
CONTRACTOR IS RESPONSIBLE FOR PLACING AND MAINTAINING THESE CONTROL
METHODS AS SHOWN ON THE PLANS OR AS REQUIRED. HE/SHE SHALL ALSO PROVIDE
THE REQUIRED EROSION PROTECTION AS REQUIRED BY LOCAL, STATE AND FEDERAL
LAW.
THE CONTRACTOR MUST DEVELOP A PLAN FOR BY-PASS OF CANAL SURFACE WATER FOR
DAILY AND STORM EVENT FLOWS. PLAN, ALONG WITH APPLICATION AND FEE, REQUIRED
TO BE SUBMITTED TO MTWCD FOR ISSUANCE OF PERMIT BEFORE CONSTRUCTION MAY
OCCUR.
STORM WATER MANAGEMENT
STORM WATER COLLECTION SHALL BE PROVIDED BY CATCH BASINS. THE AREAS THAT
ARE RE-GRADED BUT NOT DEVELOPED SHALL BE STABILIZED IMMEDIATELY AFTER
RE-GRADING. THE STORM SEWER SYSTEM HAS BEEN DESIGNED TO CARRY THE 10-YEAR,
24 HOUR EVENT PEAK FLOW RATES. RUNOFF FROM THE DEVELOPMENT WILL BE
COLLECTED IN THE PROPOSED STORM SEWER SYSTEM AND ROUTED TO THE EXISTING
MASTER STORM SEWER SYSTEM WEST OF THE SITE.
STABILIZATION PRACTICES:
TEMPORARY STABILIZATION - TOPSOIL STOCK PILES AND DISTURBED PORTIONS OF THE
SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASE, SHALL
BE STABILIZED WITH TEMPORARY SEED AND MULCH WITHIN 7 DAYS OF THE LAST
CONSTRUCTION ACTIVITY IN THAT AREA. TEMPORARY STABILIZATION PRACTICES TO
ALIGN WITH FLORIDA EROSION AND SEDIMENT CONTROL DESIGNER AND REVIEWER
MANUAL AND A GUIDE FOR ROADSIDE VEGETATION MANAGEMENT, 2012 EDITION.
PERMANENT STABILIZATION - DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION
ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITH PERMANENT SEED NO
LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY. AFTER SEEDING, EACH
AREA SHALL BE MULCHED IMMEDIATELY. ALL RETENTION/DETENTION BASINS SHALL BE
SODDED AT LEAST TO THE NORMAL WATER LINE. ALL EXPOSED AREAS WITHIN PUBLIC
RIGHT-OF-WAY SHALL BE SODDED, OTHER AREAS WITH SLOPES STEEPER THAN 4:1
SHALL BE SODDED. PERMANENT STABILIZATION PRACTICES TO ALIGN WITH FLORIDA
EROSION AND SEDIMENT CONTROL DESIGNER AND REVIEWER MANUAL AND A GUIDE FOR
ROADSIDE VEGETATION MANAGEMENT, 2012 EDITION.
STRUCTURAL PRACTICES:
EARTH DIKE - IF REQUIRED, AN EARTH DIKE SHALL BE CONSTRUCTED ALONG THE SITE
PERIMETER. A PORTION OF THE DIKE SHALL DIVERT RUN-ON AROUND THE
CONSTRUCTION SITE. THE REMAINING PORTION OF THE DIKE SHALL COLLECT RUNOFF
FROM THE DISTURBED AREA AND DIRECT THE RUNOFF TO THE SEDIMENT BASIN.
SEDIMENT BASIN - A SEDIMENT BASIN SHALL BE CONSTRUCTED IN THE COMMON
DRAINAGE AREA FOR THE SITE. ALL SEDIMENT COLLECTED IN THE BASIN MUST BE
REMOVED FROM THE BASIN UPON COMPLETION OF CONSTRUCTION. SEDIMENT FROM
THE BASIN MAY BE USED AS FILL ON THE SITE IF IT IS SUITABLE SOIL.
WASTE DISPOSAL
WASTE MATERIALS - ALL WASTE MATERIALS SHALL BE COLLECTED AND STORED IN A
METAL DUMPSTER WITH A SECURE LID IN ACCORDANCE WITH ALL LOCAL AND STATE
LAWS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE SHALL BE DEPOSITED IN
THE DUMPSTER. THE SUPERINTENDENT SHALL COORDINATE WITH THE LOCAL UTILITIES
TO HAVE THE DUMPSTER EMPTIED AT LEAST TWICE A WEEK AND THE WASTE TAKEN TO
AN APPROPRIATE LANDFILL. NO CONSTRUCTION WASTE MATERIALS SHALL BE BURIED
ON SITE. THE SUPERINTENDENT SHALL ORGANIZE TRAINING FOR THE EMPLOYEES IN
THE PROPER PRACTICES WHEN DEALING WITH WASTE MATERIALS. THE
SUPERINTENDENT SHALL BE RESPONSIBLE FOR POSTING AND ENFORCING WASTE
MATERIAL PROCEDURES.
HAZARDOUS WASTE - HAZARDOUS WASTE MATERIALS SHALL BE DISPOSED OF IN
ACCORDANCE WITH ALL LOCAL AND STATE LAWS OR AS DIRECTED BY THE
MANUFACTURER. THE SUPERINTENDENT SHALL ORGANIZE THE PROPER TRAINING FOR
EMPLOYEES IN THE PROPER PRACTICES WHEN DEALING WITH HAZARDOUS WASTE
MATERIALS. THESE PROCEDURES SHALL BE POSTED ON THE SITE. THE PERSON WHO
MANAGES THE SITE SHALL BE RESPONSIBLE FOR ENFORCING THE PROCEDURES.
SANITARY WASTE - SANITARY WASTE SHALL BE COLLECTED AND DISPOSED OF IN
ACCORDANCE WITH ALL LOCAL AND STATE LAWS. THE SUPERINTENDENT SHALL
COORDINATE WITH THE LOCAL UTILITY FOR COLLECTION OF THE SANITARY WASTE AT
LEAST THREE TIMES A WEEK TO PREVENT SPILLAGE ONTO THE SITE.
OFF-SITE TRACKING
A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED TO REDUCE SEDIMENT
TRACKING OFFSITE. THE MAJOR ROAD CONNECTED TO THE PROJECT SHALL BE
CLEANED ONCE A DAY TO REMOVE ANY EXCESS MUD, DIRT OR ROCK RESULTING FROM
CONSTRUCTION TRAFFIC. ALL TRUCKS HAULING MATERIALS OFFSITE SHALL BE
COVERED WITH A TARPAULIN.
DUST & DEBRIS CONTROL
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL WITHIN THE
CONSTRUCTION LIMITS AS WELL AS ALONG HAUL ROUTES AND ROADWAYS USED BY THE
EQUIPMENT AND VEHICLES. THE CONTRACTOR SHALL ENSURE THAT EXCESSIVE DUST IS
NOT TRANSPORTED BEYOND THE LIMITS OF CONSTRUCTION IN POPULATED AREAS. THE
CONTRACTOR MAY CONTROL DUST FOR EMBANKMENTS OR OTHER CLEARED OR
UNSURFACED AREAS BY APPLYING WATER. INSTALL MULCH, SEED, SOD, OR TEMPORARY
PAVING AS EARLY AS PRACTICAL. CONTROL DUST DURING STORAGE AND HANDLING OF
DUSTY MATERIALS BY WETTING, COVERING, OR OTHER MEANS AS APPROVED BY THE
ENGINEER.
DEBRIS SHALL NOT BE ALLOWED TO ACCUMULATE ON THE PROJECT SITE.
SIGNATURE AND DATE
NAME AND TITLE,
COMPANY / ADDRESS AND
TELEPHONE NUMBER
RESPONSIBILITY
SITE DESCRIPTION
PROJECT NAME AND LOCATION
FRED POPPE PARK - NEW ACCESS ROADWAY
TAX PARCELS:
*SEE COVER SHEET FOR LOCATION MAP
OWNER NAME AND ADDRESS
CITY OF PALM BAY
120 MALABAR ROAD SE
PALM BAY, FL 32907
CONTACT: CHRISTEEN SULLIVAN
ASST PUBLIC WORKS DIRECTOR
PHONE: (321)-726-5665
EMAIL: CHRISTEEN.SULLIVAN@PALMBAYFLORIDA.ORG
PROJECT DESCRIPTION
FRED POPPE PARK - NEW ACCESS ROADWAY IS A PROPOSED ±1300 LF OF NEW
ACCESS ROADWAY FROM THE END OF REGIONAL PARK TRAIL NW TO ST. JOHNS
HERITAGE PARKWAY. THE PROJECT WILL INCLUDE A CANAL CROSSING BRIDGE WITH
PEDESTRIAN WALKS.
PROJECT AREA: ±8.30 ACRES
CONTRIBUTING DRAINAGE AREA: ±8.30 ACRES
ULTIMATE RECEIVING WATERS: MELBOURNE-TILLMAN CANAL C7
ACTIVITIES THAT REQUIRE EROSION CONTROL
SITE CLEARING AND GRUBBING; PROVIDING A STABILIZED CONSTRUCTION
ENTRANCE, PERIMETER, AND OTHER EROSION AND SEDIMENT CONTROLS;
EXCAVATION FOR THE RETENTION POND; SITE GRADING; INSTALLATION OF STORM
WATER, SANITARY SEWER, AND WATER STRUCTURES; CURB, ROADWAYS, AND
PARKING FACILITIES.
*SEE PLANS FOR THE LOCATION OF TEMPORARY SEDIMENT BARRIERS AND OTHER
EROSION CONTROL METHODS.
SOIL PARAMETERS
SOIL TYPES:
DEWATERING
DISCHARGE OF GROUNDWATER FROM DEWATERING OPERATIONS REQUIRES
APPROVAL FROM FDEP AND THE APPLICABLE WATER MANAGEMENT DISTRICT. ANY
DISCHARGE OFF-SITE WILL REQUIRE PERMITTING AND APPROVAL FROM THE
MELBOURNE-TILLMAN WATER CONTROL DISTRICT (MTWCD) . DISCHARGES DIRECTED
TO THE COUNTY'S MS4 REQUIRES A RIGHT-OF-WAY UTILIZATION PERMIT FOR
DEWATERING PRIOR TO THE START OF DISCHARGES. TO OBTAIN RIGHT-OF-WAY
APPROVAL, COPIES OF THE FDEP PERMIT NOI, DOCUMENTATION SHOWING
DEWATERING AT THE SITE IS NOT WITHIN 500 FT OF KNOWN CONTAMINATION, AND A
DEWATERING PLAN SHALL BE SUBMITTED TO THE CITY OF PALM BAY AND MTWCD.
ANALYTICAL SAMPLING OF GROUNDWATER MAY BE REQUESTED BY LAKE COUNTY
ON A CASE-BY-CASE BASIS TO CONFIRM SITE CONTAMINATION STATUS.
SEQUENCE OF MAJOR ACTIVITIES
THE ORDER OF CONSTRUCTION IS AS FOLLOWS:
1. INSTALL FLOATING TURBIDITY BARRIER(S)
2. PROVIDE STABILIZED CONSTRUCTION ENTRANCE
3. INSTALL SILT FENCES AND OTHER EROSION CONTROL METHODS
4. CLEAR AND GRUB FOR SEDIMENT BASIN AND EARTH DIKE
5. CONSTRUCT EARTH DIKE AND SEDIMENT BASIN
6. FINISH CLEARING AND GRUBBING
7. REMOVE AND STORE TOPSOIL
8. PROVIDE INITIAL GRADING AS REQUIRED
9. STABILIZE ALL DISTURBED AREAS AS SOON AS POSSIBLE
10. INSTALL UTILITIES, STORM SEWER, CURB AND GUTTER
11. INSTALL BASE TO ROAD AND PARKING AREA
12. FINISH GRADING ENTIRE SITE
13. CONSTRUCT FINAL PAVING
14. REMOVE ACCUMULATED SEDIMENT
15. REMOVE ANY ITEMS THAT ARE NOT REQUIRED
16. REMOVE FLOATING TURBIDITY BARRIER(S)
TIMING OF CONTROL MEASURES
THE INSTALLATION OF SILT FENCE (AND OTHER EROSION CONTROL MEASURES), A
STABILIZED ENTRANCE AND SEDIMENT BASIN SHALL OCCUR PRIOR TO CLEARING
AND GRUBBING ACTIVITY. AFTER CONSTRUCTION IS COMPLETE, THE ACCUMULATED
SEDIMENT SHALL BE REMOVED AND THE AREAS SHALL BE REGRADED AND
PERMANENTLY STABILIZED AS SHOWN ON THE PLANS.
HYDROLOGIC SOIL GROUP SUMMARY
SOIL TYPE SOIL NAME RATING
71 WABASO SAND, 0 TO 2
PERCENT SLOPES
D is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C2.1
FR
ED
P O
PP
E
PA
R
K
ER
O
SI
O N
C O
N
TR
O L
D
ET
AI
LS
FL
O
R
ID
A C
IT
Y
O F
PA
LM
B
AY
SWPPP INFORMATION
Know what'sbelow.
Callbefore you dig.
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
ELEVATION A ELEVATION B
CHECK DAMS IN SWALE
2 ACRES OR LESS OF DRAINAGE AREA
(DOWNSTREAM VIEW)
2-10 ACRES OF DRAINAGE AREA
(DOWNSTREAM VIEW)
is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C2.2
FR
ED
P O
PP
E
PA
R
K
ER
O
SI
O N
C O
N
TR
O L
D
ET
AI
LS
C
IT
Y O
F
PA
LM
B
AY
FL
O R
ID
A
FOBFOBFOBFOB
ECB
ECP
EHH
ECB
EHH
EHH
EHH
EHH
EHH
EHH
EHH
EHH
X
X
X
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C3.0
FR
ED
P O
PP
E
PA
R
K O
VE
R
AL
L
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
AN
D D
EM
O
LI
TI
O N
P
LA
N C
IT
Y
O F
PA
LM
B
AY
NORTH
X
IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE
OF STATE OR FEDERALLY PROTECTED PLANT AND/OR ANIMAL SPECIES IS
DISCOVERED, CITY OF PALM BAY INSPECTOR AND APPLICABLE AGENCIES,
SHALL BE NOTIFIED WITHIN TWO WORKING DAYS OF THE PLANT AND/OR
ANIMAL SPECIES FOUND ON THE SITE. ALL WORK IN THE AFFECTED AREA
SHALL COME TO AN IMMEDIATE STOP UNTIL ALL PERTINENT PERMITS
HAVE BEEN OBTAINED, AGENCY WRITTEN AUTHORIZATION TO COMMENCE
ACTIVITIES HAS BEEN GIVEN, OR UNLESS COMPLIANCE WITH STATE AND
FEDERAL GUIDELINES CAN BE DEMONSTRATED.
Know what'sbelow.
Callbefore you dig.
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
ALERT TO CONTRACTOR:
THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR
THIS ISSUE. WHEN PERFORMING GRADING OPERATIONS DURING
PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE
OF SOILS. REFER TO MASTER SITE SPECIFICATIONS.
C3.1 C3.2 C3.3
C3.4
ST
J
OH
NS
H
ER
IT
AG
E
PA
RK
W
AY
M
EL
BO
UR
NE
T
IL
LM
AN
C
AN
AL
CH
AM
PI
O
NS
HI
P
CI
R
NW
GENERAL NOTES:-
FL
O
R
ID
A
EXISTING GRADE INFORMATION SHOWN IN THE CANAL
BELOW ELEVATION 9 FT (NAVD 88) IS APPROXIMATED AND
SHOWN FOR REFERENCE ONLY. BOTTOM ELEVATION OF
THE CANAL IS 5 FT (NAVD88) AS STATED BY MTWCD STAFF.
ST
J
OH
NS
H
ER
IT
AG
E
PA
RK
W
AY
M
EL
BO
UR
NE
T
IL
LM
AN
C
AN
AL
M
EL
BO
UR
NE
T
IL
LM
AN
C
AN
AL
CARRICK ST NW
LO
W
ER
B
EN
CH
M
AI
NT
EN
AN
CE
R
OA
D
LO
W
ER
B
EN
CH
M
AI
NT
EN
AN
CE
R
OA
D
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C3.1
FR
ED
P O
PP
E
PA
R
K
EX
IS
TI
N G
C O
N D
IT
IO
N S
AN
D
D
EM
O
LI
TI
O
N P
LA
N
C
IT
Y O
F
PA
LM
B
AY
M A
TC
H
L
IN
E
SE
E
SH
EE
T
C 3.
NORTH
X
Know what'sbelow.
Callbefore you dig.
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
1. REFER TO SHEET C2.1 FOR THE EROSION CONTROL AND TREE
PROTECTION.
2. REFER TO SHEET C3.0 FOR GENERAL NOTES.
NOTES
ALERT TO CONTRACTOR:
THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR
THIS ISSUE. WHEN PERFORMING GRADING OPERATIONS DURING
PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE
OF SOILS. REFER TO MASTER SITE SPECIFICATIONS.
KEY MAP
C3.1 C3.2 C3.3
C3.4
FL
O
R
ID
A
IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE
OF STATE OR FEDERALLY PROTECTED PLANT AND/OR ANIMAL SPECIES IS
DISCOVERED, CITY OF PALM BAY NATURAL RESOURCE INSPECTOR AND
APPLICABLE AGENCIES, SHALL BE NOTIFIED WITHIN TWO WORKING DAYS
OF THE PLANT AND/OR ANIMAL SPECIES FOUND ON THE SITE. ALL WORK IN
THE AFFECTED AREA SHALL COME TO AN IMMEDIATE STOP UNTIL ALL
PERTINENT PERMITS HAVE BEEN OBTAINED, AGENCY WRITTEN
AUTHORIZATION TO COMMENCE ACTIVITIES HAS BEEN GIVEN, OR UNLESS
COMPLIANCE WITH STATE AND FEDERAL GUIDELINES CAN BE
DEMONSTRATED.
EXISTING GRADE INFORMATION SHOWN IN THE CANAL
BELOW ELEVATION 9 FT (NAVD 88) IS APPROXIMATED AND
SHOWN FOR REFERENCE ONLY. BOTTOM ELEVATION OF
THE CANAL IS 5 FT (NAVD88) AS STATED BY MTWCD STAFF.
EHH
X
X
X
CH
AM
PI
ON
C
IR
CL
E
NW
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C3.2
FR
ED
P O
PP
E
PA
R
K
EX
IS
TI
N G
C O
N D
IT
IO
N S
AN
D
D
EM
O
LI
TI
O
N P
LA
N
C
IT
Y O
F
PA
LM
B
AY
M A
TC
H
L
IN
E
SE
E
SH
EE
T
C 3.
NORTH
Know what'sbelow.
Callbefore you dig.
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
ALERT TO CONTRACTOR:
THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR
THIS ISSUE. WHEN PERFORMING GRADING OPERATIONS DURING
PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE
OF SOILS. REFER TO MASTER SITE SPECIFICATIONS.
KEY MAP
C3.2
MATCH LINE SEE SHEET C3.4
M A
TC
H
L
IN
E
SE
E
SH
EE
T
C 3.
X
1. REFER TO SHEET C2.1 FOR THE EROSION CONTROL AND TREE
PROTECTION.
2. REFER TO SHEET C3.0 FOR GENERAL NOTES.
NOTES
POST CONSTRUCTION PHASE
1" = 20'
NORTH
CHAMPION CIRCLE NW
FL
O
R
ID
A
IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE
OF STATE OR FEDERALLY PROTECTED PLANT AND/OR ANIMAL SPECIES IS
DISCOVERED, CITY OF PALM BAY NATURAL RESOURCE INSPECTOR AND
APPLICABLE AGENCIES, SHALL BE NOTIFIED WITHIN TWO WORKING DAYS
OF THE PLANT AND/OR ANIMAL SPECIES FOUND ON THE SITE. ALL WORK IN
THE AFFECTED AREA SHALL COME TO AN IMMEDIATE STOP UNTIL ALL
PERTINENT PERMITS HAVE BEEN OBTAINED, AGENCY WRITTEN
AUTHORIZATION TO COMMENCE ACTIVITIES HAS BEEN GIVEN, OR UNLESS
COMPLIANCE WITH STATE AND FEDERAL GUIDELINES CAN BE
DEMONSTRATED.
CHAMPION CIRCLE NW
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C3.3
FR
ED
P O
PP
E
PA
R
K
EX
IS
TI
N G
C O
N D
IT
IO
N S
AN
D
D
EM
O
LI
TI
O
N P
LA
N
C
IT
Y O
F
PA
LM
B
AY
M A
TC
H
L
IN
E
SE
E
SH
EE
T
C 3.
NORTH
Know what'sbelow.
Callbefore you dig.
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
KEY MAP
C3.1 C3.2 C3.3
C3.4
ALERT TO CONTRACTOR:
THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR
THIS ISSUE. WHEN PERFORMING GRADING OPERATIONS DURING
PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE
OF SOILS. REFER TO MASTER SITE SPECIFICATIONS.
X
1. REFER TO SHEET C2.1 FOR THE EROSION CONTROL AND TREE
PROTECTION.
2. REFER TO SHEET C3.0 FOR GENERAL NOTES.
NOTES
FL
O
R
ID
A
IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE
OF STATE OR FEDERALLY PROTECTED PLANT AND/OR ANIMAL SPECIES IS
DISCOVERED, CITY OF PALM BAY NATURAL RESOURCE INSPECTOR AND
APPLICABLE AGENCIES, SHALL BE NOTIFIED WITHIN TWO WORKING DAYS
OF THE PLANT AND/OR ANIMAL SPECIES FOUND ON THE SITE. ALL WORK IN
THE AFFECTED AREA SHALL COME TO AN IMMEDIATE STOP UNTIL ALL
PERTINENT PERMITS HAVE BEEN OBTAINED, AGENCY WRITTEN
AUTHORIZATION TO COMMENCE ACTIVITIES HAS BEEN GIVEN, OR UNLESS
COMPLIANCE WITH STATE AND FEDERAL GUIDELINES CAN BE
CH
AM
PI
ON
C
IR
CL
E
NW
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C3.4
FR
ED
P O
PP
E
PA
R
K
EX
IS
TI
N G
C O
N D
IT
IO
N S
AN
D
D
EM
O
LI
TI
O
N P
LA
N
C
IT
Y O
F
PA
LM
B
AY
MATCH LINE SEE SHEET C3.2
NORTH
Know what'sbelow.
Callbefore you dig.
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
KEY MAP
C3.1 C3.2 C3.3
C3.4
ALERT TO CONTRACTOR:
THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR
THIS ISSUE. WHEN PERFORMING GRADING OPERATIONS DURING
PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE
OF SOILS. REFER TO MASTER SITE SPECIFICATIONS.
X
1. REFER TO SHEET C2.1 FOR THE EROSION CONTROL AND TREE
PROTECTION.
2. REFER TO SHEET C3.0 FOR GENERAL NOTES.
NOTES
FL
O
R
ID
A
IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE
OF STATE OR FEDERALLY PROTECTED PLANT AND/OR ANIMAL SPECIES IS
DISCOVERED, CITY OF PALM BAY NATURAL RESOURCE INSPECTOR AND
APPLICABLE AGENCIES, SHALL BE NOTIFIED WITHIN TWO WORKING DAYS
OF THE PLANT AND/OR ANIMAL SPECIES FOUND ON THE SITE. ALL WORK IN
THE AFFECTED AREA SHALL COME TO AN IMMEDIATE STOP UNTIL ALL
PERTINENT PERMITS HAVE BEEN OBTAINED, AGENCY WRITTEN
AUTHORIZATION TO COMMENCE ACTIVITIES HAS BEEN GIVEN, OR UNLESS
COMPLIANCE WITH STATE AND FEDERAL GUIDELINES CAN BE
MERGE
PROPERTY BOUNDARY
RIGHT-OF-WAY LINE
PROPOSED ASPHALT PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED CONCRETE PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED BRIDGE AND APRON (REFER TO STRUCTURAL
PLANS)
PROPOSED SIGN (SEE SHEET C5.0 FOR DETAILS)
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
NORTH
C4.0
FR
ED
P O
PP
E
PA
R
K O
VE
R
AL
L
SI
TE
P
LA
N
C
IT
Y O
F
PA
LM
B
AY
C4.1 C4.2
C4.4
C4 .3
LEGEND
ST
J
OH
NS
H
ER
IT
AG
E
PA
RK
W
AY
M
EL
BO
UR
NE
T
IL
LM
AN
C
AN
AL
CH
AM
PI
ON
SH
IP
C
IR
CL
E
NW
FL
O
R
JO
HNS
HER
ITA
GE
PA
RK
WAY
CARRICK ST NW
MEL
BO
URN
E T
ILL
MAN
CA
NAL
#7
PROPERTY BOUNDARY
RIGHT-OF-WAY LINE
PROPOSED ASPHALT PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED CONCRETE PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED BRIDGE AND APRON (REFER TO STRUCTURAL
PLANS)
PROPOSED SIGN (SEE SHEET C5.0 FOR DETAILS)
MERGE
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
NORTH
C4.1
FR
ED
P O
PP
E
PA
R
K
SI
TE
P
LA
N
C
IT
Y O
F
PA
LM
B
AY
PROJECT DATUM: NAD83
Always call 811 two full business days before you dig to have underground utilities located and marked.
LEGEND
KEY MAP
C4.1 C4.2 C4.4
C4 .3
STOP
GENERAL NOTES:
1. CONTRACTOR TO USE FDOT STANDARD PLANS INDEX 520-001 FOR
PROPOSED TYPE 'F' CURB & GUTTER.
2. CONTRACTOR TO MATCH PROPOSED TURN LANE PAVEMENT SECTION
TO THE EXISTING PAVEMENT SECTION.
3. ALL MATERIAL THAT IS IN CONFLICT WITH PROPOSED IMPROVEMENTS
SHALL BE REMOVED AND DISPOSED OF, OR MODIFIED AND RELOCATED AS
CALLED FOR IN THE PLANS. CONTRACTOR SHALL NOTIFY THE DEPARTMENT
FOR ANY QUESTIONS.
4. ALL STRIPING AND MARKING SHALL CONFORM TO FDOT DESIGN
STANDARD INDEX 711.
5. INSTALL RPM'S PER FDOT STANDARD INDEX 706.
6. ALL ROADWAY TRANSITIONS/TAPERS SHALL CONFORM TO FDOT
DEISGN MANUAL (210)(DESIGN SPEED 50 MPH).
7. MILL EXISTING ROAD PAVEMENT 1.5" OVERLAY WITH FINAL TOPPING
LAYER OF WIDENING (SEE SHEET C4.6 FOR DETAILS)
8. RIGHT OF THE WAY LINE SHOWN APPROXIMATED FROM ST JOHNS
HERITAGE PARKWAY TURN LANE IMPROVEMENTS (NORTH), PREPARED BY
B.S.E. CONSULTANTS, INC., AND APPROVED FOR CONSTRUCTION BY THE
CITY OF PALM BAY AUGUST 20, 2020.
FL
O
R
ID
A
PROPERTY BOUNDARY
RIGHT-OF-WAY LINE
PROPOSED ASPHALT PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED CONCRETE PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED BRIDGE AND APRON (REFER TO STRUCTURAL
PLANS)
PROPOSED SIGN (SEE SHEET C5.0 FOR DETAILS)
MERGE
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C4.2
FR
ED
P O
PP
E
PA
R
K
C
IT
Y O
F
PA
LM
B
AY
SI
TE
P
LA
N
NORTH
LEGEND
KEY MAP
C4.1 C4.2 C4.4
C4 .3
GENERAL NOTES:
1. CONTRACTOR TO USE FDOT STANDARD PLANS INDEX 520-001 FOR
PROPOSED TYPE 'F' CURB & GUTTER.
2. CONTRACTOR TO MATCH PROPOSED TURN LANE PAVEMENT SECTION
TO THE EXISTING PAVEMENT SECTION.
3. ALL MATERIAL THAT IS IN CONFLICT WITH PROPOSED IMPROVEMENTS
SHALL BE REMOVED AND DISPOSED OF, OR MODIFIED AND RELOCATED AS
CALLED FOR IN THE PLANS. CONTRACTOR SHALL NOTIFY THE DEPARTMENT
FOR ANY QUESTIONS.
4. ALL STRIPING AND MARKING SHALL CONFORM TO FDOT DESIGN
STANDARD INDEX 711.
5. INSTALL RPM'S PER FDOT STANDARD INDEX 706.
6. ALL ROADWAY TRANSITIONS/TAPERS SHALL CONFORM TO FDOT
DEISGN MANUAL (210)(DESIGN SPEED 50 MPH).
7. MILL EXISTING ROAD PAVEMENT 1.5" OVERLAY WITH FINAL TOPPING
LAYER OF WIDENING (SEE SHEET C4.6 FOR DETAILS)
8. RIGHT OF THE WAY LINE SHOWN APPROXIMATED FROM ST JOHNS
HERITAGE PARKWAY TURN LANE IMPROVEMENTS (NORTH), PREPARED BY
B.S.E. CONSULTANTS, INC., AND APPROVED FOR CONSTRUCTION BY THE
CITY OF PALM BAY AUGUST 20, 2020.
FL
O
R
CHAMPION CIRCLE NW
EHH
PROPERTY BOUNDARY
RIGHT-OF-WAY LINE
PROPOSED ASPHALT PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED CONCRETE PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED BRIDGE AND APRON (REFER TO STRUCTURAL
PLANS)
PROPOSED SIGN (SEE SHEET C5.0 FOR DETAILS)
MERGE
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
S.
O R
AN
G
E
AV
EN
U
E, S
U
IT
E
0, O
R
LA
N D
O , F
L
PH
O N
E:
(4
) 8
-1
W W
W .K
IM
LE
Y- H
O R
N .C
IS
TR
Y
N o.
DATUM:
NAVD88
C4.3
FR
ED
P O
PP
E
PA
R
K
C
IT
Y O
F
PA
LM
B
AY
SI
TE
P
LA
N
NORTH
NORTH
LEGEND
KEY MAP
C4.1 C4.2 C4.4
C4 .3
GENERAL NOTES:
1. CONTRACTOR TO USE FDOT STANDARD
PLANS INDEX 520-001 FOR PROPOSED TYPE
'F' CURB & GUTTER.
2. CONTRACTOR TO MATCH PROPOSED
TURN LANE PAVEMENT SECTION TO THE
EXISTING PAVEMENT SECTION.
3. ALL MATERIAL THAT IS IN CONFLICT
WITH PROPOSED IMPROVEMENTS SHALL BE
REMOVED AND DISPOSED OF, OR MODIFIED
AND RELOCATED AS CALLED FOR IN THE
PLANS. CONTRACTOR SHALL NOTIFY THE
DEPARTMENT FOR ANY QUESTIONS.
4. ALL STRIPING AND MARKING SHALL
CONFORM TO FDOT DESIGN STANDARD
INDEX 711.
5. INSTALL RPM'S PER FDOT STANDARD
INDEX 706.
6. ALL ROADWAY TRANSITIONS/TAPERS
SHALL CONFORM TO FDOT DEISGN MANUAL
(210)(DESIGN SPEED 50 MPH).
7. MILL EXISTING ROAD PAVEMENT 1.5"
OVERLAY WITH FINAL TOPPING LAYER OF
WIDENING (SEE SHEET C4.6 FOR DETAILS)
8. RIGHT OF THE WAY LINE SHOWN
APPROXIMATED FROM ST JOHNS HERITAGE
PARKWAY TURN LANE IMPROVEMENTS
(NORTH), PREPARED BY B.S.E.
CONSULTANTS, INC., AND APPROVED FOR
CONSTRUCTION BY THE CITY OF PALM BAY
AUGUST 20, 2020.
FL
O
R
ID
A
EHH
PROPERTY BOUNDARY
RIGHT-OF-WAY LINE
PROPOSED ASPHALT PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED CONCRETE PAVEMENT (SEE SHEET C10.0 FOR
DETAILS)
PROPOSED BRIDGE AND APRON (REFER TO STRUCTURAL
PLANS)
PROPOSED SIGN (SEE SHEET C5.0 FOR DETAILS)
MERGE
T h is d o c u m e n t, t o g e th e r w it h t h e c o n c e p ts a n d d e s ig n s p re s e n te d h e re in a s a n i n s tr u m e n t o f s e rv ic e is i n te n d e d o n ly f o r th e s p e c if ic p u rp o s e a n d c lie n t fo r w h ic h i t w a s p re p a re d R e u s e o f a n d i m p ro p e r re lia n c e o n t h is d o c u m e n t w it h o u t w ri tt e n a u th o ri z a ti o n a n d a d a p ta ti o n b y K im le y -H o rn a n d A s s o c ia te s In c s h a ll b e w it h o u t lia b ili ty t o K im le y -H o rn a n d A s s o c ia te s In c
BY
D
AT
E
AS
S
H O
W N
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
C H
EC
KE
D B
Y
SC
AL
E
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y
KH
A
PR
O
JE
C
T
D
AT
E:LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .