15-Drawing - Ben Taub Loading Dock Expansion.pdf

PDF 57 MB Posted

Attached to
CSP - Loading Dock Expansion at Ben Taub Hospital for Harris Health (Estimated Budget - $2, 500, 000)
Solicitation number
26/0152
Issued by
Harris County, Texas

About this file

This is a technical drawing document related to the Loading Dock Expansion project at Ben Taub Hospital for Harris Health System in Texas. The drawing illustrates the architectural and structural design specifications for the proposed loading dock expansion, a capital improvement project with an estimated budget of $2,500,000. The document provides detailed plans and design layouts necessary for the construction and renovation of the loading dock facility, serving as a reference document for bidders and contractors evaluating the project scope. The drawing establishes the physical parameters and requirements that contractors must understand to prepare accurate bids and execute the work in accordance with Harris Health's specifications.

This drawing is a foundational component of the procurement package, enabling prospective contractors to assess the complexity, scale, and technical requirements of the loading dock expansion work. As a design document, it defines the construction deliverables and serves as the basis for cost estimation and project planning. The document supports the competitive bidding process by providing visual representation of the work scope, ensuring all bidders have access to the same technical information for preparing competitive and compliant proposals for the $2,500,000 project.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .