Amendment_1.pdf
PDF 84 KB Posted
- Attached to
- 15kV Electrical Switchgear Replacement
- Solicitation number
- 14-223-SOL-00069
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| Attachment_1.pdf | ||
| Attachment_3.pdf | ||
| Attachment_2.pdf | ||
| amendment_2.pdf | ||
| Attachment_1_list_of_attendees.pdf | ||
| Attachment_2_Revised_Section_B.pdf | ||
| E-7.pdf | ||
| Attachment_J-7_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE.doc | DOC document | |
| M-3.pdf | ||
| M-1.pdf | ||
| E-3.pdf | ||
| M-4.pdf | ||
| E-10.pdf | ||
| E-9.pdf | ||
| E-6.pdf | ||
| 14-223-SOL-00069.pdf | ||
| E-14.pdf | ||
| E-15.pdf | ||
| E-8.pdf | ||
| Attachment_J-1_Specifications.pdf | ||
| E-5.pdf | ||
| E-2.pdf | ||
| E-11.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| M-2.pdf | ||
| E-1.pdf | ||
| E-13.pdf | ||
| Attachment_J-3_U.S._Department_of_Labor_General_Decision_Number__AR140125.pdf | ||
| Attachment_J-6_SAMPLE_CLIENT__LETTER.doc | DOC document | |
| COVER.pdf | ||
| E-12.pdf | ||
| E-4.pdf | ||
| S-1.pdf | ||
| Attachment_J-5_FDA_Form_3398.pdf |
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
14-223-SOL-00069
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
HFT-323
JEFFERSON AR 72079
3900 NCTR ROAD
OAGS - Field Operations Branch
FDA/OO/OFBA/OAGS/DAP
JEFFERSON AR 72079
HFT-323
3900 NCTR ROAD, Bldg. 50, Room 422 Nick Sartain OAGS - Field Operations Branch
FDA/OO/OFBA/OAGS/DAP
08/05/2014000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/18/2014
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to: amend the specifications/drawings, provide attendees list from site visit and provide an updated Section B of the solicitation.
1. Specification 012300 - Options, paragraph 3.01.C, change from: "Add the demolition and removal of PFC B. Contractor to install new PFC B 1200 KVAR 4 Stage switching, and associated wiring, materials, connections and new concrete pad. Also provide new conductors for existing PFC A."
To: "Option 3: Add the demolition and removal of PFC B. Contractor to install new PFC B
1200 KVAR 4 Stage switching, and associated wiring, materials and connections. Re-use existing concrete pad."
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JERRY W. MARTIN
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
14-223-SOL-00069/000001
2. Specification 012300 - Options, paragraph
3.01.G. Change from: "(approximately 8 poles)" to: "( Seven (7) poles)".
3. Drawing E-12 - Under Options To Be Bid, change from: "Option 3: Add the demolition and removal of PFC B and existing concrete pad.
Contractor to install new PFC B 1200 KVAR 4 Stage switching, and associated wiring as well as wiring for PFC A, materials and connections."
To: "Option 3: Add the demolition and removal of
PFC B. Contractor to install new PFC B 1200 KVAR
4 Stage switching, and associated wiring, materials and connections. Re-use existing concrete pad."
4. For clarification, on Drawing E-5 phase P4-B is part of the base bid.
5. Specification 012300 - Remove paragraph
3.01.D Option 4 in its entirety from the project.
6. Specification 012300 - Remove paragraph
3.01.F Option 6 in its entirety from the project.
7. Drawing E-12 - Under Options To Be Bid, remove Option 4 in its entirety from the project.
8. Drawing E-12 - Under Options To Be Bid, remove Option 6 in its entirety from the project.
9. See attachment 1 (2 pages) for list of attendees from site visit held on July 30, 2014.
10. See attachment 2 (2 pages) updated Section B.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .