140R6023Q0004_Amendment_5_0005.pdf

PDF 3 MB Posted

Attached to
WYAO Custodial Services (Mills, Wyoming)
Solicitation number
140R6023Q0004
Issued by

About this file

This performance work statement outlines custodial services requirements for the Bureau of Reclamation's Wyoming Area Office Complex in Mills, Wyoming. Standard services include cleaning and disinfecting interior areas such as floors, carpets, fixtures, surfaces and windows. Exterior services include window washing and trash removal. The contractor must develop a quality control plan, pandemic plan, exposure control plan, and communication plan. The contractor will provide services after 4pm daily excluding federal holidays. Semi-annual carpet cleaning is required in April and November. The contractor must use sustainable cleaning products and implement a sustainable cleaning plan. The initial term is for one year with four optional one-year extensions.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 140R6023Q0004/P0005 Page 2

Description of changes:

1) In Section B—Price Schedule, Remove Section B in its entirety, and substitute therefor with the attached revised Section B.

2) In Section C—Specifications, remove Section C in its entirety, and substitute therefor with the attached revised Section C.

3) In Section J—List of Documents, Exhibits, and Other Attachments, Remove Section J in its entirety, and substitute therefor with the attached revised Section J.

4) In Section L— Instructions, Conditions, and Notices to Bidders, remove in its entirety, and substitute therefor with the attached revised Section L.

5) In Section M—Evaluation, Remove Section M in its entirety, and substitute therefor with the attached revised Section M.

Submission of Quotations: Quotes are to be submitted via email to Contract Specialist Natalie

Oslund at NOslund@usbr.gov. See Section L for Submission of quotations and Section M for

Evaluation of quotations.

Receipt of Proposals: The hour for receipt of proposals is changed to 11:00 AM (Mountain

Time). The date for receipt of proposals is extended to February 21, 2023.

Award Information:

The Government reserves the right not to make an award. If determination is made to award a contract, one contract will be awarded.

Third Party: If you have provided a copy of this solicitation to another company or person, please forward this amendment accordingly.

mailto:NOslund@usbr.gov

SECTION B

PRICE SCHEDULE

Solicitation No. 140R6023Q0004/0005

B - 1

PRICING SCHEDULE

Main Office Building – Base Period *Note: Invoices shall be submitted by quantity, unit, unit price and monthly total price

*Note: NTE-Not to Exceed

Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 2,820 ft² C.3.1.1 Utility Closet 197 ft² C.3.1.2 Carpets & Rugs 13,838 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

13,838 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (6’ x 3’4”) 48 each C.3.1.10 Glass Door Panels (1’ x 7’2”) 26 each C.3.1.10 Windows in Vestibule, southern wall, (1’6” x 7’6”)

2 each

C.3.1.10 Vestibule east wall (9’ x 22”) all glass

1 each

C.3.1.10 Full glass doors (3’6” x 7’0”) 7 each C.3.1.10 Glass walls on east side of building Office No. 1 (8’0” x 6’8”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 1 (3’6” x 2’1”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 2 (3’6” x 2’1”)

1 each

B - 2

C.3.1.10 Glass walls on east side of building Office No. 2 (14’10” x 6’8”)

1 each

C.3.1.10 Frosted Glass on Cubicle Walls (Approximately 18” height and a total combined 25’ wide per cubicle)

35 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (5’7” x 4’0”)

5 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (2’1” x 9’1”)

5 each

C.3.1.11 Blinds and Coverings 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.1.15 Mail Room 1 AU monthly

C.3.2.2 Exterior Windows (6’ x 3’4”) 48 each C.3.2.3 Ash Receptacles and Trash

Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Main Office Building – Base Period

Control Center Building – Base Period Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 1157 ft² C.3.1.1 Tile Flooring 2100 ft² C.3.1.1 Floating Tile Flooring 1380 ft² C.3.1.2 Carpets & Rugs 90 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

90 ft²

B - 3

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

3 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Control Center Building – Base

Period

Mobile Maintenance Office – Base Period Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.2 Carpet & Rugs 1064 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1064 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

B - 4

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Mobile Maintenance Office – Base

Period

Warehouse Office and Restrooms – Base Period Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

3.1.1 Tile Flooring 280 ft²

3.1.2 Carpet & Rugs 1849 ft²

3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1849 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 5

C.3.1.10 Interior Windows (36” x 34 ½”) 8 each C.3.1.11 Blinds and Coverings (36” x

34 ½”)

1 AU

monthly C.3.1.12 Policing Inside Areas 1 AU monthly C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly C.3.2.2 Exterior Windows (36” x 34

½”) 8 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Warehouse Office and Restrooms -

Base Period

Electrical Laboratory Offices and Restroom – Base Period Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 689 ft² C.3.1.3 Floor Mats and Runners

(vacuum only)

1 AU

monthly C.3.1.4 Restrooms & Consumable

Supplies 1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (36” x 34 ½”) 3 each C.3.1.11 Blinds and Coverings (36” x 34

½”)

1 AU

B - 6

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.2 Exterior Windows (36” x 34 ½”)

3 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Electrical Laboratory Offices and Restroom – Base Period

Heavy Equipment Crew Offices and Restroom - Base Period Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 117 ft² C.3.1.2 Carpets & Rugs 361 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

361 ft²

C.3.1.3 Floor Mats and Runners ((vacuum only))

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU

B - 7

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Heavy Equipment Crew Offices and Restroom - Base Period

C.12 Above Standard Services – Base Period Section Item Quantity

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.12.1 Interior Window Washing-Main Office Building (6’ x 3’4”)

48 each

C.12.1 Interior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.1 Interior Window Washing Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.2 Exterior Window Washing- Main Office Building (6’ x 3’4”)

48 each

C.12.2 Exterior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.2 Exterior Window Washing- Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.3 High Cleaning estimate 3 hours

Per hour

C.12.4 Machine Strip and Wax Resilient Office Floors - Tile

3,186 ft²

B - 8

C.12.4 Machine Strip and Wax Resilient Office Floors – Polished Concrete Flooring

3, 977 ft²

C.12.5 Additional Disinfecting of Frequently Touched Surfaces estimate 3 hours

Per hour

C.12.6 Disinfecting in Response to a COVID-19 Event estimate 8 hours

Per hour

C.12.7 Interior Graffiti Removal estimate 1 hour

Per hour

Total Price for Above Standard Services -Base Period

Note 1: Estimated units may increase or decrease without negotiation at the awarded unit rate for standard Services. Above standard services shall be requested by the CO, COR, or their designee. Above Standard Services shall be compensated at the unit rate specified on the Pricing Schedule. See section 12.1.

Note 2: Invoices shall be submitted on a monthly basis as a single Contract Line Item Number (CLIN).

Deductions for services not performed will be subtracted from the monthly total dollar value.

B - 9

PRICING SCHEDULE

Main Office Building – Option Period One *Note: Invoices shall be submitted by quantity, unit, unit price and monthly total price

*Note: NTE-Not to Exceed

Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 2,820 ft² C.3.1.1 Utility Closet 197 ft² C.3.1.2 Carpets & Rugs 13,838 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

13,838 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (6’ x 3’4”) 48 each C.3.1.10 Glass Door Panels (1’ x 7’2”) 26 each C.3.1.10 Windows in Vestibule, southern wall, (1’6” x 7’6”)

2 each

C.3.1.10 Vestibule east wall (9’ x 22”) all glass

1 each

C.3.1.10 Full glass doors (3’6” x 7’0”) 7 each C.3.1.10 Glass walls on east side of building Office No. 1 (8’0” x 6’8”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 1 (3’6” x 2’1”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 2 (3’6” x 2’1”)

B - 10 building Office No. 2 (14’10” x 6’8”)

1 each

C.3.1.10 Frosted Glass on Cubicle Walls (Approximately 18” height and a total combined 25’ wide per cubicle)

35 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (5’7” x 4’0”)

5 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (2’1” x 9’1”)

5 each

C.3.1.11 Blinds and Coverings 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.1.15 Mail Room 1 AU monthly

C.3.2.2 Exterior Windows (6’ x 3’4”) 48 each C.3.2.3 Ash Receptacles and Trash

Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Main Office Building – Option Period One

Control Center Building – Option Period One Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 1157 ft² C.3.1.1 Tile Flooring 2100 ft² C.3.1.1 Floating Tile Flooring 1380 ft² C.3.1.2 Carpets & Rugs 90 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

90 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

B - 11

C.3.1.4 Restrooms & Consumable Supplies

3 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Control Center Building – Option

Period One

Mobile Maintenance Office – Option Period One Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.2 Carpet & Rugs 1064 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1064 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU

B - 12 monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Mobile Maintenance Office – Option

Period One

Warehouse Office and Restrooms - Option Period One Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

3.1.1 Tile Flooring 280 ft²

3.1.2 Carpet & Rugs 1849 ft²

3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1849 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 13

C.3.1.11 Blinds and Coverings (36” x

34 ½”)

1 AU

monthly C.3.1.12 Policing Inside Areas 1 AU monthly C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly C.3.2.2 Exterior Windows (36” x 34

½”) 8 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Warehouse Office and Restrooms -

Option Period One

Electrical Laboratory Offices and Restroom – Option Period One Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 689 ft² C.3.1.3 Floor Mats and Runners

(vacuum only)

1 AU

monthly C.3.1.4 Restrooms & Consumable

Supplies 1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (36” x 34 ½”) 3 each C.3.1.11 Blinds and Coverings (36” x 34

½”)

1 AU

B - 14 monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.2 Exterior Windows (36” x 34 ½”)

3 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Electrical Laboratory Offices and

Restroom – Option Period One

Heavy Equipment Crew Offices and Restroom - Option Period One Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 117 ft² C.3.1.2 Carpets & Rugs 361 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

361 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 15 monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Heavy Equipment Crew Offices and Restroom - Option

Period One

C.12 Above Standard Services – Option Period One Section Item Quantity

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.12.1 Interior Window Washing-Main Office Building (6’ x 3’4”)

48 each

C.12.1 Interior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.1 Interior Window Washing Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.2 Exterior Window Washing- Main Office Building (6’ x 3’4”)

48 each

C.12.2 Exterior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.2 Exterior Window Washing- Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.3 High Cleaning estimate 3 hours

Per hour

C.12.4 Machine Strip and Wax Resilient Office Floors - Tile

B - 16

Resilient Office Floors – Polished Concrete Flooring

3, 977 ft²

C.12.5 Additional Disinfecting of Frequently Touched Surfaces estimate 3 hours

Per hour

C.12.6 Disinfecting in Response to a COVID-19 Event estimate 8 hours

Per hour

C.12.7 Interior Graffiti Removal estimate 1 hour

Per hour

Total Price for Above Standard Services - Option Period One

Note 1: Estimated units may increase or decrease without negotiation at the awarded unit rate for standard Services. Above standard services shall be requested by the CO, COR, or their designee. Above Standard Services shall be compensated at the unit rate specified on the Pricing Schedule. See section 12.1.

Note 2: Invoices shall be submitted on a monthly basis as a single Contract Line Item Number (CLIN).

B - 17

Main Office Building – Option Period Two *Note: Invoices shall be submitted by quantity, unit, unit price and monthly total price

*Note: NTE- Not To Exceed

Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 2,820 ft² C.3.1.1 Utility Closet 197 ft² C.3.1.2 Carpets & Rugs 13,838 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

13,838 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (6’ x 3’4”) 48 each C.3.1.10 Glass Door Panels (1’ x 7’2”) 26 each C.3.1.10 Windows in Vestibule, southern wall, (1’6” x 7’6”)

2 each

C.3.1.10 Vestibule east wall (9’ x 22”) all glass

1 each

C.3.1.10 Full glass doors (3’6” x 7’0”) 7 each C.3.1.10 Glass walls on east side of building Office No. 1 (8’0” x 6’8”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 1 (3’6” x 2’1”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 2 (3’6” x 2’1”)

B - 18

C.3.1.10 Frosted Glass on Cubicle Walls (Approximately 18” height and a total combined 25’ wide per cubicle)

35 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (5’7” x 4’0”)

5 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (2’1” x 9’1”)

5 each

C.3.1.10 Frosted Glass on Cubicle Walls (18” height)

35 each

C.3.1.11 Blinds and Coverings 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.1.15 Mail Room 1 AU monthly

C.3.2.2 Exterior Windows (6’ x 3’4”) 48 each C.3.2.3 Ash Receptacles and Trash

Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Main Office Building – Option Period Two

Control Center Building – Option Period Two Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 1157 ft² C.3.1.1 Tile Flooring 2100 ft² C.3.1.1 Floating Tile Flooring 1380 ft² C.3.1.2 Carpets & Rugs 90 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

90 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

B - 19

Supplies

3 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Control Center Building – Option

Period Two

Mobile Maintenance Office – Option Period Two Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.2 Carpet & Rugs 1064 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1064 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU

B - 20

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Mobile Maintenance Office – Option

Period Two

Warehouse Office and Restrooms - Option Period Two Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

3.1.1 Tile Flooring 280 ft²

3.1.2 Carpet & Rugs 1849 ft²

3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1849 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 21

C.3.1.11 Blinds and Coverings (36” x

34 ½”)

1 AU

monthly C.3.1.12 Policing Inside Areas 1 AU monthly C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly C.3.2.2 Exterior Windows (36” x 34

½”) 8 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Warehouse Office and Restrooms -

Option Period Two

Electrical Laboratory Offices and Restroom – Option Period Two Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 689 ft² C.3.1.3 Floor Mats and Runners

(vacuum only)

1 AU

monthly C.3.1.4 Restrooms & Consumable

Supplies 1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (36” x 34 ½”) 3 each C.3.1.11 Blinds and Coverings (36” x 34

½”)

1 AU

B - 22 monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.2 Exterior Windows (36” x 34 ½”)

3 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Electrical Laboratory Offices and

Restroom – Option Period Two

Heavy Equipment Crew Offices and Restroom - Option Period Two Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 117 ft² C.3.1.2 Carpets & Rugs 361 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

361 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 23 monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Heavy Equipment Crew Offices and Restroom - Option

Period Two

C.12 Above Standard Services – Option Period Two Section Item Quantity

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.12.1 Interior Window Washing-Main Office Building (6’ x 3’4”)

48 each

C.12.1 Interior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.1 Interior Window Washing Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.2 Exterior Window Washing- Main Office Building (6’ x 3’4”)

48 each

C.12.2 Exterior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.2 Exterior Window Washing- Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.3 High Cleaning estimate 3 hours

Per hour

C.12.4 Machine Strip and Wax Resilient Office Floors - Tile

Resilient Office Floors – Polished Concrete Flooring

3, 977 ft²

C.12.5 Additional Disinfecting of Frequently Touched Surfaces estimate 3 hours

Per hour

C.12.6 Disinfecting in Response to a COVID-19 Event estimate 8 hours

Per hour

C.12.7 Interior Graffiti Removal estimate 1 hour

Per hour

Total Price for Above Standard Services - Option Period Two

Note 1: Estimated units may increase or decrease without negotiation at the awarded unit rate for standard Services. Above standard services shall be requested by the CO, COR, or their designee. Above Standard Services shall be compensated at the unit rate specified on the Pricing Schedule. See section 12.1.

Note 2: Invoices shall be submitted on a monthly basis as a single Contract Line Item Number (CLIN).

Deductions for services not performed will be subtracted from the monthly total dollar value.

B - 24

B - 25

Main Office Building – Option Period Three *Note: Invoices shall be submitted by quantity, unit, unit price and monthly total price

*Note: NTE-Not To Exceed

Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 2,820 ft² C.3.1.1 Utility Closet 197 ft² C.3.1.2 Carpets & Rugs 13,838 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

13,838 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (6’ x 3’4”) 48 each C.3.1.10 Glass Door Panels (1’ x 7’2”) 26 each C.3.1.10 Windows in Vestibule, southern wall, (1’6” x 7’6”)

2 each

C.3.1.10 Vestibule east wall (9’ x 22”) all glass

1 each

C.3.1.10 Full glass doors (3’6” x 7’0”) 7 each C.3.1.10 Glass walls on east side of building Office No. 1 (8’0” x 6’8”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 1 (3’6” x 2’1”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 2 (3’6” x 2’1”)

B - 26 building Office No. 2 (14’10” x 6’8”)

1 each

C.3.1.10 Frosted Glass on Cubicle Walls (Approximately 18” height and a total combined 25’ wide per cubicle)

35 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (5’7” x 4’0”)

5 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (2’1” x 9’1”)

5 each

C.3.1.11 Blinds and Coverings 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.1.15 Mail Room 1 AU monthly

C.3.2.2 Exterior Windows (6’ x 3’4”) 48 each C.3.2.3 Ash Receptacles and Trash

Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimated 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Main Office Building – Option Period

Three

Control Center Building – Option Period Three Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 1157 ft² C.3.1.1 Tile Flooring 2100 ft² C.3.1.1 Floating Tile Flooring 1380 ft² C.3.1.2 Carpets & Rugs 90 ft²

B - 27

C.3.1.2 Semi Annual Service- Professionally Clean Carpet (Shampoo or Steam)

90 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

3 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Control Center Building – Option

Period Three

Mobile Maintenance Office – Option Period Three Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.2 Carpet & Rugs 1064 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1064 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each

B - 28

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Mobile Maintenance Office – Option

Period Three

Warehouse Office and Restrooms - Option Period Three Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

3.1.1 Tile Flooring 280 ft²

3.1.2 Carpet & Rugs 1849 ft²

3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1849 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

B - 29

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (36” x 34 ½”) 8 each C.3.1.11 Blinds and Coverings (36” x

34 ½”)

1 AU

monthly C.3.1.12 Policing Inside Areas 1 AU monthly C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly C.3.2.2 Exterior Windows (36” x 34

½”) 8 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Warehouse Office and Restrooms -

Option Period Three

Electrical Laboratory Offices and Restroom – Option Period Three Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 689 ft² C.3.1.3 Floor Mats and Runners

(vacuum only)

1 AU

monthly C.3.1.4 Restrooms & Consumable

Supplies 1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

C.3.1.10 Interior Windows (36” x 34 ½”) 3 each

B - 30

C.3.1.11 Blinds and Coverings (36” x 34 ½”)

1 AU

monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.2 Exterior Windows (36” x 34 ½”)

3 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Electrical Laboratory Offices and

Restroom – Option Period Three

Heavy Equipment Crew Offices and Restroom - Option Period Three Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 117 ft² C.3.1.2 Carpets & Rugs 361 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

361 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 31

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Heavy Equipment Crew Offices and Restroom - Option

Period Three

C.12 Above Standard Services – Option Period Three Section Item Quantity

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.12.1 Interior Window Washing-Main Office Building (6’ x 3’4”)

48 each

C.12.1 Interior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.1 Interior Window Washing Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.2 Exterior Window Washing- Main Office Building (6’ x 3’4”)

48 each

C.12.2 Exterior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.2 Exterior Window Washing- Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.3 High Cleaning estimate 3 hours

Per hour

B - 32

Resilient Office Floors - Tile

3,186 ft²

C.12.4 Machine Strip and Wax Resilient Office Floors – Polished Concrete Flooring

3, 977 ft²

C.12.5 Additional Disinfecting of Frequently Touched Surfaces estimate 3 hours

Per hour

C.12.6 Disinfecting in Response to a COVID-19 Event estimate 8 hours

Per hour

C.12.7 Interior Graffiti Removal estimate 1 hour

Per hour

Total Price for Above Standard Services - Option Period Three

Note 1: Estimated units may increase or decrease without negotiation at the awarded unit rate for standard Services. Above standard services shall be requested by the CO, COR, or their designee. Above Standard Services shall be compensated at the unit rate specified on the Pricing Schedule. See section 12.1.

Note 2: Invoices shall be submitted on a monthly basis as a single Contract Line Item Number (CLIN).

B - 33

Main Office Building – Option Period Four *Note: Invoices shall be submitted by quantity, unit, unit price and monthly total price

Note: NTE-Not to Exceed

Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 2,820 ft² C.3.1.1 Utility Closet 197 ft² C.3.1.2 Carpets & Rugs 13,838 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

13,838 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (6’ x 3’4”) 48 each C.3.1.10 Glass Door Panels (1’ x 7’2”) 26 each C.3.1.10 Windows in Vestibule, southern wall, (1’6” x 7’6”)

2 each

C.3.1.10 Vestibule east wall (9’ x 22”) all glass

1 each

C.3.1.10 Full glass doors (3’6” x 7’0”) 7 each C.3.1.10 Glass walls on east side of building Office No. 1 (8’0” x 6’8”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 1 (3’6” x 2’1”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 2 (3’6” x 2’1”)

B - 34 building Office No. 2 (14’10” x 6’8”)

1 each

C.3.1.10 Frosted Glass on Cubicle Walls (Approximately 18” height and a total combined 25’ wide per cubicle)

35 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (5’7” x 4’0”)

5 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (2’1” x 9’1”)

5 each

C.3.1.11 Blinds and Coverings 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.1.15 Mail Room 1 AU monthly

C.3.2.2 Exterior Windows (6’ x 3’4”) 48 each C.3.2.3 Ash Receptacles and Trash

Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimated 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Main Office Building – Option Period

Four

Control Center Building – Option Period Four Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 1157 ft² C.3.1.1 Tile Flooring 2100 ft² C.3.1.1 Floating Tile Flooring 1380 ft² C.3.1.2 Carpets & Rugs 90 ft²

B - 35

C.3.1.2 Semi Annual Service- Professionally Clean Carpet (Shampoo or Steam)

90 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

3 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

AU

monthly

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Control Center Building – Option Period Four

Mobile Maintenance Office – Option Period Four Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.2 Carpet & Rugs 1064 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1064 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU

B - 36

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Mobile Maintenance Office – Option

Period Four

Warehouse Office and Restrooms - Option Period Four Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 280 ft² C.3.1.2 Carpet & Rugs 1849 ft²

C.3.1.2 Semi Annual Service- Professionally Clean Carpet (Shampoo or Steam)

1849 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU

B - 37

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (36” x 34 ½”) 8 each C.3.1.11 Blinds and Coverings (36” x

34 ½”)

1 AU

monthly C.3.1.12 Policing Inside Areas 1 AU monthly C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly C.3.2.2 Exterior Windows (36” x 34

½”) 8 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Warehouse Office and Restrooms –

Option Period Four

Electrical Laboratory Offices and Restroom – Option Period Four Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 689 ft² C.3.1.3 Floor Mats and Runners

(vacuum only)

1 AU

monthly C.3.1.4 Restrooms & Consumable

Supplies 1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (36” x 34 ½”) 3 each

B - 38

C.3.1.11 Blinds and Coverings (36” x 34 ½”)

1 AU

monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.2 Exterior Windows (36” x 34 ½”)

3 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Electrical Laboratory Offices and

Restroom – Option Period Four

Heavy Equipment Crew Offices and Restroom - Option Period Four Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 117 ft² C.3.1.2 Carpets & Rugs 361 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

361 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 39 monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Heavy Equipment Crew Offices and Restroom - Option

Period Four

C.12 Above Standard Services – Option Period Four Section Item Quantity

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.12.1 Interior Window Washing-Main Office Building (6’ x 3’4”)

48 each

C.12.1 Interior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.1 Interior Window Washing Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.2 Exterior Window Washing- Main Office Building (6’ x 3’4”)

48 each

C.12.2 Exterior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.2 Exterior Window Washing- Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.3 High Cleaning estimate 3 hours

Per hour

C.12.4 Machine Strip and Wax Resilient Office Floors - Tile

Resilient Office Floors – Polished Concrete Flooring

3, 977 ft²

C.12.5 Additional Disinfecting of Frequently Touched Surfaces estimate 3 hours

Per hour

C.12.6 Disinfecting in Response to a COVID-19 Event estimate 8 hours

Per hour

C.12.7 Interior Graffiti Removal estimate 1 hour

Per hour

Total Price for Above Standard Services - Option Period Four

Note 1: Estimated units may increase or decrease without negotiation at the awarded unit rate for standard Services. Above standard services shall be requested by the CO, COR, or their designee. Above Standard Services shall be compensated at the unit rate specified on the Pricing Schedule. See section 12.1.

Note 2: Invoices shall be submitted on a monthly basis as a single Contract Line Item Number (CLIN).

Deductions for services not performed will be subtracted from the monthly total dollar value.

B - 40

B - 41

Main Office Building – Option Six Month Extension *Note: Invoices shall be submitted by quantity, unit, unit price and monthly total price

Note: NTE-Not to Exceed

Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 2,820 ft² C.3.1.1 Utility Closet 197 ft² C.3.1.2 Carpets & Rugs 13,838 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

13,838 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (6’ x 3’4”) 48 each C.3.1.10 Glass Door Panels (1’ x 7’2”) 26 each C.3.1.10 Windows in Vestibule, southern wall, (1’6” x 7’6”)

2 each

C.3.1.10 Vestibule east wall (9’ x 22”) all glass

1 each

C.3.1.10 Full glass doors (3’6” x 7’0”) 7 each C.3.1.10 Glass walls on east side of building Office No. 1 (8’0” x 6’8”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 1 (3’6” x 2’1”)

1 each

C.3.1.10 Glass walls on east side of building Office No. 2 (3’6” x 2’1”) building Office No. 2 (14’10” x 6’8”)

1 each

C.3.1.10 Frosted Glass on Cubicle Walls (Approximately 18” height and a total combined 25’ wide per cubicle)

35 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (5’7” x 4’0”)

5 each

C.3.1.10 Glass walls on west side of building [5 Offices -1 window per office] (2’1” x 9’1”)

5 each

C.3.1.11 Blinds and Coverings 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.1.15 Mail Room 1 AU monthly

C.3.2.2 Exterior Windows (6’ x 3’4”) 48 each C.3.2.3 Ash Receptacles and Trash

Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Main Office Building – Option Six Month

Extension

Control Center Building – Option Six Month Extension Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Polished Concrete Flooring 1157 ft² C.3.1.1 Tile Flooring 2100 ft² C.3.1.1 Floating Tile Flooring 1380 ft² C.3.1.2 Carpets & Rugs 90 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

90 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

B - 42

Supplies

3 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Control Center Building – Option Six

Month Extension

Mobile Maintenance Office – Option Six Month Extension Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.3.1.2 Carpet & Rugs 1064 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1064 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

B - 43

B - 44

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.12 Policing Inside Areas 1 AU monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Mobile Maintenance Office – Option

Six Month Extension

Warehouse Office and Restrooms – Option Six Month Extension Section Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

3.1.1 Tile Flooring 280 ft²

3.1.2 Carpet & Rugs 1849 ft²

3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

1849 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

2 each monthly

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 45

C.3.1.11 Blinds and Coverings (36” x

34 ½”)

1 AU

monthly C.3.1.12 Policing Inside Areas 1 AU monthly C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly C.3.2.2 Exterior Windows (36” x 34

½”) 8 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Warehouse Office and Restrooms -

Option Six Month Extension

Electrical Laboratory Offices and Restroom – Option Six Month Extension Section Item Quantity

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 689 ft² C.3.1.3 Floor Mats and Runners

(vacuum only)

1 AU

monthly C.3.1.4 Restrooms & Consumable

Supplies 1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU monthly

C.3.1.10 Interior Windows (36” x 34 ½”) 3 each C.3.1.11 Blinds and Coverings (36” x 34

½”)

1 AU

B - 46 monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.2 Exterior Windows (36” x 34 ½”)

3 each

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Electrical Laboratory Offices and Restroom – Option Six

Month Extension

Heavy Equipment Crew Offices and Restroom - Option Six Month Extension Item Quantity/Unit

NTE

Unit

NTE

Dollar Amount per

Unit

Total Annual Price

C.3.1.1 Tile Flooring 117 ft² C.3.1.2 Carpets & Rugs 361 ft² C.3.1.2 Semi Annual Service-

Professionally Clean Carpet (Shampoo or Steam)

361 ft²

C.3.1.3 Floor Mats and Runners (vacuum only)

1 AU

monthly

C.3.1.4 Restrooms & Consumable Supplies

1 each

C.3.1.5 Fixtures 1 AU monthly

C.3.1.6 Surfaces 1 AU monthly

C.3.1.7 Frequently Touched Surfaces 1 AU monthly

C.3.1.8 Walls 1 AU monthly

C.3.1.9 Trash Removal & Trash Liners 1 AU

B - 47 monthly

C.3.1.14 Kitchen/Breakroom Areas 1 AU monthly

C.3.2.3 Ash Receptacles and Trash Containers and Consumable Supplies

1 AU

monthly

C.3.2.4 Interior Graffiti Removal estimate 1 hour

Per hour

C.4.1.2 Trash Removal (to accessible Dumpster)

1 AU

monthly

Total Price for Heavy Equipment Crew Offices and Restroom - Option Six Month Extension

C.12 Above Standard Services – Option Six Month Extension Section Item Quantity

NTE

Unit

NTE

Dollar Amount per Unit

Total Annual Price

C.12.1 Interior Window Washing-Main Office Building (6’ x 3’4”)

48 each

C.12.1 Interior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.1 Interior Window Washing Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.2 Exterior Window Washing- Main Office Building (6’ x 3’4”)

48 each

C.12.2 Exterior Window Washing- Warehouse Office & Restrooms (36” x 34 ½”)

8 each

C.12.2 Exterior Window Washing- Electrical Laboratory Office & Restrooms (36” x 34 ½”)

3 each

C.12.3 High Cleaning estimate 3 hours

Per hour

C.12.4 Machine Strip and Wax Resilient Office Floors - Tile

B - 48

Resilient Office Floors – Polished…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .