140R6018R0003_-_Amendment_1.pdf
PDF 543 KB Posted
- Attached to
- PUEBLO DAM BUTTRESS CONTRACTION JOINT TREATMENT
- Solicitation number
- 140R6018R0003
About this file
Amendment Number 0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R6018R0003 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning ____1_______
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE
03/15/2018
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/09/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Pueblo Dam -- Buttress Contraction Joint Treatment, Fryingpan-Arkansas Project, Colorado
See attachment for changes by this amendment.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Gerri Voto-Braun
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation 140R6018R0003 Amendment No. 0001 Page
Description of Changes:
1. In the Foreward –Remove the Foreward in its entirety and substitute therefor with the attached Revised Foreward.
2 In Part IV – Representations and Instruction—Section L, Remove page L-13 and substitute therefor with the Revised page L-13.
For convenience, essential changes on the revised solicitation pages are indicated by a vertical line in the margin where lines or paragraphs changed from the previous version. However, all portions of the revised solicitation pages shall apply whether changes thereon have or have not been indicated.
Acknowledgement: See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).
Receipt of Proposals: The hour and date for receipt of proposals remains the same: 3:00 PM (Mountain Time), April 16, 2018.
Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
Revised Foreward - 1
PUEBLO DAM
BUTTRESS CONTRACTION JOINT TREATMENT
Fryingpan-Arkansas Project Colorado
FOREWORD
Work is located at Pueblo Dam, located approximately 8 miles west of Pueblo, Colorado, in Pueblo County.
A. The principal components of work to be performed under these specifications on the contraction joints between the buttresses 9-10, 6-7, 17-18, 18-19, 12-13, 13-14, 14-15, 15-16, 16-17, 19-20, 20-21, 3-4, 4-5, 5-6, 7-8, 8-9, 10-11, and 11-12, (18 joints total), include the following:
1. Preparation of concrete surfaces above and below the reservoir water surface (RWS) along the upstream face of the concrete dam:
a. Preparation includes power washing surface, removing asperities and repairing voids in concrete.
2. Attaching EPDM elastomeric membranes to the upstream face of the concrete dam (across contraction joints) above elevation 4888, using adhesives and temporary attachment devices for Zone 1:
a. Removal and disposal of temporary attachment devises (if applicable).
3. Underwater drilling into concrete dam for drop in anchors.
4. Fabrication and furnishing steel seal plates, anchors and miscellaneous metalwork.
5. Underwater installation of steel seal plates and EPDM sponge rubber seals (across contraction joints) to the upstream face of concrete dam below elevation 4890 for Zone 2.
6. Concrete coring and underwater installation of bottom seals in concrete dam (along contraction joints) below elevation 4870 for Zone 2.
The Government anticipates award of a firm fixed priced construction contract with one base period and two option periods, whereby each period will allow for a 9 month period of performance, (274 days for each period).
POINT OF CONTACT
The point of contact is Contract Specialist Darlene Dillon. All questions and correspondence concerning this solicitation shall be directed to her via email at ddillon@usbr.gov. To ensure all communication will be properly documented for record purposes, phone calls will not be accepted.
PROPOSAL CLOSING DATE
See Section “A”: “SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442” immediately following the “TABLE OF CONTENTS”
METHOD OF SUBMISSION OF PROPOSALS
See Section L of this Solicitation mailto:ddillon@usbr.gov
Solicitation 140R6018R0003 Amendment No. 0001
THIS PAGE INTENTIONALLY LEFT BLANK
File details come from the government source that posted it.